case study rs115 df retention socket | bournemouth

1
Weir Lane, Worcester WR2 4AY Tel: 01905 427100 Fax: 01905 427030 Email: [email protected] www.nal.ltd.uk Case Study RS115 DF Retention Socket | Bournemouth Project: Traffic Signal Pole Knockdown Product: RS115 Retention Socket Duck Foot Bend Client: Bournemouth Borough Council Retention Sockets have been used in Bournemouth to house their traffic signal poles for many years. Recently they were put to the test when a signal pole was knocked down by a car. As the signal pole was lying flat and a health and safety issue, it was imperative that the signal was removed and replaced quickly. The Retention Socket side chamber is opened and two retaining bolts are loosened allowing the pole to be removed. A new pole was quickly installed allowing this crossing point to be opened within hours. RS115 DF Retention Socket | Bournemouth

Upload: others

Post on 12-Apr-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Case Study RS115 DF Retention Socket | Bournemouth

Weir Lane, Worcester WR2 4AY Tel: 01905 427100 Fax: 01905 427030 Email: [email protected]

www.nal.ltd.uk

Case Study

RS115 DF Retention Socket | Bournemouth

Project: Traffic Signal Pole KnockdownProduct: RS115 Retention Socket Duck Foot BendClient: Bournemouth Borough Council

Retention Sockets have been used in Bournemouth to house their traffic signal poles for many years. Recently they were put to the test when a signal pole was knocked down by a car. As the signal pole was lying flat and a health and safety issue, it was imperative that the signal was removed and replaced quickly. The Retention Socket side chamber is opened and two retaining bolts are loosened allowing the pole to be removed. A new pole was quickly installed allowing this crossing point to be opened within hours.

RS115 DF Retention Socket | Bournemouth