Appendix B:Building Systems Sequence of Operations - Template
TheBuilding Systems Sequence of Operations outlines the as-operating sequence of operations for the
HVAC and lighting control systems, as well as integration of the fire/life safety and HVAC systems if
applicable. At a minimum, this document should describe in detail any sequence of operations that were
revised during the retrocommissioning process. Note that it may be necessary to completely
document all of the as-operated sequences in order to satisfy LEED-EBEnergy & Atmosphere
prerequisite and credit requirements.
As a side note, it may be necessary to update the as-built control drawings as well if significantmodifications or additions are made to the control system. However, that is beyond the scope of this
document.
[BUILDING NAME]
SEQUENCEOF OPERATION
INDEX
[Insert a Table of Contents with links to each section heading]
-
-
-
-
-
-
-
-
--
Ongoing Commissioning Plan Appendix B Sequence of Operation Template i
-
7/30/2019 CCCRCxToolkit-Sequence Operation Template 2007
2/6
AIR HANDLING SYSTEM DESCRIPTIONAND CONTROL[Brief System Description]
COLD-DECK AIR HANDLERS: [ ] THROUGH [ ][Brief System Description]
Fan OFF condition
[Sequence Description]
Fan Start-up or Shut-down
[Sequence Description]
Return Fan Volume Control
[Sequence Description]
Discharge Air Temperature Controls[Sequence Description]
Duct Static Pressure Controls
[Sequence Description]
Building Static Pressure Controls
[Sequence Description]
Warm-up Control
[Sequence Description]
Night Low Limit
[Sequence Description]
Night purge
[Sequence Description]
Alarms and Safeties
[Sequence Description]
Manual smoke pressurization system
[Sequence Description]
DEDICATED VENTILATION AIR FANS: [ ] THROUGH [ ][Brief System Description]
[Sequence Description]
Ongoing Commissioning Plan Appendix B Sequence of Operation Template 1
-
7/30/2019 CCCRCxToolkit-Sequence Operation Template 2007
3/6
HOTDECKAIRHANDLERS: [ ] AND [ ][Brief System Description]
Fan OFF condition:
[Sequence Description]
Fan Start-up or Shut-down:
[Sequence Description]
Discharge Air Temperature Controls
[Sequence Description]
Static Pressure Controls
[Sequence Description]
Warm-up Control[Sequence Description]
Night Low Limit
[Sequence Description]
Alarms and Safeties
[Sequence Description]
VAV BOX DESCRIPTIONAND CONTROL[Brief System Description]
STRATEGYFOR SPECIAL-AREA VAV BOXES[Brief System Description]
[Area X] is Occupied (during normal building operating hours)
[Sequence Description]
[Area X] is Unoccupied (during normal building operating hours)
[Sequence Description]
Building is Unoccupied
[Sequence Description]
DUAL DUCT VAV BOXES[Brief System Description]
Ongoing Commissioning Plan Appendix B Sequence of Operation Template 2
-
7/30/2019 CCCRCxToolkit-Sequence Operation Template 2007
4/6
Occupied Condition
[Sequence Description]
Unoccupied Conditions
[Sequence Description]
COOLING-ONLY VAV BOXES[Brief System Description]
Occupied Condition
[Sequence Description]
Unoccupied Conditions
[Sequence Description]
CHILLED WATER SYSTEM DESCRIPTIONAND CONTROL[Brief System Description]
CHILLERSAND PRIMARY / SECONDARY PUMP CONTROL[Brief System Description]
EMCS Control Points
[Points List]
[Brief Description]
Chilled water supply (CHWS) temperature reset strategy and schedule
[Sequence Description]
Chilled Water System Enable
[Sequence Description]
Chiller Staging
[Sequence Description]
Primary Chilled Water Pumps
[Sequence Description]
Secondary Chilled Water Pumps
[Sequence Description]
Ongoing Commissioning Plan Appendix B Sequence of Operation Template 3
-
7/30/2019 CCCRCxToolkit-Sequence Operation Template 2007
5/6
CONDENSING WATERAND COOLING TOWER CONTROL[Brief System Description]
Cooling Tower Operation
[Sequence Description]
Condenser Water Pumps for Chillers
[Sequence Description]
Condenser Water Pumps for the Heat Exchanger (cooling tower side)
[Sequence Description]
Distribution Water Pumps for the Heat Exchanger (Liebert side)
[Sequence Description]
HEATING WATER SYSTEM DESCRIPTIONAND CONTROL[Brief System Description]
GENERAL SYSTEM CONTROL[Brief System Description]
System start-up
[Sequence Description]
System Shutdown
[Sequence Description]
CONDENSING BOILER CONTROL[Sequence Description]
NON-CONDENSING BOILER CONTROL[Sequence Description]
DISTRIBUTION WATER LOOP CONTROL[Sequence Description]
GENERAL CONTROL FEATURES[Sequence Description]
Ongoing Commissioning Plan Appendix B Sequence of Operation Template 4
-
7/30/2019 CCCRCxToolkit-Sequence Operation Template 2007
6/6
GARAGE EXHAUST FAN (EF-1) CONTROL[Brief System Description]
[Sequence Description]
GENERAL EXHAUST FAN CONTROL[Brief System Description][Sequence Description]
LIGHTING CONTROL[Brief System Description]
Lighting control for each zone-type is outlined below.
Parking Area
[Sequence Description]
General Public and Jury Assembly Areas
[Sequence Description]
Office Spaces
[Sequence Description]
Mechanical Rooms
[Sequence Description]
Courtrooms Rooms and Judges Chambers[Sequence Description]
FIRE/LIFE SAFETY SYSTEM CONTROL[Brief System Description and how the fire/life safety and HVAC systems should interact]
[Sequence Description]
Ongoing Commissioning Plan Appendix B Sequence of Operation Template 5