central plant 5s project back storage area spring 2014

14
Central Plant 5S Project Back Storage Area Spring 2014

Upload: ayla-cable

Post on 16-Dec-2015

219 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: Central Plant 5S Project Back Storage Area Spring 2014

Central Plant 5S ProjectBack Storage Area

Spring 2014

Page 2: Central Plant 5S Project Back Storage Area Spring 2014

Central Plant 5S Projects

• Richard Smith provided overview training on February 27, 2014– All HVAC Technicians and Students attended– Reviewed the 5S’s• Sort, Set in order, Shine, Standardize and Sustain

– Reviewed the 8 Wastes• Lack of Focus, Excess Inventory, Transportation, Motion,

Waiting, Defects, Over Processing and Over Production

Page 3: Central Plant 5S Project Back Storage Area Spring 2014

Charter

1. Mission – To provide Berea College with heat and cooling in a highly efficient manner along with the highest level of customer service.

2. Process Description – Service technicians search the back storage room at Central Plant for parts required for a work order.

3. Problem Statement – Because the parts were not organized by point of use, type of part, or grouped by kind, the search consisted of looking through all bins/shelves. The search was only narrowed by experience and how recently it was last used. Organizing the material be type and point of use reduces search time and flags reorder requirements quickly.

4. Sponsor – Wayne Orr5. Process Owner – Diane Zekind6. Team Lead – Diane Zekind7. Facilitator – Richard Smith8. Team – Haley Denney, Taylor Fagin, Trent Hazelwood, Nick Mullins,

Diane Zekind, Mike Alexander, Tim Alexander, Saben Blair, Richard Smith & Jonathan Taylor

Page 4: Central Plant 5S Project Back Storage Area Spring 2014

Central Plant 5S Project Team

Page 5: Central Plant 5S Project Back Storage Area Spring 2014

BEFORE

AFTER

Page 6: Central Plant 5S Project Back Storage Area Spring 2014

BEFORE

AFTER

Page 7: Central Plant 5S Project Back Storage Area Spring 2014

BEFORE

AFTER

Page 8: Central Plant 5S Project Back Storage Area Spring 2014

BEFORE

AFTER

Page 9: Central Plant 5S Project Back Storage Area Spring 2014

BEFORE

AFTER

Page 10: Central Plant 5S Project Back Storage Area Spring 2014

BEFORE

AFTER

Page 11: Central Plant 5S Project Back Storage Area Spring 2014

BEFORE

AFTER

Page 12: Central Plant 5S Project Back Storage Area Spring 2014

RED TAG PALLET

Page 13: Central Plant 5S Project Back Storage Area Spring 2014

Project Savings

• Repurposed items - $225

Page 14: Central Plant 5S Project Back Storage Area Spring 2014

SUSTAIN POSTER