central workshop€¦ · qc name : excellent dept : machine shop 10 follow up / review 9 regular...
TRANSCRIPT
-
CENTRAL WORKSHOPS
NLC INDIA Ltd.
(“NAVARATNA”--A GOVERNMENT OF INDIA ENTERPRISE)
NEYVELI –TAMILNADU –INDIA.
CCQC-2018
AT CHENNAI
FROM: 22.09.2018 TO: 23.09.2018.
CASE STUDY PRESENTATION
AT
-
CENTRAL WORKSHOP
2
-
THE NLC INDIA LIMITED, NEYVELI, TAMIL NADU, A GIANT PUBLIC SECTOR UNDERTAKING IS
AN INTEGRATED INDUSTRIAL COMPLEX
COAL IS THE WORLD’S LARGEST AND MOST POPULARLY USED SOURCE OF POWER. THOUGH
IT IS NON-RENEWABLE, IT PLAYS A VITAL ROLE IN POWER GENERATION.
IN INDIA, LIGNITE, A BASIC FORM OF COAL IS AVAILABLE IN TAMIL NADU, RAJASTHAN AND
KASHMIR, U.P. BUT 90% OF THE TOTAL AVAILABILITY OF LIGNITE IS IN TAMIL NADU.USING
LIGNITE AS FUEL TO POWER GENERATION.
IT HAS THE FOLLOWING UNIT
UNIT PRODUCTION CAPACITY1. OPEN CAST MINES – I LIGNITE 10.5 M.TONNES /ANNUM
2. OPEN CAST MINES – II LIGNITE 15.0 M.TONNES /ANNUM
3. OPEN CAST MINES – I A LIGNITE 3.0 M.TONNES /ANNUM
4. THERMAL POWERSTATION – I POWER 600 M.W
5. THERMAL POWER STATION – II POWER 1470 M.W
6. THERMAL POWER STATION– I EXP. POWER 420 M.W
7. BARSINGSAR PROJECT, LIGNITE 02.1 M.TONNES/ANNUM
BIKANER, RAJASTHAN. POWER 250 M.W.
8. THERMAL POWER STATION II EXP. POWER 500 M.W.
9. WIND POWER PLANT POWER 51 M.W.
10. SOLAR POWER PLANT POWER 440 M.W.
CENTRAL WORK SHOPS, A SERVICE UNIT OF INDUSTRIAL COMPLEX CATERS TO THE
NEEDS OF ALL THE PRODUCTION AND ANCILLARY UNITS OF N.L.C. CONCERN.
3
-
MINES–I
MINES–II
MINES–IA
THERMAL POWER STATION–I EXP
THERMAL POWER STATION-I
THERMAL POWER STATION - II
OUR MAJOR UNITS
4
-
Q.C. BIO-DATA
NAME OF THE UNIT : CENTRAL WORKSHOPS
NAME OF Q.C : EXCELLENT
Q.C.No. : 03
UNIT HEAD : SRI. K.THANGARAJU,G.M.,CWS&MSS,
AREA CO-ORDINATOR : SRI.V.BALAJI, Ad.DGM.,
FACILITATOR : Mr. R.KALAIARASAN, EE.,
LEADER : Mr. K.NATARAJAN,FOREMAN,
Dy. LEADER : Mr. A.SIVAKUMAR.FOREMAN,
MEMBERS : Mr. RM.MUNIAPPAN, SR.FOREMAN,
: Mr.M.MURUGANANDHAM.Sr.Tech.II,
: Mr. M.JUSTUS. TECH II B,
5
-
DATE OF STARTING : 02.03.1992
MEETS ON : ALL FRIDAYS
No. OF MEETINGS IN 2018-2019 : 24
ATTENDANCE (AVERAGE) : 95%
PROBLEMS IDENTIFIED : 60
PROBLEMS SOLVED : 40
CASE STUDY PRESENTED SO FAR : 38
39th
CASE
STUDY
6
-
60%
32%
4% 4%
JOBS CARRIED OUT IN MACHINE SHOP
RECONDITIONING JOBS - 2370 Nos.
PRODUCTION JOBS - 1264 Nos
MODIFICATION JOBS - 158 Nos
OTHER JOBS - 158 Nos
TOTAL JOBS - 3950 Nos
THE PIE CHART BELOW SHOWS VISUALLY
THE QUANTUM OF JOBS UNDERTAKEN
BY US IN MACHINE SHOP.
WE ARE FROM CENTRAL WORKSHOPS A VITAL UNIT OF NLC LIMITED FULFILLING THE
NEEDS OF ITS LIGNITE MINES, THERMAL POWER STATIONS AND OTHER UNITS.
DURING THE YEAR 2018 -19, 3950 JOBS OF PRODUCTION, RECONDITIONING, MODIFICATION,
FABRICATION AND OTHER NATURE OF JOBS WERE UNDERTAKEN BY US.
A FEW IMPORTANT JOBS CARRIED OUT ARE
1] MANUFACTURING AND RECONDITIONING OF DRIVE SHAFTS OF B.W.E’S
AND CONVEYORS.
2] MACHINING OF CONVEYOR IDLER SHAFTS.
3] MACHINING OF LARGE GEAR BOX HOUSINGS.
4] MACHINING OFCAM WHEELS OF BUCKET WHEEL EXCAVATORS.
5] MANUFACTURING OF 20” DIA. PLAIN PIPES AND SLOTTED PIPES.
6] SHRINK FITTINGS OF B.W.E.’S TRACK CAM WHEELS WITH SHAFTS
OUR WORK AREA
7
-
COST WORTH OF MACHINES- 50 CRORES
TYPE OF MACHINES
3035
31
97
5 5 5
2 2 1
0
5
10
15
20
25
30
35
40
45
No
. O
F M
AC
HIN
ES
WELDING MACHINES LATHES
MILLING MACHINES
VERTICAL TURRET LATHES
DRILLING MACHINES GRINDING MACHINESSHAPING MACHINES
PLANING MACHINES
BORING MACHINESSLOTTING MACHINE
8
-
WE HAVE CONDUCTED BRAIN STORMING SESSION
FOR IDENTIFYING THE PROBLEMS AND CLASSIFIED
THEM UNDER THREE CATAGORIES AS BELOW
1.PROBLEM IN CUTTING SHORT LENGTH TOOLS IN CUTTER GRINDER MACHINE. B
2.PROBLEM IN SUPPORTING FEED SHAFT IN LC.125 LATHES. A
3.PROBLEM IN MACHINING INNER SPLINES OF PIPE SLOTTING
POWER TRANSMISSION GEARS A
4.PROBLEM IN SHIFTING OF HEAVY JOBS FROM BAY TO BAY A
5.FREQUENT BRAKE FAILURE IN 10 TON OVERHEAD CRANE. B
6.PROBLEM TO EOT CRANE OPERATOR DURING THE SHRINK FIT ASSEMBLING. C
7.PROBLEM IN INTERNAL GRINDING IN CENTER LATHES. A
8.PROBLEM IN GAUGE PLATE THICKNESS MACHINING. A
9.PROBLEM IN CARRIAGE MOVEMENT WIRING SYSTEM IN LC.125 LATHES B
10.PROBLEM OF REMOVING THE TURNING CHIPS IN HEAVY DUTY LATHES. B
IDENTIFICATION OF PROBLEMS
9
-
IDENTIFICATION OF PROBLEMS
A – CAN BE SOLVED BY OUR Q.C. : 8 PROBLEMS
B – NEED SUPPORT FROM OTHER DEPARTMENT : 9 PROBLEMS
C– CAN BE SOLVED BY OUR MANAGENENT : 3 PROBLEMS
11. PROBLEM IN OFFSET SETTING OF SPLIT JOBS IN FACE PLATE LATHE. A
12. PROBLEM IN STORAGE OF RAW MATERIALS. B
13. PROBLEM IN ROOF LEAKAGE OF THE WORKSHOP SHED. C
14. PROBLEM IN CUTTING TOOL PREPARATION. C
15. PROBLEM IN MEASURING OF OUTSIDE DIAMETER OFJOBS MORE THAN 1000 mm. A
16. PROBLEM IN AUTO FEED ARRANGEMENT OF LATHE TAILSTOCK
SPINDLE MOVEMENT. B
17. PROBLEM IN SETTING THE CAM WHEEL FOR MACHINING AT FACE PLATE LATHE A
18. PROBLEM IN LABYRINTH MACHINING. B
19. PROBLEM IN DRILL BIT REGRINDING B
20. PROBLEM IN AUTO FEED SYSTEM IN FACE PLATE LATHE. B
10
-
SELECTING THE “A” GRADE PROBLEMS
BY RATING METHOD
I
F – FREQUENCY, I – IMPORTANCE, FE – FEASIBILITY
1 – LOW, 2 – MODERATE, 3 – HIGH, 4 – VERY HIGH,
ON : 13.04.2018
SL.
NO.
PROBLEM
RATING
LEADERDY
LEADER
MEMBERS
TOTALPRIO-
RITY
1 2 3
F IF
EF I
F
EF I
F
EF I
F
EF I
F
E
1PROBLEM IN SUPPORTING FEED SHAFT IN
L.C.125 LATHES2 4 3 2 3 2 2 3 3 2 4 2 2 3 2 39 V
2PROBLEM IN SETTING CAMWHEEL IN
FACEPLATE LATHE3 3 2 3 2 2 2 2 1 2 2 2 2 3 2 33 VIII
3PROBLEM IN GAUGE PLATE THICKNESS
MACHINING.3 3 3 3 2 3 3 4 4 4 2 3 4 2 3 46 II
4PROBLEM IN INTERNAL GRAINDING IN
CENTRE LATHES2 3 2 2 3 2 2 3 2 2 2 3 2 3 3 36 VI
5PROBLEMIN SHIFTING OF JOBS FROM BAY TO
BAY.2 3 2 2 4 3 2 3 2 2 2 2 2 3 1 35 VII
6
PROBLEM IN INNER SPLINES
MACHINING OF PIPE SLOTTING
POWER TRANSMISSION GEARS.
4 4 4 4 4 3 4 4 4 3 4 4 4 4 4 58
7PROBLEM IN OFFSET SETTING OF SPLIT
JOBS IN FACE PLATE LATHE2 3 3 2 4 3 2 3 2 2 3 3 2 4 2 40 IV
8PROBLEM IN MEASURING JOBS OF OUTSIDE
DIAMETER MORE THEN 1000 mm.2 4 2 3 4 3 3 3 2 2 4 3 4 3 2 44 III
I
11
-
SI.
NO.
PROBLEM / TOPICS
THEME NATURE
1PROBLEM IN SUPPORTNG OF
FEED SHAFT IN L.C.125
LATHES_ _ _ __ III
2PROBLEM IN INTERNAL
GRINDING IN CENTER LATHS. _ _ IV
3
PROBLEM IN INNER
SPLINES MACHINING OF
PIPE SLOTTING POWER
TRANSMISSION GEARS.
_I
4PROBLEM IN MEASURING
JOBS OF OUTSIDE DIAMETER
MORE THEN 1000.mm_ _ _ V
5PROBLEM IN OFFSET SETTING
OF SPLIT JOBS IN FACE PLATE
LATHE_ _ VI
6PROBLEM IN GAUGE PLATE
THICKNESS MACHINING _ _ II
PROBLEM SELECTION MATRIX
ON:13.04.2018
12
-
TOPIC
PROBLEM IN INNER SPLINES
MACHINING OF PIPE SLOTTING
POWER TRANSMISSION GEARS
13
-
DATE OF BEGINNING : 13. 04. 2018DATE OF COMPLETION : 20. 07. 2018PROJECT NO : 39.
PROJECT : PROBLEM IN INNER SPLINES MACHINING
OF PIPE SLOTTING POWER TRANSMISSION GEARS
DEPT : MACHINE SHOPQC NAME : EXCELLENT
FOLLOW UP / REVIEW10
REGULAR IMPLEMENTATION9
TRIAL IMPLEMENTATION8
7
DEVELOPING SOLUTION6
ANALYSING ROOT CAUSES5
IDENTIFING CAUSES
DATA ANALYSING3
DEFINING THE PROBLEM2
7SELECTION OF PROBLEM1
MONTHSL.
NO.
.ACTIVITY
ACTIVITY PLANING CHART
LEADER: K.NATARAJAN
Dy. LEADER : A.SIVAKUMAR
WEEK
APRIL-18 MAY-18 JUNE-18 JULY-18
I III I I III II II
IV III III IIIIV IV IV
12
6
4
4
6
MEMBER’S NAME:
RM.MUNIAPPAN
M.MURUGANANDHAM
M.JUSTUS
MEETING DAY : FRIDAY, TIME : I shift 12.00 TO 01pm, II shift. 08.30 TO 09.30 pm.
FORCEING RESISTANCE
4
T
T-Target
2
3
FACILITATOR: R.KALAIARASAN
II
7
63
TOTAL DAYS 114
14
-
DATA COLLECTION-ITHE DETAILS OF PIPE SLOTTING POWER TRANSMISSION
GEARS COMPLETED
COLLECTED FROM WORK ORDER REGISTER 2018-19.
15
MONTHWORK ORDER NO., QUANTITY
APRIL MAY-17 0199,0200 6
JUNE JULY-17 0346,0347 12
AUG. – SEP. -17 0441,0476,0478 8
OCT. – DEC. -17 0561,0599,0600,0699 8
JAN. -MARCH-18 0766,0804,0822 10
TOTAL 44
-
16
MINING OPERATION IN NLC
16
-
UNDERSTANDING THE PROBLEM
IN OUR NLC MINE I, MINE IA, MINE II, MINE II-EXP, TPS I, TPS II, TPS I-EXP, TPS II-EXP ARE
THE IMPORTANT PRODUCTION UNITS NEYVELI.
FROM THE ABOVE PLANTS VARIOUS TYPES OF WORKS COME TO OUR WORKSHOP FOR
RECONDITION, MODIFICATION, AND PRODUCTION.
WE CARRIED OUT VARIOUS KINDS OF JOBS SUCCESSFULLY LIKE CAM WHEEL, DRIVE
SHAFTS, 20’’SLOTTED PIPES BUSHES, HOUSINGS, PIPE, SLEEVES, LABRINGTH, HOLLOW SHAFTS ETC..
IN OUR MINES GROUND WATER CONTROL IS AN IMPORTANT PROCESS .FOR THE ABOVE
PROCESS DRILLED MORE THAN 150 BOREWELLS AND DISCHARGE THE GROUND WATER
BY HEAVY DUTY PUMPS 24X7 ROUND THE CLOCK.
IF THE WATER PUMPING HAD STOPPED MINES FULLY DROWNING BY WATER.SO WE
PRESERVE THE STANDBY PROPERLY.
TO MAKING BOREWELLS PLAIN STEEL PIPES,SLOTTED PIPES ARE MANUFACTURE IN OUR
WORKSHOP.
SLOTTED PIPES ARE MANUFACTURED IN TWO PIPE SLOTTING MACHINES IN OUR
WORKSHOP.
IN THE PIPE SLOTTING MACHINES 11 NOS. OF SPUR GEARS ARE USED TO TRANSMIT THE
POWER TO SLOT CUTTER SPINDLE.
DUE TO CONTINIOUS WORKING POWER TRANSMISSION GEARS WERE DAMAGED AND
REQUIRE REPLACEMENT.
17
-
UNDERSTANDING THE PROBLEM
IN OUR MACHINE SHOP WE MANUFACTURING THE REQUIRED GEARS.
IN THE GEARS INNER SPLINES MACHINING WORK CARRIED OUT IN SLOTTING MACHINE.
THERE IS ONLY ONE SLOTTING MACHINE IN OUR WORK SHOP.
VARRIOUS OTHER WORKS LIKE INNER KEYWAY MACHINING,LUBRICATION GROOVES OF
GUNMETAL BUSHES, RECONDITIONING WORNOUT GEARS, INNER SQUARE MACHINING
WORK ALSO CARRIOUT IN THE SLOTTING MACHINE.
INNER SPLINES MACHINING WAS VERY LABOURIOUS AND CHALLENGING TO US. IT TAKES
MORE TIME.
SO WE WERE UNABLE TO DELEVER THE PIPE SLOTTING GEARS WITHIN TIME.
SO, WE SELECT THE PROBLEM AS OUR CASE STUDY
18
-
SLOTTED PIPES
19
-
MANUFACTURING OF SLOTTED PIPES
20
POWER TRANSNISION GEARS
-
PIPE SLOTTING POWER TRANSMISSION GEAR CLAMPED IN SLOTTING MACHINE TABLE FOR INNER SPLINES
MACHINING
21
SLOTTING
MACHINE
-
22
MARKINGMARKED GEARS
-
PROCESS FLOW DIAGRAM FOR PIPE SLOTTING POWER TRANSMISSION GEAR INNER SPLINES MACHINING
( BEFORE IMPLEMENTATION )
23
JOB ALLOCATION
START
JOB RECEIVED
TURNING
LATHE
AVAILA
-BILITY
JOB
WAITINGNO
TEETH MACHINING
MILLING
AVAILA-
BILITY
JOB
WAITING
NO
JOB ALLOCATION
END
SPLINES MACHINING
MARKING
SETTING
NOT OKOK
INSPEC
- TION
YES
YES
NOT OKOK
-
WAY OF THINKING
SAFETY
TECHNIQUES-
TOOLS-
TIME-
METHOD
--
MAN POWER
CU
ST
OM
ER
SA
TIS
FA
CT
ION
CO
ST
RE
DU
CT
ION
WO
RK
SIM
PLIF
ICA
TIO
N
MU
RA
[DIS
CR
EPA
NC
Y]
MU
RI
[ST
RA
IN]
MU
DA
(WA
ST
E]
QUALITY
CHARACTERS
3’MU’ AIM
ON : 20.04.2018
REDEFINING THE PROBLEM
--
---
--
-
-
--
24
-
CUSTOMER SATISFACTION
WORK SIMPLIFICATION
COST REDUCTION
25
-
BRAIN STORMING - I
ON : 20.04.2018.
( TO FIND OUT THE POSSIBLE CAUSES )
26
ONLY ONE SLOTTING MACHINE.
OLD MACHINE.
MORE MAN POWER.
DIFFICULT TO SETTING.
LABOURIOUS OPERATION.
MORE MACHINING TIME.
MORE NO. OF WORK ORDERS.
VARIOUS TYPES OF JOBS.
OPERATOR FATIQUE.
FREQUENT ADJUSTMENT OF STROKE LENGTH.
MORE MARKING TIME.
NO TEMPLATE TO MARKING
NO FIXTURE TO HOLD THE JOB.
MANUAL TABLE ROTATION.
OPERATOR ABSENTEESM
-
DATA COLLECTION-II
THE FOLLOWING DATA SHOWS THE AVERAGE TIME TAKEN TO COMPLETE THE INNER
SPLINES MACHINING OF PIPE SLOTTING POWER TRANSMISSION GEAR .
FROM : 21.04.2018 TO: 23.04.2018 NO.OF JOBS: 03
27
Sl.
NoACTIVITIES
TIME IN MINUTS
PER JOBPERCENTAGE
1 MARKING 30 Min 8.5%
2 PREPARATION 45 Min 12.5%
3 JOB SETTING 60 Min 17.O%
4 MACHINE SETTING 30 Min 8.5%
5 JOB RESETTING 20 Min 5.5%
6 MACHINING 90 Min 25.5%
7 TOOL GRINDING 30 Min 8.5%
8 TOOL CHANGING 20 Min 5.5%
9
OTHERS
( LOADING & UNLOADING,
MACHINE CLEANING)
30 Min 8.5%
TOTAL 355 Min 100%
-
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
X
X
X
X
X
X
XX
XT
IME
IN
PE
RC
EN
TA
GE
100%
91.5%
86.5%
80.5%
72%
63.5%
55%
42.5%
25.5%
80/20 LINE
VITAL FEW
Y
OT
HE
RS
TO
OL
CH
AN
GIN
G
TO
OL
GR
IND
ING
JO
B
RE
SE
TT
ING
MA
CH
INE
SE
TT
ING
MA
RK
ING
PR
EPA
RA
TIO
N
JO
B S
ET
TIN
G
MA
CH
ININ
G
CAUSES
PARETO DIAGRAMBEFORE IMPLEMENTATION
ON: 24.04.2018
USEFULL MANY
28
25.5%
12.5%8.5%8.5% 8.5%
5.5% 5.5%8.5%
17%
-
CAUSE AND EFFECT DIAGRAMFOR PROBLEM OF PIPE SLOTTING POWER TRANSMISSION GEAR
INNER SPLINES MACHINING
PROBLEM OF
PIPE SLOTTING
POWER TRANSMISSION
GEAR INNER SPLINES
MACHINING
METHOD
MORE
SETTING TIME
NO FIXTURE
MORE MAN POWER
ONE MACHINE
ONLY
MORE No. OF
WORKORDERS
HARD MATERIALMACHINE NOT
AVAILABLE
STEEL METAL
UNABLE TO USE
OTHER MACHINE
SPECIFIC
OPERATION
OPERATOR
FATIGUEMORE
MACHINING
TIME
FREQUENT
RESESETTING
MAN
MACHINE MATERIAL
EFFECTMANUAL CLAMPING
OLD MACHINE
FREQUENT
STROKE
ADJUSTMENT
POOR CLAMPING
FREQUENT
RESETTING
SMALL BORE
NATURE OF THE JOB
NO JIG
MORE NO. OF
ROTATION
NATURE OF
THE JOB
ON :04.05.2018
29
-
BRAIN STORMING - II
ON :04.05.2018(TO FIND OUT THE SOLUTIONS)
30
SPECIAL FIXTURE MAY BE PURCHASED.
PURCHASE A NEW SLOTTING MACHINE. SPECIAL TYPE MULTI POINT TOOL MAY BE PURCHASED
MANUFACTURE A SPECIAL JIG.
-
SL.
NO.SUGGESTIONS ADVANTAGE DISADVANTAGE
1PURCHASE A NEW SLOTTING
MACHINE.
1.EASY TO MEET
REQUIREMENTS.
1. MORE COSTLY .
2.MORE TIMING.
3.NOT ECONOMICAL.
2SPECIAL FIXTURE MAY BE
PURCHASED.
1.EASY TO HOLD
ON SLOTTING
MACHINE TABLE.
2.EASY TO MEET
REQUIREMENTS.
1.TEDIOUS
PROCEDURE.
2.MORE TIMING.
3.MORE COST.
3SPECIAL TYPE MULTI POINT
TOOL MAY BE PURCHASED.
1.EASY TO HOLD IN
TOOL POST.
1.MORE COST.
2.TEDIOUS
PROCEDURE.
3.MORE TIMING.
4MANUFACTURE A SPECIAL JIG.
1.EASY TO MEET
REQUIREMENTS.
2.SAVE TIME &
MAN POWER. NIL
FOR PROBLEM OF PIPE SLOTTING POWER TRANSMISSION GEAR
INNER SPLINES MACHINING
31
-
Sl.
No.RECOMMENDATIONS EFFECT COST TIME PRIORITY
1SPECIAL TYPE SLOTTING
MACHINE MAY BE
PURCHASED
MORE MORE MORE III
2 SPECIAL TYPE FIXTURE MAY
BE PURCHASEDMORE MORE MORE II
3 SPECIAL TYPE MULTI POINT
TOOL MAY BE PURCHASEDLESS MORE MORE IV
4 SPECIAL TYPE JIG MAY BE
MANUFACTURED BY OUR Q.CMORE LESS LESS
E.C.T. OPTION CHARTFOR PROBLEM OF PIPE SLOTTING POWER TRANSMISSION
GEAR INNER SPLINES MACHINING
I
ON :11.05.2018.
32
-
[SEQUENTIAL TYPE]
FOR MANUFACTURING A JIG
TO DESIGN AS
PER REQUIREMENT
TO COLLECT MATERIAL
NOT O.K O.K
FABRICATE
TEST
TO DISCUSS WITH UNIT HEAD
P.D.P.C
SUITABLE JIG
MANUFACTURED
DECIDED TO MANUFACTURE
JIG BY Q.C
AGREED FOR THE
INTRODUCTION OF JIG NOT AGREED
TO COLLECT
SUPPORTING DATA
33
-
ACTION PLAN
DOCHECK
DESIGNING THE JIG
FIX THE JIG AT SLOTTING
MACHINE TABLE
MACHINED INNER SPLINES
SUCCESSFULLY. FOUND IT
SUITABLE.
COLLECTING THE
MATERIALS, MACHINING
AND WELDING DONE. JIG
MANUFACTURED.
P.D.C.A.CHART
STARTED ON : 14.05.2018 COMPLETED ON: 25.05.2018
TOTAL NO. OF DAYS : 12.
FROM : 14.05.2018
TO : 15.05.2018
FROM : 16.05.2018
TO : 18.05.2018
FROM : 21.05.2018
TO: 23.05.2018
FROM : 25.05.2018
PUT IN TO REGULAR
OPERATION.
34
-
THE 20mm THICK BOTTOM PLATE WAS
MACHINED FOR 245mm DIA AND TWO
SLOTS (22mm WIDTH 30MM LENGTH) ARE
MADE IN THE PLATE OPPOSITE TO
EACH OTHER FOR CLAMPING
PURPOSE. BOTTOM SIDE TWO
TENENTS ARE FIXED FOR PROPER
SEATING THE JIG IN THE CENTRE OF
THE MACHINE TABLE ACCURATELY.
GUIDE PLATE
CLAMPING BOLT
JIG CLAMPING
BOLT
A HOLLOW PIPE OF 170mm HEIGHT X
140mm OUTER DIA X 124.2 mm INNER
DIA WAS MACHINED AND WELDED
OVER THE BOTTOM PLATE. TWO
NUMBERS OF M20 BOLT PLACED
OPPOSITE TO EACH OTHER PROVIDED
ON TOP SIDE OF THE HOLLOW PIPE
FOR CLAMPING THE WORK PIECE AND
GUIDE PLATE.
A TOP GUIDE PLATE 20mm THICK
HAVING TWO SLOTS OPPOSITE EACH
OTHER, IT WAS PLACED ON TOP OF
THE HOLLOW PIPE. IN THE GUIDE
PLATE EIGHT SLOTS ARE (6mm DEPTH
X10mm WIDTH) MACHINED FOR
GUIDING THE CUTTING TOOL.
TENENTS
GUIDE PLATE
IMPLEMENTATION
35
-
IMPLEMENTATION
36
GUIEDE PLATE
CLAMPING BOLT
JIG CLAMPING
BOLT
SLOTS FOR GUIDING
THE CUTTING TOOL
COMPLETED
GEARS
LIFTING PLATE
-
37
GUIDE PLATE
TENENTS
-
38
-
RECURRENCE PREVENTION MEASURES
39
THE JIG, WE HAVE MADE IS SIMPLE TO USE. IT REQUIRES LITTLE
MAINTENANCE.
ALL THE PRECAUTIONARY MEASURES WERE CONSIDERED AT THE
DESIGN AND FABRICATED THE JIG TO ENSURE FOOL PROOF AND
FAIL SAFE.
A WORKING METHOD OF THE JIG WAS CLEARLY DEMONSTATED TO
ALL OPERATORS AND SUPERVISORS.WORKING MANUAL ALSO KEPT
WITH OUR GM’S OFFICE FOR FUTURE REFERANCE.
A SEPARATE PLACE IS RESERVED FOR KEEPING THE JIG,
WHEN NOT BEING USED.
AN INSTRUCTION BOARD IS DISPLAYED NEAR THE SLOTTING
MACHINE FOR OPERATOR REFERENCE.
-
REVISED DATA COLLECTION
THE FOLLOWING TIME STUDY WAS TAKEN AFTER IMPLEMENTATION
FROM: 01.06.2018 TO :06.06.2018 NO. OF JOBS:06.
40
Sl.
NoACTIVITIES
TIME IN MINUTES
PER JOBPERCENTAGE
1 MARKING NIL NIL
2 PREPARATION NIL NIL
3 JOB SETTING 18 Min. 5%
4 MACHINE SETTING 10 Min 3%
5 JOB RESETTING NIL NIL
6 MACHINING 30 Min 8.5%
7 TOOL GRINDING 10 Min 3%
8 TOOL CHANGING 7 Min 2%
9
OTHERS
A] LOADING & UNLOADING
B] MACHINE CLEANING
20 Min 5.5%
TOTAL 95 Min 27%
-
X
X
X
X
X
X
X
X
X
X
TIM
E I
N P
ER
CE
NT
AG
E
100%
91.5%
86.5%
80.5%
72%
63.5%
55%
42.5%
25.5%
80/20 LINE
Y
17%
8.5% 8.5%8.5%8.5%
12.5%
5.5% 5.5%
TIM
E I
N P
ER
CE
NT
AG
E
X
CAUSES
Y
+
+ ++ + + + +
+
8.5%5% 5.5%
3% 3% 2%0% 0% 0%
73%
27%
21.5%
27%
21.5%21.5%
13.5%16.5%
19.5%
SOLVED
( AFTER IMPLEMENTATION )ON : 06.06.2018
COMPARATIVE RESULT OF THE STUDY
( BEFORE IMPLEMENTATION )
40
-
PROCESS FLOW CHART FOR INNER
SPLINES MACHINING
JOB ALLOCATION
START
JOB RECEIVED
TURNING
LATHE
AVAILA-
BILITY
JOB
WAITINGNO
TEETH MACHINING
MILLING
AVAILA-
BILITYJOB
WAITING
NO
JOB ALLOCATION
SETTING
END
INNER SPLINES
MACHINING
( AFTER IMPLEMENTATION )
INSPECTION
41
-
FOLLOW UP ACTIVITY
43
FOLLOW
UP
PERIOD
TROUBLE
IDENTIFIEDREASON RECTIFICATION
25.05.2018
TO
20.07.2018
CLEANING INSIDE
OF THE JIG
NO WAY TO
REMOVE
SCRAPS
HOLES PROVIDED
BOTH SIDES FOR
CLEANING
-
DATE OF BEGINING : 13 . 04 . 2018DATE OF COMPLETION : 20 . 07 . 2018
PROJECT NO : 39.
PROJECT: PROBLEM IN INNER SPLINES MACHINING OF PIPE SLOTTING POWER TRANSMISSION GEARS.
.
DEPT : MACHINE SHOPQC NAME : EXCELLENT
FOLLOW UP / REVIEW10
REGULAR IMPLEMENTATION9
TRIAL IMPLEMENTATION8
7
DEVELOPING SOLUTION6
ANALYSING ROOT CAUSES5
IDENTIFING CAUSES
DATA ANALYSING3
DEFINING THE PROBLEM27SELECTION OF PROBLEM1
MONTHSL.
NO.ACTIVITY
MILE STONE CHART
LEADER: K.NATARAJAN
Dy. LEADER : A.SIVAKUMAR
WEEK
APRIL-18 MAY-18 JUNE-18 JULY-18
I III I I III II IIIV III III IIIIV IV IV
12
6
4
4
6
MEMBER’S NAME:
RM.MUNIAPPAN
M.MURUGANANDHAM
M.JUSTUS
MEETING DAY : FRIDAY, TIME : I shift 12.00 TO 01pm, II shift. 08.30 TO 09.30 pm.
FORCEING RESISTANCE
4
T
ACTIVITY
T-TARGET, A- ACTUAL
2
3
FACILITATOR: R.KALAIARASAN
II
7
63
TOTAL DAYS
61
A
1
9
2
5
6
5
2
4
99114
4
44
-
SL.
No.AIM ACHIEVEMENT
1 WORK SIMPLIFICATION ACHIEVED
2 COST REDUCTION ACHIEVED
3 CUSTOMER SATISFACTION ACHIEVED
45
-
Sl.
No.DESCRIPTION
COST IN
Rs.
1 300 mm Dia X 20 mm PLATE (1No.) 300.00
2 200 mm X 150 mm X 20 mm PLATE (1No.) 250.00
3150 mm OD X 120 mm ID X 200 mm LENGTH
HOLLOW PIPE (1No.)400.00
4 130 mm Dia X 16 mm PLATE (1 No.) 150.00
5 30 mm X25 mm X 100 mm PLATE 150.00
6 20 mm Dia X 100 mm LENGTH ROD 50.00
7 M24 BOLT 100 mm LENGTH (2No.s) 60.00
8 22 mm X 10 mm X 30 LENGTH KEY (2 No.s) 40.00
9 MACHINING AND WELDING CHARGES 1,000.00
TOTAL 2,400.00
COST OF IMPLEMENTATION
45
-
COST BENEFIT ANALYSIS
DETAILSIMPLEMENTATION
BEFORE AFTER
MAN DAYS UTILISED FOR SPLAINS
MACHINING OF PIPE SLOTTING
POWER TRANSMISION GEAR 1 No.
01 0.33
TIME SAVED PER JOB = 0.67 MAN DAYS
No. OF JOBS PER YEAR = 44 Nos.
MAN DAYS SAVED PER ANNUM = 29.5 MAN DAYS
CHARGE PER MAN HOUR = Rs. 956
( INCLUDING SUPERVISING,OVERHEAD CHARGES )
TOTAL SAVINGS PER ANNUM (956X8X29.5) = Rs. 2,25,616.00
IMPLEMENTATION COST (DEDECTION) = Rs. 2,400.00
2,23,216.00
NET SAVINGS Rs.2,23,216.00
46
-
TANGIBLE BENEFITS
TIME SAVED IS 29.5 MAN DAYS / ANNUM
MONEY SAVED IS Rs.2,23,216 / ANNUM
PRODUCTIVITY IMPROVED BY 300%
INTANGIBLE BENEFITS
# PROBLEM SOLVING SKILLS
# CREATIVITY
# Q.C. TOOLS UNDERSTANDING
AND APPLICATION
# JOB KNOWLEDGE
# RELATIONSHIP BETWEEN
SUPERIORS AND WORKERS
# LEADER SHIP SKILL
# COMMUNICATION SKILL
# TEAM WORK
ALL ARE
IMPROVED
48
-
BEFORE IMPLEMENTATION
AFTER IMPLEMENTATION
LEGEND: 5 POINT SCALE
1. POOR
2. FAIR
3. GOOD
4. VERY GOOD
5. EXCELLENT
INTANGIBLE BENEFITS RADAR CHART
4948
-
50
CUSTOMER APPRECIATION CERTIFICATE
-
51
UNIT HEAD CERTIFICATE
-
52
FINANCE DEPARTMENT CERTIFICATE
-
CONCLUSION
53
BY MAKING A SPECIAL JIG WE WERE ABLE TO IMPROVE THE
PRODUCTIVITY AND ACCURACY. MARKING FULLY
ELIMINATED. THROUGH THIS PROCESS WE WERE ABLE TO
MACHINING INNER SPLINES OF PIPE SLOTTING POWER
TRANSMISION GEARS WITH ENHANCED PRODUCTIVITY WITH
REQUIRED QUALITY. ALSO THIS IMPROVEMENT RESULTED IN
A SAVINGS OF RS.2,23,216 / ANNUM AND ALSO
IMPROVED THE PRODUCTIVITY BY 300%.
-
FUTURE PLAN
WE HAVE PLANNED TO SOLVE THE FOLLOWING PROBLEMS
ALREADY SHOWN IN OUR PROBLEM SELLECTION MATRIX
PROBLEM IN SUPPORTNG OF FEED SHAFT IN L.C.125 LATHES.
PROBLEM IN SHIFTING JOBS FROM BAY TO BAY.
PROBLEM IN MEASURING JOBS OF OUTSIDE DIAMETER
MORE THEN 1000.m.m.
PROBLEM IN GAUGE PLATE THICKNESS MACHINING.
PROBLEM IN INTERNAL GRAINDING IN CENTRE LATHES.
54
-
55
OUR SINCERE THANKS TO
NLC INDIA LIMITED, NEYVELI.
GENERAL MANAGER, CENTRAL WORK SHOPS AND MSS.
Dy.GENERAL MANAGER,LEANING AND DEVELOPMENT CENTER.
QCFI CHENNAI CHAPTER.
HONOURABLE JUDGES AND COMMITTEE,CCQC 2018.
-
PLEASE
56