Page 1: Cdd & New Site Integration
Page 2: Cdd & New Site Integration

CONTENT1.CDD(CELL DESIGN DATA)2.NEW SITE DEFINITION USING CDD3.DIP ATTACHMENT4.NEW SITE LOADING

Page 3: Cdd & New Site Integration

CDDCell Design Data includes all the parameter needs to design a cell in a BSC (Base station controller)as well as in MSC(Mobile switching center).This data is loaded in the corresponding BSC by means of a Data Transcript file. A selection of MSC parameters are also included in order to present a more complete picture of the parameters that influence the design of a radio network.

Page 4: Cdd & New Site Integration

CDD parameter is valid for· MSC - The parameter is valid for all cells in the MSC.· BSC - The parameter is valid for all cells in the BSC.· BSC EXCHANGE PROPERTY - The exchange properties arechanged by means of a special command, but they are essentially thesame as regular parameters.· CELL - The parameter is valid for both UL and OL subcell, if there is asubcell structure defined.· CELL/SUBCELL - The parameter may be defined individually for ULand OL subcells, in case there is a subcell structure defined. Otherwise,they are defined per cell.· NEIGHBOUR CELL - The parameter need to be defined for internalneighbour cells.

The parameter is initiated/affected/printed by this/theseMML commands.Different types of commands:xxxxI: Initiate.xxxxC: Change.xxxxE: End.xxxxP: Print.

Page 5: Cdd & New Site Integration

NEW SITE CREATION USING CDD1.INTRODUCTION

CDD is attached in CR which contains complete RF data of particular site. DT is prepared by running Macro given in CDD and site is defined simply running this DT in concerned BSC and MSC.2.IMPACT FACTOR ON OPERATIONNon service affecting3. TOOLS REQUIREDA)WINFIOL or COMMAND HANDLINGB)CNA4.PRE-ACTIVITY CHECKLIST Verify the DT in cell sheet is as per data given in RF DATA ENTRY sheet and Check LAT/LONG mentioned are in correct format (DD MM SS).5.METHOD/PROCEDURE

Page 6: Cdd & New Site Integration

1.Open the CHA and connect the desired BSC in which site has to be created.2.Now run following commands to check that cells are already defined or notRldep:cell=cellname;Rxtcp:moty=rxotg,cell=cellname;3.a)If defined then check MSC definitions and Neighbours and Lat/long b)If Not go to step 2.

Page 7: Cdd & New Site Integration

4.Find a Free TG in the BSC.  RXTCP:MOTY=RXOTG;RXMOP:MO=RXOTG-0&&512;5.Once the free TG is found open the RF sheet attached in the CR and enable Macros.

Page 8: Cdd & New Site Integration

6.Enter the free TG value in the box given on the sheet in SWITCH DATA ENTRY.7.Enter the TEI value and corresponding RBS software in boxes given on the sheet next to TG value box in SWITCH DATA ENTRY.8.Write down the TRX TEI values in the corresponding cell.9. Check other parameters like:-AHOP=ON

Page 9: Cdd & New Site Integration

10.Now click on SAVE AS and then CREATE DT in SWITCH DATA ENTRY11.Go to CELL page.

Page 10: Cdd & New Site Integration

12.Copy the DT from the CELL page.Sample DT is shown below:

Dt.txt

13.Paste the DT in WINFIOL and run in BSC & corresponding MSC.14.To find out the MSC run the following command: RLTDP:MSC=ALL; in the BSC. Or you can check in the CAN.15.Check for the failed commands.16.Once the DT is completed open CAN.

Page 11: Cdd & New Site Integration

17.In CNA click on the desired BSC.

Page 12: Cdd & New Site Integration

18.Go to the file-new job-Adjustment19.Name the job and run the job.

Page 13: Cdd & New Site Integration

20. After adjustment run, make a planned area for neighbour creation.21.Give any name to planned area.

Page 14: Cdd & New Site Integration

22.Select the BSC & press ctrl+I & select the cells which u have defined.23.Go to view + sites or press ctrl+S & select your site & double click on it.

Page 15: Cdd & New Site Integration

24.Now fill HEIGHT,LATTITUDE,LONGITUDE & press enter after each entry from the sheet.Click on apply& then OK.Press crtl+I again. 

Page 16: Cdd & New Site Integration

25.Then go to edit+new+neighbour relation.

Page 17: Cdd & New Site Integration

26.Now paste the neighboring cell in neighboring cell column & press enter. C N A will automatically select all parameters & then press new.27.Do this process for each cell to be defined as neighboring cell. 

Page 18: Cdd & New Site Integration

28.Now select planned area.29.Go to File + New Job + Update Job & give the name of the JOB.

Page 19: Cdd & New Site Integration

30.Click on Continue & then OK. 31.Open your Main job & sub jobs. 32. Check for failed commands if any and rectify them.

Page 20: Cdd & New Site Integration

33.Dip attachment and loading will be done further on the request of the circle team on call.34.Dip attachment:DTSTP:DIP=DIPNAME;(To check the dip status)DTDIP:DIP=DIPNAME;(to check the ETM port and dip position)DTQUP:DIP=DIPNAME;(to check the dip quality)NTCOP:SNT=ETM2-0;(to check the dip & devices details in that ETM)EXDAI:DEV=DEVICES;BLODE:DEV=DEVICES;(DEBLOCK THE DEVICES)RXAPI:MO=RXOTG-TGVALUE,DCP=1&&31,DEV=DEVICES+1;(to attach dip on port A of BTS,for port C DCP=287&&317)35.Once the dip is attached deblock the TG & CF by following commands.RXESI:MO=RXOTG-TGVALUE;RXBLE:MO=RXOTG-TGVALUE;RXESI:MO=RXOCF-TGVALUE;RXBLE:MO=RXOCF-TGVALUE;36.When the CF of the TG came operational then give the loading to whole TG.