case s-4_srs par pond1 case study 4: cercla interim action at the srs par pond

10
Case S-4_SRS Pa r Pond 1 Case Study 4: Case Study 4: CERCLA INTERIM CERCLA INTERIM ACTION AT THE ACTION AT THE SRS PAR POND SRS PAR POND

Upload: kenneth-sims

Post on 16-Dec-2015

216 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Case S-4_SRS Par Pond1 Case Study 4: CERCLA INTERIM ACTION AT THE SRS PAR POND

Case S-4_SRS Par Pond

1

Case Study 4:Case Study 4:

CERCLA INTERIM CERCLA INTERIM ACTION AT THE ACTION AT THE SRS PAR PONDSRS PAR POND

Case Study 4:Case Study 4:

CERCLA INTERIM CERCLA INTERIM ACTION AT THE ACTION AT THE SRS PAR PONDSRS PAR POND

Page 2: Case S-4_SRS Par Pond1 Case Study 4: CERCLA INTERIM ACTION AT THE SRS PAR POND

Case S-4_SRS Par Pond

2

CERCLA Interim Action CERCLA Interim Action at Par Pond at Par Pond

CERCLA Interim Action CERCLA Interim Action at Par Pond at Par Pond

CERCLA Interim Action at Par Pond CERCLA Interim Action at Par Pond provides:provides:

An analysis of interim action options at An analysis of interim action options at the Savannah River Site (SRS)the Savannah River Site (SRS)

A description of the data gathering A description of the data gathering process process

An example of how to address CERCLA An example of how to address CERCLA requirementsrequirements

Page 3: Case S-4_SRS Par Pond1 Case Study 4: CERCLA INTERIM ACTION AT THE SRS PAR POND

Case S-4_SRS Par Pond

3

The Par PondThe Par Pond The Par PondThe Par Pond

The cooling water reservoir for two nuclear The cooling water reservoir for two nuclear reactors at the SRS was contaminated with reactors at the SRS was contaminated with low levels of radioactive isotopes and other low levels of radioactive isotopes and other hazardous substances.hazardous substances.

Page 4: Case S-4_SRS Par Pond1 Case Study 4: CERCLA INTERIM ACTION AT THE SRS PAR POND

Case S-4_SRS Par Pond

4

The Par PondThe Par PondThe Par PondThe Par Pond

The water level for the Par Pond was The water level for the Par Pond was lowered by 19 feet due to concerns over the lowered by 19 feet due to concerns over the structural integrity of the earthen dam structural integrity of the earthen dam containing the reservoir.containing the reservoir.

Page 5: Case S-4_SRS Par Pond1 Case Study 4: CERCLA INTERIM ACTION AT THE SRS PAR POND

Case S-4_SRS Par Pond

5

The Par PondThe Par PondThe Par PondThe Par Pond

Page 6: Case S-4_SRS Par Pond1 Case Study 4: CERCLA INTERIM ACTION AT THE SRS PAR POND

Case S-4_SRS Par Pond

6

Lowering the water level:Lowering the water level: Exposed over 1,300 acres of Exposed over 1,300 acres of

contaminated sedimentscontaminated sediments Triggered the need for a CERCLA Triggered the need for a CERCLA

interim remedial actioninterim remedial action

The Par PondThe Par PondThe Par PondThe Par Pond

Page 7: Case S-4_SRS Par Pond1 Case Study 4: CERCLA INTERIM ACTION AT THE SRS PAR POND

Case S-4_SRS Par Pond

7

The Par PondThe Par PondThe Par PondThe Par Pond

Risk assessments were conducted to evaluate:Risk assessments were conducted to evaluate: Potential ecological hazards, orPotential ecological hazards, or Human health hazards from the exposed Human health hazards from the exposed

contaminated sedimentscontaminated sediments

Page 8: Case S-4_SRS Par Pond1 Case Study 4: CERCLA INTERIM ACTION AT THE SRS PAR POND

Case S-4_SRS Par Pond

8

The Par PondThe Par PondThe Par PondThe Par Pond

A feasibility study (FS) was initiated to A feasibility study (FS) was initiated to develop and evaluate possible remediation develop and evaluate possible remediation alternatives.alternatives.

Page 9: Case S-4_SRS Par Pond1 Case Study 4: CERCLA INTERIM ACTION AT THE SRS PAR POND

Case S-4_SRS Par Pond

9

The Par PondThe Par PondThe Par PondThe Par Pond

Alternatives outlined in the FS focused on:Alternatives outlined in the FS focused on: Containment optionsContainment options Remedial approaches Remedial approaches

that would that would mitigate potential mitigate potential hazards from the hazards from the exposed sedimentsexposed sediments

Page 10: Case S-4_SRS Par Pond1 Case Study 4: CERCLA INTERIM ACTION AT THE SRS PAR POND

Case S-4_SRS Par Pond

10

The Par PondThe Par PondThe Par PondThe Par Pond

This example illustrates the This example illustrates the overall objective of the overall objective of the RI/FS process, which is to RI/FS process, which is to support an informed risk support an informed risk management decision management decision concerning the most concerning the most appropriate remediation appropriate remediation option for option for a given site.a given site.