University of Winchester Carbon Management Programme
![Page 2: "Carbon Management Programme" - Mat Jane, University of Winchester](https://reader036.vdocument.in/reader036/viewer/2022062511/54da5a574a7959c37b8b4658/html5/thumbnails/2.jpg)
Drivers
• Doing the right thing• Environmental strategy• Student recruitment• Reduced utility costs• Reduce likelihood of CRC capture• HEFCE targets on CO2 – performance now
linked to capital funding
![Page 3: "Carbon Management Programme" - Mat Jane, University of Winchester](https://reader036.vdocument.in/reader036/viewer/2022062511/54da5a574a7959c37b8b4658/html5/thumbnails/3.jpg)
Carbon footprint baseline 2006/7
2006/7
2007/8
2008/9
0 500 1000 1500 2000 2500 3000 3500 4000 4500
Emissions by Source (tCO2)
Building Energy Water Usage Waste Disposal Fleet Vehicles Business Travel Air Travel Rail Travel
![Page 4: "Carbon Management Programme" - Mat Jane, University of Winchester](https://reader036.vdocument.in/reader036/viewer/2022062511/54da5a574a7959c37b8b4658/html5/thumbnails/4.jpg)
Footprint and target
• Footprint of 4206 tonnes• Included – Electricity, gas, water and oil,
business travel, fleet vehicles & waste• Absolute reduction in emissions of 30% by
2015• Reduction to 2945 tonnes
![Page 5: "Carbon Management Programme" - Mat Jane, University of Winchester](https://reader036.vdocument.in/reader036/viewer/2022062511/54da5a574a7959c37b8b4658/html5/thumbnails/5.jpg)
Progress to dateCarbon emissions have dropped by 7.26% by gross internal area (m2) since the baseline year
2006/7
2007/8
2008/9
0.086 0.088 0.09 0.092 0.094 0.096 0.098
CO2 by GIA(m2)
Tonnes CO2
Carbon emissions by staff and student FTE (full time equivalent) have dropped by 9.76% since the baseline year
2006/7
2007/8
2008/9
0.76 0.78 0.8 0.82 0.84 0.86 0.88 0.9 0.92
CO2 by Student and Staff FTE
Tonnes CO2
![Page 6: "Carbon Management Programme" - Mat Jane, University of Winchester](https://reader036.vdocument.in/reader036/viewer/2022062511/54da5a574a7959c37b8b4658/html5/thumbnails/6.jpg)
• Annual utilities spend of c. £1m
• All Half Hourly electricity now on CCL exempt tariff
• King Alfred’s Campus – Reduction of electricity consumption by 2.99% compared to the previous year
• West Downs Campus –Reduction of electricity consumption by 6.85% compared to the previous year
Energy
![Page 7: "Carbon Management Programme" - Mat Jane, University of Winchester](https://reader036.vdocument.in/reader036/viewer/2022062511/54da5a574a7959c37b8b4658/html5/thumbnails/7.jpg)
PC power management
![Page 8: "Carbon Management Programme" - Mat Jane, University of Winchester](https://reader036.vdocument.in/reader036/viewer/2022062511/54da5a574a7959c37b8b4658/html5/thumbnails/8.jpg)
Remote start up????
![Page 9: "Carbon Management Programme" - Mat Jane, University of Winchester](https://reader036.vdocument.in/reader036/viewer/2022062511/54da5a574a7959c37b8b4658/html5/thumbnails/9.jpg)
Waste and Recycling
• Mixed (co-mingled) recycling introduced and Pay-By-Weight• Recycling rate now 55.5 %, up from 14% in January 2009• Diverted 182 tonnes of waste from landfill saving 80.4 tonnes
of co2• Cost saving of C. £20k (20%)
![Page 10: "Carbon Management Programme" - Mat Jane, University of Winchester](https://reader036.vdocument.in/reader036/viewer/2022062511/54da5a574a7959c37b8b4658/html5/thumbnails/10.jpg)
LED Replacement for Halogen• Replacing 350 x 50w halogen
spotlights, with 3w LED • Expected life of lamps 10 years
• Cost £15,000• Energy saving £5,350 pa• Payback 2.8 years• CO2 saving 42 tonnes pa
• Additional saving from reduced cooling requirement
![Page 11: "Carbon Management Programme" - Mat Jane, University of Winchester](https://reader036.vdocument.in/reader036/viewer/2022062511/54da5a574a7959c37b8b4658/html5/thumbnails/11.jpg)
Replacement of inefficient floodlighting
• Replacing 100 external floodlights, ranging from 70w up to 400w, with 12w LED floodlights
• Expected life of lamps 10 years
• Cost £24,000• Energy saving £6,500 pa• Payback 3.7 years• CO2 saving 46 tonnes pa
![Page 12: "Carbon Management Programme" - Mat Jane, University of Winchester](https://reader036.vdocument.in/reader036/viewer/2022062511/54da5a574a7959c37b8b4658/html5/thumbnails/12.jpg)
Induction lighting
• Installation of induction lamps in the Sports Hall, replacing 75w sodium lamps with 40w induction lamps
• Induction lamps are switchable• Expected life of lamps 100,000 (15 years)
• Cost £8,000• Energy saving £2,300 pa• Payback 3.5 years• CO2 saving 15 tonnes pa
![Page 13: "Carbon Management Programme" - Mat Jane, University of Winchester](https://reader036.vdocument.in/reader036/viewer/2022062511/54da5a574a7959c37b8b4658/html5/thumbnails/13.jpg)
Thermal upgrades of boiler plant
• Installation of valve and flange jackets and pipe lagging
• Cost £27,000• Energy saving £10,800 pa• Payback 2.5 years• CO2 saving 103 tonnes
pa
![Page 14: "Carbon Management Programme" - Mat Jane, University of Winchester](https://reader036.vdocument.in/reader036/viewer/2022062511/54da5a574a7959c37b8b4658/html5/thumbnails/14.jpg)
Voltage Optimisation
• Installation of voltage optimisation equipment, reducing voltage in the West downs Student Village from 237v by around 7 %
• Cost £38,000• Energy saving £8,500 pa• Payback 4.5 years• CO2 saving 40.5 tonnes
pa
![Page 15: "Carbon Management Programme" - Mat Jane, University of Winchester](https://reader036.vdocument.in/reader036/viewer/2022062511/54da5a574a7959c37b8b4658/html5/thumbnails/15.jpg)
Voltage Optimisation results
![Page 16: "Carbon Management Programme" - Mat Jane, University of Winchester](https://reader036.vdocument.in/reader036/viewer/2022062511/54da5a574a7959c37b8b4658/html5/thumbnails/16.jpg)
Voltage Optimisation results
![Page 17: "Carbon Management Programme" - Mat Jane, University of Winchester](https://reader036.vdocument.in/reader036/viewer/2022062511/54da5a574a7959c37b8b4658/html5/thumbnails/17.jpg)
Future projects
• Sub-metering of all buildings linked back to monitoring and targeting software
• Feasibility study being completed for CHP and district heating network
• Investigating biomass to replace oil fired boilers• Replacement of street lighting with LED/solar• Further VO projects• Replacing T8/12 tubes with T5 retrofit