c_d

2
Centralizer Application Model One of the most important factors in obtaining a good primary cement  job is a pro per plac ement o f casing centralizers. Comput er mo deling has helped to decide the minimum number of centralizers, determine their optimum placement, and calculate maximum casing standoff. SpidleT urbeco has licensed CentraDesign developed by Pegasus Ventures, to aid in the design of bow spring and/or rigid centraliz er placement. Engineering Feat ures: 3D wellbore Casing deflection and centralizer compression Latest casing bending models Constant spacing or minimum stand-off designs 20 sections of pipes and 20 wellbore intervals For each pipe, user can specify: (1) no centralizer (2) constant spacing design (3) minimum stand-off design Combination of spring-bow and rigid centralizers Includes one-span casing analyses Extensive tubular database included Lateral forces on centralizers and joint Automatically export results into MS Word. Allows oil field, SI and customized units To have a spacing program run for your well, please contact our engineers in the Houston office at the following listings: Office:713-466-0072 Fax : 713-896- 451 1 Email: [email protected] Email: [email protected] Website: www.flotekind.com ORDER INFORMATION Engineering Features:

Upload: angel-aponte

Post on 15-Oct-2015

3 views

Category:

Documents


0 download

TRANSCRIPT

  • Centralizer ApplicationModel

    One of the most important factors

    in obtaining a good primary cement

    job is a proper placement of casing

    centralizers. Computer modeling

    has helped to decide the minimum

    number of centralizers, determine

    their optimum placement, and

    calculate maximum casing standoff.

    SpidleTurbeco has licensed CentraDesign

    developedbyPegasusVentures,toaid in the design of bow spring

    and/orrigid centralizerplacement.

    EngineeringFeatures: 3D wellbore

    Casing deflection and centralizer compression

    Latest casing bending models

    Constant spacing or minimum stand-off designs

    20 sections of pipes and 20 wellbore intervals

    For each pipe, user can specify:

    (1) no centralizer

    (2) constant spacing design

    (3) minimum stand-off design

    Combination of spring-bow and rigid centralizers

    Includes one-span casing analyses

    Extensive tubular database included

    Lateral forces on centralizers and joint

    Automatically export results into MS Word.

    Allows oil field, SI and customized units

    Tohaveaspacingprogramrunforyourwell,pleasecontactourengineersintheHoustonofficeatthefollowinglistings:

    Office: 713-466-0072Fax: 713-896-4511Email: [email protected]: [email protected]:www.flotekind.com

    ORDERINFORMATION

    EngineeringFeatures: