case study stansted airport - toppesfield · marriott civils - stansted airport project brief...

1
Job title Client Completion Autumn Runway Repairs Marriott Civils - Stansted Airport October 2017 Project brief Supply and lay of 720 tonnes of asphalt to repair the main runway at Stansted airport. Works were carried out overnight, so not to disturb day to day operations. Delivery Experienced in airport works, our team’s planning adhered to strict security measures and timeframes. To ensure works were not delayed, plant and material were delivered to site ahead of each shift and all security passes and checks were in place, and operatives ready to go, by the time the last aircraft had departed. The teams were each assigned a patch of runway in need of repair, which they resurfaced with 10 SMA PMB, a high-durability asphalt mix with greater resistance to rutting and cracking. Achievements Right first time, on time No disruption Accident free Defect free Case study Stansted Airport

Upload: others

Post on 16-Aug-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Case study Stansted Airport - Toppesfield · Marriott Civils - Stansted Airport Project brief Supply and lay of 720 tonnes of asphalt to repair the main runway at Stansted airport

Job title

Client

Completion

Autumn Runway Repairs

Marriott Civils - Stansted Airport

October 2017

Project brief

Supply and lay of 720 tonnes of asphalt to repair the main runway at Stansted

airport. Works were carried out overnight, so not to disturb day to day

operations.

Delivery

Experienced in airport works, our team’s planning adhered to strict security

measures and timeframes.

To ensure works were not delayed, plant and material were delivered to site

ahead of each shift and all security passes and checks were in place, and

operatives ready to go, by the time the last aircraft had departed.

The teams were each assigned a patch of runway in need of repair, which they

resurfaced with 10 SMA PMB, a high-durability asphalt mix with greater

resistance to rutting and cracking.

Achievements

• Right first time, on time

• No disruption

• Accident free

• Defect free

Case study

Stansted Airport