 CELL Project Outline October 2013 1. TECHNICAL SPECIFICATIONS  Action item: Partners to agree to technical specs and proceed with re-configuration/metadata standard implementation. 2. TECHNI CAL COMMIT TEE  Action item: Determine members of Technical Committee. We assume that Peter, Elli, Ewan, Scott and Robin are on the committee; who else? 3. EDITORIAL COMMITTEE  Action item: Determine the makeup of the Editorial Committee. Assuming Joe Tabbi is the leader, who else is on the committee? 4. FINANCE COMMIT TEE  Action item: Determine the makeup of the Finance Committee. Sandy indicates he will be part of this committee, who else? 5. PRODUCTION CALENDARS In September 2013 during the ELO conference in Paris, technical aspects, editorial concerns, and grant issues were settled and approved by the CELL partners, regarding the pr eproduction and testing phase of the project. It was agreed that three databases would be used in the testing phase: E LM CI P ADEL TA LABORATOIRE NT2 For the preproduction phase, these databases need to meet all the technical requirements. We have to agree on a date for the beginning of the testing phase, and November or December were mentioned during the Paris meeting. We propose January 2014  , just to be on the safe side.  As soon as each local database is ready for the testing phase, the technical team of NT2 will work on developing and adjusting Drupal modules and configuring the search engine while the other partners get ready to join the production phase, or in other words, meet the technical requirements.

Upload: celestelantz

Post on 04-Oct-2015

8 views

Category:

Documents


0 download

DESCRIPTION

A document I edited that was distributed to the CELL partners as an agreement to meet these deadlines.

TRANSCRIPT

  • CELL Project Outline October2013

    1. TECHNICALSPECIFICATIONSActionitem:Partnerstoagreetotechnicalspecsandproceedwithreconfiguration/metadatastandardimplementation.

    2. TECHNICALCOMMITTEEActionitem:DeterminemembersofTechnicalCommittee.WeassumethatPeter,Elli,Ewan,ScottandRobinareonthecommitteewhoelse?

    3. EDITORIALCOMMITTEEActionitem:DeterminethemakeupoftheEditorialCommittee.AssumingJoeTabbiistheleader,whoelseisonthecommittee?

    4. FINANCECOMMITTEEActionitem:DeterminethemakeupoftheFinanceCommittee.Sandyindicateshewillbepartofthiscommittee,whoelse?

    5.PRODUCTIONCALENDARSInSeptember2013duringtheELOconferenceinParis,technicalaspects,editorialconcerns,andgrantissuesweresettledandapprovedbytheCELLpartners,regardingthepreproductionandtestingphaseoftheproject.Itwasagreedthatthreedatabaseswouldbeusedinthetestingphase:

    ELMCIP ADELTA LABORATOIRENT2

    Forthepreproductionphase,thesedatabasesneedtomeetallthetechnicalrequirements.Wehavetoagreeonadateforthebeginningofthetestingphase,andNovemberorDecemberwerementionedduringtheParismeeting.WeproposeJanuary2014,justtobeonthesafeside.Assoonaseachlocaldatabaseisreadyforthetestingphase,thetechnicalteamofNT2willworkondevelopingandadjustingDrupalmodulesandconfiguringthesearchenginewhiletheotherpartnersgetreadytojointheproductionphase,orinotherwords,meetthetechnicalrequirements.

  • 1. TECHNICAL SPECIFICATIONS AsapprovedinParisonSeptember23.Everypartnerisresponsibleforhisowndatabaseonalocallevel.Theywillneedtomeetthetechnicalrequirementsbeforebeingindexedintothesearchengine.

    a)HostingTheNT2serverswillhosttheproject.Ahostingstrategyincludingtheinfrastructureandserverdetailswillbesenttoyoushortly. ThesearchinterfaceandDrupalconfigurationwillbemirroredbyADELTA,onthegovernmentalhostingsolutiontheyproposed.

    b)SearchWebsiteThesharedinterface,orthesearchwebsite,willbebuiltonaDRUPAL7platform.Assoonassomefundsaregathered,ashellsitecanbebuilt.Thismoneywillbeusedtosetupageneralsitestructureforthefuturesearchengine/interface.TheshellsitewillcomeinhandyforgrantsubmissionsasitcanbeshownasapreviewofthefinalformtheCELLprojectwilltake.ThisplatformcouldbeusedtoprovideinformationabouttheCELLProject.(Littleornodesignwouldberequiredforthisbetaversion.WelljustselectapreexistingDrupaltheme).

    c)CMSEverylocaldatabasethatisalreadyrunningonDrupalwillmergetoversion7.AllthepartnersthatarenotusingDrupalwillneedtomeetthemetadatastandardsontheirown.

    d)MetadataStandardsRDF(DublinCoreandMADS)OAIPMH

    e)IndexationThesearchenginewillbeoperatedundertheAPACHESOLRprotocol.

    Action item: Partners to agree to technical specs and proceed with re-configuration/metadata standard implementation.

    2. TECHNICAL COMMITTEE

  • ThereisnotcurrentlyadesignatedTechnicalCommittee.PresumablyitwillincludeEwan,Peter,ScottandRobin.However,membersfromtheotherpartnersshouldbeincluded,aswell.

    Action item: Determine members of Technical Committee. We assume that Peter, Elli, Ewan, Scott and Robin are on the committee; who else?

    3. EDITORIAL COMMITTEE OneofthedecisionsthatwasmadeinSeptember2013wastocreateanEditorialCommitteetodiscussspecificsontaxonomies,nameauthorities,amongotherthings.TheEditorialCommitteewillbeinchargeofmakingeditorialproposalstobesubmittedtotheotherpartnersforapprovalsodecisionscouldbemakefaster.Itsresponsibilitiesshouldinclude:Theelaborationofataxonomystrategy.(Pleasenotethatpriortothis,wewillhavetoconductananalysisofthecurrentlocaltaxonomiesandcontents.Thatway,thepartnerswillbeprovidedapreciseoverviewoftheirowncontentaswellastheotherpartnersandwillbeabletoselecttheappropriatevocabulariesandtermsfortheproject.)Decidingonwhichfieldsshouldbetaxonomized.(Thisimpliesthatforcertainfieldsalimitedamountoftermscanbeselected.)Thecreationofaelitglossary,orofaspecificvocabularyTheapprovalofthestructureforthesearchinterfaceWebsite.DefiningtheNameAuthority.

    a)NameauthorityForphaseI,wesuggestthattheNameAuthoritysscopeshouldbelimitedto:

    Aspartofthegeneralanalysis:Surveyingtheformatsusedforauthornamedisplaysintheparticipatingdatabases.Determiningadisplaystandardforauthornames.

    b)TaxonomiesAtthispointitisimportanttorepeatthateverypartnerwillorcanpreservehistaxonomyonalocallevel.ThedeterminationofaglobalCELLtaxonomydoesnotimpactthetaxonomyinplacelocally.Itwillonlystructurethesearchinterfacesemanticsinordertoallowtheusertonavigatethroughtheresultsmoreefficiently.Thisimpliesthat:

  • TheCELLtaxonomywontallowfreetagging.TheCELLtaxonomywontbemodifiable.Onceitwillbedetermined,itwontchangethroughtime.Itwillbeimportanttobuildataxonomyasbroadlyaspossiblesothatitcanefficientlyofferaglobalrepresentationofallcontentdisplayablebythesearchengine.Thetaggingwilldefineacontentmorespecificallybytheassociationofthetaxonomictermsusedfortagging.Thisbeingsaid,ifmodificationsarenecessary(toreflectcontemporarychangesinresearch),theycouldbedonewiththeapprovalofallpartners,yearly. EverypartnerwillneedtoimporttheCELLtaxonomyontheirlocaldatabase.Itcanbedisplayedonthelocalwebsiteorremaininvisible.Thatdecisionwillbemadeindependentlybyeverymember,accordingtothestructurealreadyinplace.EverypartnerwillneedtotagtheircontentwiththeCELLtaxonomyforittobeoperationalontheCELLsearchinterface.Thisisoneofthereasonswhythetaxonomyneedstobepermanent.Itisalmostimpossibletoretagallcontentsifanewtermisaddedtothelist.TheoriginaltaxonomiesofeachmembersdatabasewillbedisplayedinafieldthroughthesearchresultsinterfaceoftheCELLprojectWebsite,butwillnotbeintegratedtothesearchprotocol.Justtoemphasizethedifferencebetweenkeywordsandtaxonomy,asunderstoodonatechnicallevel:Thekeywordsarethewordsauserwillputinasearchboxthatwillgenerateresultsdisplayedbythesearchengine,andthetaxonomyactslikeasemanticstructureofallcontentdisplayablebythesearchengine.Itallowstheusertoaddfiltersonaspecificsearchandnavigatethroughcontentsmoreeasily.Itdefinesthedatabasespectrum.Thus,thekeywordssearchandthetaxonomyarecomplementary.HereisanexampletakenfromOIC(thedatabasethatusesasimilarsearchenginethatllbeusedintheCELLproject):http://oic.uqam.ca/fr/search/contenu/Fromthesearchinterface,ausercanproceedtosearchbyenteringkeywordsinthesearchbox.

    Then,dependingontheresults,hecandecidetoaddfilterstodefinethesearchbyusingthetaxonomylocatedintheleftsidebar.

  • Wecouldcallthismethod(forthepurposeofclearcommunication)asemanticdivisionofcontentorasemanticoverview.

    c)FieldsTaxonomiescouldalsobeinjecteddirectlyviacertainfields.Thismethodiscomplementarytothesemanticoverview.Itisapplicabletofieldsthatarespecificenoughtobedeclinedinalimitedamountofterms.Forinstance,thegroupdecidedbothmediaandtagswouldbesharedandbothcouldbetaxonomized.Formediaitcouldeasilybedeclined(defined?)inlimitedterms.Ifinafewyears/months/minutes,anewmediatypecomesalong,welldecideifwewanttoaddittothelist,andretagallcontents.Butthisoperationcantbedoneonaregularbasis.Fortags,thatswherethesemanticoverviewisrelevant.Insteadofauthorizingfreetagging,weprovidealistofcarefullychosentermsdividedincategoriesthataregeneralenoughtoaccommodateallcontents,butbytheirassociation,willdefineitmorespecifically.Forlicenseitcouldeasilybedeclined(defined?)inlimitedterms.Ifanewlicensetypecomesalong,welldecideifwewanttoaddittothelist,andretagallcontents.Butthisoperationcantbedoneonaregularbasis.Thesearesuggestions.TheEditorialCommitteeshouldsettledonthisafteracontentanalysisofthebiggestdatabases.

    Action item: Determine the makeup of the Editorial Committee. Assuming Joe Tabbi is the leader, who else is on the committee? Isthereafinancecommitteeinplacealready?Therecouldbe..

    4. FINANCE COMMITTEE TheFinanceCommitteewillbeinchargeofmanagingtheprojectsfinancialstructureandbudget.Itwilldistributethemoneyaccordinglytotheprojectsneedsandtheavailableresources.Itsresponsibilitiesinclude:

  • Gatheringmoneyfortheshellwebsitethatllturnintothefullsearchinterface.TheamountneededfortheshellwebsitecouldbedeterminedafterabriefdescriptionoftheCELLsneeds.Registeringthedomainnamecell.net.AsScottsuggested,cell.netisavailableandwouldbeagoodurlfortheproject.Identifyinglocalgrantstowhichaprojectcanapplywritingandeditingcollectivelythegrantproposalbeforesubmission.

    Action item: Determine the makeup of the Finance Committee. Sandy indicates he will be part of this committee, who else?

    5. PRODUCTION CALENDARS

    PREPRODUCTIONSCHEDULETECHNICALCOMMITTEE

    PHASEITestthetoolsalreadyinplaceinorder.Developandadjustmodulesaccordingtotheprojectsneeds.

    PHASEIIApplicationofthetestedprotocolsandmodulesontheselectedtestdatabases.PHASEIIIApplicationofthemodelontheotherdatabases.

    PREPRODUCTIONSCHEDULEEDITORIALCOMMITTEE

    PHASEISurveyfortheNameAuthorityprotocol. RecommendationsfortheStructureInterfaceWebsite.Produceananalysisofthedatabases.TaxonomyStrategy.

    PHASEIIELitglossary:TBD(afterphase1)

    PREPRODUCTIONSCHEDULEFINANCIALCOMMITTEE

  • PHASEIRegisteringthedomainnamecell.net:ASAP.Providingfundsfortheshellsite.Identifyinglocalgrantsandsendingproposals.