MEGAPROJECT Case Study Case compiled by: Agnieszka Łukasiewicz Contact details: [email protected] , tel. +48 664 786 880

Upload: hoangnhu

Post on 03-May-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

MEGAPROJECT Case Study Case compiled by: Agnieszka Łukasiewicz

Contact details: [email protected] , tel. +48 664 786 880

MEGAPROJECT Case Study

Basic Project Information

Case compiled by: Agnieszka Łukasiewicz

Contact details: [email protected]

Project Title Motorway A2

Location German/Polish border – Nowy Tomyśl

Purpose connects Poland with the network of European

motorways

Scope Part of A2 motorway from Polish/German border to

one of main Polish cities – Poznań Part of Route E30 (Cork/IE – Omsk/Ru)

Part of TEN-T 2nd corridor

Total Project Value 1,300 mln €

Project Status (i.e.. initiation, planning, construction,

operation, dismantling)

Operation

Contractual Framework

(e.g. fixed price, cost-plus etc.)

Fixed price

Relevant Physical

Dimensions (e.g. height, width,

volume, length)

104.9 km, 6 interchanges,

35 passages for big and medium animals, 71

passages for small animals, protective barriers for bats

etc. SECTION 1 - BASIC PROJECT INFORMATION

Stakeholder Category Case-Study Comments

(e.g. maturity,

previous

experiences of

stakeholders,

skills, influence on

project)

Inte

rnal

Supply-Side Client Autostrada Wielkopolska II SA concessionaire,

side of PPP

agreement

Financiers Subordinated Investment (388 mln €)

Commercial Loans (186 mln € BBVA S.A., Bank Pekao S.A., BRE Bank S.A., Caja Madrid,

Calyon, Deutsche Bank AG, Espirito Santo Investment, KfW IPEX-Bank GmbH, PKO BP,

Societe Generale, WestLB)

European Investment Bank (958 mln €)

Sponsors Minister of Infrastructure

Client’s Customers

Client’s Owners 1. Kulczyk Holding S.A

2. Meridiam A2 West S a.r.l.

3. Strabag AG

4. KWM Investment GmbH

Other internal supply-

side categories ( please

specify)

Category Case-Study

General Directorate for

National Roads and

Motorways

Central road administration authority for issues related to

the national road system

MEGAPROJECT Internal Stakeholder Identification (Stakeholders with a direct legally sanctioned relationship with the project)

SECTION 2 - PROJECT STAKEHOLDERS

Demand Side) Principal Contractor A2strada sp. z o.o. Company owned

by Kulczyk Holding

SA and Strabag AG

First Tier Contractors Scott Wilson Engineer

Second Tier

Consultants

AECOM Traffic and

Revenue Study

Professional Services

Providers

Autostrada Eksploatacja SA an operating

company acting

subject to an

agreement with

the Concessionaire,

Autostrada

Wielkopolska S.A.

Other internal supply-

side categories ( please

specify)

Category Case-Study

SECTION 2 - PROJECT STAKEHOLDERS

MEGAPROJECT Internal Stakeholder Identification (Stakeholders with a direct legally sanctioned relationship with the project)

Stakeholder Category Case-Study Comments

(e.g. maturity,

previous experiences

of stakeholders,

skills, influence on

project)

Extern

al

Public Regulatory Agencies General Directorate for National Roads and Motorways

Local Government Wielkopolska County, Lubuskie County

National Government Minister of Infrastrucuture

Minister of the Environment

Other internal supply-side

categories ( please specify)

Category Case-study

Private Local residents

Local Landowners Private landowners

Environmentalists Pracownia na rzecz wszystkich istot NGO monitored all

aspects of planning

new route, especially

influence on Natura

2000 areas and

animal migration

patterns

Conservationists

Archaeologists Adama Mickiewicza University in Poznan

Other External Private

stakeholders (please specify)

Category Casestudy

Drivers and passengers in general

MEGAPROJECT External Stakeholder Identification

SECTION 2 - PROJECT STAKEHOLDERS

(Stakeholders with a direct interest in the project but with no legal contract)

SECTION 2 -PROJECT STAKEHOLDERS

MEGAPROJECT Stakeholder Relationship Maps

Name of Actor

Description of

relationship

Repeat this map for as many project phases as you require

Key: - Project Actor

- Project relationship with a contractual basis - Non-contractual project relationship

Description of

relationship

SECTION 2 - PROJECT STAKEHOLDERS

MEGAPROJECT External Stakeholder Attitude Analysis

External Stakeholder External

Stakeholder’s

Attitude to this

Project

External

Stakeholder’s

Influence on project

Impact of Project on

External Stakeholder

Phase of Project of

Greatest Interest

(initiation, planning,

construction, operation,

dismantling)

Ministry of Infrastructure Favourable – although

sometimes depended

of governing party

Very high Negotiations: Price of

buiding 1km (9.6 m. €),

Rates for users,

Other conditions

Initiation, operating

General Directorate for

National Roads and

Motorways

Favourable – mostly

depended on

government’s decisions

High Controling role of road

administration

All

Ministry of Environment

Concerning about

effects on environment,

especialy Natura 2000

areas

Very high High requirtements of

environment protection

(1/4 of the whole value of

the project was allocated

on environment

protection)

Initiation, planning

European Commision Favourable

High Notification of Natura

2000 project’s influence

Initiation, planning

UEFA

Very Favourable Very high

Decision about Euro 2012

in Poland and Ukraine.

Acceleration of decision

making process about the

project.

Initiation

SECTION 2 - PROJECT STAKEHOLDERS

MEGAPROJECT External Stakeholder Attitude Analysis

External Stakeholder External Stakeholder’s

Attitude to this Project

External Stakeholder’s

Influence on project

Impact of Project on

External Stakeholder

Phase of Project of

Greatest Interest

(initiation, planning,

construction, operation,

dismantling)

Local goverments Favourable Limited Improving local flow of

traffic

Initiation, planning

Pracownia na rzecz

wszystkich istot

Worried about

environment

High Monitoring all aspects

of influence the project

on environment

Initiation, planning,

construction

MEGAPROJECT Project Management Project Organisation - Needed an interview with the project manager

Client Project Team Size &

Structure

Contractor Project Team Size

and Structure

Sub-Contractor Project Team

Involvement

Project Tools and Techniques - Needed an interview with the project manager Please √ if present, x if absent , leave blank if unknown

Life-Cycle Costing Approaches □

Stakeholder Involvement □

Building Information Modelling (BIM) □

Project Management Software □

Relationship Management Tools □

Project Knowledge Management Tools □

Lessons Learnt Transfers □

Team Building Tools □

Competency framework □

Other Tools and Techniques or More Information

SECTION 3 - PROJECT MANAGEMENT

Risk Management Processes Present (describe below) □Not Present □ No Information □

HR Management Processes Present (describe below) □Not Present □ No Information □

Procurement Management Processes Present (describe below) □Not Present □ No Information □

Integration Management Processes Present (describe below) □Not Present □ No Information □

Scope Management Processes Present (describe below) □Not Present □ No Information □

Time Management Processes Present (describe below) □Not Present □ No Information □

Cost Management Processes Present (describe below) □Not Present □ No Information □

Quality management Processes Present (describe below) □Not Present □ No Information □

Communications Management

Processes

Present (describe below) □Not Present □ No Information □

Project Processes - Needed an interview with the project manager

SECTION 3 - PROJECT MANAGEMENT

MEGAPROJECT Project Performance

Aspects of Performance Concerned with Doing the Project Right

Original Targets and changes to

targets

Actual Achievements Against

Targets

Performance relating to time

The first plan was 2006 for

finalising the project. Legal

changes and long lasting

negotiations caused 5 yrs delay.

After starting the construction

process it lasted 6 months less

than it was planned.

Performance relating to cost

6.1 m. per building 1 km

9.6 m. per building 1 km

Performance related to

achieving specification There wasn’t an issue of Natura

2000 areas. Need to change the

whole enviromnmental protection

specification.

All targets concerning natural

environment protection were

achieved, 25% of the project’s

value was spent on environment

protection.

SECTION 4 - PROJECT PERFORMANCE

Aspects of Performance Concerned with Doing the Right Project

Stakeholder or

Stakeholder Grouping

Original Aims of Project

Involvement and Changes to these

Aims

Achievement of these Aims

EC, Pracownia na rzecz

wszystkich istot (extremely

important environmental

issues)

There wasn’t an issue of Natura 2000 areas.

Need to change the whole enviromnmental

protection specification.

All targets concerning natural environment

protection were achieved, 25% of the

project’s value was spent on environment

protection.

SECTION 4 - PROJECT PERFORMANCE

MEGAPROJECT Project Environment

Legal and Regulatory Environment

Legal and Regulatory Project

Environment (regionally,

nationally and Europe wide)

National (build law)

Euroepan (environment protection law)

Specific Legal and

Regulatory events impacting

on the project

Zmiana przepisów ochrony środowiska Nowe wymogi banków finansujących projekt w zakresie ochrony środowiska podczas budowy i eksploatacji Obowiązek sporządzenia Audytu Bezpieczeostwa Zmiana obszarów chronionych w czasie realizacji projektu (powołanie nowych i poszerzenie ustalonych) Obowiązek sporządzania Raportów do Projektu Budowlanego (wymóg Komisji Europejskiej oraz banków finansujących projekt)

SECTION 5 - PROJECT ENVIRONMENT

MEGAPROJECT Project Environment

Political Environment

Political Project Environment

Hostile attitude to the concession agreement one of governing party

Specific Political Events

impacting on the project

Elections

MEGAPROJECT Project Environment

Economic Environment

Economic Project

Environment

Price of building materials increase

Specific Economic Events

impacting on the project

SECTION 5 - PROJECT ENVIRONMENT

Events and activities

relating to project

stakeholders

Events and activities

relating to project

management

Events and activities

relating to project

performance

Events and activities

relating to project

environment

MEGAPROJECT Project Key Events and Activities Timeline

TIME

SECTION 6 - PROJECT TIMELINE

1993 1995 2000 2004 2009 2011 2012

Establishing comapny winning concessioning cometition (2

fragments of A2 highway)

Negotiations about first fragment of A2 highway

Realisation of first fragment of A2 highway

Negotiations about second fragment of A2 highway

Realisation of second fragment of A2 highway

Infrastuktura uzupełniając

a rozpoczęcie

poboru opłat