This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 773897 Case Study 3: Assessing Feasibility of Scenarios, cost of Renewable integration and value of flexibilities for the European electricity system by S. Charousset, 20 May ’21; Joint work of: • Wim van Ackooij, Sandie Balaguer, Sandrine Charousset, Dominique Daniel, Laurent Dubus, Yohan Moreau, Slimane Noceir, Nadia Oudjane, Felix Trieu (EDF) • Antonio Frangioni, Rafael Lobato, Ali Ghezelsoflu, Nicollo Iardella (Pisa) • Utz-Uwe Haus, Alfio Lazzaro (HPE)

Upload: others

Post on 07-May-2022

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Case Study 3: Assessing Feasibility of Scenarios, cost of

This project has received funding from the EuropeanUnion’s Horizon 2020 research and innovationprogramme under grant agreement No 773897

Case Study 3: Assessing Feasibility of Scenarios, cost of Renewable integration and value of flexibilities for the European electricity system

by S. Charousset, 20 May ’21;

Joint work of:• Wim van Ackooij, Sandie Balaguer, Sandrine

Charousset, Dominique Daniel, Laurent Dubus, Yohan Moreau, Slimane Noceir, Nadia Oudjane, Felix Trieu (EDF)

• Antonio Frangioni, Rafael Lobato, Ali Ghezelsoflu, Nicollo Iardella (Pisa)

• Utz-Uwe Haus, Alfio Lazzaro (HPE)

Page 2: Case Study 3: Assessing Feasibility of Scenarios, cost of

❑ The objective of this case study is to assess the plan4res tool’s ability

to capture

â–Ş The feasibil ity of a given (external) Scenario for the electricity system

➢With uncertaint ies

➢ Taking into account technical const raints, including dynamic robustness

â–Ş The Impact of different levels of RES integration on the European system

costs ➢ Electr ic i ty generat ion cost

➢Cost to ensure the dynamic robustness of the system (Reserves, Inert ia )

â–Ş The Value of different f lexibil ity services: system cost reduction coming

from using the flexibil ity potentials of the different system assets.➢ Examples f rom

o S t o r a ge

o I n t e r c onnec t ions

o T h e r mal g e n e r a t io n

CS3 - Objectives

2

âť‘ Case study 3 focuses on the Pan-European electricity sector in 2050

Page 3: Case Study 3: Assessing Feasibility of Scenarios, cost of

CS3 - Methodology

3

Multi modal investmentGeneration

mix and demand

(2050) fromCS1

1

Transmission Expansion

Transmission capacity(2050)

from CS2

2

CapacityExpansion

ModelAdapts

generation mix

3

SeasonalStorage

ValuationComputes

strategies for all seasonal storages

4

European Unit Commitment

Computesoperational

scheduls and costs

5

External ScenarioGeneration mix and demand for a given

year

1/2

Page 4: Case Study 3: Assessing Feasibility of Scenarios, cost of

Scenario : openENTRANCE technoFriendly 1.0

âť‘ Power Sector:â–ŞDecarbonized

â–Ş Steady increase of Wind and PV

â–Ş Significant reductionof Fossil (oil & gas)

â–ŞCCS

âť‘ Demand:â–Ş Electrification of heat

â–ŞReduction of gas

â–Ş Increase of electransport Source: openEntrance D3.1, D7.1

www.openentrance.eu

Electricity Generation (TWh)

Page 5: Case Study 3: Assessing Feasibility of Scenarios, cost of

Climatic data: Copernicus C3S Energy

5

âť‘ Scenarised hourly time series over 1 year for:

â–Ş Electricity demand per region

â–Ş Load factors per region:

➢PV Power

➢Onshore WindPower

➢Offshore WindPower

â–Ş Inflows to reservoirs per countries

https://climate.copernicus.eu/operational-service-energy-sector

Page 6: Case Study 3: Assessing Feasibility of Scenarios, cost of

The dataset used

6

âť‘ openENTRANCE technoFriendly 1.0, 2030

Installed electricityGeneration mix

Regions :• France• Germany• Italy• Switzerland• Benelux• Iberia= Spain+Portugal• Britain= United Kingdom + Ireland• Eastern Europe= Austria+Czech

Republic+Hungary+Poland+Slovakia• Benelux = Belgium+Luxembourg+Netherlands• Baltics = Estonia+Latvia+Lithuania• Scandinavia= Denmark+Finland+Sweden+Norway• Balkans= Non EU

Balkans+Bulgaria+Croatia+Greece+Romania+Slovenia

Page 7: Case Study 3: Assessing Feasibility of Scenarios, cost of

First Step: Generation mix Adaptation

7

Non served electricity per country / climatic scenario

Page 8: Case Study 3: Assessing Feasibility of Scenarios, cost of

Scenario Assessment

8

Page 9: Case Study 3: Assessing Feasibility of Scenarios, cost of

Marginal Costs of ElectricityFrom Jul 1 to June 30

9

France Germany Italy

Switzerland Eastern Europe Benelux

Iberia Britain Balkans

Baltics Scandinavia

Page 10: Case Study 3: Assessing Feasibility of Scenarios, cost of

Storage in Hydro (Aggregated) ReservoirsFrom Jul 1 to June 30

10

France

Iberia

Balkans

Scandinavia

Italy

Switzerland

Eastern Europe

Page 11: Case Study 3: Assessing Feasibility of Scenarios, cost of

Electricity generation (1 scenario)

11

Hourly Electricity demand over 1 year (1 scenario)rom Jul 1 to June 30

Page 12: Case Study 3: Assessing Feasibility of Scenarios, cost of

Electricity Generation and interconnections (1 scenario)

12

Aggregated Exchanges over the year

Co

ntr

ibu

tio

n o

f te

chn

olo

gies

Page 13: Case Study 3: Assessing Feasibility of Scenarios, cost of

Hourly Profiles for specific weeks

13

Winter Week Summer WeekSpring Week

Page 14: Case Study 3: Assessing Feasibility of Scenarios, cost of

Value of Flexibilities

14

Page 15: Case Study 3: Assessing Feasibility of Scenarios, cost of

Interconnections

15

âť‘ Interco Capacities reduced by 10 & 25% or increased by 10%

Impact on generation per technologyImpact on operation cost

Page 16: Case Study 3: Assessing Feasibility of Scenarios, cost of

Battery Storage

16

âť‘ Battery Capacities reduced by 10 & 25% or increased by 10% or 25%

Impact on generation per technology

Impact on operation cost

Page 17: Case Study 3: Assessing Feasibility of Scenarios, cost of

Nuclear generation

17

âť‘ Nuclear flexibi lity in 1 Country increased/decreased (MinPower, Ramping, Min Durations On/Off)

Impact on generation per technology

Impact on operation cost

Page 18: Case Study 3: Assessing Feasibility of Scenarios, cost of

Impact of hosting various sharesof Renewable Energy

18

Page 19: Case Study 3: Assessing Feasibility of Scenarios, cost of

VRE Scenarios : Installed Capacity

19

From 57 to 81% Variable RenewableGeneration (Wind and PV power) in the electricity generation mix

Page 20: Case Study 3: Assessing Feasibility of Scenarios, cost of

VRE Scenarios: generation

20

Page 21: Case Study 3: Assessing Feasibility of Scenarios, cost of

VRE Curtailement

21

Page 22: Case Study 3: Assessing Feasibility of Scenarios, cost of

Costs

22

Page 23: Case Study 3: Assessing Feasibility of Scenarios, cost of

Conclusion

23

âť‘ The models are able to evaluate the feasibility of a given

long-term energy mix scenario, and to assess the costs of

this scenario from the point of view of the electricity system.

âť‘ It is possible to run flexibility assessment studies, in order to

evaluate the value of a given kind of flexibility.

âť‘ Finally we demonstrated that the models were able to

capture the cost and value of hosting more Variable

renewable Generation Systems in the electricity mix.

Page 24: Case Study 3: Assessing Feasibility of Scenarios, cost of

Thank you for attendanceQuestions to Case Study 3

24