CENTRAL PARK VILLAGE 3068 Gladwin Road, Abbotsford, BC Prepared By: Daniel Lee,* Principal 604.757.5102 [email protected] * Daniel Lee Personal Real Estate Corporation Jeron Dillon, Associate 604.647.1330 [email protected]

Upload: others

Post on 10-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CENTRAL PARK VILLAGE...november 04, 2016 suite framing revisions september 09, 2016 issued for construction august 4, 2016 building 9 elevator hoistway size reduced. w wall moved 2"

CENTRAL PARK VILLAGE3068 Gladwin Road, Abbotsford, BC

Prepared By:

Daniel Lee,* Principal [email protected]* Daniel Lee Personal Real Estate Corporation

Jeron Dillon, Associate 604.647.1330 [email protected]

Page 2: CENTRAL PARK VILLAGE...november 04, 2016 suite framing revisions september 09, 2016 issued for construction august 4, 2016 building 9 elevator hoistway size reduced. w wall moved 2"

UnitsBuilding 9 2,945 sf102 2,016 sf103 949 sf104 705 sf105 850 sf106 1,124 sf107 1,200 sf

*101+102 may be combined to create 4,961 Square foot.

Building 8 retail space 3,882 sf Building 10 3,689 sfBuilding 11 3,796 sfAsking Rate: Please Contact Listing Agents Operating Costs: Estimated $10.50 / sfTiming 2018

Central Park Village

Central Park Village is a new mixed use development just north of busy South Fraser Way, along Gladwin Road. The site is 9.6 acres and will consist of retail, office, medium and high-rise residential. Once complete the project will have over 700 residential units. The site sits in the retail node of the market and is accessed from a fully controlled intersection off of Gladwin Road (18,535 vehicles per day). Opportunities exist for all retail and service uses ranging from 700 square feet up to 5,000 square feet. Possession for retail and office is scheduled for mid 2018.

Page 3: CENTRAL PARK VILLAGE...november 04, 2016 suite framing revisions september 09, 2016 issued for construction august 4, 2016 building 9 elevator hoistway size reduced. w wall moved 2"

Building 8

Building 9

Building 10

Building 11

Page 4: CENTRAL PARK VILLAGE...november 04, 2016 suite framing revisions september 09, 2016 issued for construction august 4, 2016 building 9 elevator hoistway size reduced. w wall moved 2"

C10

22,

016

gsf

9F101

9Fa

UP

DN

UP

DN

C10

3

949

sf

C10

4

705s

f

C10

5

850s

f

C10

6

1,12

4sf

C10

7

1,20

0 sf

9F102

9F103

9F104

9F105

106

C10

12,

945

gsf

SCAL

E:M

AIN

FLO

OR

PLA

N (F

LOO

R A

REA

: 21,

543

GSF

)1/

8" =

1'-0

"

NORTH

FILE

NO

.

SHEE

T N

O.

1003

BD

ATE

DW

N.

CH

K.

CLI

ENT

PRO

JEC

T

DR

AWIN

G T

ITLE

CEN

TRA

L PA

RK

VIL

LAG

EPH

ASE

2A

- B

LDG

9

CA

NTE

RR

AD

EVEL

OPM

ENTS

LTD

.

©C

opyr

ight

res

erve

d. T

his

draw

ing

is th

epr

oper

ty o

f Foc

us A

rchi

tect

ure

Inco

rpor

ated

thei

r ex

pres

s w

ritte

n pe

rmis

sion

.

Sui

te 1

09 -

152

8 M

cCal

lum

Roa

dAb

bots

ford

, Brit

ish

Col

umbi

a V2

S 8A

3t

604.

853.

5222

f 60

4.85

3.54

42

e in

fo@

focu

sai.c

a

CO

NSU

LTAN

T

3050

& 3

060

GLA

DW

IN R

OA

DA

BB

OTS

FOR

D B

C

REV

ISIO

NS

ISSU

ED F

OR

BU

ILD

ING

PER

MIT

SEAL

DEC

01-

2015

1

A-2

.10

AR

CH

IT

EC

TU

RE

IN

CO

RP

OR

AT

ED

2015

.01.

28 CH

Plotted: May 29, 2017 at 4:13:58pm by Rochelle Wallis File: Z:\2010 Projects\1003 - Central Park Village - Gladwin\Working Drawings\PHASE 2\PHASE 2A\1003 Building Plans.dwg - Layout: A-2.10

PHA

SE 2

a

CIT

Y R

EVIE

W C

OM

MEN

TSFE

B 17

-201

6C

ITY

REV

IEW

CO

MM

ENTS

FEB

26-2

016

CIT

Y R

EVIE

W C

OM

MEN

TSM

AR 0

7-20

16C

ITY

REV

IEW

CO

MM

ENTS

APR

IL 2

5, 2

016

BUIL

DIN

G 9

ELE

VATO

R H

OIS

TWAY

AUG

UST

4, 2

016

SIZE

RED

UC

ED. W

WAL

L M

OVE

D 2

"

ISSU

ED F

OR

CO

NST

RU

CTI

ON

SEPT

EMBE

R 0

9, 2

016

SUIT

E FR

AMIN

G R

EVIS

ION

SN

OVE

MBE

R 0

4, 2

016

2

MEC

HAN

ICAL

YAR

D /

PMT

DEC

EMBE

R 0

2, 2

016

STEE

L R

OO

FIN

G C

ON

ST T

YPE

ADD

ED, C

ANO

PY R

EVIS

ION

S AS

PER

STR

UC

T. D

WG

S.

DEC

EMBE

R 0

8, 2

016

3

ADD

RAI

SED

CEI

LIN

G N

OTA

TIO

NS

JAN

UAR

Y 04

, 201

74

GR

ID L

INES

AN

D D

IMEN

SIO

NS

TOSL

AB P

LAN

S

FEBR

UAR

Y 01

, 201

75

CO

LUM

N M

OVE

D T

O M

ATC

H F

LOO

RPL

AN L

OC

ATIO

N. E

LEV

SHAF

T SI

ZER

EVIS

ED O

N S

LAB

PLAN

FEBR

UAR

Y 03

, 201

78

DET

AILS

REV

ISED

TO

MEE

TEN

VELO

PE R

EQU

IREM

ENTS

MAR

CH

06,

201

79 BU

ILD

ING

9M

AIN

FLO

OR

PLA

N

RW

RET

AIL

(UN

ITS

C10

2-C

106)

GR

OSS

FLO

OR

AR

EA: 4

828

SFR

ESID

ENTI

AL

GR

OSS

FLO

OR

AR

EA: 3

978

SF

RET

AIL

(UN

IT C

101)

GR

OSS

FLO

OR

AR

EA: 4

961

SF

Building 9 - Completed Q 2018

C101

927 sf

C102

1,122 sf

C103

943 sf

C104

873 sf

C105

1,500 sf

C106

1,000 sf

C108

1,476sf

C107

1000sf.

NORTH

SCALE:MAIN FLOOR PLAN (FLOOR AREA: 11,529 GSF)

3/32" = 1'-0"

FILE NO.

SHEET NO.

1003BDATE

DWN.

CHK.

CLIENT

PROJECT

DRAWING TITLE

CENTRAL PARK VILLAGEPHASE 2B - BLDG 8

CANTERRADEVELOPMENTS LTD.

©Copyright reserved. This drawing is theproperty of Focus Architecture Incorporated

their express written permission.

Suite 109 - 1528 McCallum RoadAbbotsford, British Columbia V2S 8A3t 604.853.5222 f 604.853.5442 e [email protected]

CONSULTANT

3010 & 3020 GLADWIN ROADABBOTSFORD BC

REVISIONS

SEAL

A-2.06

A R C H I T E C T U R EI N C O R P O R A T E D

2015.01.28

CH

Plot

ted:

May

30,

201

7 at

8:1

4:47

am b

y R

oche

lle W

allis

File

: Z:\2

010

Proj

ects

\100

3 - C

entra

l Par

k Vi

llage

- G

ladw

in\W

orki

ng D

raw

ings

\PH

ASE

2\PH

ASE

2B\1

003

BLD

G 8

PLA

NS.

dwg

- Lay

out:

A-2.

06

PHASE 2B

April 29, 2016ISSUED FOR BUILDING PERMIT

1 BUILDING 8 ELEVATOR 1 HOISTWAYAUGUST 5, 2016

SIZE REDUCED. W WALL MOVED 11"

CITY PLAN CHECK REVISIONSSEPT 27, 2016

ISSUED FOR CONSTRUCTIONApril 13, 2017

BUILDING 8MAIN FLOORPLAN

hk

COMMERCIAL GROSS FLOOR AREA: 10,727 GSF.RESIDENTIAL GROSS FLOOR AREA: 802 GSF.

1 HOUR F.R.R.

WALL CONSTRUCTION TYPE

DOOR NUMBER

LEGENDCROSS SECTION MARKERSECTION IDENTIFICATIONDIRECTION OF VIEWSHEET WHERE DRAWN

DETAIL REFERENCEDETAIL NUMBERSHEET WHERE DRAWN

1 1/2 HOUR F.R.R.

(SEE SCHEDULE ON A-0.02

3/4 HOUR F.R.R.

4 HOUR F.R.R.

A

W1

WINDOW NUMBERRWL RAIN WATER LEADER

ROOF DRAINRD

AREA OF LOW CEILINGMIN. 8'-0" A.F.F.

AHATTIC ACCESS HATCH(SEE DETAIL 4/A-7.02)

FIRE EXTINGUISHER

STANDPIPESP

FE

GUTTER DOWN SPOUTDS

GUTTER DRAINGD

DECK / ROOF SLOPE DIRECTION1:50

1

0 HOUR F.R.R.

2 HOUR F.R.R.

REQUIRED FIRE SEPARATION RATINGS

GARBAGE/DELIVERY

TOTALRETAIL/RESTAURANT

LEASE SPACE3,689 SQ. FT.

18'-0

"

23'-6" 23'-6"

10'-2

"

BUILDING 11 - SALES CENTER(EXISTING)

PATIO828 SQ. FT.

EXIT STAIR FROMU/G PARKING(EXISTING)

PARKADEEXHAUST

(CONSTRUCTEDIN PHASE 2A)

47'-0"

ROOFOVER

12"X20" GLU-LAMBEAM OVER TYP.

LINE OFPARKADEBELOW

1,128 sf

101

1,034 sf

102

1,527 sf

103

13'-0

"

CANOPYOVER

21RDN

1.0mSETBACK

3'-1

1"

2WF

1WF

3WF

AWF

BWF

CWF

DWF

A-4.01A

A-4.01C

2'-8"

A

S1

B

S1

S3

S4 S4

S5

S6

S7

S7

3'-4" 3'-1" 16'-10"

78'-6

"

9'-1

"11

'-0"

13'-0

"9'

-0"

6'-4

1/2

"6'

-10

1/2"

AWF

BWF

CWF

DWF

11'-0

"11

'-0"

11'-0

"10

'-10"

14'-8

"7'

-0"

6'-6

"

20'-7 1/8"

12'-6"

14'-10 5/8"

14'-1

1 7/

8"

4'-1

"

2WF

1WF

3WF

11'-6"11'-6"

LINE OF STAIRBELOW

POTENTIALDEMISING WALL

STEEL COLUMN

STEEL COLUMN

STEEL COLUMN(SEE STRUCT.)

RWL (SEE MECH.)

STEEL COLUMN(SEE STRUCT.)

PROPERTY LINE

ROOF ACCESSOVER

S2

12'-1

0 1/

2"6'

-4 1

/2"

11'-6"6" 11'-6" 6"

ROOFOVER

A-4.01A

A-4.01B

A-4.01C

A-4.01D

A-4.01E

EXISTING LOWCONC. WALL

STEEL FRAME C/WCORRUGATED METALSCREEN WALL

8'-4" 6'-1"

2" CLEARSPACE (TYP.)

D

C

5'-6

"9'

-0"

3'-6

"

33'-2 1/2"

6'-8"

U/G WALLBELOW

STEEL COLUMN(SEE STRUCT.)

TYP.

9'-6

"3'

-8"

EXIT:15 PERSONS

EXIT:15 PERSONS

EXIT:15 PERSONS

EXIT:15 PERSONS

EXIT:15 PERSONS

LOW FRAMEDWALL BELOW

LOW FRAMEDWALL BELOW

7A-6.01

8A-6.01

5A-6.02

5A-6.02

RWL (SEEMECH.)

STEEL COLUMN(SEE STRUCT.)

TYP.

LOW CONC.WALL

BEAM OVER (SEESTRUCT.)

8A-6.02

DETAIL ATBEAM LOCATION

2%

CANOPYBELOW

57'-0

"

3'-0"

3'-0"

PARAPET

LINE OF WALLBELOW

RDED

RDED

RDED

SLO

PE

6'-0"

3'-0

"

3'-6

"

BEAMBELOW, TYP.

A-4.01A

A-4.01C

A-4.01A

A-4.01B

A-4.01C

A-4.01E

CANOPY RWLBELOW

SLO

PE

SL.SL. SL.SL.SL.SL.

RTU (SEE MECH.)SEE 10/A-6.02 FORATTACHMENT TOROOF

PROVIDECRICKET FORDRAINAGE

COLUMNBELOW, TYP.

ROOF TOPACCESS HATCH(SEE DETAIL7/A-6.02)

PROVIDECRICKET FOR

DRAINAGE

SCALE:MAIN FLOOR PLAN (FLOOR AREA: 3,689 SF)

1/8" = 1'-0"

FILE NO.

SHEET NO.

1003BDATE

DWN.

CHK.

CLIENT

PROJECT

DRAWING TITLE

CENTRAL PARK VILLAGEPHASE 2c BUILDING 10

CANTERRADEVELOPMENTS LTD.

©Copyright reserved. This drawing is theproperty of Focus Architecture Incorporated

their express written permission.

Suite 109 - 1528 McCallum RoadAbbotsford, British Columbia V2S 8A3t 604.853.5222 f 604.853.5442 e [email protected]

CONSULTANT

GLADWIN ROADABBOTSFORD BC

REVISIONS

2016-05-30ISSUED FOR BUILDING PERMIT

SEAL

A-2.01

A R C H I T E C T U R EI N C O R P O R A T E D

2015.01.28

CH

Plot

ted:

Mar

ch 3

0, 2

017

at 1

1:04

:17a

m b

y H

ans

Krul

File

: Z:\2

010

Proj

ects

\100

3 - C

entra

l Par

k Vi

llage

- G

ladw

in\W

orki

ng D

raw

ings

\PH

ASE

2\PH

ASE

2C\1

003

BUIL

DIN

G 1

0 PL

ANS.

dwg

- Lay

out:

A-2.

01

PHASE 2c

2016-09-27CITY PLAN CHECK REVISIONS

2017-03-29CITY SPATIAL REVISIONS

NORTH

BUILDING 10MAIN FLOOR ANDROOF PLAN

HK

SCALE:ROOF PLAN

1/8" = 1'-0"

1 HOUR F.R.R.

WALL CONSTRUCTION TYPE

DOOR NUMBER

LEGENDCROSS SECTION MARKERSECTION IDENTIFICATIONDIRECTION OF VIEWSHEET WHERE DRAWN

DETAIL REFERENCEDETAIL NUMBERSHEET WHERE DRAWN

1 1/2 HOUR F.R.R.

(SEE SCHEDULE ON A-0.02

3/4 HOUR F.R.R.

2 HOUR F.R.R.

A

W1

WINDOW NUMBERRWL RAIN WATER LEADER

ROOF DRAINRD

AREA OF LOW CEILINGMIN. 8'-0" A.F.F.

AHATTIC ACCESS HATCH(SEE DETAIL 4/A-7.02)

FIRE EXTINGUISHER

STANDPIPESP

FE

GUTTER DOWN SPOUTDS

GUTTER DRAINGD

DECK / ROOF SLOPE DIRECTION1:50

1

FIRE SEPARATION

6 m SETBACK

4"

1070 nsf

1125 nsf

1517 nsf

3'-6"6'-0"

6'-0"

1WF

2WF

4WF

5WF

6WF

7WF

3WF

AWF

CWF

DWF

EWF

FWF

BWF

AUG

A-4.01A

A-4.01C

A-4.01B

W4

W4

W4 W4

W4

S3

S3 S4

S3

S3

S3

S2

S1

S7

S7

STEEL COL.(SEE STRUCT.)TYP.

9'-6" 1'-0" 9'-6" 1'-0" 9'-6" 1'-0" 9'-6" 1'-0"

58'-0"

1'-0

"9'

-6"

1'-0

"9'

-6"

1'-4

"5'

-9 1

/2"

12'-4

"

4'-0

"

12'-4

"

5'-0

1/8

"

60'-1

1 5/

8"

4"

STL. ROOFACCESSLADDER

16'-9 1/2" 2'-6 1/4" 33'-11 1/4"53'-3"

11'-1"HYDRO

PMT

31'-0

"9'

-0"

4'-0

"9'

-0"

2'-4

"55

'-4"

6"

6 3/

8"14

'-10

1/2"

6 1/

2"4'

-0"

8'-4

"

S5

S6

STAINED WOODSCREEN

4" HSS(SEE 9/A-6.01)

1'-0"

1'-0"

A-4.01D

A-6.023

A-6.021

2'-0"

A-6.025

A-4.01E

3"15'-3"

10'-6"10'-6"

10'-6"10'-5 1/2" 6 1/2"

10'-6

"10

'-5 1

/2"

6 1/

2"

4"12

'-0"

12'-0

"4"

101°

79°

4'-1

1 1/

2"

LINE OF CANOPYOVER

LINE OF BRICKVENEER OVER

LINE OF BRICKVENEER OVER

LINE OF ROOFOVER

RWL

LINE OF FUTURE BLDG 10AND COMMON GARBAGEROOM

A-4.02F 6"

4'-6"

3'-2

"

4x4 P.T. WOOD POST(TYP)

CARRY INTERIOR GYPSUM BOARDOVER DOOR OPENINGA

6 m SETBACK

1WF

2WF

4WF

5WF

6WF

7WF

3WF

AWF

CWF

DWF

EWF

FWF

BWF

AUG

RD

2% 2%

2%

2%

A-4.01A

A-4.01C

A-4.01B

LADDER TO ROOFTOP

1'-6"

3'-6

"

CANOPYBELOW

3'-6"

6"

6"

8'-4

"

1'-6 1/2"

A-4.01D

ED

RDED

RD

2%

A-4.01E

MUA (SEE MECH.)

FUTURE MUA (SEEMECH.)

MECHANICALEXHAUST (SEEMECH.)

SCUPPER DRAIN

12"x12" CONC.SPLASH PAD

SCUPPER DRAIN

20'-3

7/8

"

A-4.02F

SCALE:SALES CENTER:SHELL PLAN

1/8" = 1'-0"

THIS

DR

AWIN

G IS

TH

E PR

OPE

RTY

OF

FOC

US

ARC

HIT

ECTU

RE

INC

OR

POR

ATED

AN

D S

HO

ULD

NO

T BE

DU

PLIC

ATED

IN A

NY

WAY

WIT

HO

UT

THEI

R E

XPR

ESS

WR

ITTE

N P

ERM

ISSI

ON

.Pl

otte

d: A

pril

07, 2

017

at 1

1:31

:36a

m b

y H

ans

Krul

File

: Z:\2

010

proj

ects

\100

3 - c

entra

l par

k vi

llage

- gl

adw

in\w

orki

ng d

raw

ings

\sal

es c

ente

r\Sal

es C

ente

r pla

n.dw

g - L

ayou

t: A-

1.03

NORTH

SCALE:SALES CENTER: ROOF PLAN

1/8" = 1'-0"

1 HOUR F.R.R.

WALL CONSTRUCTION TYPE

DOOR NUMBER

LEGENDCROSS SECTION MARKERSECTION IDENTIFICATIONDIRECTION OF VIEWSHEET WHERE DRAWN

DETAIL REFERENCEDETAIL NUMBERSHEET WHERE DRAWN

1 1/2 HOUR F.R.R.

(SEE SCHEDULE ON A-0.0?)

3/4 HOUR F.R.R.

2 HOUR F.R.R.

A

W1

WINDOW NUMBERRWL RAIN WATER LEADER

ROOF DRAINRD

AREA OF LOW CEILINGMIN. 8'-0" A.F.F.

AHATTIC ACCESS HATCH(SEE DETAIL 2/A-9.0?)FIRE EXTINGUISHER

STANDPIPESP

FE

GUTTER DOWN SPOUTDS

GUTTER DRAINGD

DECK / ROOF SLOPE DIRECTION1:50

1

(SEE DETAIL 6/A-9.0?)

FIRE SEPARATION

Building 10 - Completed Q3 2018

Building 8 - Completed Q3 2018 Building 11 - Existing (occupancy TBD)

Page 5: CENTRAL PARK VILLAGE...november 04, 2016 suite framing revisions september 09, 2016 issued for construction august 4, 2016 building 9 elevator hoistway size reduced. w wall moved 2"

Neighborhood ProfileThe City of Abbotsford is located in the Fraser Valley region of BC, and is situated to the east of Greater Vancouver

and 45 minutes from Downtown. The city has a population of just over 140,000 residents with projected population

of 160,000 people by the year 2022. The Abbotsford/Mission trade area encompasses over 185,000 people. The

city continues to outpace the national population growth which has lead to a stable and diverse economy within

the region. Over the last number of years Abbotsford has grown into a self sustaining community that includes an

international airport, multi spot plex and regional college.

Site Plan - Phase 1 Central Park Village . Abbotsford, BC

26,841H O U S E H O L D S

67,358P O P U L A T I O N (PEOPLE LIVING IN THE AREA)

$86,838I N C O M EA V E R A G E H O U S E H O L D

66,531D A Y T I M EP O P U L A T I O N

Demographics (2017)* *within 3km of Central Park Village

Page 6: CENTRAL PARK VILLAGE...november 04, 2016 suite framing revisions september 09, 2016 issued for construction august 4, 2016 building 9 elevator hoistway size reduced. w wall moved 2"

The New Heart of Abbotsford

Explore. Shop. Dine. Relax. Live

Approximately 5,000 square foot grocery opportunity

High profile restaurant opportunities

Page 7: CENTRAL PARK VILLAGE...november 04, 2016 suite framing revisions september 09, 2016 issued for construction august 4, 2016 building 9 elevator hoistway size reduced. w wall moved 2"

Market Strategy3068 Gladwin Rd

Thursday, June 29, 2017

3068 Gladwin Rd

E. & O. E.: The information contained in this report was obtained from sources which we deem reliable and, while thought to be correct, is not guaranteed by Avison Young Commercial Real Estate (B.C.) Inc.; DBA, Avison Young.Sources: Statscan; Pitney Bowes Canada, 2017 Estimates and Projections.

3068 Gladwin Road, Abbotsford, BC

Census Summary 1 km 2 km 3 km

Population

2017 Population estimate

9,978 38,067 67,358

Total Households

2017 estimated

4,849 16,171 26,841

Total Daytime Population

Daytime Employees

Daytime Population at home

8,707

3,384

5,323

41,086

20,696

20,390

66,531

31,687

34,844

Market Overview

Page 8: CENTRAL PARK VILLAGE...november 04, 2016 suite framing revisions september 09, 2016 issued for construction august 4, 2016 building 9 elevator hoistway size reduced. w wall moved 2"

Jeron Dillon, Associate 604.647.1330 [email protected]

avisonyoung.com

Partnership. Performance.

© 2017 Avison Young. All rights reserved.

E. & O.E.: The information contained herein was obtained from sources which we deem reliable and, while thought to be correct, is not guaranteed by Avison Young Commercial Real Estate (B.C.) Inc.; DBA, Avison Young.

Avison Young #2900-1055 W. Georgia Street Box 11109 Royal Centre Vancouver, BC V6E 3P3, Canada

Daniel Lee*, Principal 604.757-5102 [email protected] * Daniel J. Lee Personal Real Estate Corporation