Tier IV Case Study:

Injazat Data Centre

Abu Dhabi, UAE

Injazat Data Centre

Injazat Data Centre

• Project Objective Deliver a TIER IV Compliant ‘Co-hosting Data Centre’ with a managed,

secure and environmentally controlled 2000m² Data Hall for hosting mission critical servers and other related IT equipment.

• Project Timescales - Design commenced October 2006 - Project commenced on-site May 2007 - Construction Completion May 2008 - Operational December 2008 • Operating Environment - Arid Desert - Remote Location - 46 Degree Ambient Temperature

Injazat Data Centre

• Construction - Two storey construction - Plant rooms at ground floor level

- Data Centre at first floor level - Physical separation of redundant power and cooling systems in

accordance with Tier IV

• Power Requirements - 6.6 MVA Building Load (5.4 MVA of Critical Load) - Utility power from 2 separate/redundant primary supplies (A & B) - Fully redundant power distribution systems - Simultaneous power from both distribution systems - Total system isolation until point of power delivery - Critical power equipment fully supported by DRUPS - Stand alone fuel capability for 72 hours operation

Injazat Data Centre

Injazat Data Centre

• Why Hitec Diesel Rotary UPS? The Hitec DRUPS provides the highest level of security to critical

services to maintain 99.995% Data Hall uptime regardless of utility service failure or maintenance activities.

Hitec’s tried and tested DRUPS equipment design is the most compact,

efficient and suitable for a Tier IV infrastructure that demands the highest possible level of Data Centre Resilience and Reliability.

• Injazat is the first facility of its type in the Middle East • Injazat is the first UTI certified Tier IV Data Centre

outside the USA

Picture

May 2007

Injazat Data Centre

March 2008

Injazat Data Centre

MV DRUPS

System ‘B’

MV DRUPS

System ‘A’

Non-Critical Load

Critical Cooling & Mech’ Load

Critical IT & Server Load

Low-Voltage

O/P Bus O/P Bus

ADWEA SUPPLY

A

ADWEA SUPPLY

B

Normal Operation (Mains Available)

Injazat Data Centre

Tier IV - 2 (N+1) Architecture

(Medium Voltage)

MV DRUPS

System ‘B’

MV DRUPS

System ‘A’

Non-Critical Load

Critical Cooling & Mech’ Load

Critical IT & Server Load

Low-Voltage

O/P Bus O/P Bus

ADWEA SUPPLY

A

ADWEA SUPPLY

B

Emergency Operation (Supply A Fails)

Injazat Data Centre

Tier IV - 2 (N+1) Architecture

(Medium Voltage)

MV DRUPS

System ‘B’

MV DRUPS

System ‘A’

Non-Critical Load

Critical Cooling & Mech’ Load

Critical IT & Server Load

Low-Voltage

O/P Bus O/P Bus

ADWEA SUPPLY

A

ADWEA SUPPLY

B

Injazat Data Centre

Tier IV - 2 (N+1) Architecture

(Medium Voltage)

Emergency Operation (Supply B Fails)

MV DRUPS

System ‘B’

MV DRUPS

System ‘A’

Non-Critical Load

Critical Cooling & Mech’ Load

Critical IT & Server Load

Low-Voltage

O/P Bus O/P Bus

ADWEA SUPPLY

A

ADWEA SUPPLY

B

Emergency Operation (Supply A and Supply B Fail)

Tier IV - 2 (N+1) Architecture

(Medium Voltage)

Injazat Data Centre

Injazat Data Centre

Cause & Effect Analysis

Network Schematic – Single HV DRUPS System

Injazat Data Centre

Network Schematic – Downstream Load Distribution

Injazat Data Centre

Essential Load

Critical Load

Essential Load

Critical Load

Essential Load

Critical Load

Mains Available

Supporting the Critical & Essential loads

Utility A

Utility B

TR1

TR3

TR2

High Voltage Network - Single System

Essential Load

Critical Load

Essential Load

Critical Load

Essential Load

Critical Load

Mains Failed

Utility A

Utility B

Supporting the Critical & Essential loads

TR1

TR3

TR2

High Voltage Network - Single System

Essential Load

Critical Load

Essential Load

Critical Load

Essential Load

Critical Load

Mains Failed + 8 Seconds

Utility A

Utility B

High Voltage Network - Single System

Supporting the Critical & Essential loads

TR1

TR3

TR2

Injazat Data Centre

Plan View – DRUPS Plantroom ‘A’

Rear Elevation View – DRUPS Plantrooms ‘A’ and ‘B’

Injazat Data Centre

Injazat Data Centre

Equipment Delivery and Offloading

Injazat Data Centre

Specialist Plant Handling • 150 Ton Mobile Crane • 8 No. 28,000 kg Lifts • ‘Zero Shock’ Requirement • Levelled Rails • Hydraulic Rams

Injazat Data Centre

Injazat Data Centre

Roof Mounted Remote Radiators

Injazat Data Centre

Roof Mounted Remote Radiators

Injazat Data Centre

Two of the four modules in System ‘B’

LV to HV Step-up Transformers

Injazat Data Centre

Service Fuel tanks and Heat Exchangers

Injazat Data Centre

DRUPS Control Room – System ‘A’

Injazat Data Centre

DRUPS Control Panel Mimics

Injazat Data Centre

Injazat Data Centre

Abu Dhabi, UAE

The Finished Installation

Injazat Data Centre

Injazat Data Centre

Injazat Data Centre

Injazat Data Centre

Injazat Data Centre

Injazat Data Centre

• It is extremely RELIABLE

• It has a very HIGH operating EFFICIENCY

• It has a LOW LIFE COST

• It is a COMPACT & UNCOMPLICATED design

• provides ACTIVE POWER CONDITIONING

• It can support Leading pf and Motive Loads

• It is the GREENEST UPS solution

Why Hitec DRUPS?

February 2009

http://www.injazat.com/data-center/inazat.swf

Injazat Data Centre