centralcentral – wan chai bypass tunnel (slip road section 8) contract no. hy/2010/08 additional...
TRANSCRIPT
Central – Wan Chai Bypass Tunnel
(Slip Road Section 8)
Contract No. HY/2010/08
Additional Mitigation Plan for Slip Road 8 under condition 2.16 of FEP- 10/364/2009/B
Revision: 4
January 2019
Prepared by:
Environmental Officer
Gabriel Wong Date: 11 January 2019
This document contains confidential information of China State Construction Engineering
(Hong Kong) Limited and shall not be copied or amended without the approval of the
Contractor’s Representative
Contract No. HY/2010/08 Central – Wan Chai Bypass Tunnel (Slip Road 8 Section) Additional Mitigation Plan January 2019
Table of Content
1 INTRODUCTION 1
2 SCOPE OF WORKS 1
3 LIST OF REFERENCE DOCUMENT 2
4 KEY FACTORS CONSIDERED DURING CONSTRUCTION OF NOISE
SCREENING STRUCTURE WITH AESTHETIC DESIGN
2
5 DETAILS OF PROPOSED NOISE SCREENING STRUCTURE 3
6. CONSTRUCTION SCHEDULE 4
7 TREE & SHRUB PLANTING AMONGST THE NOISE SCREENING
STRUCTURE
4
8 NOISE SCREENING STRUCTURE WITH AESTHETIC DESIGN 4
9 Landscaping Area above Slip Road 8 change of design 4
List of Appendices
Appendix A
Location of Noise Screening Structure with Aesthetic Design & Landscape Area
Appendix B
Tree Planting Plan & Shrub Planting Plan
Appendix C
Detail Section of Noise Screening Structure & Wall Pattern of Noise Screening
Appendix D
Change of Landscaping Area above Slip Road 8
Appendix E
Victoria Park Re-provisioning Irrigation System Layout Plan
Contract No. HY/2010/08 Central – Wan Chai Bypass Tunnel (Slip Road 8 Section) Additional Mitigation Plan January 2019
PlanD’s observation / comment via memo dated 18 October 2018 ref. (23) in EP2/H4/S3/15 in Annex
Responses
Central-Wan Chai Bypass –Tunnel (Causeway Bay Typhoon Shelter Section) EP Condition 2.16: Additional Mitigation Plan for Slip Road 8 (Revision 3)
It is acknowledged that the amendments shown in Appendices C and D in the revised plan, please find below our comments from landscape planning perspective: 1. For Appendix C – ‘Change in the Wall Painting
(planting of Babusa vulgaris wamin instead of painting bamboo like pattern on the screen wall) of the noise screening structure’: The proposed planting of Bambusa vulgaris is
an acceptable alternative measure, subject to the agreement from the future vegetation maintenance agent e.g. LCSD on the proposed plant species and its spacing etc.
Acceptance of the proposed planting of Bambusa vulgaris from LCSD has been obtained on 30 October 2017 as per the email attached in Appendix C.
Details to support the proposed bamboo planting, e.g. width and depth of soil medium and irrigation arrangement should be indicated in the section A-A drawing.
For the width of the soil medium please refer to the site sketch as attached in Appendix C. For the depth of the soil medium, it varies from 1.7m to 4.5m. For the irrigation arrangement layout and details of waterpoint, please refer to the site sketch as attached in Appendix E.
2. For Appendix D – ‘Part of the landscape area above Slip Road 8 occupied by additional elderly fitness facilities’:
Provided that the original proposed shrub and/or tree planting in this landscape area will not be affected, we have no comment on the above proposal.
Noted
The EP holder is reminded to seek comment from the future maintenance agent regarding the additional elderly fitness facilities, in particular the horizontal clearance requirements.
The acceptance from VPMO regarding the additional elderly fitness facilities have been obtained on 22 October 2018, please refer to Appendix D.
Noting that the location of proposed additional elderly fitness facilities is adjacent to the Slip Road 8, dense screen planting should be considered to protect users from the air pollution sources.
Please note that the proposed elderly fitness facilities was located on top of Slip Road 8 and away from tunnel portal. With the structure of screen wall along tunnel portal and planting area surrounding the elderly fitness facilities, the user would be protected from the air pollution source.
Contract No. HY/2010/08 Central – Wan Chai Bypass Tunnel (Slip Road 8 Section) Additional Mitigation Plan January 2019
1
1.0 Introduction
In accordance with condition 2.16 of the Further Environmental Permit No. FEP-
10/364/2009/B, the purpose of this additional mitigation plan is to set out the noise and
visual mitigation measures of Slip Road 8 Section in Victoria Park, i.e. noise screening
structure with aesthetic design of the Central – Wan Chai Bypass Tunnel (Slip Road 8
Section) Project (hereafter SR8).
Landscape issue will be discussed in a separate landscape plan in accordance with the
condition 2.14 of FEP-10/364/2009/B.
Noise screening structure with aesthetic design forms part of works for Central – Wan Chai
Bypass as recommended in the approved EIA report (Registration No.: AEIAR-125/2008).
As the permit holder of the Further Environmental Permit No. FEP-10/364/2009/B, China
State Construction Engineering (Hong Kong) Limited (hereafter CSHK) would be
responsible for construction of the screening structure.
2.0 Scope of Works of SR8
In accordance with the conditions stipulated in the Environmental Permit No. EP-
364/2009/B and Further Environmental Permit No. FEP-10/364/2009/B, this plan aims to
reduce the noise & visual impacts of the Slip Road 8 on users of the Victoria Park during
the operation phase.
The scope of works mainly includes:
i) Construction of about 100m long Slip Road 8 tunnel structure in Causeway Bay
Typhoon Shelter (CBTS) by cut- and cover method;
ii) Construction of about 200m slip road 8 tunnel underneath Victoria Park Road and
within Victoria Park by cut-and- cover method;
iii) Construction of about 410m at grade carriageway connecting to Tsing Fung Street;
&
iv) A Landscape area in accordance with Figure 4.5 of the approved EIA report.
Location of noise screening structure with aesthetic design and landscape area, please refer
to Appendix A.
Contract No. HY/2010/08 Central – Wan Chai Bypass Tunnel (Slip Road 8 Section) Additional Mitigation Plan January 2019
2
3.0 List of Reference Document
Relevant conditions in the EP and FEP are listed as follows for ease of references.
EP and FEP Condition Remarks
EP No. EP-364/2009, Condition 2.16
and
FEP-10/364/2009/B, Condition 2.16
- Referring to the Condition 2.16 stipulated
in Environmental Permit No. EP-364/2009
and FEP-10/364/2009/B, submission of
additional mitigation plan at least one
month prior commencement of the works.
- 4 hard copies & 1 electronic copy of
additional mitigation plan shall be certified
by ET Leader and verified by the IEC as
conforming to the relevant information and
recommendation contained in the approved
EIA Report (Register No.: AEIAR-
125/2008).
4.0 Key Factors Considered during Construction of Noise Screening
Structure with Aesthetic Design
The following factors have been taken into account during the preparation for this
additional mitigation plan
4.1 The proposed aesthetic design would be applied on the side facing Victoria Park and
the noise screening wall should be structure with compatible form, color and pattern
to create a harmonious visual relationship with Victoria Park. Different forms and
aesthetic design were considered.
Further to the noise screening structure proposed under the Additional Mitigation Plan
(Rev.02) approved on 09-04-2015, Noise Screening Structure will be constructed
without the wall pattern, a Planter Kerb will be constructed in front of the screen wall
and Bambusa Vulgaris cv. Wamin (BVW) will be planted. (Please refers to Appendix
B for the proposed planting plan and Appendix C for details on noise screening
structure).
4.2 Re-provisional works of the existing bowling green field prior to construction of noise
screening structure.
Contract No. HY/2010/08 Central – Wan Chai Bypass Tunnel (Slip Road 8 Section) Additional Mitigation Plan January 2019
3
4.3 Diversion of traffic on Tsing Fung Street, Victoria Park Road & Island East Corridor
(IEC) to facilitate the construction works.
4.4 Plants established for the noise screening structure & landscape area. Please refer to
Appendix C for more details.
4.5 The purpose of the screen wall is to further reduce the traffic noise impact of Slip
Road 8. The screen wall is an additional measure to the noise mitigation measures
stated in the EIA report and therefore the overall performance on noise mitigation will
be better than the recommendations in the EIA.
5.0 Details of Proposed Noise Screening Structure
5.1 Taking into account of the key factors mentioned in Section 4 above & in accordance
with the Table 10.4 (Significant Landscape Impacts of the Proposed Works during
Construction Phase) of the approved EIA report, the construction works of noise screening
structure is designed and its details are elaborated below
(a) Approx. 1,900m2 of Victoria Park will be permanently alienated by the Slip Road
8,
(b) One bowling green court will be permanently alienated by the Slip Road 8,
(c) Existing trees will be affected by the roadworks and
(d) Existing trees will be affected by the reprovisioning of the affected facilities in the
Victoria Park including the reprovisioning of a bowling green, and
(e) Existing trees will be affected by the Landscape Deck across Victoria Park Road
5.2 Maintenance of planting & shrubs –
(a) To carry out the establishment period as stipulated in the Particular Specification,
(b) Liaise with the Engineer on site to tackle the earth works issue(s),
(c) Drawings shown indicative layout, final decision will subject to the site condition
& Engineer’s decision.
5.3 Change in alignment of structure & construction details, if any, would be subject to the
instruction & drawings of Highways Department.
Contract No. HY/2010/08 Central – Wan Chai Bypass Tunnel (Slip Road 8 Section) Additional Mitigation Plan January 2019
4
6.0 Construction Schedule
The anticipated schedule of the noise screening structure is shown in Appendix A. It is
prepared based on the latest Works Programme and may subject to changes to cope with
the actual site situation and progress. Noise screening structure with aesthetic design would
be the permanent structure along the carriageway.
Construction of noise screening structure on site subject to the works carried out. Works
programme refers to Appendix A for details.
7.0 Tree & shrub planting amongst the Noise Screening Structure
The overall tree planting & shrub planting of noise screening structure is summarized and
enclosed in Appendix B.
8.0 Noise screening structure with aesthetic design
The detail section of noise screening structure, please refer to Appendix C for details.
9.0 Landscaping Area above Slip Road 8 change of design
Part of the Landscaping Area above Slip Road 8 was occupied by Elderly Fitness Area, as
instructed by AECOM on 22nd June 2017 (AECOM ref
CWN:PP:mplm:60095653/C8/M15/210/039/0950-2017006058T) (Appendix D refers).
Trees / shrubs will be planted inside the remaining Landscape Area. Please refer to
Appendix B for tree and shrub planting detail.
Contract No. HY/2010/08 Central – Wan Chai Bypass Tunnel (Slip Road 8 Section) Additional Mitigation Plan January 2019
5
Appendix A
Location of Noise Screening Structure
with Aesthetic Design
& Landscape Area
Contract No. HY/2010/08 Central – Wan Chai Bypass Tunnel (Slip Road 8 Section) Additional Mitigation Plan January 2019
6
Appendix B
Tree Planting Plan &
Shrub Planting Plan
Contract No. HY/2010/08 Central – Wan Chai Bypass Tunnel (Slip Road 8 Section) Additional Mitigation Plan January 2019
7
Appendix C
Detail Section of Noise Screening Structure
& Wall Pattern of Noise Screening
Contract No. HY/2010/08 Central – Wan Chai Bypass Tunnel (Slip Road 8 Section) Additional Mitigation Plan January 2019
8
Appendix D
Change of Landscaping Area above Slip
Road 8
Contract No. HY/2010/08 Central – Wan Chai Bypass Tunnel (Slip Road 8 Section) Additional Mitigation Plan January 2019
9
Elderly Facilities with tree planting plan
Contract No. HY/2010/08 Central – Wan Chai Bypass Tunnel (Slip Road 8 Section) Additional Mitigation Plan January 2019
10
Appendix E
Victoria Park Re-provisioning Irrigation
System Layout Plan
Contract No. HY/2010/08 Central – Wan Chai Bypass Tunnel (Slip Road 8 Section) Additional Mitigation Plan December 2018
5
Appendix A
Location of Noise Screening Structure
with Aesthetic Design
& Landscape Area
Contract No. HY/2010/08 Central – Wan Chai Bypass Tunnel (Slip Road 8 Section) Additional Mitigation Plan August 2018
6
Appendix B
Tree Planting Plan &
Shrub Planting Plan
Contract No. HY/2010/08 Central – Wan Chai Bypass Tunnel (Slip Road 8 Section) Additional Mitigation Plan August 2018
7
Appendix C
Detail Section of Noise Screening Structure
& Wall Pattern of Noise Screening
TS
¿ì̈
ó̄¦aº
Bowling Green
LLL
L
EASTERNCORRI
DOR
4.0
4.4
5.5
5.5
12.6
P
P
TS
ó̄¦aº¹C¼
Bowling Green
Playground
H
4.0
4.2
4.2
4.3
4.4
4.4
4.7
4.8
ISLAND EASTERN C
ORRIDOR
A/M
A/M
SLIP
ROAD 8
A/M
A
COMPOUND
NURSERY
Aó̄¦aº
Bowling Green
4.0
PLANTER KERB
EXISTING
MATCH WITH
BOWLING GREEN OFFICE
REPROVISIONED
PAVILION
REPROVISIONED
ARBOUR
BOWLING GREENREPROVISIONED
NEW ENTRANCE
FOOTPATHPROPOSED MATCH WITH
(TYPE 3)
PLANTER KERB
PROPOSED U-CHANNELCONNECTED FROM
WALL
EXISTING FENCE
MATCH WITH
DEMOLISHED
PLANTER TO BE
EXISTING
EXISTING FOOTPATHMATCH WITH
150
U-CHANNEL
225
U-CHANNEL
STEPPED
225 U-CHANNEL
STEPPED
225
U-CHANNEL
SKETCH NO.
Rev. Date Description Drawn Prepared Checked
(SLIP ROAD 8 SECTION)
CENTRAL - WAN CHAI BYPASS - TUNNEL
CONTRACT NO. HY/2010/08
CENTRAL - WAN CHAI BYPASS AND IEC LINK
SCALE
TITLE:
P
TS
Office
Victoria Par
k Fast F
ood
Kios
k
¿ì¨
ºû¦
ó̄¦aº
¹C¼
Bowling Green
Playground
SHR
PO
L
LL
LL
L
H
LLLL
LL
L L
L
L
L
L
LL
L
L
L
ISLAND
EASTERNCORRI
DOR
ªF°Ï
3.8
3.8
4.0
4.4
4.7
4.8
4.9
5.1
5.2
5.2
5.3
5.5
5.5
5.5
5.6
5.6
5.8
5.9
6.1
6.2
6.2
6.6
7.1
7.1
7.1
7.2
7.3
7.5
7.6
7.87.9
8.2
8.3
8.6
8.8
8.9 8.9
8.9
9.0
9.1
9.2
9.3
9.4
9.7
9.7
10.3
10.3
11.1
11.211.2
11.2
11.2
11.3
11.6
11.7
12.2
12.4
12.5
12.6
15.0
¹C¼Playground
²îSlipway
±Æ¤
H
W
M
Seawall
Outfall
L
L
L
L
L
L L
L
L
H
L
L
VICTORIA PARKROAD
ºû¶
3.4
4.3
4.3
15.0
15.5
16.5
P
P
TS
Chan
ging R
oom
§ó¦
ó̄¦aº
·È¦
ºô²
¬Ý
¬Ý
ºû¶éºô
ºô²
ºû¦h§Q̈ È
¹C¼
¹C¼
Victoria Park Swimming Pool
Bowling Green
Skatin
g Area
Tennis C
ourts
Sta
nd
Stan
d
Tennis C
ourts
Playground
Playground
WIP Sep 2007
LLLL
L
H
4.0
4.14.2
4.2
4.3
4.3
4.4
4.4
4.5
4.54.5
4.5
4.5
4.6
4.6
4.7
4.7
4.8
4.8
4.9
H
L
LEGEND:
KEY PLAN
ARBOUR
SECTION A-A
WALL
FENCE
SCREEN WALL
OFFICE
BOWLING GREEN
TO BE MAINTAINED
EXISTING FENCE WALL
-
1:500(A3)
14-06-17 FOR CONSTRUCTION CPL FF TH
1:5000SCALE
NO.60095653/T2/5542)
WORKING DRG.
(DETAILS REFER TO
BOUNDARY FENCE
MAINTAINED
FENCE TO BE
EXISTING BOUNDARY
60095653/T2/SK0269)
REFER TO SKETCH NO.
FENCE WALL (DETAILS
60095653/T2/SK0250)
REFER TO SKETCH NO.
(TYPE A PAVEMENT,
PROPOSED WALKWAY
3%
BEHIND REPROVISIONED BGO
LAYOUT PLAN FOR ADDITIONAL WALKWAY
F.F.L.
S.O.L.
PLANTING AREA
4500 C/C APPROX.
5x5 NOTCH IN FINISH AT
GRANOLITHIC FINISH WITH
25 THK. WASHED COLOURED
PLANTER KERB (TYPE 3)
A3 1:25SCALEA3 1:100SCALE
13-10-17 CPL TC THA
60095653/T2/SK0721D
WALKWAY
MAIN
IRRIGATION
FOUL SEWER
225 COVERED U-CHANNEL500
U-SHAPE STRUCTURE
CV WAMIN (BVW)
BAMBUSA VULGARIS
佛肚竹
大
WALKWAY
2500 MIN.
ARBOUR
2500
500
2000
APPROX.
1400
金連翹
連翹
花葉
STAGGER
'GOLDEN' (DRG)
AND DURANTA REPENS
'VARIEGATA' (DRV)
DURANTA REPENS
(TYPE 3)
PLANTER KERB WITH A252 WIRE MESH
GRADE 20/20 FOOTING
250
250
500
100
5025 25
200
LAYER
50 THK. BLINDING
300
50
100
PLANTER KERB
TO MATCH WITH EXISTING
PLANTER KERB (TYPE 3)
PLANTING AREA
60095653/T2/5522)
DRG. NO.
(REFER TO WORKING
PROPOSED GULLY
DETAILS ADDED
PLANTER & DRAINAGE
CPL TC TH21-11-17B
DETAIL '1'
PLANTING AREA1630
A3 1:25SCALE
DETAIL '1'
PLANTERPLANTER
AND DETAIL '1' ADDED
225 U-CHANNEL REVISED
AND SK0609)
60095653/T2/SK0759
SKETCH NOS.
60095653/T2/5522 AND
DRG. NO.
REFER TO WORKING
DRAINPIT (DETAILS
U-CHANNEL WITH
PAVEMENT
WITH TYPE A
TRANSITION AREA
C 07-02-18 KFC TC THSECTION A-A REVISED
NOTE 2 ADDED AND
SKETCH NO. 60095653/T2/SK0762.
FOR LIGHTING LAYOUT, REFER TO 2.
STATED.
MILLIMETRES UNLESS OTHERWISE
ALL DIMENSIONS ARE IN 1.
NOTES:
(TYPE 3)
PLANTER KERB
100
CABLE
LIGHTING
POST
LIGHTING
200
D 29-06-18 KFC TC THNEXT TO REPROVISIONED BG
DIVIDED PLANTER AREA
60095653/T2/SK0496)
SKETCH NO.
MANHOLE (REFER TO
EXISTING STORMWATER
60095653/T2/SK0496)
(REFER TO SKETCH NO.
STORMWATER MANHOLE
D
D
A3 1 : 100
SCALE A1 1 : 50
NOTES:
NO. 60095653/T2/3011C TO 3013C.
THIS DRAWING IS READ IN CONJUNCTION WITH DRAWING 2.
SPECIFIED.
ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE1.
SKETCH NO.
Rev. Date Description Drawn Prepared Checked
(SLIP ROAD 8 SECTION)
CENTRAL - WAN CHAI BYPASS - TUNNEL
CONTRACT NO. HY/2010/08
CENTRAL - WAN CHAI BYPASS AND IEC LINK
SCALE
TITLE:
75mm BLINDING LAYER
SCALE A1 1 : 50
FALL
FALL
A3 1 : 100
NO. SSD14)
(REFER TO HyD. STD.
TYPE 2 PARAPET
UTILITY TROUGH
UTILITY TROUGH
100 THK. PAVEMENTFINISHED ROAD LEVEL
WATERPROOFING MEMBRANE
(DRAWN AT S.O.L. SR08 CH254.675)
S.
O.
L.
SR
O8
SLIP ROAD 8
TO DRG. NO. 60095653/T2/2011
U-SHAPE STRUCTURE REFER
DETAILS FOR PIPE ALONG
FALL
(+mPD)
ACCESS LEVEL
MAINTENANCE
82451500 1500 3000
350
350
1000
AP
PR
OX. 2000
3000
VA
RI
ES
SCREEN WALL
CH240.00
CH230.00
CH220.00
CH210.00
M.J.
M.J.
M.J.
M.J.
6.50mPD
4.50mPD 4.50mPD 4.50mPD
4.70mPD
ELEVATION
6.70mPDU8A-1
350
FINISHED ROAD LEVEL
SCREEN WALL
SCREEN WALL WITH PAINT FINISH
WALL PATTERN DETAIL FOR NOISE SCREENING
A3 1 : 50
SCALE A1 1 : 25
BOWLING GREEN OFFICE
225 COVERED U-CHANNEL
金連翹
花葉連翹
STAGGER
'GOLDEN' (DRG)
AND DURANTA REPENS
'VARIEGATA' (DRV)
DURANTA REPENS
WAMIN (BVW)
BAMBUSA VULGARIS CV
大佛肚竹
3%
(TYPE 3)
PLANTER KERB
LIGHTING CABLE
FOUL SEWER
FENCE WALL
500
MAIN
IRRIGATION
200500
2000
(TYPE 3)
PLANTER KERB
APPROX.
1400
PLANTER 500 MIN. WALKWAY 500 ARBOUR PLANTER U-SHAPE STRUCTURE
- 11-07-18 AS BUILT KFC TC TS
SCREEN WALL ASBUILT
60095653/T2/SK0830 AS SHOWN
TYPICAL SECTION OF STRUCTURE SLAB
mPD
3
5
7
1000
FENCE
BOUNDARY
Contract No. HY/2010/08 Central – Wan Chai Bypass Tunnel (Slip Road 8 Section) Additional Mitigation Plan August 2018
8
Appendix D
Change of Landscaping Area above Slip
Road 8
Contract No. HY/2010/08 Central – Wan Chai Bypass Tunnel (Slip Road 8 Section) Additional Mitigation Plan January 2018
9
Elderly Facilities with tree planting plan
Contract No. HY/2010/08 Central – Wan Chai Bypass Tunnel (Slip Road 8 Section) Additional Mitigation Plan January 2019
10
Appendix E
Victoria Park Re-provisioning Irrigation
System Layout Plan
P
TS
Office
Victoria Par
k Fast F
ood
Kios
k
¿ì ¤
”߃
¤¨⁄
§Ö?
fló ƒa”
„C…
Bowling Green
Playground
SHR
PO
L
LL
LL
L
H
LLLL
LL
L L
L
L
L
L
L
L
ISLAND
EASTERNCORRI
DOR
“F° ˇ
3.8
4.0
4.4
4.7
4.8
4.9
4.9
4.9
5.1
5.2
5.2
5.2
5.2
5.2
5.3
5.5
5.5
5.5
5.6
5.6
5.8
5.9
6.2
6.6
7.1
7.1
7.1
7.2
7.3
7.5
7.6
7.87.9
8.2
8.3
8.6
8.8
8.9 8.9
8.9
9.0
9.1
9.2
9.3
9.4
9.7
9.7
10.3
10.3
11.1
11.211.2
11.2
11.2
11.3
11.6
11.7
12.2
12.4
12.5
12.6
15.0
H
L
„C…RCP
Playground
–̆⁄
Seawall
Outfall
L L
L
L
LL
L
L L
L
L
L
H
L
VICTORIA PARKROAD
” ߶
3.4
4.3
4.3
15.5
16.5
P
P
TS
TS
Chan
ging R
oom
Victoria Park
Shroff Office
Table Tennis
§óƒ
” ߃h§Q”̂ ¶
¾À†y
¥â ¥ª
”߃h§
Q
fló ƒa”
” ô †
•¨ƒ
” ô †
”ô†
‹Ý
‹Ý
”߶
Ø”
ô
” ô †”ô†
‹Ý
‹Ý
⁄â†
” ߃h§Q¤̈
„C…
„C…
Victoria Park Swimming Pool
Bowling Green
Skatin
g Area
Tennis Courts
Tennis Courts
Tennis C
ourts
Sta
nd
Stan
d
Tennis CourtsVicto
ria Park
Centre Court
Tennis C
ourts
Sta
nd
Stan
d
Hand
ball
Field
Playground
Playground
WIP Sep 2007
LL
L
LL
L
H
ƒæ⁄
H
4.0
4.14.2
4.2
4.3
4.3
4.4
4.4
4.5
4.54.5
4.5
4.5
4.5
4.6
4.6
4.7
4.7
4.7
4.7
4.8
4.8
4.8
4.8
4.8
4.9
A/M
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
22
22
22
42
22
76
76
22
22
22
22
22
22
1"
25GI
A/M
T
T
T
T
T
T
T
*
T
T
T
WP 1-2
WP 1-3
WP 2-3
DN 25SV
22
25
25
DN 25S
V
22
DN 25SV
42
25
76
76
22
WP 5-1
*
DN 25SV
DN 25SV
*
25
T
*WP 1-6
*WP 1-4
*WP 1-6
*WP 4
-2
*WP 4-1
*WP 1-1
DN 25SV
DN 25
SV
WP 4-3
DN 25
SV
DN 25S
V
DN 25S
V
DN 25SV
DN 25S
V
WP 1-
5*DN
25SV
DN 25SV
DN 25SV
DN 25SV
DN 25SV
DN 25S
V
SKETCH NO.
Rev. Date Description Drawn Prepared Checked
(SLIP ROAD 8 SECTION)
CENTRAL - WAN CHAI BYPASS - TUNNEL
CONTRACT NO. HY/2010/08
CENTRAL - WAN CHAI BYPASS AND IEC LINK
SCALE
TITLE:
816200 N
816100 N
816000 N
ISLAND
EASTERN CORRI
DOR
A/M
A/M SLIP
ROAD 8
F/P
A/M
837500
E
837600
E
LEGEND:
WORKS BOUNDARY
EXISTING IRRIGATION PIPE
NOTES:
FROM VICTORIA PARK.
SHALL BE AGREED WITH THE REPRESENTATIVES
ANY TEMPORARY SUSPENSION OF WATER SUPPY
OTHER FACILITIES THAT REQUIRED WATER SUPPY,
THE WATER SUPPLY TO IRRIGATION POINT AND
WATERMAIN, THE CONTRACTOR SHALL MAINTAIN
3. BEFORE THE COMPLETION OF THE PERMANENT
WATERMIANS.
OF THE CONNECTION POINT TO THE EXISTING
RESPONSIBLE TO VERIFY THE EXACT LOCATION
INDICATIVE ONLY. THE CONTRACTOR IS
1. THE ALIGNMENT OF EXISTING WATERWORKS IS
REFER TO DRG. 60095653/T2/5532-5533.
2. DETAILS OF WATERWORKS WITHIN VICTORIA PARK
837400
E
ON DRG. 60095653/T2/5533.
IRRIGATION POINT SHALL BE TYPE I AS SHOWN
4. UNLESS OTHERWISE SPECIFIED, THE PROPOSED
UNLESS OTHERWISE STATED.
6. ALL PIPES SHALL BE JOINTED BY SPIGOT AND SOCKET
PIPE SHALL BE 20/20.
7. CONCRETE GRADE FOR HAUNCHING AND SURROUND TO
FOR FUTURE CONNECTION.
8. BLANK FLANGE SHALL BE PROVIDED TO THE PIPE ENDS
UNDERGROUND.
9. THRUST BLOCKS SHALL BE PROVIDED AT ALL BENDS
CONCENTRIC TEE PIECES UNLESS OTHERWISE AGREED.
11. ALL TEE OFFS EXCEPT THE WASH OUT TEES SHALL BE
STANDARD DRAWING NO. WSD 1.4 & WSD 1.40.
14. FOR TYPICAL DETAILS OF THRUST BLOCK REFER TO WSD
WATERMAIN ARE 1.5MPa AND 1.0MPa RESPECTIVELY.
15. TESTING AND WORKING PRESSURE FOR THE PROPOSED
OF DIFFERENT ZONES, REFER TO HyDTC NO. 3/90.
KERB ZONE AND 600mm IN FOOTWAY ZONE FOR DEFINITION
COVER OF 1000mm IN CARRIAGEWAY ZONE, 1500mm IN
13. ALL UNDERGROUND WATERPIPES SHALL HAVE MINIMUM
LAID UNDERGROUND.
16. ALL PIPES AS INDICATED ON THE DRAWING SHOULD BE
THE PIPE LAYING WORKS AS SHOWN ON THE DRAWINGS.
WIS 4-22-11 AND WIS 4-32-14 SHOULD BE ADOPTED FOR
5. POLYETHYLENE PIPE AND FITTING CONFORMING BS 6572,
DRAWING NO. WSD 1.31.
WATERMAINS IN ACCORDANCE WITH WSD STANDARD
12. IDENTIFICATION TAPES SHALL BE LAID ALONG ALL
F/P
A/M
TEXISTING IRRIGATION POINT
T
TO BE DEMOLISHED
EXISTING IRRIGATION POINT
*
SV SLUICE VALVE
GV GATE VALVE
SAV SINGLE AIR VALVE
DOUBLE AIR VALVEDAV
WOV WASH OUT VALVE
WALL/ABUTMENT WALL
RETAINING
STRUCTURE SLAB
U-SHAPE STRUCTURE
FOOTPATH
VALVE
AMENITY AREA
IRRIGATION POINT
VICTORIA HARBOUR
REDE
VELOP
MENT P
ROJECT
VICT
ORIA
PARK SWI
MMING
POOL
WATERMAI
N TO
BE L
AID
UNDER
CWB PROJ
ECT
LAID
UNDER
WATERMAI
N TO
BE
IRRIGATION MAIN
TO BE DEMOLISHED/ABANDONED
EXISTING IRRIGATION MAIN
SHALL BE INSTALLED IN PLANTERS
10. WATER PIPES AND WATER BOXES OF IRRIGATION SYSTEM
APPROVAL PRIOR TO FIBRICATION AND ASSIMBLY.
IRRIGATION PIPES AND FITTINGS FOR ENGINEER’S
CONTRACTOR SHALL SUBMIT SHOP DRAWINGS OF THE
17. THE PIPE FITTINGS ARE INDICATIVE ONLY. THE
EXTRACTED FROM WORKING DRAWING No. 60095653/T2/5531B 60095653/T2/SK0536 1:1000(A3)
- PC TH05-04-17 SYC
* 25
F/P
A/M
IRRIGATION SYSTEM LAYOUT PLAN
VICTORIA PARK REPROVISIONING
ALIGNMENT REVISED
IRRIGATION POINT AND
60095653/T2/SK0667
REFER TO SKETCH NO.
REPROVISIONED BOWLING GREEN
DETAILS OF IRRIGATION SYSTEM AT
IRRIGATION MAIN
EXISTING
CONNECTED TO
IRRIGATION MAIN
EXISTING
CONNECTED TO
IRRIGATION POINT
CONNECTED TO EXISTING
EXISTING IRRIGATION MAIN
CONNECTED IRRIGATION TO
EXISTING IRRIGATION MAIN
CONNECTED IRRIGATION TO
WP 5-2