cato ridge lap & precinct plans to chamber
TRANSCRIPT
-
7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber
1/26
eThekwini MunicipalityOUTER WEST CORRIDOR STUDY &
CATO RIDGE LOCAL AREA PLANS
GRAHAM MULLER ASSOCIATES CONSORTIUM
OUTER WEST CORRIDOR STUDY
CATO RIDGE LOCAL AREA PLAN & PRECINCT PLANS
PRESENTATION TO DURBAN CHAMBER OF COMMERCE AND INDUSTRY Tuesday, 11th December 2012
-
7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber
2/26
eThekwini MunicipalityOUTER WEST CORRIDOR STUDY &
CATO RIDGE LOCAL AREA PLANS
GRAHAM MULLER ASSOCIATES CONSORTIUM
Presentation Outline:
1. Introduction Project Context
2. Opportunities and Constraints
Socio-Economic
Environmental Analysis
Bulk Infrastructure
Transport & Traffic Infrastructure
3. Cato Ridge Local Area Plan & Precinct Plans
4. Summary of Issues and Constraints
2INTRODUCTION
-
7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber
3/26
eThekwini MunicipalityOUTER WEST CORRIDOR STUDY &
CATO RIDGE LOCAL AREA PLANS
GRAHAM MULLER ASSOCIATES CONSORTIUM
INTRODUCTION & PROJECT CONTEXT
-
7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber
4/26
eThekwini MunicipalityOUTER WEST CORRIDOR STUDY &
CATO RIDGE LOCAL AREA PLANS
GRAHAM MULLER ASSOCIATES CONSORTIUM
NATIONAL, PROVINCIAL & REGIONAL CONTEXT
Cato Ridge and the Outer West Corridor are
strategically located on the N3 national routebetween eThekwini Municipality and
Mkhambathini Municipality and close to
Pietermaritzburg.
Cato Ridge offers potential space for industry and
logistics and benefits uniquely from its positioning
astride both the N3 national route and the
NATCOR railway line.
The area could respond to increasing demand for
industrial land in eThekwini Municipality and
serve to better integrate the economies of
eThekwini, Mkhambathini and Msunduzi
Municipalities
METRO & LOCAL DEVELOPMENT CONTEXT
Back of Port area serious pressures (new roads,
railways and truck routes) and space (logistics); Western suburbs are growing rapidly
Areas to north and to the south of Shongweni and
Mpumalanga comprise largely traditional rural
settlements
The area exhibits substantial tourism and
recreational potential,
Mpumalanga township is expanding and upgrading,
Revitalisation and growth of the Hammarsdale
industrial area is anticipated,
The Shongweni node around the N3 and M4
intersections is to be developed further
Revitalisation and growth of the Cato Ridge industrial
area is already evident
Areas consist of traditional rural settlements
Valuable agricultural activities along the N3 areexpected to remain
-
7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber
5/26
eThekwini MunicipalityOUTER WEST CORRIDOR STUDY &
CATO RIDGE LOCAL AREA PLANS
GRAHAM MULLER ASSOCIATES CONSORTIUM
PURPOSE OF THE CATO RIDGE LAP
produce a plan that will inform: industrial development in Cato
Ridge/Harrison Flats.
Commercial & Residential expansion
in Cato Ridge Town Centre
infrastructure required to sustain the
proposed activities
To develop the Cato Ridge Town Centre
and Industrial area comprehensively
To develop various land use scenarios
FUTURE POSSIBILITIES:
This is a 20 year set of plans
A large site in the Harrison Flats
area is reserved as a possible
future landfill site for the Metro
The intermodal hub remains a
possibility and has been
accommodated within the plan.
-
7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber
6/26
eThekwini MunicipalityOUTER WEST CORRIDOR STUDY &
CATO RIDGE LOCAL AREA PLANS
GRAHAM MULLER ASSOCIATES CONSORTIUM
OPPORTUNITIES &
CONSTRAINTS
-
7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber
7/26
eThekwini MunicipalityOUTER WEST CORRIDOR STUDY &
CATO RIDGE LOCAL AREA PLANS
GRAHAM MULLER ASSOCIATES CONSORTIUM
N3
R103
MR385
N3 and
NATCOR Rail topmb and
Gauteng
Rail to
DBN Port
Future land reserved
for landfill (100yrs)
OPPORTUNITIES
-
7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber
8/26
eThekwini MunicipalityOUTER WEST CORRIDOR STUDY &
CATO RIDGE LOCAL AREA PLANS
GRAHAM MULLER ASSOCIATES CONSORTIUM SOCIO-ECONOMIC OPPORTUNITIES &CONSTRAINTS
KEY ECONOMIC CONSTRAINTSKEY ECONOMIC OPPORTUNITIES
Employment creation for the local populations at
KwaXimba, Fredville & south across the valley at
Mpumalanga;
Provision of land for development which, at a metropolitan
scale, is required in the long term for
o Large manufacturers;
o Service & light industry;
o Logistics & distribution.
The Cato Ridge area presents one of the only immediate
opportunities to release significant amounts of industrial
land with site sizes in excess of 5,000 m2;
Large areas of topographically suitable land, much of it
currently zoned industrial;
The possibility to exploit the national road & rail routes that
intersect in the area.
The study area serves as a gateway to the Valley of 1000
Hills, the Msini resort at Nagle Dam & hosts existing
successful tourism & recreational businesses in the
Craiglea area.
Inadequate existing road capacity to support
meaningful development at Cato Ridge in the
medium to long term;
Inadequate bulk infrastructure (particularly waste
water treatment & electricity) to support any
meaningful development in Cato Ridge;
Large land owners (historically speaking) not
releasing their land for sale to 3rd party private
developers;
Acute environmental concerns with respect to bio-
diversity, critical habitats & water catchments that
must be balanced against any form of
development.
Need to preserve & support tourism and
recreational service development which has the
potential to employ large numbers of unskilled
people from surrounding communities.
8
-
7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber
9/26
eThekwini MunicipalityOUTER WEST CORRIDOR STUDY &
CATO RIDGE LOCAL AREA PLANS
GRAHAM MULLER ASSOCIATES CONSORTIUM
ENVIRONMENTAL
ANALYSIS
OUTER WEST CORRIDOR STUDY &
-
7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber
10/26
eThekwini MunicipalityOUTER WEST CORRIDOR STUDY &
CATO RIDGE LOCAL AREA PLANS
GRAHAM MULLER ASSOCIATES CONSORTIUM
AREAS OF VARYING BIODIVERSITYIMPORTANCE INCLUDING CORRIDORS
ENVIRONMENTAL ANALYSIS 10
WATERSHED
OUTER WEST CORRIDOR STUDY &
-
7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber
11/26
eThekwini MunicipalityOUTER WEST CORRIDOR STUDY &
CATO RIDGE LOCAL AREA PLANS
GRAHAM MULLER ASSOCIATES CONSORTIUMINFRASTRUCTURE PLAN
OUTER WEST CORRIDOR STUDY &
-
7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber
12/26
eThekwini MunicipalityOUTER WEST CORRIDOR STUDY &
CATO RIDGE LOCAL AREA PLANS
GRAHAM MULLER ASSOCIATES CONSORTIUM
INFRASTRUCTURE CONSTRAINTS
INFRASTRUCTURE PLAN 12
Umgeni Catchment Ridge Line
Slopes steeper than 1 : 3
Rivers and Flood Lines
Environmental Value
Sewer 1 Requires pumping
Sewer 2 Requires pumping
and is also north of the ridge
line
Sewer 3 Gravity type 0 but
north of ridge line
OUTER WEST CORRIDOR STUDY &
-
7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber
13/26
eThekwini MunicipalityOUTER WEST CORRIDOR STUDY &
CATO RIDGE LOCAL AREA PLANS
GRAHAM MULLER ASSOCIATES CONSORTIUM
PROPOSED CIVIL INFRASTRUCTURE
INFRASTRUCTURE PLAN 13
Sewer Pump Stations
Sewer Gravity systems
Storm water systems and
attenuation devises
Water networks
OUTER WEST CORRIDOR STUDY &
-
7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber
14/26
eThekwini MunicipalityOUTER WEST CORRIDOR STUDY &
CATO RIDGE LOCAL AREA PLANS
GRAHAM MULLER ASSOCIATES CONSORTIUMTRAFFIC & TRANSPORT
OUTER WEST CORRIDOR STUDY &
-
7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber
15/26
eThekwini MunicipalityOUTER WEST CORRIDOR STUDY &
CATO RIDGE LOCAL AREA PLANS
GRAHAM MULLER ASSOCIATES CONSORTIUM TRANSPORT
INTRODUCTION
15
PhaseTotal GLA
(m2)Road Infrastructure
Additional RoadInfrastructure
Existing 340,687 NA Widening of bridge over the
N3 at the HammarsdaleInterchange
Upgrade of HammarsdaleInterchange to signals
Phase 1 537,310
Link 4-3, 8-1, 10-1 and 10-2
Signalisation of EddieHagan Drive/94042 TRK
Phase 2 638,134
Link 3-1
Signalisation of EddieHagan Drive/R103 and
Eddie Hagan Drive/Link 3-1intersections
New interchange and linkroad for the N3
Widening of the N3 to fourlanes per direction between
the Peacevale and CatoRidge Interchanges
Upgrade of the Cato Ridgeinterchange to signals
Widening of theMR385/R103 to two lanes
per direction from theDoornrug Road intersection
to the eastbound on-slip
Signalisation of the DunbarDrive/R103 intersection
Phase 3 850,597
Link 1-1
Signalisation of EddieHagan Drive/65301TRK and
Eddie HaganDrive/Drakensberg Street
intersections
Phase 4 999,432 Link 2-1Upgrade of the R103 to twolanes per direction betweenthe eastbound on-slip and
Eddie Hagan Drive
Phase 5 1,049,418
Link 7-4
Construction of intersectionon the link road
Phase 6 1,188,427 Link 7-3
OUTER WEST CORRIDOR STUDY &
-
7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber
16/26
eThekwini MunicipalityOUTER WEST CORRIDOR STUDY &
CATO RIDGE LOCAL AREA PLANS
GRAHAM MULLER ASSOCIATES CONSORTIUM
ROAD INFRASTRUCTURE PROPOSED AREAS
16TRANSPORT
Existing
Short Term
Medium Term
Long Term
PhaseTotal GLA
(m2)Road Infrastructure
Additional RoadInfrastructure
Existing 340,687 NA Widening of bridge over the
N3 at the HammarsdaleInterchange
Upgrade of HammarsdaleInterchange to signals
Phase 1 537,310
Link 4-3, 8-1, 10-1 and 10-2
Signalisation of EddieHagan Drive/94042 TRK
Phase 2 638,134
Link 3-1
Signalisation of EddieHagan Drive/R103 and
Eddie Hagan Drive/Link 3-1intersections
New interchange and linkroad for the N3
Widening of the N3 to fourlanes per direction between
the Peacevale and CatoRidge Interchanges
Upgrade of the Cato Ridgeinterchange to signals
Widening of theMR385/R103 to two lanes
per direction from theDoornrug Road intersection
to the eastbound on-slip
Signalisation of the DunbarDrive/R103 intersection
Phase 3 850,597
Link 1-1
Signalisation of EddieHagan Drive/65301TRK and
Eddie HaganDrive/Drakensberg Street
intersections
Phase 4 999,432 Link 2-1Upgrade of the R103 to twolanes per direction betweenthe eastbound on-slip and
Eddie Hagan Drive
Phase 5 1,049,418
Link 7-4
Construction of intersectionon the link road
Phase 6 1,188,427 Link 7-3
OUTER WEST CORRIDOR STUDY &
-
7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber
17/26
eThekwini MunicipalityOUTER WEST CORRIDOR STUDY &
CATO RIDGE LOCAL AREA PLANS
GRAHAM MULLER ASSOCIATES CONSORTIUM
ROAD INFRASTRUCTURE PROPOSED AREAS
17TRANSPORT
Existing
Short Term
Medium Term
Long Term
PhaseTotal GLA
(m2)Road Infrastructure
Additional RoadInfrastructure
Existing 340,687 NA Widening of bridge over the
N3 at the HammarsdaleInterchange
Upgrade of HammarsdaleInterchange to signals
Phase 1 537,310
Link 4-3, 8-1, 10-1 and 10-2
Signalisation of EddieHagan Drive/94042 TRK
Phase 2 638,134
Link 3-1
Signalisation of EddieHagan Drive/R103 and
Eddie Hagan Drive/Link 3-1intersections
New interchange and linkroad for the N3
Widening of the N3 to fourlanes per direction between
the Peacevale and CatoRidge Interchanges
Upgrade of the Cato Ridgeinterchange to signals
Widening of theMR385/R103 to two lanes
per direction from theDoornrug Road intersection
to the eastbound on-slip
Signalisation of the DunbarDrive/R103 intersection
Phase 3 850,597
Link 1-1
Signalisation of EddieHagan Drive/65301TRK and
Eddie HaganDrive/Drakensberg Street
intersections
Phase 4 999,432 Link 2-1Upgrade of the R103 to twolanes per direction betweenthe eastbound on-slip and
Eddie Hagan Drive
Phase 5 1,049,418
Link 7-4
Construction of intersectionon the link road
Phase 6 1,188,427 Link 7-3
OUTER WEST CORRIDOR STUDY &
-
7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber
18/26
eThekwini MunicipalityOUTER WEST CORRIDOR STUDY &
CATO RIDGE LOCAL AREA PLANS
GRAHAM MULLER ASSOCIATES CONSORTIUM
ROAD INFRASTRUCTURE PROPOSED AREAS
18TRANSPORT
Existing
Short Term
Medium Term
Long Term
PhaseTotal GLA
(m2)Road Infrastructure
Additional RoadInfrastructure
Existing 340,687 NA Widening of bridge over theN3 at the Hammarsdale
Interchange
Upgrade of HammarsdaleInterchange to signals
Phase 1 537,310
Link 4-3, 8-1, 10-1 and 10-2
Signalisation of EddieHagan Drive/94042 TRK
Phase 2 638,134
Link 3-1
Signalisation of EddieHagan Drive/R103 and
Eddie Hagan Drive/Link 3-1intersections
New interchange and linkroad for the N3
Widening of the N3 to fourlanes per direction between
the Peacevale and CatoRidge Interchanges
Upgrade of the Cato Ridgeinterchange to signals
Widening of theMR385/R103 to two lanes
per direction from theDoornrug Road intersection
to the eastbound on-slip
Signalisation of the DunbarDrive/R103 intersection
Phase 3 850,597
Link 1-1
Signalisation of EddieHagan Drive/65301TRK and
Eddie HaganDrive/Drakensberg Street
intersections
Phase 4 999,432 Link 2-1Upgrade of the R103 to twolanes per direction betweenthe eastbound on-slip and
Eddie Hagan Drive
Phase 5 1,049,418
Link 7-4
Construction of intersectionon the link road
Phase 6 1,188,427 Link 7-3
OUTER WEST CORRIDOR STUDY &
-
7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber
19/26
eThekwini MunicipalityOUTER WEST CORRIDOR STUDY &
CATO RIDGE LOCAL AREA PLANS
GRAHAM MULLER ASSOCIATES CONSORTIUM
ROAD INFRASTRUCTURE PROPOSED AREAS
19TRANSPORT
Existing
Short Term
Medium Term
Long Term
PhaseTotal GLA
(m2)Road Infrastructure
Additional RoadInfrastructure
Existing 340,687 NA Widening of bridge over theN3 at the Hammarsdale
Interchange
Upgrade of HammarsdaleInterchange to signals
Phase 1 537,310
Link 4-3, 8-1, 10-1 and 10-2
Signalisation of EddieHagan Drive/94042 TRK
Phase 2 638,134
Link 3-1
Signalisation of EddieHagan Drive/R103 and
Eddie Hagan Drive/Link 3-1intersections
New interchange and linkroad for the N3
Widening of the N3 to fourlanes per direction between
the Peacevale and CatoRidge Interchanges
Upgrade of the Cato Ridgeinterchange to signals
Widening of theMR385/R103 to two lanes
per direction from theDoornrug Road intersection
to the eastbound on-slip
Signalisation of the DunbarDrive/R103 intersection
Phase 3 850,597
Link 1-1
Signalisation of EddieHagan Drive/65301TRK and
Eddie HaganDrive/Drakensberg Street
intersections
Phase 4 999,432 Link 2-1Upgrade of the R103 to twolanes per direction betweenthe eastbound on-slip and
Eddie Hagan Drive
Phase 5 1,049,418
Link 7-4
Construction of intersectionon the link road
Phase 6 1,188,427 Link 7-3
OUTER WEST CORRIDOR STUDY &
-
7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber
20/26
eThekwini Municipality CATO RIDGE LOCAL AREA PLANS
GRAHAM MULLER ASSOCIATES CONSORTIUM
OUTER WEST CORRIDOR, CATO RIDGE
LOCAL AREA PLAN & PRECINCT PLANS
OUTER WEST CORRIDOR STUDY &
-
7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber
21/26
eThekwini Municipality CATO RIDGE LOCAL AREA PLANS
GRAHAM MULLER ASSOCIATES CONSORTIUM 21
OUTER WEST CORRIDORCONCEPTUAL SPATIAL FRAMEWORK
Location of major general industrial areas
Extending ultimately also to south of N3
Maintenance of agricultural usage
Upgrading of surrounding rural development
Integrating major open space corridors
Upgrading village
Growth depending on economic development
Improved access and services
More efficient development
Limiting environmental impact
Economic / social upliftment
Village growth aligned with
Industrial development
New N3 interchange and access
Existing and zoned industrial
Proposed additional industrial
Pot. Future intermodal hub
Environmental protection zone
Rural residential
CATO RIDGE LOCAL AREA PLAN & PRECINCT PLANS
Th k i i M i i liOUTER WEST CORRIDOR STUDY &
-
7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber
22/26
eThekwini Municipality CATO RIDGE LOCAL AREA PLANS
GRAHAM MULLER ASSOCIATES CONSORTIUM 22
CATO RIDGE INDUSTRIAL PRECINCT PLAN
Informed by CR LAP
Site-specific dev. guidance
Existing / existing zoned industrial
Industry with min. addit.
Infrastructure
Industry with major addit.
Infrastructure
Pot. future inter-modal hub
Pot. future landfill site
Small mixed use node
Agriculture
Rural residential
Significant conservation area
Limitations posed by sensitive
environment severe topography,
Umgeni catchment
CATO RIDGE LOCAL AREA PLAN & PRECINCT PLANS
Natcor Railway Line
Intermodal Hub &
supporting logistics
Th k i i M i i litOUTER WEST CORRIDOR STUDY &
-
7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber
23/26
eThekwini Municipality CATO RIDGE LOCAL AREA PLANS
GRAHAM MULLER ASSOCIATES CONSORTIUM 23CATO RIDGE LOCAL AREA PLAN & PRECINCT PLANS
CATO RIDGE VILLAGEPRECINCT PLAN
Upgrading exist.
development
Some residential infill
Some residential
growth
Variety of densities
New community
centre
Additional local
amenities
Additional
commercial / busin. Environmental
considerations
Retaining existing
agriculture
Retaining existing
golf course
Improving structure
and legibility
Relocation truck stop
Th k i i M i i litOUTER WEST CORRIDOR STUDY &
-
7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber
24/26
eThekwini Municipality CATO RIDGE LOCAL AREA PLANS
GRAHAM MULLER ASSOCIATES CONSORTIUM 24
Phase Land Released Estimated Cost (based on2010)
Short 39ha Industrial R287 millionMedium 40ha Industrial R526 million
Long 40ha Industrial R143.2 million
PHASING AND ASSOCIATED COST
16 995m commercial/business in total
12 000m facility in total
eThekwini MunicipalityOUTER WEST CORRIDOR STUDY &
-
7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber
25/26
eThekwini Municipality CATO RIDGE LOCAL AREA PLANS
GRAHAM MULLER ASSOCIATES CONSORTIUM
SUMMARY OF ISSUES AND
CONSTRAINTS
eThekwini MunicipalityOUTER WEST CORRIDOR STUDY &
CATO RIDGE LOCAL AREA PLANS
-
7/30/2019 Cato Ridge LAP & Precinct Plans to Chamber
26/26
eThekwini Municipality CATO RIDGE LOCAL AREA PLANS
GRAHAM MULLER ASSOCIATES CONSORTIUM 26
ISSUES AND CONSTRAINTS
Has tracts of industrial zoned land with
relatively large site sizes available for
development.
Is well located in terms of the road and railnetworks
Could provide much needed industrial land in
eThekwini and provide a means to
accommodate the growing pressures from the
Port development
Development is dependent on service provision.
Environmental Constraints
Funding Constraints
Impact of other development along N3 on Cato
Ridge