Case Study #3 Fast moving parts IMGT 4142 Supply Chain Management

Upload: hansi-thenuwara

Post on 17-Feb-2017

142 views

Category:

Business


0 download

TRANSCRIPT

Page 1: Case study3

Case Study #3Fast moving partsIMGT 4142 Supply Chain Management

Page 2: Case study3

IMGT

414

2 Ca

se st

udy

3

Introduction• Name of the case study : Fast Moving Parts• Group : 122081, 122119, 122139, 122143, 122160, 122171

Page 3: Case study3

IMGT

414

2 Ca

se st

udy

3

Content• Background• Theories and literature• Issues and problems• Alternative solutions• Optimal solution• Recommendation and conclusion

Page 4: Case study3

IMGT

414

2 Ca

se st

udy

3

Background• Fast Moving Company is a public transportation operator

whose mission is to provide a reliable, safe and comfortable transportation service at an affordable price to the general public

• At present, maintenance department is having difficulties with parts inventory and availability

Page 5: Case study3

IMGT

414

2 Ca

se st

udy

3

Theories and Literature• Belongs to operations management category• Match production capacity and output to customer demand• Techniques used,• KANBAN• MRP• OPT• JIT

Page 6: Case study3

IMGT

414

2 Ca

se st

udy

3

Issues and Problems• Problems in the MMS • Required manual updating • Warehouse staff part is not completely implemented • No records on material consumption

• Problems regarding staff• Users of MMS not being fully aware of the system• Users withdraw more material than the needed amount • Unofficial mini – warehouses for own use• Warehouse staff being reluctant to use the system

Page 7: Case study3

IMGT

414

2 Ca

se st

udy

3

Issues and Problems Cont.• Problems regarding logistics• For each of the four warehouses, users have to submit separate

material requisition forms• Orders have to be collected personally from warehouses • 70% of the maintenance cost are from materials

Page 8: Case study3

IMGT

414

2 Ca

se st

udy

3

Alternative solutions• MMS• Upgrade the system• Assign a system administrator• Make the system more user friendly• Implement the complete system

• Staff• Hold awareness programs and conduct training sessions

regarding MMS• Re-schedule the flow of authority

Page 9: Case study3

IMGT

414

2 Ca

se st

udy

3

Alternative solutions Cont.• Logistics• Implement an integrated logistics management system• Use effective and efficient material handling techniques

• MRP, JIT, KANBAN, etc.• Proper management of information flow within the company

Page 10: Case study3

IMGT

414

2 Ca

se st

udy

3

Optimal solution• Strengthen the flow of information, inbound logistics,

outbound logistics and operations within the company to achieve their mission effectively and efficiently

Page 11: Case study3

IMGT

414

2 Ca

se st

udy

3

Recommendation and conclusion• FM has faced these problems because of the shortcomings in

the MMS, staff and the logistics• Among them, the highest effect comes from the problems

regarding logistics