cbi energy conference: alastair martin, managing director, flextricity ltd
DESCRIPTION
Presentation by Alastair Martin, managing frector, Flextricity Ltd at the CBI's energy conference. London, October 2009.TRANSCRIPT
![Page 1: CBI Energy Conference: Alastair Martin, managing director, Flextricity Ltd](https://reader035.vdocument.in/reader035/viewer/2022070322/5594dd1a1a28ab6d328b45d2/html5/thumbnails/1.jpg)
![Page 2: CBI Energy Conference: Alastair Martin, managing director, Flextricity Ltd](https://reader035.vdocument.in/reader035/viewer/2022070322/5594dd1a1a28ab6d328b45d2/html5/thumbnails/2.jpg)
![Page 3: CBI Energy Conference: Alastair Martin, managing director, Flextricity Ltd](https://reader035.vdocument.in/reader035/viewer/2022070322/5594dd1a1a28ab6d328b45d2/html5/thumbnails/3.jpg)
0
10,000
20,000
30,000
40,000
50,000
60,000
Tran
smis
sio
n s
yste
m d
em
and
(MW
)
Saturday 3rd January 2009
France
OCGT (gasoil)
Pumped Storage
Wind
Hydro
Oil
CCGT (gas)
Coal
Nuclear
Nuclear power station failed at 16:34;632MW generation lost
STOR call received at 16:38Flexitricity started generation in same minute; full power by 16:43
Day peak 17:15 - 17:20
STOR cease received at 17:46
![Page 4: CBI Energy Conference: Alastair Martin, managing director, Flextricity Ltd](https://reader035.vdocument.in/reader035/viewer/2022070322/5594dd1a1a28ab6d328b45d2/html5/thumbnails/4.jpg)
Who participates?
• Standby generators
– Premium power
– Fossil fuel
– Critical infrastructure
• Load reduction
– Disruption is not tolerated
• Combined Heat and Power
– Variation to schedule
– Use of thermal storage
![Page 5: CBI Energy Conference: Alastair Martin, managing director, Flextricity Ltd](https://reader035.vdocument.in/reader035/viewer/2022070322/5594dd1a1a28ab6d328b45d2/html5/thumbnails/5.jpg)
Who participates?
• Retail
• Water
• Banking
• Datacentres/communications
• Logistics and cold storage
• Events/leisure
• District heating
• Waste processing
• Horticulture
![Page 6: CBI Energy Conference: Alastair Martin, managing director, Flextricity Ltd](https://reader035.vdocument.in/reader035/viewer/2022070322/5594dd1a1a28ab6d328b45d2/html5/thumbnails/6.jpg)
What do they want?
1. Respect for core business processes
– This is still an optional activity
2. Money
3. Reliability
4. Emissions reduction
– At national level
![Page 7: CBI Energy Conference: Alastair Martin, managing director, Flextricity Ltd](https://reader035.vdocument.in/reader035/viewer/2022070322/5594dd1a1a28ab6d328b45d2/html5/thumbnails/7.jpg)
£0
£10,000
£20,000
£30,000
£40,000
£50,000
£60,000
Energy Partner gross revenue
Energy Partner costs
An
nu
al r
eve
nu
e/c
ost
Export capacity costs
Triad maintenance costs
STOR maintenance costs
Triad fuel costs
STOR fuel costs
STOR availability
Electricity generated
Triad benefit
STOR utilisation
Money
• Area: East Midlands
• Capacity: 1MW firm
• Type: standby generator
• Run hours: 50-60 hours/year
![Page 8: CBI Energy Conference: Alastair Martin, managing director, Flextricity Ltd](https://reader035.vdocument.in/reader035/viewer/2022070322/5594dd1a1a28ab6d328b45d2/html5/thumbnails/8.jpg)
Ener
gy p
rice
Run hours
![Page 9: CBI Energy Conference: Alastair Martin, managing director, Flextricity Ltd](https://reader035.vdocument.in/reader035/viewer/2022070322/5594dd1a1a28ab6d328b45d2/html5/thumbnails/9.jpg)
Reliability
![Page 10: CBI Energy Conference: Alastair Martin, managing director, Flextricity Ltd](https://reader035.vdocument.in/reader035/viewer/2022070322/5594dd1a1a28ab6d328b45d2/html5/thumbnails/10.jpg)
A neglected standby generator
It doesn’t
do this any
more
![Page 11: CBI Energy Conference: Alastair Martin, managing director, Flextricity Ltd](https://reader035.vdocument.in/reader035/viewer/2022070322/5594dd1a1a28ab6d328b45d2/html5/thumbnails/11.jpg)
Emissions
System Uncertainty 2005Response & Reserve
0
1000
2000
3000
4000
5000
6000
7000
0.5
2.5
4.5
6.5
8.5
10.5
12.5
14.5
16.5
18.5
20.5
22.5
Lead Time (Hours)
Req
uir
em
en
t (M
W)
Occasional Response Standing Reserve System Length
Free Headroom Ad. Spinning Requirement Warming Requirment
System Uncertainty + Response
Static plant
Spinning plant
Warming
System Uncertainty 2025
Response & Reserve
0
2000
4000
6000
8000
10000
12000
0.5
2.5
4.5
6.5
8.5
10.5
12.5
14.5
16.5
18.5
20.5
22.5
Lead Time (Hours)
Req
uir
em
en
t (M
W)
Occasional Response Standing Reserve System Length
Free Headroom Ad. Spinning Requirement Warming Requirment
System Uncertainty + Response
Spinning plant
Static plant
Warming
![Page 12: CBI Energy Conference: Alastair Martin, managing director, Flextricity Ltd](https://reader035.vdocument.in/reader035/viewer/2022070322/5594dd1a1a28ab6d328b45d2/html5/thumbnails/12.jpg)
![Page 13: CBI Energy Conference: Alastair Martin, managing director, Flextricity Ltd](https://reader035.vdocument.in/reader035/viewer/2022070322/5594dd1a1a28ab6d328b45d2/html5/thumbnails/13.jpg)