ccna discovery- designing and supporting computer networks - version 4.0 dcompntwk chapter 2 93%

Upload: jesusforgiveme

Post on 10-Apr-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/8/2019 CCNA Discovery- Designing and Supporting Computer Networks - Version 4.0 DCompNtwk Chapter 2 93%

    1/5

    1What is the purpose of SNMP?

    to facilitate the exchange of information between devices and the NMSto monitor and control IP address allocation in a network

    to report user login to a monitoring station

    to verify traffic throughout the network and keep a log of all activity

    2

    What is the purpose of system-level acceptance testing?to develop an installation plan for the newly designed network

    to train end users and support personnel on the newly installed network

    to check that the newly installed network meets the business goals anddesign requirements

    to justify the financial investment required to implement the technology change

    3When should a network baseline be performed within the stages of the Cisco

    Lifecycle Services?Prepare Phase

    Plan Phase

    Design Phase

    Implement Phase

    Operate Phase

    4

    What is a business constraint that may impact the WAN design of a company?company policy regarding specific operating systems on LAN devices

    current monitoring protocols implemented on end-user devices

    non-availability of end users during implementation

    company policy requiring the use of specific vendor networking equipmentdue to partnerships

    5

    A corporation (client) wants a network upgrade and is putting out a requestfor services to various network consulting companies (contractors). Whichstatement is true concerning the required RFQ?

    sent from the contractors to the client in response to a RFP

    sent from the client to the contractors along with the RFP to provide more specific technical

    details

    sent from the client to the contractors in place of a RFP when the technicalspecifications of a project are known

    sent from the contractors to the client outlining reasons for financial investments for the

    network upgrade

    6Which two statements best describe the responsibilities of an accountmanager? (Choose two.)

    acts as the primary point of contact between the company and the clientdirects the sales teams and support personnel

    provides technical support to critical clients

    selects the equipment and technologies to be used for the client solutionacts as the network design lead

  • 8/8/2019 CCNA Discovery- Designing and Supporting Computer Networks - Version 4.0 DCompNtwk Chapter 2 93%

    2/5

    7.Why is it important to prioritize business goals when developing networkdesign?

    to ensure that the least expensive technologies are implemented first

    to simplify the configuration, administration, and monitoring of the newly installed network

    to anticipate the effects of changes and growth of the business

    to adhere to the best opportunities to contribute to the success of thebusiness

    8Which two statements are true regarding the response to an RFQ? (Choosetwo.)

    The response should be brief.

    It should strictly conform to the formatting requirements specified by theRFQ.

    Only the items that the contracting company will be addressing should be answered.

    The response helps the customer compare pricing with other potential

    contractors.The response is more complicated than a response to an RFP.

    9A network engineer working for a contracting company is informed of a pre-bid meeting with a potential client. What purpose does the network engineerhave for attending the pre-bid meeting?

    to submit request for proposal responses

    to discuss proposed installation and monitoring plans

    to perform system-level acceptance tests on the current network

    to clarify project scope and timelines not included in the original request for

    proposalto create a business case outlining reasons for financial investment in a network upgrade

    10What is a purpose of establishing a network baseline?

    It provides a statistical average for network performance.

    It manages the performance of network devices.

    It creates a point of reference for future network evaluations.It checks the security configuration of network devices.

    11

    Which two items help identify business goals and priorities before a newnetwork project starts? (Choose two.)

    installation

    motivation

    profitabilitytrustworthiness

    customer satisfaction

    12

    A network engineer is analyzing the network of a potential client company toidentify problems and determine whether a network upgrade or addition is

    needed. Which role in the sales team is this engineer assuming?post-sales field engineerpre-sales engineer

  • 8/8/2019 CCNA Discovery- Designing and Supporting Computer Networks - Version 4.0 DCompNtwk Chapter 2 93%

    3/5

    account manager

    network designer

    13What are two benefits of using a top-down approach instead of a bottom-upapproach to network design? (Choose two.)

    incorporates organizational requirementsallows for a quick response to a design request

    requires less time up front to create a network design

    clarifies design goals from the perspective of applications and networksolutions

    facilitates a design by using devices and technologies that are based on previous experience

    14

    In a network management architecture, which statement best describes amanagement agent?

    standardized database storing network performance parameters

    communication protocol used between a management station and managed devicehost with the management application loaded that is used by the administrator to monitor

    and configure network devices

    software running on a managed device to collect network information andallow that device to be managed by a management station

    15

    Which stage of the Cisco Lifecycle Services strategy is usually completedbefore an organization issues a Request For Proposal (RFP) or Request ForQuotation (RFQ)?

    Prepare PhasePlan PhaseDesign Phase

    Implement Phase

    Operate Phase

    Optimize Phase

    16A major corporation has decided to hire someone to upgrade their networkinfrastructure. A network consulting company wants the job. What documentmust the network consulting company obtain to learn about the businessgoals, the project scope, the requirements for the new network and theexpected deliverables?

    Business Case

    Project Plan

    Request for ProposalRequest for Comments

    17During an evaluation of the currently installed network, the IT staff performsa gap analysis to determine whether the existing network infrastructure cansupport the desired new features. At which stage of the Cisco LifecycleServices approach does this activity occur?

    Prepare PhasePlan PhaseDesign Phase

  • 8/8/2019 CCNA Discovery- Designing and Supporting Computer Networks - Version 4.0 DCompNtwk Chapter 2 93%

    4/5

    Implement Phase

    Operate Phase

    Optimize Phase

    18

    What is the purpose of creating a prioritized list of technical requirements?

    defines the project scopedetermines the business profitability

    creates a feasibility report for analysis

    identifies existing and new user groups

    19What is the purpose of preparing a business case?

    to justify the financial investment in implementing the technology changeto provide an example of a previous job done in the RFP

    to define the technical requirements of the network

    to define timelines and critical milestones

    20

    Which stage of the Cisco Lifecycle Services involves proactive management toidentify and resolve issues before the organization is affected?

    Prepare Phase

    Plan Phase

    Design Phase

    Implement Phase

    Operate Phase

    Optimize Phase21

    Which software component is installed on network devices that are managedthrough SNMP?

    management agentsmanagement stations

    network management protocol

    Management Information Base (MIB)

    22A network engineer working for ABC company is writing a response to an RFPfor a network upgrade and must create an executive summary. Whichstatement describes the basic components of an executive summary?

    quick overview of the problem, the recommended solution, and the justification for ABC company doing the job

    detailed description of the solution, including but not limited to, timelines, turn-over

    schedule, warranty information, and emergency recovery information

    detailed description of costs including, the cost of software and hardware components,

    licensing requirements, labor cost, and other applicable fees

    multiple page document containing additional information such as detailed lists of

    equipment required, diagrams, company background information, and insurance coverage

    23

    (1) Not At All Enthusiastic (2) Slightly Enthusiastic (3) Enthusiastic (4) Very

  • 8/8/2019 CCNA Discovery- Designing and Supporting Computer Networks - Version 4.0 DCompNtwk Chapter 2 93%

    5/5

    Enthusiastic (5) Completely Enthusiastic

    In your opinion (this has no bearing on your grade), please indicate how enthusiastic you are about

    the content of this course and the things youre learning (or have learned):

    24

    (1) Not At All Interested (2) Slightly Interested(3) Interested (4) Very Interested (5)Completely Interested

    In your opinion (this has no bearing on your grade), please indicate your interest in this course:

    25

    (1) Not At All Motivated (2) Slightly Motivated (3) Motivated (4) Very Motivated

    (5) Completely Motivated

    In your opinion (this has no bearing on your grade), please rate your motivation to do well in this

    course: