case study – leed platinum building – may 2008 al habtoor leighton proposed head office dubai,...
TRANSCRIPT
Case Study – LEED Platinum Building – May 2008
Al Habtoor Leighton Proposed Head Office
Dubai, UAE
LEED Platinum BuildingPresented by
Mario Seneviratne
On
Behalf of Paul Watson
Case Study – LEED Platinum Building – May 2008
AL HABTOOR LEIGHTON GROUP
Case Study – LEED Platinum Building – May 2008
78
Case Study – LEED Platinum Building – May 2008
What is LEED…• Building Design Tool
• Sets Building Performance Criteria
• Benchmark of Design, Construction and Operation of High Performance Green Buildings
• Whole Building Approach to Sustainability
• Targets Conserving Energy and Natural Resources, in turn Conserving the Environment and the Ecology
• Makes Business Sense
Case Study – LEED Platinum Building – May 2008
Triple Bottom Line Objective;
AL HABTOOR LEIGHTON GROUP
• Environmental• Employees• Economic
Case Study – LEED Platinum Building – May 2008
LEED PLATINUM 68
Case Study – LEED Platinum Building – May 2008
AL HABTOOR LEIGHTON GROUP
Case Study – LEED Platinum Building – May 2008
• Total integration and commitment prior to Design Commencement by;
• Owner• Developer• Consultants team• LEED consultant• Contractor• Tennant and its employee representative• Facilities Manager
AL HABTOOR LEIGHTON GROUP
Case Study – LEED Platinum Building – May 2008
Cost Consultant
ArchitectContractors
Owner
User Groups
Engineer(s)
LEED an Integrated Design Process
LEEDConsultant
Case Study – LEED Platinum Building – May 2008
Division of Documentation Effort
• Spec• Plan• Letter• Narrative• Drawing• Calculation• Product Info
• Spec• Plan• Letter• Narrative• Drawing• Calculation• Product Info
Case Study – LEED Platinum Building – May 2008
• Discuss in general terms the macro issues that must be embedded into the project design to ensure that the built environment gives LEED Platinum rating.
• Eg – windows coverage• MEP
– Recycled water systems– Energy usage and conservation– Method of air conditioning – bottom up
• Façade treatment• Fly Ash in Cement• Ability to recycle materials during construction and also operations
AL HABTOOR LEIGHTON GROUP
Case Study – LEED Platinum Building – May 2008
• The Al Habtoor Leighton Group seeks to become the leading builder of Green Technology Projects in the UAE by gathering worlds best practice through its international network and delivering it domestically.
• It’ s commitment to a greener world and a healthier work environment is to build its own LEED Platinum Headquarters building in Dubai for completion in 2009
AL HABTOOR LEIGHTON GROUP
Case Study – LEED Platinum Building – May 2008
• Al Habtoor Leighton Group is offering a “one stop fully integrated turn key delivery system” for Green Technology in the Built Environment in the UAE
Case Study – LEED Platinum Building – May 2008
ENERGY EFFICIENCY TARGETS
Case Study – LEED Platinum Building – May 2008
WATER REDUCTION TARGETS
Case Study – LEED Platinum Building – May 2008
The Green Path
LEED Design Charrette
Goal Setting and Design Direction
Participate in 2 - 3 Design Workshops
Modeling
USGBC Submission (s)
Construction and Completion
Final Submission to USGBC
LEED Platinum Award
Case Study – LEED Platinum Building – May 2008
AL HABTOOR LEIGHTON GROUP
Case Study – LEED Platinum Building – May 2008
Al Habtoor Leighton Proposed Head Office
Dubai, UAE
LEED Platinum BuildingPresented by
Mario Seneviratne
On
Behalf of Paul Watson