TRANSCRIPT

  • 7/31/2019 Case Study Staircase

    1/19

    46

    CASE STUDY

    INTRODUCTION

    In this Staircases Work study, we in a group are needed to come to the construction site to make

    some research about what we had study in the staircase topic practically. Besides, we also want to

    gain a new knowledge and experience on how the construction of staircase made on the site. We

    had decided to choose Sri Pulai Perdana 2 as our site to make this research. We choose Sri Pulai

    Perdana 2 as our project site because it was among the nearest construction site from Universiti

    Teknologi Malaysia that built up the residential area. Besides, the side was doing our part of

    research which is staircase while we searching for sites. The construction sites members also very

    kind for giving us permission to complete our project and help to answer all our questions about

    staircases work.

    FIGURE 29 : FRONTVIEW OF THE SITE

  • 7/31/2019 Case Study Staircase

    2/19

    47

    BACKGROUND

    Sri Pulai Perdana 2 is a premium upmarket housing development catering to the discerning and

    privileged. Comprising a development mix of contemporary housing design to meet the needs of an

    aspiring state, Sri Pulai Perdana 2 embraces the concept and lifestyle of garden resort living in a

    relaxed and care-free setting where distinctive feature of an exclusive Clubhouse with swimming

    pool and gym will make garden resort living a healthy and truly enjoyable experience for

    residents and guest. The upmarket residential component will be fully equipped with gated

    and guarded facilities and Sri Pulai Perdana 2 will be another showpiece of Iskandar

    Malaysia. This beautiful freehold residence has easy access to the North-South Highway,

    Sultan Ismail Airport, the Second Link and other surrounding housing areas. It also provides

    an easier way to go shopping (Jusco, Taman Universiti and U mall) which can be accessed

    only with 10 minutes. It is among the nearest residential area with the high class university

    (Universiti Teknologi Malaysia).

    FIGURE 30 : LOCATION MAP

  • 7/31/2019 Case Study Staircase

    3/19

    48

    CONSTRUCTION TEAM

    Company

    Sri Pulai Perdana 2 is under company Mah sing Group Properties project. The corporate

    headquarters is located at Wisma Mah Sing, Penthouse Suite 1, No 163, Jalan Sungei

    Besi, 57100 Kuala Lumpur. Mah Sing Group is an investment holding company while its

    subsidiaries principle activities involve property developments and investments. It was

    incorporated since 1991 and listed on the Main Board of the Bursa Malaysia. Mah Sing

    Group Berhad is Malaysias leading developer at the forefront of building quality homes

    and prime commercial projects in strategic locations.

    Site Manager

    Encik Azman is the site manager of this project. He needs to monitor all the work made

    by contractor. He also manages all the materials orders that arrived at the site. He is the

    one we deal with for coming at this site. He told us lots of thing about how staircases

    work being carried on site. We did get lot of information from him.

  • 7/31/2019 Case Study Staircase

    4/19

    49

    STAIRCASES WORK

    TYPE OF STAIR USED

    According to the site manager, Mr. Azman, the type of stair used at this construction site of

    Sri Pulai Perdana 2, is a closed treads and risers straight flight stairs. There is a landing at

    each consecutive floor.

    FIGURE 31 : THE STRAIGHT FLIGHT STAIRS

  • 7/31/2019 Case Study Staircase

    5/19

    50

    MATERIALS USED AT THE CONSTRUCTION SITE

    1. CONCRETE Ready mix concrete is being used as the concrete for this construction site. The grade of concrete used is Grade 25 which using the ratio of 1:1:5:3 1 cement : 1 sand : 5 aggregates : 3 water

    FIGURE 32 : READY MIX COCNRETE

  • 7/31/2019 Case Study Staircase

    6/19

    51

    2. REINFORCEMENT Using mild steel and high tensile Used to be foundation for the staircase, supports and keeps strengthen of the staircase

    and also functions to receive the load of the staircases.

    FIGURE 33 : REINFORCEMENT OF STAIRCASE

  • 7/31/2019 Case Study Staircase

    7/19

    52

    3. FORMWORK Using plywood and timber Gives shape to the staircase

    FIGURE 34 : FORMWORK

    4. HAMMER Used to knock the nails into the formwork

    FIGURE 35 : HAMMER

  • 7/31/2019 Case Study Staircase

    8/19

    53

    5. NAILS AND SCREWS To join the formwork of the staircases

    FIGURE 36 : SCREWS

    FIGURE 37 : NAILS

  • 7/31/2019 Case Study Staircase

    9/19

    54

    6. FLOAT TROWEL Smoothening the surface of concrete

    FIGURE 38 : FLOAT TROWEL

    7. SAW To cut the formwork into the size which suite the best

    FIGURE 39 : SAW

  • 7/31/2019 Case Study Staircase

    10/19

    55

    8. BINDER To bind the spacer and the reinforcement

    FIGURE 40 : BINDER

    9. SPACER Being tied with the reinforcement to give space for the concrete to flow in the middle of

    them.

    FIGURE 41 : SPACER

    http://www.bing.com/images/search?q=binding+wireshttp://www.bing.com/images/search?q=binding+wires
  • 7/31/2019 Case Study Staircase

    11/19

    56

    10.MEASURING TAPE To measure the height and width of risers and treads of each of the stairs.

    FIGURE 42 : MEASURING TAPE

    11.SPIRIT BUBBLED To make sure that the level of the staircase constructed is just the same

    FIGURE 43 : SPIRIT BUBBLED

  • 7/31/2019 Case Study Staircase

    12/19

  • 7/31/2019 Case Study Staircase

    13/19

    58

    CONSTRUCTION OF STAIRCASES

    First, the supports such as soffits and struts have to be set up. This supports must strong

    enough to support the load from formwork and concrete. Then, the formwork which made of

    timbers and ply woods will be installed. The formwork acts like a mould. It gives shape to the

    staircase.

    FIGURE 32 : FORMWORK FOR STAIRS

    FIGURE 33 : SCALFOLDING OF STAIRS

  • 7/31/2019 Case Study Staircase

    14/19

    59

    After the formwork is already installed, the spacers will be put at the formwork first. The

    reinforcement will be put in the formwork. Spacers will be tie together with reinforcement so

    that the reinforcement will be in the middle of the concrete. Reinforcement at the ground

    floor slab will be connected to the reinforcement of the staircase. Reinforcement from the

    slab will be tied up with the staircases reinforcement. Reinforcement from the slab is

    important to make sure that the staircase always connects to the slab and will not fall over.

    Then reinforcement will be tied up using the wires and mild steel. The reinforcement will be

    put layer by layer to make sure that the stair is strong to withstand the loads. The function of

    the reinforcement is to give internal support to the concrete stair.

    FIGURE 34 : SPACER THAT TIED WITH REINFORCEMENT

  • 7/31/2019 Case Study Staircase

    15/19

    60

    FIGURE 35 : REINFORMENT IS INSTALLED

    FIGURE 36 : INSTALLATION OF REINFORMENT

  • 7/31/2019 Case Study Staircase

    16/19

    61

    FIGURE 37 : LAYERED OF REINFORCEMENT

    FIGURE 38 : MILD STEEL TIED THE HIGH TENSILE REINFORCEMENT

    After the reinforcement is already putted in the formwork, the risers is being installed. The

    horizontal formwork will install first because they will act as the mould to steps

  • 7/31/2019 Case Study Staircase

    17/19

    62

    FIGURE 39 : FORMWORK OF RISER IS BEING INSTALLED

    FIGURE 40 : COMPLETE INSTALLED FORMWORK

    After that, the concreting process is followed. . The process of concreting will start from the

    up to down. The concrete will be pour from upper level to the lower level. This enables the

    concrete flows through the risers and the space below the risers. After that, the concrete is

    vibrated so that the concrete is compressed.

  • 7/31/2019 Case Study Staircase

    18/19

    63

    FIGURE 41 : POURING AND VIBRATING THE CONCRETE

    After that, the concrete is smoothening by using the float and left to dry for few days. After

    the hardening and drying process of the concrete, the formwork of the stairs will be opened.

    The side formwork will be opened first followed by the horizontal formwork. The complete

    concrete staircase is done.

    FIGURE 42 : COMPLETE STAIRS AFTER FORMWORK BEING REMOVED

    For the finishes of the stairs, they only used the cement screeds as shown below.

  • 7/31/2019 Case Study Staircase

    19/19

    64

    FIGURE 43 : CEMENT SCREEDS FOR THE STAIRS