Concept Factsheets Each of the 16 factsheets below highlights one of the CC2DCA concepts developed for the retained corridors (see the Corridor Factsheets for information on the corridors). For each concept, the following information is provided: A conceptual plan view and conceptual profile view. A brief description of the concept. A table showing whether the concept meets the concept screening criteria. A statement of whether the concept is being proposed for elimination or is being preliminarily retained for further consideration. Elimination of Corridor 6 Although Corridor 6 met all the corridor screening criteria and was, therefore, retained for further consideration during the corridor screening phase, it was found during concept development that this corridor cannot accommodate any concept due to the presence of heavy infrastructure along the path of the corridor, including the above- and underground Metrorail tracks. Therefore, Corridor 6 was eliminated during the concept development process and concepts were developed for the four remaining retained corridors only. Definition of concepts Concepts are types of connection defined at a high level. A concept may be a bridge, a tunnel, or a hybrid of both. It may also contain surface elements. Important aspects of a potential CC2DCA connection remain undefined at the concept level, including the width, height, or depth of any structure; the location of any piers or columns; and any aesthetic features. The CC2DCA Study team has identified four concepts for each retained corridor. Each set of four concepts includes a tunnel only concept, a bridge only concept, and two hybrid concepts. Concepts are identified by the Corridor number followed by a letter. “A” denotes a tunnel only concept; “D” denotes a bridge only concept; “B” and “C” denote hybrid concepts. For instance, Concept 8A is a tunnel only concept along Corridor 8. Concept Screening A preliminary screening of the concepts was conducted using screening criteria derived from the CC2DCA Study’s Purpose and Need. Information on the criteria is provided in the table below. For each criterion, the table shows, from left to right: The Purpose and Need element from which the criterion is derived. The criterion. The evaluation approach. Additional information on the criterion and how concepts were evaluated.

Upload: others

Post on 21-Apr-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CC2DCA November 2021 Concept Factsheets

Concept Factsheets

Each of the 16 factsheets below highlights one of the CC2DCA concepts developed for the retained corridors (see the Corridor Factsheets for information on the corridors). For each concept, the following information is provided:

• A conceptual plan view and conceptual profile view.

• A brief description of the concept.

• A table showing whether the concept meets the concept screening criteria.

• A statement of whether the concept is being proposed for elimination or is being preliminarily retained for further consideration.

Elimination of Corridor 6 Although Corridor 6 met all the corridor screening criteria and was, therefore, retained for further consideration during the corridor screening phase, it was found during concept development that this corridor cannot accommodate any concept due to the presence of heavy infrastructure along the path of the corridor, including the above- and underground Metrorail tracks. Therefore, Corridor 6 was eliminated during the concept development process and concepts were developed for the four remaining retained corridors only. Definition of concepts Concepts are types of connection defined at a high level. A concept may be a bridge, a tunnel, or a hybrid of both. It may also contain surface elements. Important aspects of a potential CC2DCA connection remain undefined at the concept level, including the width, height, or depth of any structure; the location of any piers or columns; and any aesthetic features. The CC2DCA Study team has identified four concepts for each retained corridor. Each set of four concepts includes a tunnel only concept, a bridge only concept, and two hybrid concepts. Concepts are identified by the Corridor number followed by a letter. “A” denotes a tunnel only concept; “D” denotes a bridge only concept; “B” and “C” denote hybrid concepts. For instance, Concept 8A is a tunnel only concept along Corridor 8. Concept Screening A preliminary screening of the concepts was conducted using screening criteria derived from the CC2DCA Study’s Purpose and Need. Information on the criteria is provided in the table below. For each criterion, the table shows, from left to right:

• The Purpose and Need element from which the criterion is derived.

• The criterion.

• The evaluation approach.

• Additional information on the criterion and how concepts were evaluated.

Page 2: CC2DCA November 2021 Concept Factsheets

To be retained for further consideration, a concept must meet every criterion. A single “not compatible” response results in elimination, because, in this case, the concept would not meet the Purpose and Need. Preliminary screening has resulted in 10 of the 16 concepts being proposed for elimination and 6 being preliminarily retained for further consideration. These are:

• Concept 7D: Bridge along Corridor 7

• Concept 8A: Tunnel along Corridor 8

• Concept 8B: Tunnel + bridge along Corridor 8

• Concept 8D: Bridge along Corridor 8

• Concept 9A: Tunnel along Corridor 9

• Concept 9D: Bridge along Corridor 9 Please review the pre-recorded presentation and Feedback Form at www.cc2dca.us for further information on the Purpose and Need and the concept screening process as well as for opportunities to provide comments.

Page 3: CC2DCA November 2021 Concept Factsheets

Summary of Concept Screening Criteria

Purpose and Need Element Screening Criterion Evaluation Additional Information

Support Active Transportation Travel Choice

Provide a direct and safe active transportation option

Does this concept minimize the number of level changes for users?

Compatible/Not Compatible

This criterion responds to the Purpose and Need element to provide a direct active transportation option. Level changes, for instance moving from a tunnel to a bridge, represent an inconvenience for users and reduce the directness of the connection. Due to topography and connection typologies, level changes may be unavoidable, especially at either end of any potential connection. To maintain directness, they should be minimized. Therefore, a concept is compatible with this criterion if there are no more than two level changes from the beginning to the end of the concept. It is not compatible if there are more than two level changes.

Addresses the limitations of existing paths between DCA and Crystal City, encourages mode shift, and accommodates anticipated demand from planned growth in Crystal City

Is this concept accessible? Compatible/Not Compatible

This criterion responds to the Purpose and Need element to address the limitations of existing pathways, which do not meet modern Americans with Disabilities Act (ADA) standards. Providing an ADA-compliant connection is a requirement and is essential to making a CC2DCA connection accessible to individuals of all ages and abilities. Therefore, a concept is compatible with this criterion if it can comply with ADA standards and guidance. Otherwise, it is not compatible.

Facilitate Intermodal Connectivity

Enable air-rail connections Does this concept provide a convenient connection for rail passengers?

Compatible/Not Compatible

This criterion responds to the Purpose and Need element to enable air-rail connections. The convenience of the connection is evaluated based on the walking distance on the VRE Crystal City Station’s platform or future Amtrak platform to the connection’s western (Crystal City) landing. A concept is compatible with this criterion if it would permit all VRE and Amtrak passengers to access the potential connection by walking less than a ¼ mile. If rail passengers would have to walk more than ¼ mile, the concept is not compatible.

Advance Goals of Local and Regional Plans

Is consistent with ongoing and planned projects at Crystal City and DCA

Is this concept compatible with the future VRE Crystal City Station and the future Amtrak platform?

Compatible/Not Compatible

This criterion and the next two respond to the Purpose and Need element to be consistent with projects in Crystal City and DCA. VRE has begun final design for the future VRE Crystal City Station. At a later time and as a separate project, addition of a platform for Amtrak service is anticipated. A concept is compatible with this criterion if it avoids conflicts with the future station and platforms’ vertical circulation elements. Otherwise, it is not compatible.

Is this concept compatible with the Fourth Track project?

Compatible/Not Compatible

The Virginia Passenger Rail Authority (VPRA) and CSX have begun design work on a fourth track and associated access road modifications along the railroad corridor within the CC2DCA study area. This railroad corridor experiences heavy traffic and disruptions should be minimized. A concept is compatible with this criterion if it avoids conflicts with the Fourth Track project infrastructure elements (tracks and access road). Otherwise, it is not compatible.

Is this concept compatible with ongoing projects at DCA?

Compatible/Not Compatible

The Metropolitan Washington Airports Authority (MWAA) has just finished constructing new security concourses and is planning to modify the airport’s roadway network, along with constructing a consolidated rental car facility. A concept is compatible with this criterion if it avoids conflicts with newly completed and planned DCA infrastructure projects. Otherwise, it is not compatible.

Page 4: CC2DCA November 2021 Concept Factsheets

Concept 7A

Description • Tunnel concept

• Vertical circulation access from 2011 Crystal Drive

• Tunnel under railroad tracks, George Washington Memorial Parkway, and West Entrance Road

• Vertical circulation to north end of the Metrorail DCA Station

• Access to DCA passenger facilities via existing Terminal C pedestrian connector

1. Terminal (Term.) B/C Garage

2. Bridge to Term. C 3. Bridge to Term. B/C 4. National Hall 5. Term. C 6. Term. B/C

7. Term. B 8. Term. A Garage 9. Proposed Consolidated

Rental Car Facility 10. 2011 Crystal Drive 11. 2231 Crystal Drive 12. 2451 Crystal Drive 13. Metrorail Station

14. Future VRE

Platform 15. GWMP 16. W. Entrance Road 17. Security Portal 18. Water Park 19. Future Amtrak

Platform

Bridge

Tunnel

Existing or Planned Infrastructure/Path

Vertical Circulation

Screening Criterion Preliminary Assessment

Does this concept minimize the number of level changes for users? Is this concept accessible? Does this concept provide a convenient connection for rail passengers?

Is this concept compatible with the future VRE Crystal City Station and the future Amtrak platform?

Is this concept compatible with the Fourth Track project? Is this concept compatible with ongoing projects at DCA?

= Compatible = Not Compatible

CONCEPT PROPOSED FOR ELIMINATION

Legend (Both Drawings)

Page 5: CC2DCA November 2021 Concept Factsheets

Concept 7B

Description • Bridge - Tunnel concept

• Access via Future VRE Crystal City Station South Entrance

• Bridge across railroad tracks

• Vertical circulation to tunnel

• Tunnel under the George Washington Memorial Parkway and West Entrance Road

• Vertical circulation to north end of the Metrorail DCA Station

• Access to DCA passenger facilities via existing Terminal C pedestrian connector

1. Terminal (Term.) B/C Garage

2. Bridge to Term. C 3. Bridge to Term. B/C 4. National Hall 5. Term. C 6. Term. B/C

7. Term. B 8. Term. A Garage 9. Proposed Consolidated

Rental Car Facility 10. 2011 Crystal Drive 11. 2231 Crystal Drive 12. 2451 Crystal Drive 13. Metrorail Station

14. Future VRE

Platform 15. GWMP 16. W. Entrance Road 17. Security Portal 18. Water Park 19. Future Amtrak

Platform

Bridge

Tunnel

Existing or Planned Infrastructure/Path

Vertical Circulation

Screening Criterion Preliminary Assessment

Does this concept minimize the number of level changes for users? Is this concept accessible? Does this concept provide a convenient connection for rail passengers?

Is this concept compatible with the future VRE Crystal City Station and the future Amtrak platform?

Is this concept compatible with the Fourth Track project? Is this concept compatible with ongoing projects at DCA?

= Compatible = Not Compatible

CONCEPT PROPOSED FOR ELIMINATION

Legend (Both Drawings)

Page 6: CC2DCA November 2021 Concept Factsheets

Concept 7C

Description • Bridge - Tunnel – Bridge concept

• Access via Future VRE Crystal City Station South Entrance

• Bridge across railroad tracks

• Vertical circulation to tunnel

• Tunnel under the George Washington Memorial Parkway

• Vertical circulation to bridge across West Entrance Road

• Access to DCA passenger facilities via Terminal B/C garage and Terminal C pedestrian connector

1. Terminal (Term.) B/C Garage

2. Bridge to Term. C 3. Bridge to Term. B/C 4. National Hall 5. Term. C 6. Term. B/C

7. Term. B 8. Term. A Garage 9. Proposed Consolidated

Rental Car Facility 10. 2011 Crystal Drive 11. 2231 Crystal Drive 12. 2451 Crystal Drive 13. Metrorail Station

14. Future VRE

Platform 15. GWMP 16. W. Entrance Road 17. Security Portal 18. Water Park 19. Future Amtrak

Platform

Bridge

Tunnel

Existing or Planned Infrastructure/Path

Vertical Circulation

Screening Criterion Preliminary Assessment

Does this concept minimize the number of level changes for users? Is this concept accessible? Does this concept provide a convenient connection for rail passengers?

Is this concept compatible with the future VRE Crystal City Station and the future Amtrak platform?

Is this concept compatible with the Fourth Track project? Is this concept compatible with ongoing projects at DCA?

= Compatible = Not Compatible

CONCEPT PROPOSED FOR ELIMINATION

Legend (Both Drawings)

Page 7: CC2DCA November 2021 Concept Factsheets

Concept 7D

Description

• Bridge concept

• Access via Future VRE Crystal City Station South Entrance

• Bridge across railroad tracks, the George Washington Memorial Parkway, and West Entrance Road

• Access to DCA passenger facilities via Terminal B/C garage and Terminal C pedestrian connector

1. Terminal (Term.) B/C Garage

2. Bridge to Term. C 3. Bridge to Term. B/C 4. National Hall 5. Term. C 6. Term. B/C

7. Term. B 8. Term. A Garage 9. Proposed Consolidated

Rental Car Facility 10. 2011 Crystal Drive 11. 2231 Crystal Drive 12. 2451 Crystal Drive 13. Metrorail Station

14. Future VRE

Platform 15. GWMP 16. W. Entrance Road 17. Security Portal 18. Water Park 19. Future Amtrak

Platform

Bridge

Tunnel

Existing or Planned Infrastructure/Path

Vertical Circulation

Screening Criterion Preliminary Assessment

Does this concept minimize the number of level changes for users? Is this concept accessible? Does this concept provide a convenient connection for rail passengers?

Is this concept compatible with the future VRE Crystal City Station and the future Amtrak platform?

Is this concept compatible with the Fourth Track project? Is this concept compatible with ongoing projects at DCA?

= Compatible = Not Compatible

CONCEPT PRELIMINARILY

RETAINED

Legend (Both Drawings)

Page 8: CC2DCA November 2021 Concept Factsheets

Concept 8A

Description • Tunnel concept

• Access from north side of 2231 Crystal Drive

• Sloped surface path to tunnel

• Tunnel under railroad tracks, the George Washington Memorial Parkway, and West Entrance Road

• Vertical circulation to Terminal B/C garage

• Access to DCA passenger facilities via Terminal C pedestrian connector

1. Terminal (Term.) B/C Garage

2. Bridge to Term. C 3. Bridge to Term. B/C 4. National Hall 5. Term. C 6. Term. B/C

7. Term. B 8. Term. A Garage 9. Proposed Consolidated

Rental Car Facility 10. 2011 Crystal Drive 11. 2231 Crystal Drive 12. 2451 Crystal Drive 13. Metrorail Station

14. Future VRE

Platform 15. GWMP 16. W. Entrance Road 17. Security Portal 18. Water Park 19. Future Amtrak

Platform

Bridge

Tunnel

Existing or Planned Infrastructure/Path

Vertical Circulation

Screening Criterion Preliminary Assessment

Does this concept minimize the number of level changes for users? Is this concept accessible? Does this concept provide a convenient connection for rail passengers?

Is this concept compatible with the future VRE Crystal City Station and the future Amtrak platform?

Is this concept compatible with the Fourth Track project? Is this concept compatible with ongoing projects at DCA?

= Compatible = Not Compatible

CONCEPT PRELIMINARILY

RETAINED

Legend (Both Drawings)

Page 9: CC2DCA November 2021 Concept Factsheets

Concept 8B

Description • Tunnel – Bridge concept

• Access from north side of 2231 Crystal Drive

• Sloped surface path to tunnel

• Tunnel under railroad tracks and the George Washington Memorial Parkway

• Vertical circulation to bridge across West Entrance Road

• Access to DCA passenger facilities via Terminal B/C garage and Terminal C pedestrian connector

1. Terminal (Term.) B/C Garage

2. Bridge to Term. C 3. Bridge to Term. B/C 4. National Hall 5. Term. C 6. Term. B/C

7. Term. B 8. Term. A Garage 9. Proposed Consolidated

Rental Car Facility 10. 2011 Crystal Drive 11. 2231 Crystal Drive 12. 2451 Crystal Drive 13. Metrorail Station

14. Future VRE

Platform 15. GWMP 16. W. Entrance Road 17. Security Portal 18. Water Park 19. Future Amtrak

Platform

Bridge

Tunnel

Existing or Planned Infrastructure/Path

Vertical Circulation

Screening Criterion Preliminary Assessment

Does this concept minimize the number of level changes for users? Is this concept accessible? Does this concept provide a convenient connection for rail passengers?

Is this concept compatible with the future VRE Crystal City Station and the future Amtrak platform?

Is this concept compatible with the Fourth Track project? Is this concept compatible with ongoing projects at DCA?

= Compatible = Not Compatible

CONCEPT PRELIMINARILY

RETAINED

Legend (Both Drawings)

Page 10: CC2DCA November 2021 Concept Factsheets

Concept 8C

Description • Tunnel – Surface - Bridge concept • Access from north side of 2231 Crystal

Drive • Sloped surface path to tunnel • Tunnel under the railroad tracks • Vertical circulation to surface • Surface path across the George

Washington Memorial Parkway, using existing, abandoned underpass

• Vertical circulation to bridge across West Entrance Road

• Access to DCA passenger facilities via Terminal B/C garage and Terminal C pedestrian connector

1. Terminal (Term.) B/C Garage

2. Bridge to Term. C 3. Bridge to Term. B/C 4. National Hall 5. Term. C 6. Term. B/C

7. Term. B 8. Term. A Garage 9. Proposed Consolidated

Rental Car Facility 10. 2011 Crystal Drive 11. 2231 Crystal Drive 12. 2451 Crystal Drive 13. Metrorail Station

14. Future VRE

Platform 15. GWMP 16. W. Entrance Road 17. Security Portal 18. Water Park 19. Future Amtrak

Platform

Bridge

Tunnel

Existing or Planned Infrastructure/Path

Vertical Circulation

Screening Criterion Preliminary Assessment

Does this concept minimize the number of level changes for users? Is this concept accessible? Does this concept provide a convenient connection for rail passengers?

Is this concept compatible with the future VRE Crystal City Station and the future Amtrak platform?

Is this concept compatible with the Fourth Track project? Is this concept compatible with ongoing projects at DCA?

= Compatible = Not Compatible

CONCEPT PROPOSED FOR ELIMINATION

Legend (Both Drawings)

Page 11: CC2DCA November 2021 Concept Factsheets

Concept 8D

Description

• Bridge concept

• Access from north side of 2231 Crystal Drive

• Bridge across railroad tracks, the George Washington Memorial Parkway, and West Entrance Road

• Access to DCA passenger facilities via Terminal B/C garage and Terminal C pedestrian connector

1. Terminal (Term.) B/C Garage

2. Bridge to Term. C 3. Bridge to Term. B/C 4. National Hall 5. Term. C 6. Term. B/C

7. Term. B 8. Term. A Garage 9. Proposed Consolidated

Rental Car Facility 10. 2011 Crystal Drive 11. 2231 Crystal Drive 12. 2451 Crystal Drive 13. Metrorail Station

14. Future VRE

Platform 15. GWMP 16. W. Entrance Road 17. Security Portal 18. Water Park 19. Future Amtrak

Platform

Bridge

Tunnel

Existing or Planned Infrastructure/Path

Vertical Circulation

Screening Criterion Preliminary Assessment

Does this concept minimize the number of level changes for users? Is this concept accessible? Does this concept provide a convenient connection for rail passengers?

Is this concept compatible with the future VRE Crystal City Station and the future Amtrak platform?

Is this concept compatible with the Fourth Track project? Is this concept compatible with ongoing projects at DCA?

= Compatible = Not Compatible

CONCEPT PRELIMINARILY

RETAINED

Legend (Both Drawings)

Page 12: CC2DCA November 2021 Concept Factsheets

Concept 9A

Description • Tunnel concept

• Access from south side of 2231 Crystal Drive

• Vertical circulation to tunnel

• Tunnel under railroad tracks, the George Washington Memorial Parkway, and West Entrance Road

• Vertical circulation to Terminal B/C garage

• Access to DCA passenger facilities via garage and Terminal C pedestrian connector

1. Terminal (Term.) B/C Garage

2. Bridge to Term. C 3. Bridge to Term. B/C 4. National Hall 5. Term. C 6. Term. B/C

7. Term. B 8. Term. A Garage 9. Proposed Consolidated

Rental Car Facility 10. 2011 Crystal Drive 11. 2231 Crystal Drive 12. 2451 Crystal Drive 13. Metrorail Station

14. Future VRE

Platform 15. GWMP 16. W. Entrance Road 17. Security Portal 18. Water Park 19. Future Amtrak

Platform

Bridge

Tunnel

Existing or Planned Infrastructure/Path

Vertical Circulation

Screening Criterion Preliminary Assessment

Does this concept minimize the number of level changes for users? Is this concept accessible? Does this concept provide a convenient connection for rail passengers?

Is this concept compatible with the future VRE Crystal City Station and the future Amtrak platform?

Is this concept compatible with the Fourth Track project? Is this concept compatible with ongoing projects at DCA?

= Compatible = Not Compatible

CONCEPT PRELIMINARILY

RETAINED

Legend (Both Drawings)

Page 13: CC2DCA November 2021 Concept Factsheets

Concept 9B

Description • Bridge – Tunnel concept

• Access from south side of 2231 Crystal Drive

• Bridge across railroad tracks

• Vertical circulation to tunnel

• Tunnel under the George Washington Memorial Parkway and West Entrance Road

• Vertical circulation to Terminal B/C garage

• Access to DCA passenger facilities via garage and Terminal C pedestrian connector

1. Terminal (Term.) B/C Garage

2. Bridge to Term. C 3. Bridge to Term. B/C 4. National Hall 5. Term. C 6. Term. B/C

7. Term. B 8. Term. A Garage 9. Proposed Consolidated

Rental Car Facility 10. 2011 Crystal Drive 11. 2231 Crystal Drive 12. 2451 Crystal Drive 13. Metrorail Station

14. Future VRE

Platform 15. GWMP 16. W. Entrance Road 17. Security Portal 18. Water Park 19. Future Amtrak

Platform

Bridge

Tunnel

Existing or Planned Infrastructure/Path

Vertical Circulation

Screening Criterion Preliminary Assessment

Does this concept minimize the number of level changes for users? Is this concept accessible? Does this concept provide a convenient connection for rail passengers?

Is this concept compatible with the future VRE Crystal City Station and the future Amtrak platform?

Is this concept compatible with the Fourth Track project? Is this concept compatible with ongoing projects at DCA?

= Compatible = Not Compatible

CONCEPT PROPOSED FOR ELIMINATION

Legend (Both Drawings)

Page 14: CC2DCA November 2021 Concept Factsheets

Concept 9C

Description • Bridge - Tunnel – Bridge concept

• Access from south side of 2231 Crystal Drive

• Bridge across railroad tracks

• Vertical circulation to tunnel

• Tunnel under the George Washington Memorial Parkway

• Vertical circulation to bridge across West Entrance Road

• Access to DCA passenger facilities via Terminal B/C garage and Terminal C pedestrian connector

1. Terminal (Term.) B/C Garage

2. Bridge to Term. C 3. Bridge to Term. B/C 4. National Hall 5. Term. C 6. Term. B/C

7. Term. B 8. Term. A Garage 9. Proposed Consolidated

Rental Car Facility 10. 2011 Crystal Drive 11. 2231 Crystal Drive 12. 2451 Crystal Drive 13. Metrorail Station

14. Future VRE

Platform 15. GWMP 16. W. Entrance Road 17. Security Portal 18. Water Park 19. Future Amtrak

Platform

Bridge

Tunnel

Existing or Planned Infrastructure/Path

Vertical Circulation

Screening Criterion Preliminary Assessment

Does this concept minimize the number of level changes for users? Is this concept accessible? Does this concept provide a convenient connection for rail passengers?

Is this concept compatible with the future VRE Crystal City Station and the future Amtrak platform?

Is this concept compatible with the Fourth Track project? Is this concept compatible with ongoing projects at DCA?

= Compatible = Not Compatible

CONCEPT PROPOSED FOR ELIMINATION

Legend (Both Drawings)

Page 15: CC2DCA November 2021 Concept Factsheets

Concept 9D

Description • Bridge concept

• Access from south side of 2231 Crystal Drive

• Bridge across railroad tracks, the George Washington Memorial Parkway, and West Entrance Road

• Access to DCA passenger facilities via Terminal B/C garage and Terminal C pedestrian connector

1. Terminal (Term.) B/C Garage

2. Bridge to Term. C 3. Bridge to Term. B/C 4. National Hall 5. Term. C 6. Term. B/C

7. Term. B 8. Term. A Garage 9. Proposed Consolidated

Rental Car Facility 10. 2011 Crystal Drive 11. 2231 Crystal Drive 12. 2451 Crystal Drive 13. Metrorail Station

14. Future VRE

Platform 15. GWMP 16. W. Entrance Road 17. Security Portal 18. Water Park 19. Future Amtrak

Platform

Bridge

Tunnel

Existing or Planned Infrastructure/Path

Vertical Circulation

Screening Criterion Preliminary Assessment

Does this concept minimize the number of level changes for users? Is this concept accessible? Does this concept provide a convenient connection for rail passengers?

Is this concept compatible with the future VRE Crystal City Station and the future Amtrak platform?

Is this concept compatible with the Fourth Track project? Is this concept compatible with ongoing projects at DCA?

= Compatible = Not Compatible

CONCEPT PRELIMINARILY

RETAINED

Legend (Both Drawings)

Page 16: CC2DCA November 2021 Concept Factsheets

Concept 10A

Description • Tunnel concept

• Access from 2451 Crystal Drive

• Vertical circulation to tunnel

• Tunnel under railroad tracks, the George Washington Memorial Parkway, airport roadways, and proposed Consolidated Rental Car Facility

• Vertical circulation to Terminal B/C garage

• Access to DCA passenger facilities via garage and Terminal B pedestrian connector

1. Terminal (Term.) B/C Garage

2. Bridge to Term. C 3. Bridge to Term. B/C 4. National Hall 5. Term. C 6. Term. B/C

7. Term. B 8. Term. A Garage 9. Proposed Consolidated

Rental Car Facility 10. 2011 Crystal Drive 11. 2231 Crystal Drive 12. 2451 Crystal Drive 13. Metrorail Station

14. Future VRE

Platform 15. GWMP 16. W. Entrance Road 17. Security Portal 18. Water Park 19. Future Amtrak

Platform

Bridge

Tunnel

Existing or Planned Infrastructure/Path

Vertical Circulation

Screening Criterion Preliminary Assessment

Does this concept minimize the number of level changes for users? Is this concept accessible? Does this concept provide a convenient connection for rail passengers?

Is this concept compatible with the future VRE Crystal City Station and the future Amtrak platform?

Is this concept compatible with the Fourth Track project? Is this concept compatible with ongoing projects at DCA?

= Compatible = Not Compatible

CONCEPT PROPOSED FOR ELIMINATION

Legend (Both Drawings)

Page 17: CC2DCA November 2021 Concept Factsheets

Concept 10B

Description • Bridge – Tunnel concept

• Access from 2451 Crystal Drive

• Bridge across railroad tracks

• Vertical circulation to tunnel

• Tunnel under the George Washington Memorial Parkway, airport roadways, and proposed Consolidated Rental Car Facility

• Vertical circulation to Terminal B/C garage

• Access to DCA passenger facilities via garage and Terminal B pedestrian connector

1. Terminal (Term.) B/C Garage

2. Bridge to Term. C 3. Bridge to Term. B/C 4. National Hall 5. Term. C 6. Term. B/C

7. Term. B 8. Term. A Garage 9. Proposed Consolidated

Rental Car Facility 10. 2011 Crystal Drive 11. 2231 Crystal Drive 12. 2451 Crystal Drive 13. Metrorail Station

14. Future VRE

Platform 15. GWMP 16. W. Entrance Road 17. Security Portal 18. Water Park 19. Future Amtrak

Platform

Bridge

Tunnel

Existing or Planned Infrastructure/Path

Vertical Circulation

Screening Criterion Preliminary Assessment

Does this concept minimize the number of level changes for users? Is this concept accessible? Does this concept provide a convenient connection for rail passengers?

Is this concept compatible with the future VRE Crystal City Station and the future Amtrak platform?

Is this concept compatible with the Fourth Track project? Is this concept compatible with ongoing projects at DCA?

= Compatible = Not Compatible

CONCEPT PROPOSED FOR ELIMINATION

Legend (Both Drawings)

Page 18: CC2DCA November 2021 Concept Factsheets

Concept 10C

Description • Bridge – Tunnel – Bridge concept

• Access from 2451 Crystal Drive

• Bridge across railroad tracks

• Vertical circulation to tunnel

• Tunnel under the George Washington Memorial Parkway

• Vertical circulation to bridge across airport roadways through proposed Consolidated Rental Car Facility

• Access to DCA passenger facilities via Terminal B/C garage and Terminal B pedestrian connector

1. Terminal (Term.) B/C Garage

2. Bridge to Term. C 3. Bridge to Term. B/C 4. National Hall 5. Term. C 6. Term. B/C

7. Term. B 8. Term. A Garage 9. Proposed Consolidated

Rental Car Facility 10. 2011 Crystal Drive 11. 2231 Crystal Drive 12. 2451 Crystal Drive 13. Metrorail Station

14. Future VRE

Platform 15. GWMP 16. W. Entrance Road 17. Security Portal 18. Water Park 19. Future Amtrak

Platform

Bridge

Tunnel

Existing or Planned Infrastructure/Path

Vertical Circulation

Screening Criterion Preliminary Assessment

Does this concept minimize the number of level changes for users? Is this concept accessible? Does this concept provide a convenient connection for rail passengers?

Is this concept compatible with the future VRE Crystal City Station and the future Amtrak platform?

Is this concept compatible with the Fourth Track project? Is this concept compatible with ongoing projects at DCA?

= Compatible = Not Compatible

CONCEPT PROPOSED FOR ELIMINATION

Legend (Both Drawings)

Page 19: CC2DCA November 2021 Concept Factsheets

Concept 10D

Description • Bridge concept

• Access from 2451 Crystal Drive

• Vertical circulation to tunnel

• Bridge across railroad tracks, the George Washington Memorial Parkway, and airport roadways through proposed Consolidated Rental Car Facility

• Access to DCA passenger facilities via Terminal B/C garage and Terminal B pedestrian connector

1. Terminal (Term.) B/C Garage

2. Bridge to Term. C 3. Bridge to Term. B/C 4. National Hall 5. Term. C 6. Term. B/C

7. Term. B 8. Term. A Garage 9. Proposed Consolidated

Rental Car Facility 10. 2011 Crystal Drive 11. 2231 Crystal Drive 12. 2451 Crystal Drive 13. Metrorail Station

14. Future VRE

Platform 15. GWMP 16. W. Entrance Road 17. Security Portal 18. Water Park 19. Future Amtrak

Platform

Bridge

Tunnel

Existing or Planned Infrastructure/Path

Vertical Circulation

Screening Criterion Preliminary Assessment

Does this concept minimize the number of level changes for users? Is this concept accessible? Does this concept provide a convenient connection for rail passengers? Is this concept compatible with the future VRE Crystal City Station and the future Amtrak platform?

Is this concept compatible with the Fourth Track project? Is this concept compatible with ongoing projects at DCA?

= Compatible = Not Compatible

CONCEPT PROPOSED FOR ELIMINATION