cato ridge lap & precinct plans to chamber

Upload: durban-chamber-of-commerce-and-industry

Post on 04-Apr-2018

219 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber

    1/26

    eThekwini MunicipalityOUTER WEST CORRIDOR STUDY &

    CATO RIDGE LOCAL AREA PLANS

    GRAHAM MULLER ASSOCIATES CONSORTIUM

    OUTER WEST CORRIDOR STUDY

    CATO RIDGE LOCAL AREA PLAN & PRECINCT PLANS

    PRESENTATION TO DURBAN CHAMBER OF COMMERCE AND INDUSTRY Tuesday, 11th December 2012

  • 7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber

    2/26

    eThekwini MunicipalityOUTER WEST CORRIDOR STUDY &

    CATO RIDGE LOCAL AREA PLANS

    GRAHAM MULLER ASSOCIATES CONSORTIUM

    Presentation Outline:

    1. Introduction Project Context

    2. Opportunities and Constraints

    Socio-Economic

    Environmental Analysis

    Bulk Infrastructure

    Transport & Traffic Infrastructure

    3. Cato Ridge Local Area Plan & Precinct Plans

    4. Summary of Issues and Constraints

    2INTRODUCTION

  • 7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber

    3/26

    eThekwini MunicipalityOUTER WEST CORRIDOR STUDY &

    CATO RIDGE LOCAL AREA PLANS

    GRAHAM MULLER ASSOCIATES CONSORTIUM

    INTRODUCTION & PROJECT CONTEXT

  • 7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber

    4/26

    eThekwini MunicipalityOUTER WEST CORRIDOR STUDY &

    CATO RIDGE LOCAL AREA PLANS

    GRAHAM MULLER ASSOCIATES CONSORTIUM

    NATIONAL, PROVINCIAL & REGIONAL CONTEXT

    Cato Ridge and the Outer West Corridor are

    strategically located on the N3 national routebetween eThekwini Municipality and

    Mkhambathini Municipality and close to

    Pietermaritzburg.

    Cato Ridge offers potential space for industry and

    logistics and benefits uniquely from its positioning

    astride both the N3 national route and the

    NATCOR railway line.

    The area could respond to increasing demand for

    industrial land in eThekwini Municipality and

    serve to better integrate the economies of

    eThekwini, Mkhambathini and Msunduzi

    Municipalities

    METRO & LOCAL DEVELOPMENT CONTEXT

    Back of Port area serious pressures (new roads,

    railways and truck routes) and space (logistics); Western suburbs are growing rapidly

    Areas to north and to the south of Shongweni and

    Mpumalanga comprise largely traditional rural

    settlements

    The area exhibits substantial tourism and

    recreational potential,

    Mpumalanga township is expanding and upgrading,

    Revitalisation and growth of the Hammarsdale

    industrial area is anticipated,

    The Shongweni node around the N3 and M4

    intersections is to be developed further

    Revitalisation and growth of the Cato Ridge industrial

    area is already evident

    Areas consist of traditional rural settlements

    Valuable agricultural activities along the N3 areexpected to remain

  • 7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber

    5/26

    eThekwini MunicipalityOUTER WEST CORRIDOR STUDY &

    CATO RIDGE LOCAL AREA PLANS

    GRAHAM MULLER ASSOCIATES CONSORTIUM

    PURPOSE OF THE CATO RIDGE LAP

    produce a plan that will inform: industrial development in Cato

    Ridge/Harrison Flats.

    Commercial & Residential expansion

    in Cato Ridge Town Centre

    infrastructure required to sustain the

    proposed activities

    To develop the Cato Ridge Town Centre

    and Industrial area comprehensively

    To develop various land use scenarios

    FUTURE POSSIBILITIES:

    This is a 20 year set of plans

    A large site in the Harrison Flats

    area is reserved as a possible

    future landfill site for the Metro

    The intermodal hub remains a

    possibility and has been

    accommodated within the plan.

  • 7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber

    6/26

    eThekwini MunicipalityOUTER WEST CORRIDOR STUDY &

    CATO RIDGE LOCAL AREA PLANS

    GRAHAM MULLER ASSOCIATES CONSORTIUM

    OPPORTUNITIES &

    CONSTRAINTS

  • 7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber

    7/26

    eThekwini MunicipalityOUTER WEST CORRIDOR STUDY &

    CATO RIDGE LOCAL AREA PLANS

    GRAHAM MULLER ASSOCIATES CONSORTIUM

    N3

    R103

    MR385

    N3 and

    NATCOR Rail topmb and

    Gauteng

    Rail to

    DBN Port

    Future land reserved

    for landfill (100yrs)

    OPPORTUNITIES

  • 7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber

    8/26

    eThekwini MunicipalityOUTER WEST CORRIDOR STUDY &

    CATO RIDGE LOCAL AREA PLANS

    GRAHAM MULLER ASSOCIATES CONSORTIUM SOCIO-ECONOMIC OPPORTUNITIES &CONSTRAINTS

    KEY ECONOMIC CONSTRAINTSKEY ECONOMIC OPPORTUNITIES

    Employment creation for the local populations at

    KwaXimba, Fredville & south across the valley at

    Mpumalanga;

    Provision of land for development which, at a metropolitan

    scale, is required in the long term for

    o Large manufacturers;

    o Service & light industry;

    o Logistics & distribution.

    The Cato Ridge area presents one of the only immediate

    opportunities to release significant amounts of industrial

    land with site sizes in excess of 5,000 m2;

    Large areas of topographically suitable land, much of it

    currently zoned industrial;

    The possibility to exploit the national road & rail routes that

    intersect in the area.

    The study area serves as a gateway to the Valley of 1000

    Hills, the Msini resort at Nagle Dam & hosts existing

    successful tourism & recreational businesses in the

    Craiglea area.

    Inadequate existing road capacity to support

    meaningful development at Cato Ridge in the

    medium to long term;

    Inadequate bulk infrastructure (particularly waste

    water treatment & electricity) to support any

    meaningful development in Cato Ridge;

    Large land owners (historically speaking) not

    releasing their land for sale to 3rd party private

    developers;

    Acute environmental concerns with respect to bio-

    diversity, critical habitats & water catchments that

    must be balanced against any form of

    development.

    Need to preserve & support tourism and

    recreational service development which has the

    potential to employ large numbers of unskilled

    people from surrounding communities.

    8

  • 7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber

    9/26

    eThekwini MunicipalityOUTER WEST CORRIDOR STUDY &

    CATO RIDGE LOCAL AREA PLANS

    GRAHAM MULLER ASSOCIATES CONSORTIUM

    ENVIRONMENTAL

    ANALYSIS

    OUTER WEST CORRIDOR STUDY &

  • 7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber

    10/26

    eThekwini MunicipalityOUTER WEST CORRIDOR STUDY &

    CATO RIDGE LOCAL AREA PLANS

    GRAHAM MULLER ASSOCIATES CONSORTIUM

    AREAS OF VARYING BIODIVERSITYIMPORTANCE INCLUDING CORRIDORS

    ENVIRONMENTAL ANALYSIS 10

    WATERSHED

    OUTER WEST CORRIDOR STUDY &

  • 7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber

    11/26

    eThekwini MunicipalityOUTER WEST CORRIDOR STUDY &

    CATO RIDGE LOCAL AREA PLANS

    GRAHAM MULLER ASSOCIATES CONSORTIUMINFRASTRUCTURE PLAN

    OUTER WEST CORRIDOR STUDY &

  • 7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber

    12/26

    eThekwini MunicipalityOUTER WEST CORRIDOR STUDY &

    CATO RIDGE LOCAL AREA PLANS

    GRAHAM MULLER ASSOCIATES CONSORTIUM

    INFRASTRUCTURE CONSTRAINTS

    INFRASTRUCTURE PLAN 12

    Umgeni Catchment Ridge Line

    Slopes steeper than 1 : 3

    Rivers and Flood Lines

    Environmental Value

    Sewer 1 Requires pumping

    Sewer 2 Requires pumping

    and is also north of the ridge

    line

    Sewer 3 Gravity type 0 but

    north of ridge line

    OUTER WEST CORRIDOR STUDY &

  • 7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber

    13/26

    eThekwini MunicipalityOUTER WEST CORRIDOR STUDY &

    CATO RIDGE LOCAL AREA PLANS

    GRAHAM MULLER ASSOCIATES CONSORTIUM

    PROPOSED CIVIL INFRASTRUCTURE

    INFRASTRUCTURE PLAN 13

    Sewer Pump Stations

    Sewer Gravity systems

    Storm water systems and

    attenuation devises

    Water networks

    OUTER WEST CORRIDOR STUDY &

  • 7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber

    14/26

    eThekwini MunicipalityOUTER WEST CORRIDOR STUDY &

    CATO RIDGE LOCAL AREA PLANS

    GRAHAM MULLER ASSOCIATES CONSORTIUMTRAFFIC & TRANSPORT

    OUTER WEST CORRIDOR STUDY &

  • 7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber

    15/26

    eThekwini MunicipalityOUTER WEST CORRIDOR STUDY &

    CATO RIDGE LOCAL AREA PLANS

    GRAHAM MULLER ASSOCIATES CONSORTIUM TRANSPORT

    INTRODUCTION

    15

    PhaseTotal GLA

    (m2)Road Infrastructure

    Additional RoadInfrastructure

    Existing 340,687 NA Widening of bridge over the

    N3 at the HammarsdaleInterchange

    Upgrade of HammarsdaleInterchange to signals

    Phase 1 537,310

    Link 4-3, 8-1, 10-1 and 10-2

    Signalisation of EddieHagan Drive/94042 TRK

    Phase 2 638,134

    Link 3-1

    Signalisation of EddieHagan Drive/R103 and

    Eddie Hagan Drive/Link 3-1intersections

    New interchange and linkroad for the N3

    Widening of the N3 to fourlanes per direction between

    the Peacevale and CatoRidge Interchanges

    Upgrade of the Cato Ridgeinterchange to signals

    Widening of theMR385/R103 to two lanes

    per direction from theDoornrug Road intersection

    to the eastbound on-slip

    Signalisation of the DunbarDrive/R103 intersection

    Phase 3 850,597

    Link 1-1

    Signalisation of EddieHagan Drive/65301TRK and

    Eddie HaganDrive/Drakensberg Street

    intersections

    Phase 4 999,432 Link 2-1Upgrade of the R103 to twolanes per direction betweenthe eastbound on-slip and

    Eddie Hagan Drive

    Phase 5 1,049,418

    Link 7-4

    Construction of intersectionon the link road

    Phase 6 1,188,427 Link 7-3

    OUTER WEST CORRIDOR STUDY &

  • 7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber

    16/26

    eThekwini MunicipalityOUTER WEST CORRIDOR STUDY &

    CATO RIDGE LOCAL AREA PLANS

    GRAHAM MULLER ASSOCIATES CONSORTIUM

    ROAD INFRASTRUCTURE PROPOSED AREAS

    16TRANSPORT

    Existing

    Short Term

    Medium Term

    Long Term

    PhaseTotal GLA

    (m2)Road Infrastructure

    Additional RoadInfrastructure

    Existing 340,687 NA Widening of bridge over the

    N3 at the HammarsdaleInterchange

    Upgrade of HammarsdaleInterchange to signals

    Phase 1 537,310

    Link 4-3, 8-1, 10-1 and 10-2

    Signalisation of EddieHagan Drive/94042 TRK

    Phase 2 638,134

    Link 3-1

    Signalisation of EddieHagan Drive/R103 and

    Eddie Hagan Drive/Link 3-1intersections

    New interchange and linkroad for the N3

    Widening of the N3 to fourlanes per direction between

    the Peacevale and CatoRidge Interchanges

    Upgrade of the Cato Ridgeinterchange to signals

    Widening of theMR385/R103 to two lanes

    per direction from theDoornrug Road intersection

    to the eastbound on-slip

    Signalisation of the DunbarDrive/R103 intersection

    Phase 3 850,597

    Link 1-1

    Signalisation of EddieHagan Drive/65301TRK and

    Eddie HaganDrive/Drakensberg Street

    intersections

    Phase 4 999,432 Link 2-1Upgrade of the R103 to twolanes per direction betweenthe eastbound on-slip and

    Eddie Hagan Drive

    Phase 5 1,049,418

    Link 7-4

    Construction of intersectionon the link road

    Phase 6 1,188,427 Link 7-3

    OUTER WEST CORRIDOR STUDY &

  • 7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber

    17/26

    eThekwini MunicipalityOUTER WEST CORRIDOR STUDY &

    CATO RIDGE LOCAL AREA PLANS

    GRAHAM MULLER ASSOCIATES CONSORTIUM

    ROAD INFRASTRUCTURE PROPOSED AREAS

    17TRANSPORT

    Existing

    Short Term

    Medium Term

    Long Term

    PhaseTotal GLA

    (m2)Road Infrastructure

    Additional RoadInfrastructure

    Existing 340,687 NA Widening of bridge over the

    N3 at the HammarsdaleInterchange

    Upgrade of HammarsdaleInterchange to signals

    Phase 1 537,310

    Link 4-3, 8-1, 10-1 and 10-2

    Signalisation of EddieHagan Drive/94042 TRK

    Phase 2 638,134

    Link 3-1

    Signalisation of EddieHagan Drive/R103 and

    Eddie Hagan Drive/Link 3-1intersections

    New interchange and linkroad for the N3

    Widening of the N3 to fourlanes per direction between

    the Peacevale and CatoRidge Interchanges

    Upgrade of the Cato Ridgeinterchange to signals

    Widening of theMR385/R103 to two lanes

    per direction from theDoornrug Road intersection

    to the eastbound on-slip

    Signalisation of the DunbarDrive/R103 intersection

    Phase 3 850,597

    Link 1-1

    Signalisation of EddieHagan Drive/65301TRK and

    Eddie HaganDrive/Drakensberg Street

    intersections

    Phase 4 999,432 Link 2-1Upgrade of the R103 to twolanes per direction betweenthe eastbound on-slip and

    Eddie Hagan Drive

    Phase 5 1,049,418

    Link 7-4

    Construction of intersectionon the link road

    Phase 6 1,188,427 Link 7-3

    OUTER WEST CORRIDOR STUDY &

  • 7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber

    18/26

    eThekwini MunicipalityOUTER WEST CORRIDOR STUDY &

    CATO RIDGE LOCAL AREA PLANS

    GRAHAM MULLER ASSOCIATES CONSORTIUM

    ROAD INFRASTRUCTURE PROPOSED AREAS

    18TRANSPORT

    Existing

    Short Term

    Medium Term

    Long Term

    PhaseTotal GLA

    (m2)Road Infrastructure

    Additional RoadInfrastructure

    Existing 340,687 NA Widening of bridge over theN3 at the Hammarsdale

    Interchange

    Upgrade of HammarsdaleInterchange to signals

    Phase 1 537,310

    Link 4-3, 8-1, 10-1 and 10-2

    Signalisation of EddieHagan Drive/94042 TRK

    Phase 2 638,134

    Link 3-1

    Signalisation of EddieHagan Drive/R103 and

    Eddie Hagan Drive/Link 3-1intersections

    New interchange and linkroad for the N3

    Widening of the N3 to fourlanes per direction between

    the Peacevale and CatoRidge Interchanges

    Upgrade of the Cato Ridgeinterchange to signals

    Widening of theMR385/R103 to two lanes

    per direction from theDoornrug Road intersection

    to the eastbound on-slip

    Signalisation of the DunbarDrive/R103 intersection

    Phase 3 850,597

    Link 1-1

    Signalisation of EddieHagan Drive/65301TRK and

    Eddie HaganDrive/Drakensberg Street

    intersections

    Phase 4 999,432 Link 2-1Upgrade of the R103 to twolanes per direction betweenthe eastbound on-slip and

    Eddie Hagan Drive

    Phase 5 1,049,418

    Link 7-4

    Construction of intersectionon the link road

    Phase 6 1,188,427 Link 7-3

    OUTER WEST CORRIDOR STUDY &

  • 7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber

    19/26

    eThekwini MunicipalityOUTER WEST CORRIDOR STUDY &

    CATO RIDGE LOCAL AREA PLANS

    GRAHAM MULLER ASSOCIATES CONSORTIUM

    ROAD INFRASTRUCTURE PROPOSED AREAS

    19TRANSPORT

    Existing

    Short Term

    Medium Term

    Long Term

    PhaseTotal GLA

    (m2)Road Infrastructure

    Additional RoadInfrastructure

    Existing 340,687 NA Widening of bridge over theN3 at the Hammarsdale

    Interchange

    Upgrade of HammarsdaleInterchange to signals

    Phase 1 537,310

    Link 4-3, 8-1, 10-1 and 10-2

    Signalisation of EddieHagan Drive/94042 TRK

    Phase 2 638,134

    Link 3-1

    Signalisation of EddieHagan Drive/R103 and

    Eddie Hagan Drive/Link 3-1intersections

    New interchange and linkroad for the N3

    Widening of the N3 to fourlanes per direction between

    the Peacevale and CatoRidge Interchanges

    Upgrade of the Cato Ridgeinterchange to signals

    Widening of theMR385/R103 to two lanes

    per direction from theDoornrug Road intersection

    to the eastbound on-slip

    Signalisation of the DunbarDrive/R103 intersection

    Phase 3 850,597

    Link 1-1

    Signalisation of EddieHagan Drive/65301TRK and

    Eddie HaganDrive/Drakensberg Street

    intersections

    Phase 4 999,432 Link 2-1Upgrade of the R103 to twolanes per direction betweenthe eastbound on-slip and

    Eddie Hagan Drive

    Phase 5 1,049,418

    Link 7-4

    Construction of intersectionon the link road

    Phase 6 1,188,427 Link 7-3

    OUTER WEST CORRIDOR STUDY &

  • 7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber

    20/26

    eThekwini Municipality CATO RIDGE LOCAL AREA PLANS

    GRAHAM MULLER ASSOCIATES CONSORTIUM

    OUTER WEST CORRIDOR, CATO RIDGE

    LOCAL AREA PLAN & PRECINCT PLANS

    OUTER WEST CORRIDOR STUDY &

  • 7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber

    21/26

    eThekwini Municipality CATO RIDGE LOCAL AREA PLANS

    GRAHAM MULLER ASSOCIATES CONSORTIUM 21

    OUTER WEST CORRIDORCONCEPTUAL SPATIAL FRAMEWORK

    Location of major general industrial areas

    Extending ultimately also to south of N3

    Maintenance of agricultural usage

    Upgrading of surrounding rural development

    Integrating major open space corridors

    Upgrading village

    Growth depending on economic development

    Improved access and services

    More efficient development

    Limiting environmental impact

    Economic / social upliftment

    Village growth aligned with

    Industrial development

    New N3 interchange and access

    Existing and zoned industrial

    Proposed additional industrial

    Pot. Future intermodal hub

    Environmental protection zone

    Rural residential

    CATO RIDGE LOCAL AREA PLAN & PRECINCT PLANS

    Th k i i M i i liOUTER WEST CORRIDOR STUDY &

  • 7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber

    22/26

    eThekwini Municipality CATO RIDGE LOCAL AREA PLANS

    GRAHAM MULLER ASSOCIATES CONSORTIUM 22

    CATO RIDGE INDUSTRIAL PRECINCT PLAN

    Informed by CR LAP

    Site-specific dev. guidance

    Existing / existing zoned industrial

    Industry with min. addit.

    Infrastructure

    Industry with major addit.

    Infrastructure

    Pot. future inter-modal hub

    Pot. future landfill site

    Small mixed use node

    Agriculture

    Rural residential

    Significant conservation area

    Limitations posed by sensitive

    environment severe topography,

    Umgeni catchment

    CATO RIDGE LOCAL AREA PLAN & PRECINCT PLANS

    Natcor Railway Line

    Intermodal Hub &

    supporting logistics

    Th k i i M i i litOUTER WEST CORRIDOR STUDY &

  • 7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber

    23/26

    eThekwini Municipality CATO RIDGE LOCAL AREA PLANS

    GRAHAM MULLER ASSOCIATES CONSORTIUM 23CATO RIDGE LOCAL AREA PLAN & PRECINCT PLANS

    CATO RIDGE VILLAGEPRECINCT PLAN

    Upgrading exist.

    development

    Some residential infill

    Some residential

    growth

    Variety of densities

    New community

    centre

    Additional local

    amenities

    Additional

    commercial / busin. Environmental

    considerations

    Retaining existing

    agriculture

    Retaining existing

    golf course

    Improving structure

    and legibility

    Relocation truck stop

    Th k i i M i i litOUTER WEST CORRIDOR STUDY &

  • 7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber

    24/26

    eThekwini Municipality CATO RIDGE LOCAL AREA PLANS

    GRAHAM MULLER ASSOCIATES CONSORTIUM 24

    Phase Land Released Estimated Cost (based on2010)

    Short 39ha Industrial R287 millionMedium 40ha Industrial R526 million

    Long 40ha Industrial R143.2 million

    PHASING AND ASSOCIATED COST

    16 995m commercial/business in total

    12 000m facility in total

    eThekwini MunicipalityOUTER WEST CORRIDOR STUDY &

  • 7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber

    25/26

    eThekwini Municipality CATO RIDGE LOCAL AREA PLANS

    GRAHAM MULLER ASSOCIATES CONSORTIUM

    SUMMARY OF ISSUES AND

    CONSTRAINTS

    eThekwini MunicipalityOUTER WEST CORRIDOR STUDY &

    CATO RIDGE LOCAL AREA PLANS

  • 7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber

    26/26

    eThekwini Municipality CATO RIDGE LOCAL AREA PLANS

    GRAHAM MULLER ASSOCIATES CONSORTIUM 26

    ISSUES AND CONSTRAINTS

    Has tracts of industrial zoned land with

    relatively large site sizes available for

    development.

    Is well located in terms of the road and railnetworks

    Could provide much needed industrial land in

    eThekwini and provide a means to

    accommodate the growing pressures from the

    Port development

    Development is dependent on service provision.

    Environmental Constraints

    Funding Constraints

    Impact of other development along N3 on Cato

    Ridge