case study: tgf project– 2016 / 2017 turkmenistan · ground and railway with hl ... pre-carriage...
TRANSCRIPT
10
Name : Garabogaz Fertilizer Plant Project Site location : Garabogaz, Turkmenistan Volume : 168,582 CBM
Collection from FOB European origins Direct FTL, LTL, rail and Airfreight shipments Transhipment operations River transportation up to Caspian port Discharging to Caspian port & Storage Re-loading on trailers & barges Shuttle barge operations : Turkmenbashi - Garabogaz Road permits, obstacle removals, civil works Transportation up to site
River vessels utilized : 37 Heaviest unit 478 mt along with 19 units over 100 mt 9 Shuttle barge transportation between Turkmenbashi - Garabogaz
CASE STUDY: TGF PROJECT– 2016 / 2017 TURKMENISTAN
11
Name : Gas to Gasoline Project Site location : Ovadandepe, Turkmenistan Volume : 154,110 CBM
Collection from FAS worldwide origins Direct FTL, LTL, rail and Airfreight shipments Ocean carriage up to TS ports Transhipment operations River transportation up to Caspian port Discharging to Caspian port & Storage Re-loading on trailers & transit clearance Road permits, obstacle removals, civil works Transportation up to site Lifting & Erection works Import customs clearance at final destination
Axles utilized : 210 hydraulic Axle movements : 1,280 movements River vessels utilized : 36 Overland distance: 645 km’s Heaviest unit 317 mt along with 23 units over 100 mt 77 OOG/HL units Ocean, river, air, truck transportation from 27 different origins Project is the largest gas to gasoline plant ever built in the world!
CASE STUDY: GTG PROJECT– 2016 / 2017 TURKMENISTAN
12
Name : Karbala Refinery Site location : Karbala, Iraq Volume : 200,000 CBM
Transportation from Umm Qasr port up to final destination Storage Civil works & by-pass constructions Bridge and flyover constructions Various engineering works
Axles utilized : 180 hydraulic & 52 SPMT axles 6 x 665 mt, 3 x 720 mt bullets Total 540 km’s overland distance Heaviest ever cargo to be transported in Iraq! Extensive road improvement works: ¾Samawah Tubular Bridge Construction (150 m length) ¾Kofa Cement Factory Ramp (400 m L) & flyover bridge
(12m) construction. ¾ 350 km of road width extension (4 m extension) done ¾ 16 x bypass road construction avoiding the culverts.
CASE STUDY: KARBALA PROJECT– 2016 / 2017 IRAQ
13
Heaviest Unit
12.42 length
5.42 Width
4.84 height
410 tons
Name : Samsung Kirikkale CCPP Site location : Kirikkale, Yahsiyan, Turkey Volume : 300,000 CBM
Discharging to Samsun Port Storage Re-loading on trailers Transportation up to site Equipment installation with gantry crane
Axles utilized : 200 SPMT Axle movements : 820 movements Overland distance : 360 km’s
CASE STUDY: KIRIKKALE CCPP PROJECT – 2016 TURKEY
14
- Historical Structure Relocation -
The ancient town of Hasankeyf is located in southeastern Turkey The Zeynel Bey Tomb which is located in Hasankeyf, commemorates the warrior son of a Turkish ruler, who died in a battle against the Ottomans six centuries ago. The burial chamber has long disappeared but the tomb, made from cut stones, is architecturally unique in Turkey and an example of central Asian influences The discussions of possibility to relocate the structure began three-and-a-half years ago after scientists warned that the structure was at risk of being submerged with the construction of the Ilısu Dam In the conclusion of long studies and discussions, CJ-ICM Engineers and Crew have rolled up their sleeves to take important part of saving the historic Zeynel Bey Tomb The 1,100 tons Zeynel Bey Monument was transported for 2km by using 48 Axles SPMT in May, 2017
CASE STUDY: ZEYNELBEY PROJECT– 2016 TURKEY
15
Name : Formula-1 Grand Prix of Europe Site location : Baku, Azerbaijan Volume : 2,400 MT
Ocean freight Discharging at Poti Port On-carriage to Baku by rail Customs clearance Re-loading on trailers Transportation to site & offloading Post race logistics (sea, road & air freight)
14 Charter flights (B747) Over 1,550 mt of airfreight Over 550 mt of containerized cargo incl. block train from Poti to Baku 160 TEU Over 200 FTL local deliveries Over 300 tons of int’l road freight shipments about 42 FTL
CASE STUDY: FORMULA1 GRAND PRIX– 2016 AZERBAIJAN
Widest Unit
28 length
7.4 width
7.6 height
152 tons
Heaviest Unit
45 length
6.8 width
7.7 height
253 tons
Transhipment Unloading Civil Works Onshore Haulage Loading @ Origin Storing Reloading
16
Name : UGCC Ethylene Plant Project Site location : Akchalak, Uzbekistan Volume : 98,240 CBM
Loading at origins & transshipment to river vessels River vessel transportation & various HL engineering works Discharging to Caspian port & Storage Re-loading on trailers & transit clearance Road permits, obstacle removals, civil works Transportation up to site
Axles utilized : 258 hydraulic Axle movements : 1,082 movements River vessels utilized : 13 Overland distance : 827 km’s 126 OOG/HL units 16 major bypass constructions
CASE STUDY: UGCC PROJECT– 2014 UZBEKISTAN
17
Highest Unit
5.1 length
3.8 width
9.94 height
22 tons
Heaviest Unit
43 length
8.2 width
9,04 height
263 tons
Name : Turkmenbashi Oil Refineries Site location : Turkmenbashi, Turkmenistan Volume : 98,240 CBM
Transshipment to river vessels River vessel transportation Various HL engineering works Discharging to Caspian port Re-loading on trailers & transit clearance Road permits, obstacle removals, civil works Transportation up to site
● CHALLENGE ● Passing the gas-line pipes on ground and railway with hl unit
● SOLUTION ● CJ-ICM designed & built a fly-over bridge to eliminate the challenge.
CASE STUDY: TORE PROJECT– 2013 TURMENISTAN
Heaviest Unit
37 length
5.6 Width
6.44 height
473 tons
18
Name : South Yoloten Gas Development Project Site location : Mary, Yoloten, Turkmenistan Volume : ~700,000 CBM
Collection from FOB & EX-works worldwide origins Pre-carriage up to FOB load ports, airports Direct FTL, LTL, rail and Airfreight shipments Ocean carriage up to TS ports Transhipment operations River transportation up to Caspian port Discharging to Caspian port & Storage Re-loading on trailers & transit clearance Road permits, obstacle removals, civil works Transportation up to site Import customs clearance at final destination
Axles utilized : 270 hydraulic Axle movements : 2,068 movements River vessels utilized : 79 290 OOG/HL units Transported 100 KM (8,614 pieces) of 56” coated pipes from FOB Italy to site with 24 ocean & 44 river vessels in 143 days
CASE STUDY: YOLOTEN PROJECT– 2010/2013 TURKMENISTAN
19
CASE STUDY: VARIOUS HL TRANSPORTATION PROJECTS