CenterPoint Energy Process Efficiency Program

Confidential

1

Chandan Rao

5/25/2016

Confidential

2

Process Efficiency Program Overview

Confidential

3

3-Phase Approach & Outcomes

Participation in a no-cost, one-day EnVinta session based on the One-2-Five energy management model

High-level, walk-through, audit

Develop an energy action plan

Utilize engineering and technical support to clarify technical opportunities May qualify for 75% or more of the cost of engineering support

Acquire pre-approvals where necessary

Selecting system improvements

setting a timeline for installation

PE Program drives Strategic Energy

Management Objectives

Confidential

4

Energy Management Diagnostic Elements

Confidential

5

Confidential

6

Confidential

7

Purchased Utilities

ElectricAnnual

Annual Consumption, Unit Cost,

Billing Period Cost, $ kWh $/kWh Min Max Avg Min Max Avg

Apr'14 - Mar'15 $564,950 6,579,698 $0.086 1,121 1,313 1,206 15,924 20,133 18,027

GasAnnual

Annual Consumption, Unit Cost,

Billing Period Cost, $ mmBtu $/mmBtu Min Max Avg

Apr'14 - Mar'15 $239,137 41,660 $5.740 88 182 115

Total Annual Cost$804,087

Peak Demand, kW Consumption Per Day, kWh/day

Usage Per Day,

Confidential

8

Purchased Utilities

Electric

Gas

Confidential

9

Purchased Utilities

Dips in Winter

Confidential

10

Preliminary Energy Usage Allocations

Confidential

11

Overall Savings Potential for Sample Site

Electricity kWh/Yr % Of Total Cost

Min Savings

Range

Max Savings

Range

Min Savings

Range

Max Savings

Range

Min Savings

Range

Max Savings

Range

Die Casting 2,562,000 39% $219,980 5% 10% $10,999 $21,998 128,100 256,200

HVAC 1,848,840 28% $158,746 7% 15% $11,112 $23,812 179,340 384,300

Compressed Air 529,332 8% $45,450 15% 25% $6,817 $11,362 384,300 640,500

Lighting 506,880 8% $43,522 25% 60% $10,881 $26,113 640,500 1,537,200

Other 380,503 6% $32,671 - - - - - -

Tower Water 367,759 6% $31,577 15% 30% $4,737 $9,473 384,300 768,600

Machining 281,250 4% $24,149 2% 5% $483 $1,207 51,240 128,100

Vacuum 70,497 1% $6,053 10% 20% $605 $1,211 256,200 512,400

Waste Water Treatment 32,638 0% $2,802 10% 20% $280 $560 256,200 512,400

$564,950 $45,914 $95,737 2,023,980 4,227,300

8% 17%

Gas

MMBtu /

% Total Cost

Min Savings

Range

Max Savings

Range

Min Savings

Range

Max Savings

Range

Min Savings

Range

Max Savings

Range

MMBtu/Yr

Melting Furnaces

Ladle heaters

8,839 MMBtu/Yr

21% Space Heating

$239,137 $19,568 $48,555

8% 20%

Min Max

Total $65,482 $144,292 /Yr

8% 18%

Percent Cost Energy

1,641 4,923

1,768 3,536

Percent Cost Energy

5% 15% $28,260

20%

$9,420

40% $10,148 $20,296

32,821

79%

Base

Variable

$188,398

$50,739

Confidential

12

Savings Potential Drill Down

Approx 7% to 22% Energy Cost Savings

Potential

Confidential

13

Questions

Thank you

President, Graphet Inc

Over 25 years of experience in energy conservation for the large and mid industrial and commercial sectors

Energy teams facilitation and development of long-term plans for sustainability

Expertise in evaluation/optimization of compressed air systems, industrial ventilation systems and process heating & cooling systems