case study - subsea - structural design and seafastening€¦ · title: case study - subsea -...

1
www.pdi-ltd.com Project Development International Ltd PDi House, 137 Gallowgate Aberdeen, AB25 1BU United Kingdom PDi’s scope included: 400Te RDS Grillage and seafastening design; 400Te Reel seafastening design; Chute Grillage and seafastening design: Tensioner Grillage and seafastening design; Turning Bollard modifications and seafastening design; Uraduct installation work platform design and seafastening; Additional structural verification checks relevant to the project. The Dunbar, Ellon and Grant oil and gas fields (also known as the Alwyn South area) are located in the southeastern part of the East Shetland Basin, approximately 140 km E of the Shetland Islands. Bibby Offshore Ltd (BOL) approached PDi to provide structural design packages associated with an umbilical lay spread onboard the Olympic Ares as part of the Ellon & Grant Life Extension Project for Total. Client Bibby Offshore Ltd Location UKCS, Northern North Sea Date March 2015 (6 weeks) PDi were contracted to provide the design deliverables to Bibby Offshore Ltd as part of the Total Ellon & Grant Field Life Extension Project. STRUCTURAL DESIGN AND SEAFASTENING

Upload: others

Post on 26-Oct-2020

27 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Case Study - Subsea - Structural Design and Seafastening€¦ · Title: Case Study - Subsea - Structural Design and Seafastening.pdf Created Date: 20200127132013Z

www.pdi-ltd.com

Project Development International LtdPDi House, 137 GallowgateAberdeen, AB25 1BUUnited Kingdom

PDi’s scope included:• 400Te RDS Grillage and seafastening design;• 400Te Reel seafastening design;• Chute Grillage and seafastening design:• Tensioner Grillage and seafastening design;• Turning Bollard modifications and seafasteningdesign;

• Uraduct installation work platform design andseafastening;

• Additional structural verification checks relevant tothe project.

The Dunbar, Ellon and Grant oil and gas fields (alsoknown as the Alwyn South area) are located in thesoutheastern part of the East Shetland Basin,approximately 140 km E of the Shetland Islands.

Bibby Offshore Ltd (BOL) approached PDi to providestructural design packages associated with an umbilicallay spread onboard the Olympic Ares as part of the Ellon& Grant Life Extension Project for Total.

Client Bibby Offshore LtdLocation UKCS, Northern North SeaDate March 2015 (6 weeks)

PDi were contracted to provide the design deliverables to BibbyOffshore Ltd as part of the Total Ellon & Grant Field Life ExtensionProject.

STRUCTURAL DESIGN AND SEAFASTENING