CASE STUDY OF COLLEGE OF THE DESERT’S COMPUTER AIDED FACILITY MANAGEMENT IMPLEMENTATION
Steve RenewDirector, Facilities Services
KimonOnumaPrincipal
Scott HairDivision Director
Patrick DanielsSenior Project Manager
• Ron Beeler• Ava Hill
11/11/2013
2
3
COLLEGE DESERT• Need• Vision• Execution…
OfThe
COLLEGE DESERTPalm Desert, California
OfThe
11/11/2013
3
Salton Sea
Mecca Campus3 Buildings, 14,807 ft2
• Facilities Condition Assessment• Equipment Inventory• HVAC Component Level
Assessment• Equipment Inventory• Preventative Maintenance• Populate SchoolDude Database
Mecca Campus
Main Campus52 Buildings, 412,249 ft2
• Facilities Condition Assessment• Equipment Inventory• HVAC Component Level
Assessment• Infrastructure Assessment • Equipment Inventory• Preventative Maintenance• Populate SchoolDude Database
Main Campus
College of the Desert
PROJECT SCOPECollege of the Desert
PROJECT SCOPE
EXECUTION
Spring 2013Alpha Performs Assessment
Summer 2013Data compiled and reported
Fall 2013Data Integrated into FUSION
INITIALIZATIONSummer 2011Purchased:• MaintenanceDirect• PMDirect
Fall 2012Evaluating partnership with Alpha to perform assessment and database population
Fall 2012Purchased PlanningDirect, now tracking over $13millionin capital needs
TIMETIME
Timeline
CAPITAL PLANNING CHRONOLOGYTimeline
CAPITAL PLANNING CHRONOLOGYINFORMATION
Fall 2010Webcast:
Capital Planning in Higher Education
Fall 2010Webcast:
Best Practices in Higher Education Capital Planning
Spring 2011Private Webcast:
Work order management Preventive maintenance
2010 2011 2012 20142013
11/11/2013
4
7
…Identify, measure, manage
“…We are business consultants that focus on optimizing the financial performance of real estate portfolios”
“…We are business consultants that focus on optimizing the financial performance of real estate portfolios”
MBAs ACCOUNTANTS ARCHITECTS CIVIL ENGINEERS MECHANICAL ENGINEERS STRUCTURAL ENGINEERSCONSTRUCTION MANAGERS FACILITY MANAGERS COMPUTER PROGRAMMERS PROJECT MANAGERS
MBAs ACCOUNTANTS ARCHITECTS CIVIL ENGINEERS MECHANICAL ENGINEERS STRUCTURAL ENGINEERSCONSTRUCTION MANAGERS FACILITY MANAGERS COMPUTER PROGRAMMERS PROJECT MANAGERS
11/11/2013
5
Fiscal needs of a portfolio• Operations and maintenance• Deferred maintenance• Prioritizes remedies • Predictions based on the
present condition and historical performance
Source: Registration Survey for Capital Planning and Forecasting for Educational Facility Funding Needs”
Planning
ARE YOU CAPITAL PLANNING…?Planning
ARE YOU CAPITAL PLANNING…?Analyzing a portfolio to identify opportunities for optimization
BUDGETING: Reconciles intermediate needs based on a predetermined revenue stream.CAPITAL PLANNING: Anticipates financial considerations over an extended forecasting period, and coordinates with projected expense and revenue streams.
• Cost of capital• Depreciation• Organizational risk (Liability)• Return on investment• Predictions based on the
statistical probability of failure• Legitimizes fundraising
(Bonds)
EXPIREDEXPIRED
TIMETIME
DESIGN LIFE(REGULAR PREVENTATIVE MAINTENANCE)
DESIGN LIFE(REGULAR PREVENTATIVE MAINTENANCE)
USEFUL LIFEUSEFUL LIFE
AdequateLevel of Performance
(Repair – Low Probability of Failure)
AdequateLevel of Performance
(Repair – Low Probability of Failure)
InadequateLevel of Performance
(Replace – High Probability of Failure)
InadequateLevel of Performance
(Replace – High Probability of Failure)
EXTENDEDLIFE
EXTENDEDLIFE
PE
RFO
RM
AN
CE
PE
RFO
RM
AN
CE
100%
0%
100%
0%
Minimum Acceptable Level of Performance
(Specified by Client)
Minimum Acceptable Level of Performance
(Specified by Client)
LIFECYCLE CURVELIFECYCLE CURVEEXTENDEDEXTENDED
EXPIREDEXPIRED EXPIREDEXPIRED
Asset Management
LIFECYCLE CURVESAsset Management
LIFECYCLE CURVES
11/11/2013
6
Facility Condition Assessment
DATA COLLECTION + HOSTINGFacility Condition Assessment
DATA COLLECTION + HOSTING
ONUMA
2‐4 wks
ALPHA2 wks
SchoolDudeSchoolDude
REPORTING• Quality Control• Data Manipulation• Database Population• Preventative Maintenance • Draft Report Production• Client Review and Feedback• Final Report Production
Facility Condition Assessment
WORKFLOW TIMELINEFacility Condition Assessment
WORKFLOW TIMELINE
ALPHA2 wks
ALPHA6 wks
2 wks2 wks
2 wks2 wks
DATABASE• Data Hosting and Training
FUSION COORDINATION• Export Facilities Data to FUSION • Validate Data Transfer
FIELD WORK• Interviews• Review Exiting Records• Assessments• Equipment Inventory
FIELD PREPARATION• Map Facilities• Coordinate Spaces with FUSION• Client Questionnaires• Prep Database & Field Tools
16 Weeks16 Weeks
11/11/2013
7
STANDARDS DEVELOPMENT• Set Standards• Review Records• Interview Staff• Project Controls
ASSESSMENT• Perform Field Assessment
• Document Deficiencies• Analyze Data
• Design• Construct
• Maintenance• Repair• Replacement
REPORTING• Host Data• ReportPLANNING• Develop Projects• Secure Funding
EXECUTION• Solicit• Retain• Execute• Update Database
DATA HOSTING
Facility Condition Assessment
FCA WORKFLOWFacility Condition Assessment
FCA WORKFLOW
DATA CAPTUREDATA CAPTURE
Field Work
DATA MIGRATIONField Work
DATA MIGRATION
11/11/2013
8
Field Work
DATA MIGRATIONField Work
DATA MIGRATION
Data Collection and Storage
EQUIPMENT INVENTORYData Collection and Storage
EQUIPMENT INVENTORY
11/11/2013
9
Data Collection and Storage
PREVENTATIVE MAINTENANCE Data Collection and Storage
PREVENTATIVE MAINTENANCE
Facility Condition Assessment
REPORTING FINDINGSFacility Condition Assessment
REPORTING FINDINGS
11/11/2013
10
Cost Assumption• Rough Order of Magnitude (ROM) cost estimate provided for the
replacement of systems at the end of useful life.
• R.S. Means (2013) regionally adjusted cost indices utilized to obtain pricing.
FCI = 70%
Terminology
FACILITY CONDITION INDEXTerminology
FACILITY CONDITION INDEX
Facility Condition Assessments
Repair…?Re-task…?Replace…?
Facility Condition Assessments
Repair…?Re-task…?Replace…?
.87
.80
.76
.62
11/11/2013
11
Facility Condition Index
FACILITY SUMMARYFacility Condition Index
FACILITY SUMMARY
Facility Condition Index
FACILITY SUMMARYFacility Condition Index
FACILITY SUMMARY
Cumulative Cost of Annual Facility NeedsCost of needs that are Immediate and Urgent
Cost of needs that are routine
Average Funding Need: $74,818/ year
11/11/2013
12
Faci
lity
Con
diti
on I
ndex
FAC
ILIT
Y S
UM
MA
RY
Faci
lity
Con
diti
on I
ndex
FAC
ILIT
Y S
UM
MA
RY
Faci
lity
Con
diti
on I
ndex
FAC
ILIT
Y S
UM
MA
RY
Faci
lity
Con
diti
on I
ndex
FAC
ILIT
Y S
UM
MA
RY Table 145. HVAC Summary of Findings – V Dawson House President’s Residence
Table 144. Current Needs: Itemized Component Deficiencies (Level 2) – V Dawson House President’s Residence
11/11/2013
13
Facility Condition Index
PORTFOLIO SUMMARYFacility Condition Index
PORTFOLIO SUMMARY
Facility Condition Index
PORTFOLIO SUMMARYFacility Condition Index
PORTFOLIO SUMMARY
Cumulative Cost of Annual Facility NeedsCost of needs that are Immediate and Urgent
Cost of needs that are routine
Average Funding Need: $1.4M/ year
11/11/2013
14
Facility Costs by Reporting Period 2013 costs per Facility
2018 costs per Facility
Acceptable Condition Index (>80%)Consider for Renewal (<40%)Faci
lity
Con
diti
on I
ndex
PO
RT
FOLI
O F
CA
Faci
lity
Con
diti
on I
ndex
PO
RT
FOLI
O F
CA
Facility FCI by Reporting Period 2012 FCI per Facility
2017 FCI per Facility
Cost Alert Threshold >$250,000
Faci
lity
Con
diti
on I
ndex
PO
RT
FOLI
O C
OS
TS
Faci
lity
Con
diti
on I
ndex
PO
RT
FOLI
O C
OS
TS
11/11/2013
15
…Identify, measure, manage
Provides operations software for colleges and universities, school districts & independent schools
Over 1,000,000 users everyday use SchoolDude
Launched Software as a Service (SaaS) in May, 2001Building solutions for education since 1984
Based in Cary, North Carolina200+ employees
Pure SaaSbusiness model In the Cloud
11/11/2013
16
31
PlanningDirectPlanningDirect
Centralize data Forecast future facility “scenarios” or need proposals Graphs and reports Integrates with MaintenanceDirect work orders and equipment
11/11/2013
17
Pla
nnin
gDir
ect
PO
RT
FOLI
O S
UM
MA
RY
Pla
nnin
gDir
ect
PO
RT
FOLI
O S
UM
MA
RY
Pla
nnin
gDir
ect
V D
AW
SO
N H
OU
SE
: FA
CIL
ITY
Pla
nnin
gDir
ect
V D
AW
SO
N H
OU
SE
: FA
CIL
ITY
11/11/2013
18
Pla
nnin
gDir
ect
V D
AW
SO
N H
OU
SE
: SY
ST
EM
SP
lann
ingD
irec
t
V D
AW
SO
N H
OU
SE
: SY
ST
EM
S
INTEGRATING LIFECYCLE CONSIDERATIONS INTO THE DESIGN PROCESS
www.alpha-fs.com
SBA 8(a) Certified SDVOSB (Service Disabled Veteran Owned Small Business) Texas HUB SCTRCA (South Central Texas Regional Certification Agency) MBE (Minority)
STEVE RENEWCollege of the DesertDirector Facilities Services
PATRICK DANIELS Alpha Facilities SolutionsAIA, NCARB, LEED AP BD+C & O+M, CSI CCCA, EDAC, CMAA CMIT, IFMA CFM
SCOTT HAIR SchoolDudeDivision Director
RON BEELERFacilities Planning & Program Services, Inc.
STEVE RENEWCollege of the DesertDirector Facilities Services
PATRICK DANIELS Alpha Facilities SolutionsAIA, NCARB, LEED AP BD+C & O+M, CSI CCCA, EDAC, CMAA CMIT, IFMA CFM
SCOTT HAIR SchoolDudeDivision Director
RON BEELERFacilities Planning & Program Services, Inc.
11/11/2013
19
Facility Condition Assessment
FUTURE TECHNOLOGIESFacility Condition Assessment
FUTURE TECHNOLOGIESFa
cilit
y C
ondi
tion
Ass
essm
ent
SE
NS
ITIV
ITY
AN
ALY
SIS
Faci
lity
Con
diti
on A
sses
smen
t
SE
NS
ITIV
ITY
AN
ALY
SIS
505040403030202010100YEARS
0YEARS
FUNDING100%
FUNDING100%
80%80%
60%60%
40%40%
20%20%
0%0%
11/11/2013
20
Reporting…
FacilityConditionAssessment
Reporting…
FacilityConditionAssessment
DE
SIG
ND
ES
IGN
BU
ILD
BU
ILD
OP
ER
AT
EO
PE
RA
TE
VISUALIZATION• MAYA• VIS• 3D MAX• GOOGLE SKETCH
UP
PRODUCTION• REVIT• MICROSTATION• ARCHICAD
VISUALIZATION• MAYA• VIS• 3D MAX• GOOGLE SKETCH
UP
PRODUCTION• REVIT• MICROSTATION• ARCHICAD
CONTRACTORCONTRACTOR
x3Dimensions
x3Dimensions
x4Dimensions
x4Dimensions
x6Dimensions
x6Dimensions
x5Dimensions
x5Dimensions
x7Dimensions
x7Dimensions
DESIGN TEAMDESIGN TEAM
ArchitectArchitect
EngineerEngineer
OWNER TEAMOWNER TEAM
COORDINATION• REVIT• MICROSTATION• ARCHICAD
SCHEDULING &PRICING• PLUG-INS• CUSTOM
SOFTWARE
COORDINATION• REVIT• MICROSTATION• ARCHICAD
SCHEDULING &PRICING• PLUG-INS• CUSTOM
SOFTWARE
OPERATIONS• COBie• ENTERPRISE • CAFM• CMMS• FCA DATABASE
OPERATIONS• COBie• ENTERPRISE • CAFM• CMMS• FCA DATABASE
OWNERSHIPCOST
>80%OWNERSHIP
COST
>80%
FIRSTCOST
<20%FIRSTCOST
<20%
DIMENSIONSDIMENSIONSUSERSUSERS SOFTWARESOFTWARE
Production
BIM
Production
BIM
11/11/2013
21
Cost Modeling
BIM PRESCRIPTIVE ESTIMATINGCost Modeling
BIM PRESCRIPTIVE ESTIMATING
Wall• $10/Linear foot• .5 hour/Linear foot• 1,000 linear feet• $10,000 (Cost)• 500 hours (Time)
Wall• $10/Linear foot• .5 hour/Linear foot• 1,000 linear feet• $10,000 (Cost)• 500 hours (Time)
Roof• $50/Square foot• 1 hour/Square foot• 100 Square feet• $5,000 (Cost)• 100 hours (Time)
Roof• $50/Square foot• 1 hour/Square foot• 100 Square feet• $5,000 (Cost)• 100 hours (Time)
Foundation• $50/Cubic yard• 5 hour/Cubic yard• 50 Cubic yards• $2,500 (Cost)• 250 hours (Time)
Foundation• $50/Cubic yard• 5 hour/Cubic yard• 50 Cubic yards• $2,500 (Cost)• 250 hours (Time)
$17,500 | 31.25 days$17,500 | 31.25 days
Cost Modeling
BIM PREDICTIVE ESTIMATINGRoofing System: 100,000ft2
Cost Modeling
BIM PREDICTIVE ESTIMATINGRoofing System: 100,000ft2
Operation & Maintenance• Cleaning• Inspection• Repair$.025/ft2 = $2,500/yr
Operation & Maintenance• Cleaning• Inspection• Repair$.025/ft2 = $2,500/yr
EXPENSEEXPENSE
$1M
$750K
$500K
$250K
$0
$1M
$750K
$500K
$250K
$0
Installation$10/ft2 = $1MInstallation$10/ft2 = $1M
YEARSYEARS0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 250 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Rejuvenation• Flood Coat• Seal & Patch• $.015/ft2 = $1500/yr
Rejuvenation• Flood Coat• Seal & Patch• $.015/ft2 = $1500/yr
Demolition$50,000Reinstallation$+1M
Demolition$50,000Reinstallation$+1M
Demolition$50,000 Reinstallation$+1M
Demolition$50,000 Reinstallation$+1M
11/11/2013
22
TIMETIME
EX
PE
NS
EE
XP
EN
SE
Electrical, $9.21M
HVAC, $11.29M
Interior Finishes $6.20M
Other, $4.91M
Plumbing $4.52M
PROJECTED COST OF EXPIRED BUILDING SYSTEMS
Predicting 85% of the Value of Lifecycle Costs, in addition to the 15% First Cost
PROJECTED COST OF EXPIRED BUILDING SYSTEMS
Predicting 85% of the Value of Lifecycle Costs, in addition to the 15% First Cost
TIMETIME
EX
PE
NS
EE
XP
EN
SE
Cost Modeling
BIM PREDICTIVE ESTIMATINGCost Modeling
BIM PREDICTIVE ESTIMATING
11/11/2013
23
INTEGRATING LIFECYCLE CONSIDERATIONS INTO THE DESIGN PROCESS
www.alpha-fs.com
SBA 8(a) Certified SDVOSB (Service Disabled Veteran Owned Small Business) Texas HUB SCTRCA (South Central Texas Regional Certification Agency) MBE (Minority)
STEVE RENEWCollege of the DesertDirector Facilities Services
PATRICK DANIELS Alpha Facilities SolutionsAIA, NCARB, LEED AP BD+C & O+M, CSI CCCA, EDAC, CMAA CMIT, IFMA CFM
SCOTT HAIR SchoolDudeDivision Director
RON BEELERFacilities Planning & Program Services, Inc.
STEVE RENEWCollege of the DesertDirector Facilities Services
PATRICK DANIELS Alpha Facilities SolutionsAIA, NCARB, LEED AP BD+C & O+M, CSI CCCA, EDAC, CMAA CMIT, IFMA CFM
SCOTT HAIR SchoolDudeDivision Director
RON BEELERFacilities Planning & Program Services, Inc.