A division of W Lucy & Co Ltd LUCY SWITCHGEAR CASE STUDY Automation Case Study – Abu Dhabi Distribution Company, UAE ADDC Forges Ahead with Distribution Automation Programme Abu Dhabi Distribution Company (ADDC) has serious ambitions for the widespread implementation of Distribution Automation across its operating area to enhance the service to its customers. The Distribution Automation (DA) strategy is to apply automation capability across the 11kV underground network in the urban conurbations and typically in the 11kV/ LV substations. Lucy Switchgear has been a key supplier of MV ring main equipment over many years to ADDC and a considerable proportion of the network is populated with our ring main units. ADDC approached a number of RTU manufacturers for suitable solutions with the proviso that a turnkey package should be offered in terms of retrofitting automation capability to the existing 11kV network. Wi-Mesh, a wireless internet infrastructure, is being installed extensively throughout Abu Dhabi city and the emirate has been chosen by ADDC as their preferred method of communication. The existing Distribution Management System’s (DMS) inherent scalability is being utilised to ‘SCADA connect’ the 11kV/ LV automated substations into this system once commissioned. The Lucy Switchgear Solution There are typically two main configurations for the type of ring main units normally purchased by ADDC, namely the TRM and QRM being a 2+1 (ring switches and circuit breaker) and 2+2 respectively. These configurations are satisfied with the SABRE VRN2a (non-extensible RMU) and the SABRE VRE2a+VCE2a (extensible ring main unit and circuit breaker). To reduce the necessity for two types of RTU, a single Remote Terminal Unit (RTU) format was designed to cater for the QRM and, by definition, the TRM. ADDC has therefore benefited from reduced stocking issues. The automated ring main units were equipped to include: Motorised actuation for the incoming ring switches (Open and Close operations) Shunt tripping for the transformer CB Protection relay alarms T ransformer loading Earth fault detection Low gas pressure monitoring

Upload: ranasherdil

Post on 25-Oct-2015

17 views

Category:

Documents


2 download

DESCRIPTION

case study-lv system automation

TRANSCRIPT

Page 1: case study-lv system automation.pdf

A division of W Lucy & Co Ltd

LU

CY

SW

ITC

HG

EA

R C

AS

E S

TU

DY

Automation Case Study – Abu Dhabi Distribution Company, UAE

ADDC Forges Ahead with Distribution Automation ProgrammeAbu Dhabi Distribution Company (ADDC) has serious ambitions for the widespread

implementation of Distribution Automation across its operating area to enhance the service

to its customers. The Distribution Automation (DA) strategy is to apply automation capability

across the 11kV underground network in the urban conurbations and typically in the

11kV/ LV substations.

Lucy Switchgear has been a key supplier of MV ring main equipment over many years to

ADDC and a considerable proportion of the network is populated with our ring main units.

ADDC approached a number of RTU manufacturers for suitable solutions with the proviso

that a turnkey package should be offered in terms of retrofitting automation capability

to the existing 11kV network.

Wi-Mesh, a wireless internet infrastructure, is being installed extensively throughout

Abu Dhabi city and the emirate has been chosen by ADDC as their preferred method of

communication. The existing Distribution Management System’s (DMS) inherent scalability

is being utilised to ‘SCADA connect’ the 11kV/ LV automated substations into this system

once commissioned.

The Lucy Switchgear Solution

There are typically two main configurations for the type of ring main units normally

purchased by ADDC, namely the TRM and QRM being a 2+1 (ring switches and circuit

breaker) and 2+2 respectively. These configurations are satisfied with the SABRE VRN2a

(non-extensible RMU) and the SABRE VRE2a+VCE2a (extensible ring main unit and circuit

breaker). To reduce the necessity for two types of RTU, a single Remote Terminal Unit (RTU)

format was designed to cater for the QRM and, by definition, the TRM. ADDC has therefore

benefited from reduced stocking issues.

The automated ring main units were equipped to include:

• Motorised actuation for the incoming ring switches (Open and Close operations)

• Shunt tripping for the transformer CB

• Protection relay alarms

• Transformer loading

• Earth fault detection

• Low gas pressure monitoring

Page 2: case study-lv system automation.pdf

A division of W Lucy & Co Ltd

LU

CY

SW

ITC

HG

EA

R C

AS

E S

TU

DY

The Automation division within Lucy Switchgear liaised with ADDC to ensure that

interoperability was achieved with their existing DMS/ SCADA in terms of database and

communication configuration and protocol. The IEC 60870-5-104 protocol was configured

to a ‘report by exception mode’ to reduce communication overhead with a ‘health

ping’ to each RTU every ten minutes.

In order to protect ADDC’s original investment in Lucy Switchgear ring main units, Lucy

Switchgear offered a service whereby existing Lucy ring main units can be recovered

from the network and refurbished at our manufacturing facilities in Dubai and equipped

with suitable automation facilities. The refurnished units can subsequently be returned

to the 11kV network as fully automated ring main units with the necessary Gemini-RTU

2, communication device and cabling. On-site installation times were minimised by

plug-in connections between components and pre-RTU configuration.

Implementation

ADDC’s contractors received full training on all aspects of installation and commissioning

of the automated ring main units and feedback on the ease of installation has been

very positive.

Installation works have continued at a pace and it is expected that over 150 substations

will have been upgraded to automation by the end of 2010 - a considerable achievement

given the original timescales.

What does the future hold?

ADDC is looking to progress this work into its sister company, Al Ain Distribution

Company, and a similar project approach is being adopted for this phase of the DA

roll-out. For the time being, ADDC will use another IP based communication system in

GPRS with a potential to revert to Wi-Mesh once the network has been established.

Fibre optic links are also deemed to be another potential communication media.

It is clear that this substantial investment in DA will bring enormous benefits to ADDC’s

customers in terms of supply security and availability and provide ADDC with real time

data that can be archived for future network planning purposes. Having visibility and

control of the 11kV network will also increase network operational flexibility, deferment

of reinforcement investment, reduced manpower and transportation costs.

The future for ADDC’s customers is certainly looking brighter.

Lucy Switchgear

Howland Road, Thame,Oxfordshire, OX9 3UJ, UK

tel: +44 (0)1844 267267fax: +44 (0)1844 267223

email: [email protected]

Lucy Middle East

PO Box 17335, Jebel Ali,Dubai, United Arab Emirates

tel: +9714 812 9999fax: +9714 812 9900

email: [email protected]

The Saudi Lucy Company Ltd

PO Box 834, Al-Khobar,31952, Saudi Arabia

tel: +966 3 8823057fax:+ 966 3 8822553

email: [email protected]

Lucy South Africa

Suite 22, Fourways Business Centre,Design Quarter, Nicole GroveOffice Park, Leslie Road, Fourways2005, South Africa

tel: +27 (0)11 5133415tel: +27 (0)11 5133000fax: +27 (0)86 6783418

email: [email protected] Asia Pacific Sdn Bhd

Suite 32-01-92, 32nd Floor, Wisma KeckSeng, 203 Jalan Bukit Bintang, 55100Kuala Lumpur, Malaysia

tel: +603 2116 5640fax: +603 2116 5647

email: [email protected]