cardboard project pt. 1
DESCRIPTION
Spring 2012 Freshman Level Project. Students were asked to submit their idea for a large scale cardboad project. The structure needed to fit in the School of Architecture's Gallery, and needed to be built around 4 columns. My "Storefront" idea was originally voted on, and picked by the students and professor as the best idea for the project, but it fell through due to time restraints. Here are the simply AutoCAD drawings submitted for the vote that took place.TRANSCRIPT
![Page 1: Cardboard Project Pt. 1](https://reader036.vdocument.in/reader036/viewer/2022071808/568c4c661a28ab4916a00201/html5/thumbnails/1.jpg)
![Page 2: Cardboard Project Pt. 1](https://reader036.vdocument.in/reader036/viewer/2022071808/568c4c661a28ab4916a00201/html5/thumbnails/2.jpg)
![Page 3: Cardboard Project Pt. 1](https://reader036.vdocument.in/reader036/viewer/2022071808/568c4c661a28ab4916a00201/html5/thumbnails/3.jpg)