BSD Lord Combustion Limited Education DW Flue System MHS ADI LT High Efficiency Condensing Front Entrance Twin wall flue  Airtherm have recently d esigned, supplied and insta lled a complete twin wall stainless steel flue system serving each MHS Adinox ADI LT 200 modulating boiler at Oakham Primary School in Dudley in the West Midlands. The existing cast iron boilers were removed by the contractor during the School summer shut-down, working on a tight program the MHS high efficiency boilers were installed followed by the installation of our flue system. All of the plant was commissioned in time for the return of the pupils to enter a new begging. The flue system installed was designed to completely evacuate the products combustion taking into account for the over-pressure from each appliance. Each primary flue incorporated a volume control damper and draft regulator in the event of unstable operation. The complete system had a 3 0 fall back to the appliance to allow condense to vacate and drain from the flue. Airtherm Engineering Ltd only uses branded products which are synonymous with the highest quality - and it is this reputation that enables specifiers and contractors to use our versatile product range with total confidence We can provide technical solutions for the specialist areas of high temperature exhaust systems, serving generators & combined heat and powder units, fan assisted, flue dilution and atmospheric applications. MHS ADI LT Boilers Header System with 3 0 incline 

Upload: airtherm-engineering-ltd

Post on 04-Apr-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Case Study for Oakham Primary School .pdf

7/30/2019 Case Study for Oakham Primary School .pdf

http://slidepdf.com/reader/full/case-study-for-oakham-primary-school-pdf 1/2

BSD

Lord Combustion Limited

Education

DW Flue System

MHS ADI LT

High Efficiency Condensing

Front Entrance

Twin wall flue

Airtherm have recently designed, supplied and installed a complete twin wall stainless steel flue system serving each MHS Adinox ADI LT 200 modulating boiler at Oakham Primary School in Dudley in the West Midlands.

The existing cast iron boilers were removed by the contractor during the Schoolsummer shut-down, working on a tight program the MHS high efficiency boilerswere installed followed by the installation of our flue system. All of the plant wascommissioned in time for the return of the pupils to enter a new begging.

The flue system installed was designed to completely evacuate the productscombustion taking into account for the over-pressure from each appliance. Eachprimary flue incorporated a volume control damper and draft regulator in the eventof unstable operation. The complete system had a 3 0 fall back to the appliance toallow condense to vacate and drain from the flue.

Airtherm Engineering Ltd only uses branded products which are synonymous withthe highest quality - and it is this reputation that enables specifiers and contractorsto use our versatile product range with total confidence

We can provide technical solutions for the specialist areas of high temperatureexhaust systems, serving generators & combined heat and powder units, fanassisted, flue dilution and atmospheric applications.MHS ADI LT Boilers

Header System with 3 0 incline

Page 2: Case Study for Oakham Primary School .pdf

7/30/2019 Case Study for Oakham Primary School .pdf

http://slidepdf.com/reader/full/case-study-for-oakham-primary-school-pdf 2/2

• Boilers: MHS• Model: ADI LT 200

• Application: Chimney / Flue system

• Operating mode: Wet

• Pressure: Negative / positive pressure

• Working pressure: 200 Pa (product will operate 1000pa max)

• Inner wall: 316L1.4404/1.457 thickness 0,6 mm

Outer wall: 304/ 1.4301 thickness 0,5• Insulation: 30mm thick Rockwool insulation

• Sealant : Tri-lip 'o' type silicone ring

• Fuel type: Gas

• Condensing boilers

• Atmospheric gas-fired boilers

• Gas blown boilers

• Industrial ovens, large-scale establishments