catalogo completo en - tesicnor.com · polígono mocholí, c/río elorz, nave 13 e, 31110 noáin...

17

Upload: danghanh

Post on 28-Jul-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: catalogo completo EN - tesicnor.com · Polígono Mocholí, c/Río Elorz, nave 13 E, 31110 Noáin (Navarra) Polígono Camporroso, c/ Montevideo 3, nave 5, ... Impact test with absorbed
Page 2: catalogo completo EN - tesicnor.com · Polígono Mocholí, c/Río Elorz, nave 13 E, 31110 Noáin (Navarra) Polígono Camporroso, c/ Montevideo 3, nave 5, ... Impact test with absorbed

PORTABLE LABORATORY

For high voltage tests

We o�er a unique service throughout Spain, a mobile laboratory for checking high voltage electrical material at the customer facilities, at the

substations at wind farms, hydroelectric power plants, solar parks, etc.

ENG

0 - 100 kV portable

Equipment which can be tested includes:

Tests conducted by our technical operators in accordance with the

applicable UNE standards for each.

On site testsInsulating stick current leakage tests, threshold

and voltage tests in voltage absence

detectors.

NEW!Sending report of the

inspection and technical assessment in situ.

Issue of reports

Insulating stick current leakage tests.

Threshold voltage tests in voltage absence detectors.

Test voltage trials for insulating gloves of all classes: CL I, CLII, CLIII, CLIV.

WE CONDUCT

Insulating sticks and rescue sticks in accordance with UNE EN 50508

NO 1221/LE2354

Insulating matting in accordance with UNE EN 61111

Insulating platforms in accordance with UNE EN 204001

Voltage detectors in accordance with UNE EN 61243-1

Insulating gloves in accordance with UNE EN 60903

Portable equipment for earthing in accordance with UNE EN

Insulating ladders UNE-EN 131

ACCREDITED BY

Polígono Mocholí, c/Río Elorz, nave 13 E, 31110 Noáin (Navarra)Polígono Camporroso, c/ Montevideo 3, nave 5, 28806 Alcalá de Henares (Madrid)

www.tesicnor.com - [email protected] (+34) 948 21 40 40 / F (+34) 948 21 40 41

Page 3: catalogo completo EN - tesicnor.com · Polígono Mocholí, c/Río Elorz, nave 13 E, 31110 Noáin (Navarra) Polígono Camporroso, c/ Montevideo 3, nave 5, ... Impact test with absorbed

FREESTANDING SACKSfor elevation of materials

Freestanding sacks for elevation of materials to nacelleThe interior mechanical system prevents the detachment of

the canvas, permitting the handling of the equipment contained in the sack.

ENG

Own manufacture.

CE marking. Working load limit 250 kg.

When unfolded, the canvas sacking remains taut, permitting access to the di�erent equipment located within.

Can be folded for transportation when empty.

Lower cover of sack has outer layer of plywood, which can be replaced to guarantee long service life.

Lower anchorage for connection with the retained line.

Upper anchorage in two positions to guarantee access to the capsule sack.

Made of high resistance 900 g/m2 canvas.

Yellow �nish for high visibility.

With retrore�ective tape for high visibility in poor light.

SPECIFICATIONS OF THE DEVICE

Can be folded for transportation when

empty.

Easy-to-foldWorking load limit 250 kg.

Load capacity

kg

Has lower anchorage for connection with the

retained line.

Lower anchorage

Polígono Mocholí, c/Río Elorz, nave 13 E, 31110 Noáin (Navarra)Polígono Camporroso, c/ Montevideo 3, nave 5, 28806 Alcalá de Henares (Madrid)

www.tesicnor.com - [email protected] (+34) 948 21 40 40 / F (+34) 948 21 40 41

Page 4: catalogo completo EN - tesicnor.com · Polígono Mocholí, c/Río Elorz, nave 13 E, 31110 Noáin (Navarra) Polígono Camporroso, c/ Montevideo 3, nave 5, ... Impact test with absorbed

Polígono Mocholí, c/Río Elorz, nave 13 E, 31110 Noáin (Navarra)Polígono Camporroso, c/ Montevideo 3, nave 5, 28806 Alcalá de Henares (Madrid)

www.tesicnor.com - [email protected] (+34) 948 21 40 40 / F (+34) 948 21 40 41

SAFETY LINESInstallation Maintenance

Installation and maintenance of horizontal, vertical safety lines and anchor points.

Protects workspaces with risk of falls from a height of more than two metres, generating safe working protocols.

ENG

ACCREDITATIONS

PROJECTS

Access ladders to wind towers.Protection of silos in companies from the paper industry.Protection of maintenance zones in slaughterhouses.

Installation of vertical fall arrest systemsGantry crane sliding rails.

Building roo�ng for the installation of solar panels.

Maintenance of building roo�ng.

Tanker loader.

Installation of horizontal fall arrest systems

Tesicnor has a computer programme for the management of the safety line maintenance.

ADDED VALUE

Safety Line

We have the necessary training to ensure the correct installation and maintenance of these systems.

We install and distribute the leading names in the sector.

Page 5: catalogo completo EN - tesicnor.com · Polígono Mocholí, c/Río Elorz, nave 13 E, 31110 Noáin (Navarra) Polígono Camporroso, c/ Montevideo 3, nave 5, ... Impact test with absorbed

Polígono Mocholí, c/Río Elorz, nave 13 E, 31110 Noáin (Navarra)Polígono Camporroso, c/ Montevideo 3, nave 5, 28806 Alcalá de Henares (Madrid)

www.tesicnor.com - [email protected] (+34) 948 21 40 40 / F (+34) 948 21 40 41

NON-DESTRUCTIVE TESTS ON OWN CREATIONS

Liquid penetrant inspection of welds

Ultrasonic testingDimensional control

Magnetic particle inspection

INSPECTIONElevation

equipment

Verification of the correct conditions of use and resistance of the load elevation elements. A particularly important activity

in the case of large or heavy loads, as given their characteristics, the presence of operators is required

underneath the radius of action.

ENG

DEVELOPMENTS

Inspection of own creations Inspection in the wind sector Inspection in the paper industry

INSPECTION SHEETSTesicnor has speci�c sheets for the inspection of:

Steel cable slings

Steel chain slings

Flat slings

Round slings

Swivel eye bolts

Pin and nut shackles

Hoisting pulleys

Rocker arms

DEVICE

Page 6: catalogo completo EN - tesicnor.com · Polígono Mocholí, c/Río Elorz, nave 13 E, 31110 Noáin (Navarra) Polígono Camporroso, c/ Montevideo 3, nave 5, ... Impact test with absorbed

Anti-intruder protection in wind turbines and industrial installations, with double security: magnetic tape and security bolt.

ENG

Excellent anti-intruder resistance. The lock does not have any accessible exterior elements which can be handled.

There are two security devices, magnetically coded exterior tape and interior bolt with security head.

Door secured to the frame with MI 6 security bolt. The door is secured to the wind turbine frame, making leverage of the door more di�cult.

Permits opening from interior.

Does not require electrical power, lock is activated with the natural magnetic �eld.

Zinc-coated to protect against weathering.

SPECIFICATIONS OF THE DEVICE

WIND TURBINE LOCK with security bolt and magnetic tape

Exterior view Interior view Cross-section

Polígono Mocholí, c/Río Elorz, nave 13 E, 31110 Noáin (Navarra)Polígono Camporroso, c/ Montevideo 3, nave 5, 28806 Alcalá de Henares (Madrid)

www.tesicnor.com - [email protected] (+34) 948 21 40 40 / F (+34) 948 21 40 41

Page 7: catalogo completo EN - tesicnor.com · Polígono Mocholí, c/Río Elorz, nave 13 E, 31110 Noáin (Navarra) Polígono Camporroso, c/ Montevideo 3, nave 5, ... Impact test with absorbed

Polígono Mocholí, c/Río Elorz, nave 13 E, 31110 Noáin (Navarra)Polígono Camporroso, c/ Montevideo 3, nave 5, 28806 Alcalá de Henares (Madrid)

www.tesicnor.com - [email protected] (+34) 948 21 40 40 / F (+34) 948 21 40 41

GRID GUARDS to prevent ice falling

on vehicles

Protective grids to prevent ice that is detached from the wind turbines falling on vehicles below. Protection of the roof and

front of the vehicle.

ENG

Own manufacture..

Does not require implementation of any legalisation in the MOT to permit driving with the system folded up on the roof of the vehicle.

Rapid assembly of the guard on the vehicle, without the need for any special tools, or modi�cations to the vehicle chassis.

Once the guard has been installed on the vehicle, it can be opened out and folded up by one person alone, as the front guard has two gas cylinders which assist the operator.

The system has a high level of resistance as it has successfully passed tests intended for earthmoving equipment: UNE EN 115231 and 1365 joules of impact. The absorbed energy on front and upper impact is even higher. The standard requires 700 joules and the system withstood 2351 joules during the tests.

Economically viable, as the only expenditure is on the system itself. No resources are required for legalisations, drafting of individual projects, etc.

SPECIFICATIONS OF THE DEVICE

01

02

03

04

Designed in accordance with UNE 115231/2001.

Absorbed energy above 700 joules.

Impact test with absorbed energy equal to 2351 joules.

Does not require special legalisation in the MOT to permit driving with the system folded up.

Page 8: catalogo completo EN - tesicnor.com · Polígono Mocholí, c/Río Elorz, nave 13 E, 31110 Noáin (Navarra) Polígono Camporroso, c/ Montevideo 3, nave 5, ... Impact test with absorbed

Polígono Mocholí, c/Río Elorz, nave 13 E, 31110 Noáin (Navarra)Polígono Camporroso, c/ Montevideo 3, nave 5, 28806 Alcalá de Henares (Madrid)

www.tesicnor.com - [email protected] (+34) 948 21 40 40 / F (+34) 948 21 40 41

ANCHOR DEVICES MODEL PAZ03/AW

This anchor device complies with the safety requirements laid out in the European standard UNE EN 795: 2012 Class A for anchor devices

and UNE EN 50308:2008.

ENG

The installation date must be recorded for regular

inspection, at least annually, by a competent

operator.

Permits connection of standard and wide

opening carabineer.

ConnectionMaximum number of

users: 2.

UsersSwivel and hinge.

Anchor pointMaximum permitted

load.

25 kN

Length of connection ring: 400 mm.

Fastening with clamp for 80x80 pro�le (please enquire about other measurements).

M6 tightening torque: 9 Nm.

MI 2 tightening torque: 20 Nm. (Apply Loctite 270 in assembly).

ISO 7379 10x16 torque: 2 Nm (Apply Loctite 270 in assembly).

M20 tightening torque: 170 Nm. (Supplied with the torque applied).

Engraved aluminium sheet clearly attached to the carabineer.

Any device lacking this identi�cation must be immediately replaced.

SPECIFICATIONS OF THE DEVICE

kN

Page 9: catalogo completo EN - tesicnor.com · Polígono Mocholí, c/Río Elorz, nave 13 E, 31110 Noáin (Navarra) Polígono Camporroso, c/ Montevideo 3, nave 5, ... Impact test with absorbed

Polígono Mocholí, c/Río Elorz, nave 13 E, 31110 Noáin (Navarra)Polígono Camporroso, c/ Montevideo 3, nave 5, 28806 Alcalá de Henares (Madrid)

www.tesicnor.com - [email protected] (+34) 948 21 40 40 / F (+34) 948 21 40 41

ANCHOR POINTS for wind turbines

Anchor points specifically for wind turbines, compliant to UNE EN 50308: 2005.

ENG

Designed for point load of 20 kN in any direction without breaking.

Can be used by two people.

Own manufacture. Designed in accordance with UNE EN 50308:2005 and UNE EN 795: 2012.

Working load limit 25 kN. Designed for point load of 20 kN.

Swivel and hinge anchor point, permits correct orientation in any direction.

Option to assemble directly on M20 bolt, or using base plate with two MI 0 bolts. Please enquire for other measurements.

62 mm opening of ring. This allows easy connection of two standard or wide-opening carabineers.

Manufacture in zinc-coated F114 steel, ring painted yellow and with plate identifying maximum permitted load.

Identi�cation plate with: manufacture, model, serial number, working load limit and applicable standards.

SPECIFICATIONS OF THE DEVICE

kN

Page 10: catalogo completo EN - tesicnor.com · Polígono Mocholí, c/Río Elorz, nave 13 E, 31110 Noáin (Navarra) Polígono Camporroso, c/ Montevideo 3, nave 5, ... Impact test with absorbed

ELEVATION EQUIPMENT Design, construction and certification

Design of specific solutions for handling loads.Study and personalised design, adapted to both the element to be

handled and the operating process.

ENG

CERTIFICATION

PRELIMINARY TESTPerformance of tests and measurements,

prior to start-up of the equipment in accordance with applicable standards.

C-hooks for piping Rocker arms for speci�c applications

Stock bench and elevation rocker arm

Leveling and extraction bench

Instructions for use, assembly, dismounting,

maintenance and cleaning.

User manualCE and speci�cations

plate.

MarkingDeclaration of

conformity.

CompliancePreparation de

technical construction �le.

File

DEVELOPMENTS

Polígono Mocholí, c/Río Elorz, nave 13 E, 31110 Noáin (Navarra)Polígono Camporroso, c/ Montevideo 3, nave 5, 28806 Alcalá de Henares (Madrid)

www.tesicnor.com - [email protected] (+34) 948 21 40 40 / F (+34) 948 21 40 41

Page 11: catalogo completo EN - tesicnor.com · Polígono Mocholí, c/Río Elorz, nave 13 E, 31110 Noáin (Navarra) Polígono Camporroso, c/ Montevideo 3, nave 5, ... Impact test with absorbed

Polígono Mocholí, c/Río Elorz, nave 13 E, 31110 Noáin (Navarra)Polígono Camporroso, c/ Montevideo 3, nave 5, 28806 Alcalá de Henares (Madrid)

www.tesicnor.com - [email protected] (+34) 948 21 40 40 / F (+34) 948 21 40 41

Handles to facilitate access to wind turbinesTesicnor designs, constructs and assembles fastenings

adapted to the con�guration of the wind turbine. Made in

accordance with UNE EN 50308, these are an aid during

ascension as they o�er a safe grip in areas with a risk of falling.

Own manufacture High level of resistance and long-lasting

Fixed anchor pointOwn design and construction. Design option with �xed anchor

point.

Distances studied: If more than one handle is required to ensure adequate support for the body,

these must be installed at a distance of 1 metre.

Shape: Flat and rounded, and able to prevent hand from slipping.

Free space: There must be a minimum free space for hands between the handle and any other part of the structure of 60 mm.

REQUIREMENTS AND SPECIFICATIONS OF THE SYSTEM

Standard 50308. Handles with the same resistance as an anchor point.

Areas with a risk of falling: These must be installed in areas with a risk of falling and where it is not possible to install guard rails.

Logical position: In relation to the body and placed in the correct direction to provide support.

Minimum length: 0.15 metres.

INIT

IA

L SITUATION

HANDLE INSTALLED

REAR

VIE

W

ENG

Page 12: catalogo completo EN - tesicnor.com · Polígono Mocholí, c/Río Elorz, nave 13 E, 31110 Noáin (Navarra) Polígono Camporroso, c/ Montevideo 3, nave 5, ... Impact test with absorbed

Spill collector with built-in and floating channelsSpill container/collector for oil from the wind turbine gearbox

to the ground via pipe. Prevents oil spills in piping from

reaching the ground and causing environmental damage.

DESIGNED FOR

ALSTOMGAMESA

GENERAL ELECTRICVESTAS

SPECIFICATIONS OF THE SYSTEM

Manufactured in 630 g PVC.

Permits direct drainage of oil accumulated in the collector to a suitable recipient.

Mounted at height, not touching the ground, thereby preventing friction and external damage.Anti-puncture

resistance

System uses neodymium magnets. These keep the collector in position as it extends around the tower.Assembly by one operator alone.

Assembly in any environment, given that as it does not touch the ground, uneven ground is not an obstacle.

Quick and easy to assemble

Internal structure made of aluminium.

Aluminium provides a rigid and lightweight structure.

Weight of less than 25 kg.

Lightweight

ENG

Polígono Mocholí, c/Río Elorz, nave 13 E, 31110 Noáin (Navarra)Polígono Camporroso, c/ Montevideo 3, nave 5, 28806 Alcalá de Henares (Madrid)

www.tesicnor.com - [email protected] (+34) 948 21 40 40 / F (+34) 948 21 40 41

Page 13: catalogo completo EN - tesicnor.com · Polígono Mocholí, c/Río Elorz, nave 13 E, 31110 Noáin (Navarra) Polígono Camporroso, c/ Montevideo 3, nave 5, ... Impact test with absorbed

PORTABLE CRANE for elevation of loads

Polígono Mocholí, c/Río Elorz, nave 13 E, 31110 Noáin (Navarra)Polígono Camporroso, c/ Montevideo 3, nave 5, 28806 Alcalá de Henares (Madrid)

www.tesicnor.com - [email protected] (+34) 948 21 40 40 / F (+34) 948 21 40 41

Davit for raising loads to intermediate platforms of the wind turbine.

ENG

Working Load Limit (WLL).

ConnectionThe portable crane is connected to the connection �ange of the tower sections.

100 kg

Tower connection �ange

Equipment weight.

Divided into three pieces of: 2.5, 6 and 4.5 kilogrammes.

13 kg

Own manufacture.

Strenx 700 MC steel (high elastic limit).

CE marking.

Compliant to Directive 2006/42/EC of the European parliament and of the Council.

SPECIFICATIONS OF THE DEVICE

With interior foam casing for parts.

Transport backpack

PORTABLE CRANE for elevation of loads

Page 14: catalogo completo EN - tesicnor.com · Polígono Mocholí, c/Río Elorz, nave 13 E, 31110 Noáin (Navarra) Polígono Camporroso, c/ Montevideo 3, nave 5, ... Impact test with absorbed

Polígono Mocholí, c/Río Elorz, nave 13 E, 31110 Noáin (Navarra)Polígono Camporroso, c/ Montevideo 3, nave 5, 28806 Alcalá de Henares (Madrid)

www.tesicnor.com - [email protected] (+34) 948 21 40 40 / F (+34) 948 21 40 41

Perimeter guard rails at the entrance

to wind turbine

Perimeter protective system for access ladders to the wind turbine, designed and tested in accordance with UNE EN ISO

14122-3 section 7.3 and UNE EN 50308 section 4.4.

Has side plate for filling gaps. Hot-dipped galvanised finish and non-slip surface.

ADAPTABLE ANCHORSAllow guard rails to be adapted to a large variety of wind turbine models.

AdaptabilityDesign can be adapted to customer

requirements.

VersatileDesign valid for di�erent wind

turbine models.

SafetyEnsures safety when entering or

exiting the wind turbine.

ENG

SPECIFICATIONS

Own manufacture.

Anti-corrosion resistance Hot-dipped galvanised �nish, 85 microns.UNE EN ISO 14122-3/UNE EN 50308: Designed and tested in accordance with UNE EN ISO 14122-3 section 7.3 and UNE EN 50308 section 4.4. Tests performed by Cemitec, Cetena Foundation.

Guaranteed safety: When entering or leaving the tower, and while opening the door.

Competitive price: In manufacture and assembly.

Page 15: catalogo completo EN - tesicnor.com · Polígono Mocholí, c/Río Elorz, nave 13 E, 31110 Noáin (Navarra) Polígono Camporroso, c/ Montevideo 3, nave 5, ... Impact test with absorbed
Page 16: catalogo completo EN - tesicnor.com · Polígono Mocholí, c/Río Elorz, nave 13 E, 31110 Noáin (Navarra) Polígono Camporroso, c/ Montevideo 3, nave 5, ... Impact test with absorbed

DIS

Polígono Mocholí Río Elorz, nave 13 E, 31110 Noáin (Navarra)Polígono Camporroso, c/ Montevideo 3, nave 5, 28806 Alcalá de Henares (Madrid)

www.tesicnor.com - [email protected] (+34) 948 21 40 40 / F (+34) 948 21 40 41

SELLINGSale and distribution of Personal and Collective Protection Equipment, as well as professional advice regarding the products more appropriates for

your necessities.Descenders

Anti-fall arresters

Harness

SERVICES

RENTINGWe rent Personal Protection Equipment.

PPE REVIEWVisual and functional inspection of the PPE for

the work at height.

Signals

LifelinesHelmets and lanyards

Our brands

Tesicnor distributes material for the Personal and Collective protection equipment; in all economic sectors but we are specialised in the wind

energy area.We o�er a wide range of products from first labels.

DISTRIBUTION AND SUPPLY

Page 17: catalogo completo EN - tesicnor.com · Polígono Mocholí, c/Río Elorz, nave 13 E, 31110 Noáin (Navarra) Polígono Camporroso, c/ Montevideo 3, nave 5, ... Impact test with absorbed