Page 1: CDBG LABOR STANDARDS

2010 CDBG Recipients’ Workshop

CDBG LABOR STANDARDS

Page 2: CDBG LABOR STANDARDS

Page 22010 CDBG Recipients’ Workshop September 30, 2010

What is the Davis-Bacon Act?

• Outlines labor standards for federal projects

• Includes all contracts > $2K involving federal funds

• Provides minimum wages by position

• Ensures minimum pay & other labor standards are enforced at work site

Page 3: CDBG LABOR STANDARDS

Page 32010 CDBG Recipients’ Workshop September 30, 2010

Steps to Complying with Davis-Bacon Labor Standards

1. Request for Wage Rates

2. Request for Contractor Clearance

3. Notice of Contract Action

4. Preconstruction Conference

5. Payroll Submission and Review

Page 4: CDBG LABOR STANDARDS

Page 42010 CDBG Recipients’ Workshop September 30, 2010

Request for Wage Determination

• Submit request to Pam Truitt at DCA

• 30 days prior to advertising for contract bids

• Wage rates, posters and Notice of Contract Action form will be sent to you

• Wage rates must be a part of the bid package

Page 5: CDBG LABOR STANDARDS

Page 52010 CDBG Recipients’ Workshop September 30, 2010

Request for Contractor Clearance

• Form can be mailed, e-mailed or faxed to Pam Truitt

• Ensures that contractor is not on Federal Debarred list

• Must be cleared before entering into a contract

Page 6: CDBG LABOR STANDARDS

Page 62010 CDBG Recipients’ Workshop September 30, 2010

Notice of Contract Action

• Must be submitted to DCA twice▪ First Time - When contract is awarded

• Verify that the appropriate Wage Decision was used

▪ Second Time - When construction begins• Field Reps will schedule formal labor review after form

has been submitted

• Construction drawdowns will be withheld if not submitted

Page 7: CDBG LABOR STANDARDS

Page 72010 CDBG Recipients’ Workshop September 30, 2010

Preconstruction Conference

• Mandatory, conducted by your grant administrator with the contractor

• Held prior to the start of construction

• Outlines contractor & subcontractor responsibilities, project timelines, logistics, etc.

• Explains Davis-Bacon, other applicable laws & contract provisions

• Notify your CDBG Field Rep of place and time

Page 8: CDBG LABOR STANDARDS

Page 82010 CDBG Recipients’ Workshop September 30, 2010

Wage Decision & Posters

• A copy of both must be posted on the Job Site

• Employees must be able to view

• Protect from the weather

Page 9: CDBG LABOR STANDARDS

Page 92010 CDBG Recipients’ Workshop September 30, 2010

Payrolls

• Contractors must submit all payrolls to grant recipient

• Must include the name, address and last 4 digits of SSN of each worker the first time they appear

• Every payroll must ▪ list the worker’s classification, which must match the

Wage Decision document▪ include the hourly rate of pay▪ be numbered, with the last payroll labeled “Final Payroll”▪ be certified by the owner, officer or designee of the

construction company

Page 10: CDBG LABOR STANDARDS

Page 102010 CDBG Recipients’ Workshop September 30, 2010

Job Site Interviews

• Have to be conducted on representative # of workers in each classification

• Interview responses should be checked against Wage Decision and payrolls

• CONDUCT INTERVIEWS EARLY AND OFTEN

Page 11: CDBG LABOR STANDARDS

Page 112010 CDBG Recipients’ Workshop September 30, 2010

Common Pitfalls

• Failure to obtain a wage determination prior to solicitation for bids

• Not obtaining Contractor Clearance before entering into a contract

• Payrolls not submitted on a weekly basis

• Payroll job classifications not matching wage decision classifications

Page 12: CDBG LABOR STANDARDS

Page 122010 CDBG Recipients’ Workshop September 30, 2010

Contact Information

Pam Truitt, Grants Consultant

Phone: (404) 679-5240

E-Mail: [email protected]