CEEP 1011 Project Report 1 FINAL REPORT Implementing and promoting energy efficiency solutions in heritage buildings through retrofitting the 1880's Southern Midlands Town Hall CEEP 1011 01 June 2014

Upload: phungkhanh

Post on 28-Mar-2018

223 views

Category:

Documents


1 download

TRANSCRIPT

CEEP 1011 Project Report 1

FINAL REPORT

Implementing and promoting energy efficiency solutions in heritage buildings through retrofitting the 1880's Southern

Midlands Town Hall

CEEP 1011

01 June 2014

2  CEEP 1011 Project Report 

Contents

Contents

1.0 INTRODUCTION ............................................................................................................................... 3

2.0 PROJECT BACKGROUND .............................................................................................................. 3

3.0 PROJECT DETAIL ............................................................................................................................ 4

3.1 BASELINE ENERGY AUDIT ................................................................................................................. 43.1.1 Carbon Footprint .................................................................................................................... 53.1.2 Projected energy savings for the CEEP Project ..................................................................... 6

3.2 TOWN HALL ENERGY EFFICIENCY ACTIVITIES ................................................................................... 73.2.1 Heating and Lighting upgrades ............................................................................................... 73.2.2 Draft proofing of entrances ..................................................................................................... 83.2.3 Addressing heat loss into high ceiling spaces ....................................................................... 103.2.4 Retro double glazing of windows .......................................................................................... 113.2.5 Sealing old fireplaces ............................................................................................................ 123.2.6 Upgrade of insulation ............................................................................................................ 12

3.3 COMMUNICATIONS ACTIVITIES ....................................................................................................... 143.3.1 Energy Efficiency & Comfort in Heritage Buildings ............................................................. 143.3.2 Interpretation ........................................................................................................................ 153.3.3 Other communications activities ........................................................................................... 16

4.0 PROJECT OUTCOMES .................................................................................................................. 17

4.1 ENERGY EFFICIENCY OUTCOMES ..................................................................................................... 174.1.1 Baseline, projected and achieved energy efficiency .............................................................. 17

4.2 COMMUNICATIONS ACTIVITIES OUTCOMES ...................................................................................... 18

5.0 PROJECT BUDGET ......................................................................................................................... 19

6.0 CONCLUSION .................................................................................................................................. 21

ATTACHMENT 1: PROJECT ENERGY EFFICIENCY IMPROVEMENT ...................................... 22

APPENDIX 1: ENERGY EFFICIENCY - FUTURE PROOFING YOUR HERITAGE HOME - COURSE NOTES ....................................................................................................................................... 23

CEEP 1011 Project Report 3

1.0 Introduction Southern Midlands Council received funding of $25,646 from the Australian Government under the Community Energy Efficiency Program in September 2012 to implement and promote effective measures to improve energy efficiency in older or heritage listed buildings. A key objective of the Project was to provide an example of how energy efficiency in a heritage building can be implemented without compromising the heritage features of the building. The centerpiece of the Project is the Town Hall at Oatlands, a Georgian building constructed in the 1880s which now houses the administration and works services offices of Southern Midlands Council – located in the rural heart of Tasmania’s midlands. The ‘Centre for Heritage at Oatlands - Heritage Education and Skills Centre’, a partner in the Project, was tasked with the role of promoting the retrofitted Town Hall as a case study in a course entitled ‘Energy Efficiency and Comfort in Heritage Buildings’. The aim of the course is to stimulate transference and adoption of the techniques used in the Project. The Project site is well situated to achieve this as surrounding Oatlands there is a large local, regional and statewide representation of colonial sandstone buildings, a building type notorious for poor energy efficiency.

2.0 Project Background The Town Hall at Oatlands was constructed at a time (1880) when there was little awareness or need for energy efficiency. Heritage buildings often leak significant amounts of heat due to lack of insulation, chimney drafts, poorly sealed windows and doors, numerous vents and high ceilings. Absence of insulation and high thermal mass also means that many heritage buildings actively transfer warmth from the core to the outside necessitating high energy use during winter months to maintain an adequate level of internal comfort. Energy efficiency was not a consideration at the time of construction of buildings such as the Town Hall. This was primarily due to the abundant locally available cheap sources of firewood – fireplaces are a feature in every room of such buildings. Also, thoughts of energy constraint and efficiency planning were not yet in the general consciousness. Following ‘hydro-industrialisation’ in Tasmania, during the period 1970-2000, electricity was relatively cheap in Tasmania and as a primarily renewable energy state there was less momentum in the community to begin to address energy consumption. With growing awareness of climate change and energy use constraints driving price increases, Southern Midlands Council developed a climate change and energy efficiency

4  CEEP 1011 Project Report 

program in 2008. Part of the approach was to closely monitor energy use and to explore options for energy efficiency at both a corporate and community level. Detailed energy efficiency audits were undertaken at several of Council’s office buildings, including the Town Hall at Oatlands. This work provided the perfect platform on which to build the energy efficiency project part funded under the CEEP grant.

3.0 Project Detail The Project was undertaken between September 2012 and June 2014. Key components of the project were:

undertake an initial baseline energy consumption audit; identification of activities appropriate to reducing energy consumption at the

Town Hall, together with forecast energy savings of each activity; implementation - retrofitting the Town Hall at Oatlands with the identified

activities; development of the course curriculum for ‘Energy Efficiency and Comfort in

Heritage Buildings’; promotion of ‘Energy Efficiency and Comfort in Heritage Buildings’ and conduct

course(s) – dependent upon enrolments; promote Project activities through a range of options including an interpretations

panel and web site; and undertake an energy audit of the Town Hall on completion of the Project activities

to guage the success of the Project against the anticipated benefits.

3.1 Baseline Energy Audit Prior to the implementation of the CEEP funded Project a baseline energy audit of the Town Hall at Oatlands was commissioned and undertaken by Dr John Todd of Eco Energy Solutions. Key points from the audit were:

the Town Hall has a floor area of 380 m2 (downstairs where all the offices are located) housing 11 staff.

In 2010/11 activities in the building consumed 64,800 kWh of electricity Annual electricity use in the Town Hall over the prior 6 years was relatively

constant. Electricity usage per staff member was 5,890 kWh for the period prior to energy

efficiency measures being implemented. Figures for typical office energy use per Australian government employee are 3,000 kWh per employee per year. This is almost half the Town Hall figure (5,890 kWh/staff/year).

CEEP 1011 Project Report 5

Energy usage in relation to floor area of the Town Hall offices is 170 kWh/m2/yr. The annual electricity use for commercial office buildings in Hobart is about 195 to 240 kWh/m2/yr. The target for new buildings is 100 to 125 kWh/m2/yr (Building Operators and Managers Association recommendation for Hobart office buildings). It is likely that the reason for the relatively low energy use per square metre of floor area is because the building has a large floor area per staff member, with the large entrance hallway, large staircase, and intermittently used Council Chambers.

Space heating accounted for about two thirds of the electricity use at the Town Hall; with lighting also significant. The high proportion of electricity used for space heating and lighting is not surprising given the design of the building and the cool climate in Oatlands. The building has relatively small window areas and all occupied sections of the building the lighting is quite inefficient (e.g. the chandeliers), although factors other than energy efficiency (i.e. historical style) may make the on-going use of these lights appropriate. The high space heating component also reflects the historical building construction. The high thermal mass (thick sandstone walls) and lack of insulation means the whole building structure cools down overnight and so the radiant temperature of all internal surfaces is cold most mornings; this means air temperatures must be higher to achieve suitable comfort levels.

3.1.1 Carbon Footprint In the 2010/11 financial year, activities at the Town Hall consumed 64,800 kWh of electricity. The greenhouse gas intensity for Tasmania is 0.30 kg of CO2 (equivalent) per kWh (based on the published figures from the Australian Department of Climate Change and Energy Efficiency in 2011). This gives a carbon dioxide (equivalent) emission of 19,440 kg for the year. Note: this estimate of CO2 (equivalent) emissions for electricity is based on the official government emission factors for Tasmania. In practice, when electricity is saved in Tasmania it does not lead to a reduction in hydroelectric electricity generation, it means less electricity imported into the state via the Basslink cable. The actual reduction in CO2 emissions associated with improved efficiency is better linked to the average carbon intensity of the Eastern Australian grid. Thus, an electricity saving of 1 kWh reduces greenhouse gas emissions by 1.07 kg CO2 (equivalent) rather than 0.3 kg CO2 (equivalent).

6  CEEP 1011 Project Report 

3.1.2 Projected energy savings for the CEEP Project The audit of the Town Hall undertaken by Eco Energy Solutions provided a forecast of energy savings in relation to the energy efficiency activities planned under the CEEP Project. Detail of these forecasts is summarised below: Key measures

Action Electricity Savings

(kWh / year)

Retrofit sash windows throughout Town Hall with Perspex inlays (retro-double glazing).

4,540

Install eiling insulation and sarking - Works and Services Section.

3,050

Install perspex double glazing under dorma ceiling and skylights in the Works and Services Section.

2,010

Improve fireplace and chimney seals throughout (draught proofing).

730

Refurbish main entrance off High St. – draft seal, re-glaze and insulate above.

1,790

Refurbish Stutzer St. entry with an air lock (draught proofing).

480

Replace portable fan & oil heaters with 240W under-desk thermo-film panels.

3,200

Improve efficiency of lighting – install sensors in toilets and kitchen.

1,500

Project target energy savings

A total projected saving of 22,274 kWh annually - equivalent to a 35% saving as

compared to the baseline.

CEEP 1011 Project Report 7

3.2 Town Hall energy efficiency activities Energy efficiency activities at the Town Hall were undertaken by Heritage Building Solutions.

3.2.1 Heating and Lighting upgrades Activity 1.2.2 – heating upgrade Most staff at the Town Hall employed supplementary heating additional to the space heating supplied by heat pumps in the building. These heaters were all inefficient fan heaters or oil column heaters consuming up to 2000 w each. These heaters were all disposed of and staff provided with either 160w or 240w ‘thermo-film’ under-desk personal heaters. After a short period of adjustment staff were content with the replacement heaters and found that they provided adequate localised warmth.

Replace portable fan & oil heaters with 160W or 240W under-desk thermo-film panels

Cost $960

Projected

saving:

3,200 kWh/yr

Activity 1.2.3 – lighting efficiency improvement Lighting in infrequently used spaces at the Town Hall was often left on for the whole day resulting in unnecessary energy consumption. Sensor operated lighting was installed in toilets & kitchen to address this situation. These spaces are now only lit on-demand.

8  CEEP 1011 Project Report 

3.2.2 Draft proofing of entrances

Activity 1.3.1 – refurbishment of the High Street entry to the Town Hall

The High Street entrance to the Town Hall was very poorly sealed and insulated. The foyer essentially offered no resistance to the entry of wind and cold air into the Town Hall. Under this activity the following measures were adopted to rectify the situation:

Improve lighting efficiency – install sensors in toilets and kitchen

Cost $1340

Projected

saving:

1,500 kWh/yr

CEEP 1011 Project Report 9

replace 3mm glass with comfort plus laminate glass; draft seal the double doors; and insulate and seal the ceiling area with R 4.1 polyester insulation bats.

Activity 1.3.4 - refurbishment of the Stutzer Street entry to the Town Hall

The Stutzer Street entry to the Town Hall was a similar scenario to the High Street entry in that it offered little resistance to the ingress of cold air to the building. The ‘closer’ on the door to the outside was ineffective, often resulting in the door being left ajar. This entrance was completely rebuilt to create an air lock compartment. The existing door to the outside of the building was draft-sealed and fitted with an effective ‘closer’.

Refurbish High Street entrance to the Town Hall – draft proof, re-glaze and insulate.

Cost

$3950

Projected

saving:

1,790 kWh/yr

Refurbish Stutzer Street entry with air lock (draught

proofing)

Cost $5900

Projected

saving:

480 kWh/yr

10  CEEP 1011 Project Report 

3.2.3 Addressing heat loss into high ceiling spaces Activity 1.3.2 – seal ceiling space The Works and Technical Services Section of the Town Hall has a particularly high ceiling – typical of older buildings. This situation previously offered no resistance to the loss of heated air into the ceiling cavity and then out through the poorly insulated roof. To rectify this situation a double glazed ‘false-ceiling’ unit was installed into the ceiling space to provide an effective barrier to heat loss. A ceiling fan was also installed to circulate warmed air throughout the office. The Works and Technical Services Section also had no ceiling insulation. The roofing iron was removed, insulation and sarking installed and the iron replaced - refer to Section 3.2.6.

Activity 1.2.1 – install double-glaze skylight In a similar measure, a double glazed unit was installed in the ‘print room’ replacing an old skylight that offered no barrier to the flow of warm air.

CEEP 1011 Project Report 11

3.2.4 Retro double glazing of windows Activity 1.6.1 – retro double-glazing and window sealing The sash windows of the Town Hall were poorly sealed and hence drafty. All windows were refurbished and fitted with 5 mm poly-glass units to create a double-glazed effect and an effective insulating layer of air between the outside of the building and the office spaces. Each poly-glass unit was framed, backed with foam to provide a snug seal, and clipped into place enabling ease of removal if necessary.

Addressing heat loss into ceiling spaces

Projected

saving:

2,010 kWh/yr

Cost $5650 (activities 1.2.1 & 1.3.2)

Upgrade sash

windows throughout the Town Hall offices (renovate windows &

install poly-glass inlays for double

glaze effect)

Cost

$5140

Projected saving:

4,540 kWh/yr

12  CEEP 1011 Project Report 

3.2.5 Sealing old fireplaces Activity 1.3.5 – draft sealing fire places Every room in the Town Hall has a fireplace. The fireplaces offer an efficient conduit for air exchange into the building meaning loss of warm air and creating drafts. Seven fireplaces were sealed in two ways: poly-foam insulation inserts installed into the base of chimneys; and facades facing to the offices sealed with plywood.

3.2.6 Upgrade of insulation Activity 1.3.3 – insulation Heritage buildings were not insulated on construction. As mentioned previously this was largely due to the absence of energy efficiency concerns at the time and an abundant energy source – firewood. The roof of Works and Technical Services Section was chosen as the most pressing location at the Town Hall requiring insulation and sealing. Staff often mentioned the drafty nature of the office and ingress of dust through the ceiling. The roofing iron was lifted from the offices, R4.1 polyester insulation bats installed, sarking installed, and roofing iron replaced.

Improve fireplace and chimney seals (draught proofing)

Cost $700

Projected

saving:

730 kWh/yr

CEEP 1011 Project Report 13

Ceiling insulation and sarking installed - Works and Services Section

Cost

$14,200

Projected

saving:

3,050 kWh/yr

14  CEEP 1011 Project Report 

3.3 Communications Activities 3.3.1 Energy Efficiency & Comfort in Heritage Buildings Activity 1.1.4 – development of course material The curriculum for the course ‘Energy Efficiency & Comfort in Heritage Buildings’ was developed by a consultant engaged through the Centre for Heritage at Oatlands. Refer to Appendix 1. Activity 1.8.1 – promotion of energy efficiency courses The course ‘Energy Efficiency and Comfort in Heritage Buildings’ was advertised through the Centre for Heritage at Oatlands - Heritage Education and Skills Centre through their web site and brochures – see below:

CEEP 1011 Project Report 15

To date the course has not been run as insufficient numbers enrolled to make running the course viable. The course will continue to be promoted in the foreseeable future.

3.3.2 Interpretation Activity 1.7.1 – interpretation panel A digital display highlighting Project aims, activities and outcomes was produced and installed in a prominent location at the reception desk of Southern Midlands Council.

16  CEEP 1011 Project Report 

The interpretations display clearly highlights project activities and the benefits they deliver in energy savings. The objective of the display is to promote the Government’s and Councils joint commitment to and leadership in the field of energy efficiency, and to inspire uptake of further energy efficiency activities within the local community.

3.3.3 Other communications activities The Project was well publicised in the following ways: Newsletter articles Project information was submitted on a regular basis to the quarterly Southern Midlands Council ratepayer’s newsletter and the monthly community newsletter ‘Southern Midlands News’. Forums Southern Midlands Council has a representative on Tasmania’s southern region local government climate change forum – the Regional Climate Change Initiative. This forum meets on a quarterly basis and involves representatives from local government, state government and regional authorities. CEEP Project updates were provided at these meetings. Web sites An overview of the Project and regular progress updates were posted on the Southern Midlands Council website: http://www.southernmidlands.tas.gov.au/climate-change-and-energy-efficiency/ Course promotion was undertaken on the Heritage Education and Skills Centre web site www.centreforheritage.com.au

CEEP 1011 Project Report 17

4.0 Project Outcomes

4.1 Energy efficiency outcomes

4.1.1 Baseline, projected and achieved energy efficiency Project baseline* during the baseline period (2010/11 – 12 months) activities at the

Town Hall Oatlands consumed 64,800 kWh of electricity Project target* a total projected saving of 22,274 kWh annually (equivalent to

35% less than baseline energy usage) Achieved to date** a total achieved saving of 21,954 kWh annually**(equivalent to

34% less than baseline energy usage)

*figures from the Project baseline energy audit undertaken by Eco Energy Solutions (Section 3.1) **figures derived from the final Project energy audit undertaken by Planet Footprint Refer to Attachment 1 for further information on the energy efficiency outcomes of the Project.

0

50

100

150

200

250

300

1/07/2010

1/10/2010

1/01/2011

1/04/2011

1/07/2011

1/10/2011

1/01/2012

1/04/2012

1/07/2012

1/10/2012

1/01/2013

1/04/2013

1/07/2013

1/10/2013

1/01/2014

1/04/2014

Oatlands Town HallAverage daily consumption (KwH)

18  CEEP 1011 Project Report 

4.2 Communications activities outcomes The communications activities outcomes for the Project were as follows:

establishment of a Project web page: http://www.southernmidlands.tas.gov.au/climate-change-and-energy-efficiency/

four articles submitted to the Southern Midlands ratepayer newsletter; one article published in the ‘Southern Midlands News’; development of the curriculum for the course ‘Energy Efficiency & Comfort in

Heritage Buildings’; promotion of the course ‘Energy Efficiency & Comfort in Heritage Buildings’

undertaken through the Heritage Education and Skills Centre web site – brochures and web site www.centreforheritage.com.au

development and installation of an electronic interpretations panel at the front reception desk of Southern Midlands Council – located in the Town Hall at Oatlands; and

five quarterly updates provided through the Regional Climate Change Initiative forum.

To date, the outcomes of the communications activities are more difficult to quantify than the energy efficiency outcomes of the Project as there is always some uncertainty as to the level of engagement in the community despite best efforts to cover a range of promotional methods. The course ‘Energy Efficiency in Heritage Buildings’ although not successfully run during the timeframe of the Project, will continue to be promoted. Enrolment numbers and course feedback will provide a more concrete measure of the communications outcomes of the Project.

CEEP 1011 Project Report 19

5.0 Project Budget The CEEP 1011 Project Activity was undertaken within budget. Taking into account all cash and in-kind contributions the final budget position is + $436. All major Project expenses as quoted by Heritage Building Solutions went according to budget. Project expenses related to outstanding grant contributions as at 3/6/14 (related to Milestone 5 and 6 payments) have been covered to date by Southern Midlands Council. Cash contribution to the Project by Southern Midlands Council was greater than expected (+ $1939), whilst in-kind contribution was less by a similar amount (- $2010).

Total Expended to June 3rd 

2014 (excl GST) 

Budget Forecast (excl GST) 

Balance (June 3rd 2014) 

Project Total (Cash & in-kind) 58,661.85 59,098.00 +436.15*

Grant Claims Received 18,706.00 25,646.00 ‐6940.00

CEEP funded activities 25,771.64 25,646.00 ‐125.64

Southern Midlands Council funded activities (cash)

16,609.07 14,670.00 ‐1939.07

Southern Midlands Council contribution

(in kind) 14,219.85 16,230.00 +2010.15

Heritage Education & Skills Centre

contribution (in kind) 1856.00 1856.00 0

Heritage Education & Skills Centre funded

(cash) 438.89 696.00 +257.11

*This is the projected final budget position assuming receipt of remaining grant funds of $6940 The full Project budget is provided in the table below:

20  CEEP 1011 Project Report 

Southern Midlands Council

CEEP 1011 Project Budget

Period 01/07/12 to 03/06/14Analysis View Revenue & Expenditure

Filters G/L Account: 10000..89999, PROJECT: G3050002

D EP A R T M EN T Climate Change PROJECT G3050002

G/L Ac c ount No.

Posting Da te Milestone # De sc riptionAmount

(e xc l GST)

Gra nt Cla ims

Rec e ive d

CEEP funded

Southe rn Midla nds Counc il (c a sh)

Southe rn Midla nds Counc il (in kind)

He rita ge Educ a tion

& Skills Centre

(HESC) (in kind)

He rita ge Educ ation

& Skills Ce ntre (HESC) (c a sh)

66530 19/10/2012 1Claim 1 First Milestone CEEP Grant 1011

3,000.00 3,000.00

23035 3/10/2012 2Energy Effic iency Course Development

1771.64 843.64 928

71011 - 71013 1/7/12 to 20/12/12 2-3

Project Management & Communications (salary)

2,187.00 2,187.00

71011 - 71013 1/7/12 to 20/12/12 2-3 Administration 210.00 210.00

73031 11/10/2012 3Thermofilm Heater 160w

120.00 120.00

73031 11/10/2012 3Thermofilm heaters 240w

630.00 630.00

73031 11/10/2012 3Thermofilm Heater 240w

210.00 210.00

23035 20/02/2013 3Sensors to WC's & Kitchen/Supp & Fit Ceiling Fan

1,336.36 1,336.36

23035 26/02/2013 3Print Room/Fit Skylight & Double Glaze Unit

1,250.00 1,250.00

3Baseline Energy Audit

3,000.00 3,000.00

23035 30/05/2013 4Dorma Opening/Poly Glass etc

4,400.00 4,400.00

23035 30/05/2013 4

Remove Roofing Install Insulation/Sarking etc

14,200.00 14,200.00

23035 30/05/2013 4Seal Windows & Fireplaces

1,400.00 1,400.00

23035 30/05/2013 4

Council Chambers Side Entry/Air Lock/New Door etc

5,900.00 5,900.00

23035 30/05/2013 4

Front Foyer Replace Glass/Comfort Plus Laminate

3,950.00 3,950.00

23035 30/05/2013 4Finalisation of Energy Effic iency Course Devmnt

1,856.00 928.00 928.00

71011 - 71013 21/12/12 to 19/5/13 4

Project Management & Communications (salary)

1,029.00 1,029.00

71011 - 71013 21/12/12 to 19/5/13 4 Administration 227.50 227.50

66530 3/06/2013 4Claim 2 Fourth Milestone CEEP Grant 1011

15,706.00 15,706.00

Totals Milestone 4 (excl GST) 32,962.50 19,528.00 11,250.00 1,256.50 928.00 0.00

28/08/2013 5Promotion of Energy Effic iency Course

696.00 438.89

73026 5/09/2013 5

Energy effic iency audit by contractor & project financial audit

1,650.00 2,700.00

73044 26/03/2014 5

Interpretive material (Digital display) promoting project in Town Hall

400.00 72.71

23035 22/05/2014 5

Perspex units installed to 'double glaze' windows

4,440.00 4,440.00

71011 - 7101320/05/2013 to

01/06/145

Communications (salary)(activities 1.5.2, 1.8.2, 1.8.3, 1.9.2)

2,872.00 2,640.00

71011 - 7101320/05/2013 to

01/06/145

Project Management (salary)($84.2/wk)

4,462.60 4,462.60

71011 - 7101320/05/2013 to

01/06/14 5Administration ($8.75/wk for 53 wks)

463.75 463.75

66530 3/06/2014 5Claim 3 Fifth Milestone CEEP Grant 1011

4,440.00

Totals Milestone 5 (excl GST) 14,984.35 4,440.00 2,772.71 7,566.35 0.00 438.89

Totals to June 3rd 2014 (excl GST) 58,661.85 18,706.00 25,771.64 16,609.07 14,219.85 1,856.00 438.89

Budget Total 59,098.00 25,646.00 14,670.00 16,230.00 1,856.00 696.00

Balance of Project Contributions as at June 3rd 2014 436.15 6,940.00 -125.64 -1,939.07 2,010.15 0.00 257.11

CEEP 1011 Project Report 21

6.0 Conclusion The CEEP 1011 Project was a great success. The Project was implemented according to plan and aligned closely to the allocated budget. The Project activities resulted in the forecast energy savings at the Town Hall being met. The Town Hall is now a considerably more energy efficient building (34% improvement) with greatly improved comfort levels for staff and visitors. The Project has improved awareness amongst staff, and all associated with usage of the Town Hall, of the considerable environmental and financial benefits of undertaking a carefully planned energy efficiency upgrade. The project has also demonstrated that the unique features of heritage buildings do not need to be compromised when making upgrades for energy efficiency. The benefits of the Project will continue to be realised indefinitely for Southern Midlands Council, and also more broadly as the foundation has been laid for ongoing promotion of energy efficiency in older/heritage buildings - the Town Hall at Oatlands provides a fine example of what can be achieved.

22  CEEP 1011 Project Report 

Attachment 1: Project Energy Efficiency Improvement

PROJECT TITLE

Implementing & Promoting Energy Efficiency Solutions in Heritage Buildings Through Retrofitting the 1880s Southern Midlands Town Hall

PROJECT ID CEEP 1011

FUNDING RECIPIENT Southern Midlands Council DATE 2nd June 2014

Building, Facility or Site 1 Name of Building, Facility or Site 1

Town Hall Oatlands

Location (address) 71 High Street, Oatlands, TAS 7120

Type of building, facility or site

Council Administration Works and Services Office

Activity Type and Measure

Energy efficiency retrofit including – double glazing, airlock entries, insulation, draft proofing, sensor lights and heating upgrade.

Energy Efficiency Estimate Method

The simulation used to provide the estimates is based on the 2012 Building Code of Australia from JV3.

Baseline Energy Usage Baseline period – 12 months (1 July 2010 to 30 June 2011)

64,800 kWh per annum

Baseline Energy Efficiency

64,800 kWh / 380 m2 x 3.6 = 614 MJ per m2 per annum

64,800 kWh / 11 x 3.6 = 21,207 MJ per FTE per annum

Energy Efficiency Improvement

21,954 kWh reduction – equivalent to:

21,954 kWh / 380 m2 x 3.6 = 208 MJ per m2 per annum

21,954 kWh / 11 x 3.6 = 7,185 MJ per FTE per annum

Reporting Data (Measuring Energy Efficiency and Additional Data)

A total area of 380 m2 and 11 FTE occupants

80% average operational occupancy level

Daily hours of operation 8 am to 5 pm

Building construction date 1880

Cost of Activity $40,300

Estimated Cost Savings (based on current data)

$6,147 per annum.

Cost savings based upon the current cost of electricity for the Site of $0.28 per kWh (March 2014)

CEEP 1011 Project Report 23

Appendix 1: Energy efficiency - Future proofing your heritage home - course notes Supplied as a separate document