  • 7/30/2019 CCCRCxToolkit-Sequence Operation Template 2007

    1/6

    Appendix B:Building Systems Sequence of Operations - Template

    TheBuilding Systems Sequence of Operations outlines the as-operating sequence of operations for the

    HVAC and lighting control systems, as well as integration of the fire/life safety and HVAC systems if

    applicable. At a minimum, this document should describe in detail any sequence of operations that were

    revised during the retrocommissioning process. Note that it may be necessary to completely

    document all of the as-operated sequences in order to satisfy LEED-EBEnergy & Atmosphere

    prerequisite and credit requirements.

    As a side note, it may be necessary to update the as-built control drawings as well if significantmodifications or additions are made to the control system. However, that is beyond the scope of this

    document.

    [BUILDING NAME]

    SEQUENCEOF OPERATION

    INDEX

    [Insert a Table of Contents with links to each section heading]

    -

    -

    -

    -

    -

    -

    -

    -

    --

    Ongoing Commissioning Plan Appendix B Sequence of Operation Template i

  • 7/30/2019 CCCRCxToolkit-Sequence Operation Template 2007

    2/6

    AIR HANDLING SYSTEM DESCRIPTIONAND CONTROL[Brief System Description]

    COLD-DECK AIR HANDLERS: [ ] THROUGH [ ][Brief System Description]

    Fan OFF condition

    [Sequence Description]

    Fan Start-up or Shut-down

    [Sequence Description]

    Return Fan Volume Control

    [Sequence Description]

    Discharge Air Temperature Controls[Sequence Description]

    Duct Static Pressure Controls

    [Sequence Description]

    Building Static Pressure Controls

    [Sequence Description]

    Warm-up Control

    [Sequence Description]

    Night Low Limit

    [Sequence Description]

    Night purge

    [Sequence Description]

    Alarms and Safeties

    [Sequence Description]

    Manual smoke pressurization system

    [Sequence Description]

    DEDICATED VENTILATION AIR FANS: [ ] THROUGH [ ][Brief System Description]

    [Sequence Description]

    Ongoing Commissioning Plan Appendix B Sequence of Operation Template 1

  • 7/30/2019 CCCRCxToolkit-Sequence Operation Template 2007

    3/6

    HOTDECKAIRHANDLERS: [ ] AND [ ][Brief System Description]

    Fan OFF condition:

    [Sequence Description]

    Fan Start-up or Shut-down:

    [Sequence Description]

    Discharge Air Temperature Controls

    [Sequence Description]

    Static Pressure Controls

    [Sequence Description]

    Warm-up Control[Sequence Description]

    Night Low Limit

    [Sequence Description]

    Alarms and Safeties

    [Sequence Description]

    VAV BOX DESCRIPTIONAND CONTROL[Brief System Description]

    STRATEGYFOR SPECIAL-AREA VAV BOXES[Brief System Description]

    [Area X] is Occupied (during normal building operating hours)

    [Sequence Description]

    [Area X] is Unoccupied (during normal building operating hours)

    [Sequence Description]

    Building is Unoccupied

    [Sequence Description]

    DUAL DUCT VAV BOXES[Brief System Description]

    Ongoing Commissioning Plan Appendix B Sequence of Operation Template 2

  • 7/30/2019 CCCRCxToolkit-Sequence Operation Template 2007

    4/6

    Occupied Condition

    [Sequence Description]

    Unoccupied Conditions

    [Sequence Description]

    COOLING-ONLY VAV BOXES[Brief System Description]

    Occupied Condition

    [Sequence Description]

    Unoccupied Conditions

    [Sequence Description]

    CHILLED WATER SYSTEM DESCRIPTIONAND CONTROL[Brief System Description]

    CHILLERSAND PRIMARY / SECONDARY PUMP CONTROL[Brief System Description]

    EMCS Control Points

    [Points List]

    [Brief Description]

    Chilled water supply (CHWS) temperature reset strategy and schedule

    [Sequence Description]

    Chilled Water System Enable

    [Sequence Description]

    Chiller Staging

    [Sequence Description]

    Primary Chilled Water Pumps

    [Sequence Description]

    Secondary Chilled Water Pumps

    [Sequence Description]

    Ongoing Commissioning Plan Appendix B Sequence of Operation Template 3

  • 7/30/2019 CCCRCxToolkit-Sequence Operation Template 2007

    5/6

    CONDENSING WATERAND COOLING TOWER CONTROL[Brief System Description]

    Cooling Tower Operation

    [Sequence Description]

    Condenser Water Pumps for Chillers

    [Sequence Description]

    Condenser Water Pumps for the Heat Exchanger (cooling tower side)

    [Sequence Description]

    Distribution Water Pumps for the Heat Exchanger (Liebert side)

    [Sequence Description]

    HEATING WATER SYSTEM DESCRIPTIONAND CONTROL[Brief System Description]

    GENERAL SYSTEM CONTROL[Brief System Description]

    System start-up

    [Sequence Description]

    System Shutdown

    [Sequence Description]

    CONDENSING BOILER CONTROL[Sequence Description]

    NON-CONDENSING BOILER CONTROL[Sequence Description]

    DISTRIBUTION WATER LOOP CONTROL[Sequence Description]

    GENERAL CONTROL FEATURES[Sequence Description]

    Ongoing Commissioning Plan Appendix B Sequence of Operation Template 4

  • 7/30/2019 CCCRCxToolkit-Sequence Operation Template 2007

    6/6

    GARAGE EXHAUST FAN (EF-1) CONTROL[Brief System Description]

    [Sequence Description]

    GENERAL EXHAUST FAN CONTROL[Brief System Description][Sequence Description]

    LIGHTING CONTROL[Brief System Description]

    Lighting control for each zone-type is outlined below.

    Parking Area

    [Sequence Description]

    General Public and Jury Assembly Areas

    [Sequence Description]

    Office Spaces

    [Sequence Description]

    Mechanical Rooms

    [Sequence Description]

    Courtrooms Rooms and Judges Chambers[Sequence Description]

    FIRE/LIFE SAFETY SYSTEM CONTROL[Brief System Description and how the fire/life safety and HVAC systems should interact]

    [Sequence Description]

    Ongoing Commissioning Plan Appendix B Sequence of Operation Template 5