case study wakemed health & hospitals · 2017-12-13 · wakemed health & hospitals case...

4
WakeMed Health & Hospitals CASE STUDY WakeMed saved $2.1 million in FTE overme costs over two years with the help of ShiſtWizard. Prior to adopng ShiſtWizard, the nursing staff scheduling process at WakeMed was paper-intensive, error-prone, and unit-centered as opposed to paent-centered. It also lacked standardizaon. WakeMed upgraded to ShiſtWizard’s workforce management soluon in 2013, beginning with their inpaent nursing departments before implemenng system-wide. Over a two-year period WakeMed calculated $2.1 million in saving aributed to the benefits ShiſtWizard provided. HOSPITAL AT A GLANCE QUICKVIEW Workforce Management Soſtware. Created by Nurses for Healthcare. 900+ staffed beds 8 facilies 8,500+ employees Established in 1961 HQ in North Carolina ANCC Magnet Recognion 1 2.1 Million in Overme Savings $ WakeMed Raleigh Nursing Service Line 659 Beds WakeMed Cary Nursing Service Line 156 Beds WakeMed Raleigh Rehab Service Line 98 Beds 71% 48% 76% FTE Overme Reducon 8 mo. aſter implementaon FTE Overme Reducon 7 mo. aſter implementaon FTE Overme Reducon 3 mo. aſter implementaon

Upload: others

Post on 24-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CASE STUDY WakeMed Health & Hospitals · 2017-12-13 · WakeMed Health & Hospitals CASE STUDY WakeMed had a problem on their hands with staffing processes that caused inefficiencies

WakeMed Health & HospitalsCASE STUDY

WakeMed saved $2.1 million in FTE overtime costs over two years with the help of ShiftWizard.

Prior to adopting ShiftWizard, the nursing staff scheduling process at WakeMed was paper-intensive, error-prone, and unit-centered as opposed to patient-centered. It also lacked standardization.

WakeMed upgraded to ShiftWizard’s workforce management solution in 2013, beginning with their inpatient nursing departments before implementing system-wide. Over a two-year period WakeMed calculated $2.1 million in saving attributed to the benefits ShiftWizard provided.

HOSPITAL AT A GLANCE

QUICKVIEW

Workforce Management Software. Created by Nurses for Healthcare.

• 900+ staffed beds• 8 facilities• 8,500+ employees• Established in 1961• HQ in North Carolina• ANCC Magnet Recognition

1

2.1 Millionin Overtime Savings$

WakeMed RaleighNursing Service Line659 Beds

WakeMed CaryNursing Service Line156 Beds

WakeMed RaleighRehab Service Line98 Beds

71% 48% 76%FTE Overtime Reduction8 mo. after implementation

FTE Overtime Reduction7 mo. after implementation

FTE Overtime Reduction3 mo. after implementation

Page 2: CASE STUDY WakeMed Health & Hospitals · 2017-12-13 · WakeMed Health & Hospitals CASE STUDY WakeMed had a problem on their hands with staffing processes that caused inefficiencies

WakeMed Health & HospitalsCASE STUDY

WakeMed had a problem on their hands with staffing processes that caused inefficiencies and unnecessary expenditures. The staff scheduling process at WakeMed was paper-intensive and unit-centered as opposed to patient-centered. It also lacked standardization.

WakeMed’s Chief Nursing Officer approached ShiftWizard in search of a solution. A product demo followed and “upon detailed review of ShiftWizard, it was apparent that the product was a good fit for us due to its ease of use, very specific features and broad scope of application across all clinical disciplines,” according to Pam Cayton, Director of Staffing Resources for WakeMed.

While ShiftWizard was initially deployed for WakeMed’s inpatient nursing departments, Surgical Services and Adult and Children’s Emergency Services, it has since expanded to meet workforce management needs throughout the organization, such as:

Labor costs typically represent the largest percentage of a hospital’s operating expenses, and each incremental improvement in the labor-to-revenue ratio goes straight to the bottom line. WakeMed is no exception.

In 2013, WakeMed conducted an internal study to determine the effectiveness of using ShiftWizard to help reduce overtime either by reallocating staff members within their divisions or using staffing resource nurses to replace staff who would be in an overtime situation. The study was directly overseen by WakeMed’s clinical administrators and included nursing staff at two hospital locations as well as the acute rehabilitation hospital.

“The study came about in response to feedback from employees who were concerned about not being able to work their assigned number of shifts, while others were working extra shifts in overtime,” explained Sabrina Tyndall, Director of System Nursing Operations and Adult Medicine at WakeMed’s Raleigh campus.

MAKING THE SHIFT

CONTROLLING LABOR COSTS

2

• Outpatient surgical services• Outpatient rehab• Respiratory therapy• Acute rehabilitation• Imaging• Laboratory

• Pharmacy• Call center• Food and nutrition services• Other 24/7 operations and

shift-based departments

Page 3: CASE STUDY WakeMed Health & Hospitals · 2017-12-13 · WakeMed Health & Hospitals CASE STUDY WakeMed had a problem on their hands with staffing processes that caused inefficiencies

WakeMed Health & HospitalsCASE STUDY

“The goal was to use ShiftWizard to proactively identify employees who had scheduled an extra shift and had the potential to accrue overtime so we could replace them with others who weren’t at capacity.”

This initial study served as a benchmark for the following year. Over the two-year period, WakeMed calculated a $2.1 million savings in overtime FTE reductions using ShiftWizard as a tool while fine-tuning staffing allocation practices with patients at the center of these decisions. This equates to a reduction of $2,200 per bed using ShiftWizard!

3

CONTROLLING LABOR COSTS, Cont’d

After two years, it was clear that ShiftWizard provided us with the ability to track projected overtime and reallocate staff accordingly. As a result, we have been able to positively impact our labor costs.

Pam CaytonDirector of Staffing ResourcesWakeMed Health & Hospitals

“”

WakeMed Raleigh Nursing Division Overtime Report FY 2013/2014

Before ShiftWizard Implementation

After ShiftWizard Implementation

Oct ‘12

0

480

960

1,440

Ove

rtim

e H

ours

Nov ‘12

Dec ‘12

Jan ‘13

Feb ‘13

Mar ‘13

Apr ‘13

Jun ‘13

Jul ‘13

Aug ‘13

Sep ‘13

Nov ‘13

Oct ‘13

Dec ‘13

May ‘13

Page 4: CASE STUDY WakeMed Health & Hospitals · 2017-12-13 · WakeMed Health & Hospitals CASE STUDY WakeMed had a problem on their hands with staffing processes that caused inefficiencies

WakeMed Health & HospitalsCASE STUDY

“WakeMed shares staff across its entire system, including three hospital campuses, three stand-alone emergency departments and physician practices. The ability to have centralized oversight and communication across multiple departments, locations and facilities is very important, and the ShiftWizard interface provides us with that ability.”

Cindy Boily SVP and Chief Nursing Officer

“With a couple of clicks, our charge nurses can go into ShiftWizard’s productivity tab to look at the upcoming shift as well as real-time census and associated resources. They can easily see what is scheduled and what is needed to provide the right resources for the projected patient load while avoiding the use of contingency staff, if possible.”

Pam Cayton Director of Staffing Resources

4

MANAGING STAFF ACROSS LOCATION ENABLING PRODUCTIVITY

Schedule a Demo: www.shiftwizard.com || (866) 828-3318

“It is important to understand that staffing decisions are based on more than just numbers,” said Tyndall. “If additional staff is required to ensure the best possible patient care, the notes feature in ShiftWizard makes it easy to document exactly why additional staff was needed.”

Sabrina Tyndall Director of System Nursing Ops

IMPROVING PATIENT CARE COLLABORATIVE INNOVATION

“Working with ShiftWizard has been a collaborative experience that has provided value to our organization. Customer feedback is important, and [ShiftWizard is] committed to continually improving their product with that feedback in mind.”

Sabrina Tyndall Director of System Nursing Ops