car
DESCRIPTION
carTRANSCRIPT
PS-SR
PS-SR
COMMISSIONING ACTION REQUEST
(SAR)Format No.:
QMS/SR/18-F05/00
Sheet 01 to 02
Activity Proceeding
Activity Stopped
Site: KALPAKKAM SAR No. : PD-A- 001 Date: 12.06.2012
Unit No. : I Rating: 1x500 MWCustomer No. : 283
Vendor Ref. / Code:
Product Identification:
DU: E-8 Product Name: EXPANSION BELLOW
Drg. No: PE DG 283 147 M008 Rev 01Item Name
Defect Code: Design / Manufacturing / Erection / Commissioning / Others
Description of Nonconformity:Cost Debitable: YES/NO
1.
Site recommendation / Action taken:
1. Pl. Dispatch the above mentioned materials as per the drawing on priority.Sign & Date: EE / TG
QAE / HOS
Site Incharge
Distribution:
1. Unit QA/ BHEL/Haridwar........: 2 Copies (Action copy)
2. Head Quality/PSSR/Chennai: 1 Copy
3. QAE /HOS (office copy)..: 1 Copy
PROJECT / SITE NAME :SAR No :DATE :
SITE RECOMMENDATION APPROVEDSAR DISPOSITIONED AS FOLLOWS
SIGNATURE OF UNIT EC
DISTRIBUTION :
1. SITE I/C ( ACTION COPY)
2. OFFICE COPY
SITE ACTION COMPLETION REPORT :
SIGNATURE OF ERECTION / COMMNG ENGINEER
DISTRIBUTION :DATE:
QAE / HOS (ACTION COPY)
INSPECTION / TEST RESULTS :
SIGNATURE & DATEQAE / HOS
DISTRIBUTION :
QAE / HOS (OFFICE COPY)
NOTE:
1. TICK ( ) FOR STATUS AS APPLICABLE.
2. ATTACH ENCLOSURES WHEREVER NECESSARY INDICATING SAR NO. & DATE AT TOP RIGHT CORNER
3. QA UNIT COPY INDICATE NAME OF THE UNIT
4. FOR SUPERVISORY SITES, SITE INCHARGE WILL ACT AS QAE.
EMBED PBrush
NOT SATISFACTORY
SATISFACTORY