SAMPLE FOR DISPLAY NO COMPANY Project: Distillery Test Plan Cathy Campbell 6/23/2015

Upload: catherine-campbell

Post on 15-Aug-2015

21 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Cathy's Sample Test Plan

SAMPLE FOR DISPLAY NO COMPANY

Project: Distillery

Test Plan

Cathy Campbell

6/23/2015

Page 2: Cathy's Sample Test Plan

Project: Distillery

Contents1. Introduction.........................................................................................................................................2

1.1 Objectives..........................................................................................................................................2

2. Scope...................................................................................................................................................2

3. Testing Strategy...................................................................................................................................2

3.1 Unit Testing.......................................................................................................................................2

3.1.1 Definition....................................................................................................................................2

3.1.2 Participants.................................................................................................................................2

3.1.3 Methodology Used.....................................................................................................................2

3.2 System and Integration Testing.........................................................................................................2

3.3 Performance, Load, or Automation Testing.......................................................................................2

3.4 Regression Testing.............................................................................................................................2

3.5 User Acceptance Testing....................................................................................................................2

4. Entrance and Exit Criteria....................................................................................................................4

4.1 Environment Requirements...............................................................................................................4

4.2 Use Case / Requirement completion Requirements..........................................................................4

4.3 The definition of “Done” as described by the PMO...........................................................................4

Page 3: Cathy's Sample Test Plan

Project: Distillery

1. IntroductionThis test approach document will outline the appropriate strategies, process, workflows and methodologies used for testing my fictional project. Ideally, my introduction will provide the overview of the project and the strategy, a high level list of deliverables, I would include a list of acronyms commonly used if they were too many to list hopefully I would point to a reference document stored in the company repository (Confluence, Sharepoint, a drive, etc)

1.1 ObjectivesThe objectives section of the test plan, I would describe the testing I want to accomplish. For my Distillery project I want to test the function of the new inventory system that will be implemented. I will describe the tasks and responsibilities, our communication or reports, and that this document is primarily my service contract with the PMO and the End User Community.

2. ScopeThe Scope section of my test plan describes what will be tested and what is out of scope for the test team. I would discuss the interfaces used, what my procedures where for notifying the key people, my schedule and what my expected turnaround is from people who support testing (Requirements or development)

3. Testing StrategyThe Testing Strategy I write describes the different phases of testing we would include. It’s my overall approach. I will describe each type of testing, list the activities, techniques and tools used by each group. I will also talk about the features tested. I would also discuss the methodology used if needed and not predetermined.

We would also discuss defect creation and reporting, We would hopefully decide and list here who the correct resources where for Point of Contact for questions, defect assignments, and reporting status.

Page 4: Cathy's Sample Test Plan

Project: Distillery

3.1 Unit Testing

3.1.1 Definition

3.1.2 Participants

3.1.3 Methodology Used

3.2 System and Integration Testing

3.3 Performance, Load, or Automation Testing

3.4 Regression Testing

3.5 User Acceptance Testing

4. Entrance and Exit CriteriaHere I would define what the expectations where before we started and how we ended testing.

4.1 Environment Requirements

4.2 Use Case / Requirement completion Requirements

4.3 The definition of “Done” as described by the PMO. This piece will state what test cases or requirements must be fulfilled as a minimum by the end users. What the acceptable level of defects for the project would be.

Page 5: Cathy's Sample Test Plan

Project: Distillery

5. Test Schedule

5.1 Milestones and time needed to do each tasks.

6. Features To Be Tested

7. Features Not To Be Tested

8. Resources- Roles and Responsibilities

9. Dependencies

10. Risk and Assumptions

11. Contingency plans

12. Test Artifacts

12.1 What do I owe and to whom?

13. Approvals