carrier path - abstract

Upload: rajesh-ramakrishnan

Post on 04-Jun-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/13/2019 Carrier Path - Abstract

    1/5

    1

    Development of a feature-rich Web Based Search Portal

    1. Title of the project:Carrier Path

    2. Project Architecture : N-Tire Architecture

    3. Abstract of the project:

    This project is aimed at developing an online search Portal for the PlacementDetails for job seekers. The system is an online application that can be accessedthroughout the organization and outside as well with proper login provided. This systemcan be used as an Online Job Portal for job seekers. Job Seekers logging should be ableto upload their information in the form of a CV. Visitors/Company representatives loggingin may also access/search any information put up by Job aspirants

    .4. Existing System:

    The existing system is a manual system. Here the employees needs to save the

    information in the form of excel sheets or Disk Drives.

    There is no sharing is possible if the data is in the form of paper or Disk drives.

    The manual system gives us very less security for saving data; some data may be

    lost due to mismanagement.

    Its a limited systemand fewer users friendly.

    Searching of particular information is very critical it takes lot of time.

    It is very critical to maintain manually call records of customers, because call center

    receives huge no of calls per a day.

    It is a tedious job to maintain different customers are asking different service details,

    normally solve these queries are not possible. Automated system is needed.

    Every employee having different rosters, different shift timings, manually handle

    these roster is tough work.

    Search an employee roster in call center system is a tedious job.

    5. Proposed System:

    The development of this new system contains the following activities, which tryto automate the entire process keeping in the view of database integration approach.

    User Friendliness is provided in the application with various controls provided by

    system Rich User Interface.

  • 8/13/2019 Carrier Path - Abstract

    2/5

    2

    The system makes the overall project management much easier and flexible.

    It can be accessed over the Intranet.

    The user information can be stored in centralized database which can be maintained

    by the system.

    This can give the good security for user information because data is not in clientmachine.

    Authentication is provided for this application only registered Users can access.

    There is no risk of data management at any level while the project development is

    under process.

    The automated system will provide to the customers for reliable services.

    The speed and accuracy of this system will improve more and more.

    6. Modules:

    Admin

    Job Seeker

    Job Provider

    Notification

    Search

    Report

    Authentication

    .

    7.Functional components of the project:

    1. A person should be able to

    Access/ Search CVs/information from the first page (only read access).

    Login to the system through the first page of the application

    Change the password after logging into the system Upload his/her CV.

    See/change his/her details.

    Get help about the application on how to use the different features of thesystem.

    2. An admin login should be present who can read as well as remove any uploads.

  • 8/13/2019 Carrier Path - Abstract

    3/5

    3

    8. Keywords:

    Generic Technology Keywords: Databases, User Interface, Programming

    Specific Technology Keywords:ASP.Net, C#.Net, MS SQL Server

    Project Type Keywords:Analysis, Design, Implementation, Testing

    SDLC Keywords: Presentation, Business, Data Access Layers

    9. Environment:

    Servers:

    Operating System Server: - Microsoft Windows 2000 or Higher

    Data Base Server:Microsoft SQL Server 2000/2005

    Clients: Microsoft Internet Explorer,

    Tools: Microsoft Visual Studio .Net

    User Interface:ASP.NET with AJAX

    Code Behind: VC#.NET

    10. Requirements:

    Hardware requirements:

    Number Description

    1 PC with 2 GB hard-diskand 256 MB RAM

    Software requirements:

    Number Description

    1 Windows 2000/ XP/ orHigher with MS-office

    2. MS-SQL server2000/2005

    3. Ms-Visual Studio .Net2005

    4. Ms-Internet Explorer

    Manpower requirements:3 to 4 Developers can complete this in 3-4 months.

    11. Milestones:

    No. MilestoneName

    Milestone Description Remarks

  • 8/13/2019 Carrier Path - Abstract

    4/5

    4

    1 RequirementsSpecification

    Complete specification of thesystem including defininghierarchies constitutes thismilestone. A documentdetailing the same should bewritten and a presentation onthat be made.

    Attempt should be made to addsome more relevant functionalityother than those that are listed inthis document.

    2 Technologyfamiliarization

    Understanding of thetechnology needed toimplement the project.

    The presentation should be fromthe point of view of being able toapply it to the project, rather thanfrom a theoretical perspective.

    3 Databasecreation

    A database of at least 10entries of users with at least 1should application admin.

    It is important to finalize on thedatabase at this stage itself sothat development and testing canproceed with the actual databaseitself.

    4 High-level andDetailedDesign

    Listing down all possiblescenarios and then coming upwith flow-charts or pseudo codeto handle the scenario.

    The scenarios should map to therequirement specification

    5 Developmentof front endfunctionalities.

    Implementation of the mainscreen giving the login, screenthat follows the login givingvarious options, screens foreach of the options

    During this milestone period, itwould be a good idea for theteam to start working on a test-plan for the entire system. Thistest-plan can be updated as andwhen new scenarios come tomind.

    6 Integrating thefront-end withthe database

    The front-end developed in theearlier milestone will now beable to update the database.Other features should befunctional at this stage. Inshort, the system should beready for integration testing.

    7 IntegrationTesting

    The system should bethoroughly tested by running allthe test cases written for thesystem (from milestone 5).

    Another 2 weeks should be thereto handle any issues foundduring testing of the system.

    After that, the final demo can bearranged.

    8 Final Review Issues found during theprevious milestone are fixedand the system is ready for thefinal review.

    During the final review of theproject, it should be checked thatall the requirements specifiedduring milestone number 1 arefulfilled

    12. The following steps will be helpful to start off the project:

    Study and be comfortable with technologies such as: ASP.Net with C#, and SQL

    Server.

  • 8/13/2019 Carrier Path - Abstract

    5/5

    5

    Gather some knowledge of product hierarchies and maintenance before starting the

    design.

    Create a user database with different access levels.

    Start with creating the login screen.

    Create menus for navigation and group the functionalities as sub menus. Create the help-pages of the application in the form of FAQ. This will helps user.