  • CENTRAL WORKSHOPS

    NLC INDIA Ltd.

    (“NAVARATNA”--A GOVERNMENT OF INDIA ENTERPRISE)

    NEYVELI –TAMILNADU –INDIA.

    CCQC-2018

    AT CHENNAI

    FROM: 22.09.2018 TO: 23.09.2018.

    CASE STUDY PRESENTATION

    AT

  • CENTRAL WORKSHOP

    2

  • THE NLC INDIA LIMITED, NEYVELI, TAMIL NADU, A GIANT PUBLIC SECTOR UNDERTAKING IS

    AN INTEGRATED INDUSTRIAL COMPLEX

    COAL IS THE WORLD’S LARGEST AND MOST POPULARLY USED SOURCE OF POWER. THOUGH

    IT IS NON-RENEWABLE, IT PLAYS A VITAL ROLE IN POWER GENERATION.

    IN INDIA, LIGNITE, A BASIC FORM OF COAL IS AVAILABLE IN TAMIL NADU, RAJASTHAN AND

    KASHMIR, U.P. BUT 90% OF THE TOTAL AVAILABILITY OF LIGNITE IS IN TAMIL NADU.USING

    LIGNITE AS FUEL TO POWER GENERATION.

    IT HAS THE FOLLOWING UNIT

    UNIT PRODUCTION CAPACITY1. OPEN CAST MINES – I LIGNITE 10.5 M.TONNES /ANNUM

    2. OPEN CAST MINES – II LIGNITE 15.0 M.TONNES /ANNUM

    3. OPEN CAST MINES – I A LIGNITE 3.0 M.TONNES /ANNUM

    4. THERMAL POWERSTATION – I POWER 600 M.W

    5. THERMAL POWER STATION – II POWER 1470 M.W

    6. THERMAL POWER STATION– I EXP. POWER 420 M.W

    7. BARSINGSAR PROJECT, LIGNITE 02.1 M.TONNES/ANNUM

    BIKANER, RAJASTHAN. POWER 250 M.W.

    8. THERMAL POWER STATION II EXP. POWER 500 M.W.

    9. WIND POWER PLANT POWER 51 M.W.

    10. SOLAR POWER PLANT POWER 440 M.W.

    CENTRAL WORK SHOPS, A SERVICE UNIT OF INDUSTRIAL COMPLEX CATERS TO THE

    NEEDS OF ALL THE PRODUCTION AND ANCILLARY UNITS OF N.L.C. CONCERN.

    3

  • MINES–I

    MINES–II

    MINES–IA

    THERMAL POWER STATION–I EXP

    THERMAL POWER STATION-I

    THERMAL POWER STATION - II

    OUR MAJOR UNITS

    4

  • Q.C. BIO-DATA

    NAME OF THE UNIT : CENTRAL WORKSHOPS

    NAME OF Q.C : EXCELLENT

    Q.C.No. : 03

    UNIT HEAD : SRI. K.THANGARAJU,G.M.,CWS&MSS,

    AREA CO-ORDINATOR : SRI.V.BALAJI, Ad.DGM.,

    FACILITATOR : Mr. R.KALAIARASAN, EE.,

    LEADER : Mr. K.NATARAJAN,FOREMAN,

    Dy. LEADER : Mr. A.SIVAKUMAR.FOREMAN,

    MEMBERS : Mr. RM.MUNIAPPAN, SR.FOREMAN,

    : Mr.M.MURUGANANDHAM.Sr.Tech.II,

    : Mr. M.JUSTUS. TECH II B,

    5

  • DATE OF STARTING : 02.03.1992

    MEETS ON : ALL FRIDAYS

    No. OF MEETINGS IN 2018-2019 : 24

    ATTENDANCE (AVERAGE) : 95%

    PROBLEMS IDENTIFIED : 60

    PROBLEMS SOLVED : 40

    CASE STUDY PRESENTED SO FAR : 38

    39th

    CASE

    STUDY

    6

  • 60%

    32%

    4% 4%

    JOBS CARRIED OUT IN MACHINE SHOP

    RECONDITIONING JOBS - 2370 Nos.

    PRODUCTION JOBS - 1264 Nos

    MODIFICATION JOBS - 158 Nos

    OTHER JOBS - 158 Nos

    TOTAL JOBS - 3950 Nos

    THE PIE CHART BELOW SHOWS VISUALLY

    THE QUANTUM OF JOBS UNDERTAKEN

    BY US IN MACHINE SHOP.

    WE ARE FROM CENTRAL WORKSHOPS A VITAL UNIT OF NLC LIMITED FULFILLING THE

    NEEDS OF ITS LIGNITE MINES, THERMAL POWER STATIONS AND OTHER UNITS.

    DURING THE YEAR 2018 -19, 3950 JOBS OF PRODUCTION, RECONDITIONING, MODIFICATION,

    FABRICATION AND OTHER NATURE OF JOBS WERE UNDERTAKEN BY US.

    A FEW IMPORTANT JOBS CARRIED OUT ARE

    1] MANUFACTURING AND RECONDITIONING OF DRIVE SHAFTS OF B.W.E’S

    AND CONVEYORS.

    2] MACHINING OF CONVEYOR IDLER SHAFTS.

    3] MACHINING OF LARGE GEAR BOX HOUSINGS.

    4] MACHINING OFCAM WHEELS OF BUCKET WHEEL EXCAVATORS.

    5] MANUFACTURING OF 20” DIA. PLAIN PIPES AND SLOTTED PIPES.

    6] SHRINK FITTINGS OF B.W.E.’S TRACK CAM WHEELS WITH SHAFTS

    OUR WORK AREA

    7

  • COST WORTH OF MACHINES- 50 CRORES

    TYPE OF MACHINES

    3035

    31

    97

    5 5 5

    2 2 1

    0

    5

    10

    15

    20

    25

    30

    35

    40

    45

    No

    . O

    F M

    AC

    HIN

    ES

    WELDING MACHINES LATHES

    MILLING MACHINES

    VERTICAL TURRET LATHES

    DRILLING MACHINES GRINDING MACHINESSHAPING MACHINES

    PLANING MACHINES

    BORING MACHINESSLOTTING MACHINE

    8

  • WE HAVE CONDUCTED BRAIN STORMING SESSION

    FOR IDENTIFYING THE PROBLEMS AND CLASSIFIED

    THEM UNDER THREE CATAGORIES AS BELOW

    1.PROBLEM IN CUTTING SHORT LENGTH TOOLS IN CUTTER GRINDER MACHINE. B

    2.PROBLEM IN SUPPORTING FEED SHAFT IN LC.125 LATHES. A

    3.PROBLEM IN MACHINING INNER SPLINES OF PIPE SLOTTING

    POWER TRANSMISSION GEARS A

    4.PROBLEM IN SHIFTING OF HEAVY JOBS FROM BAY TO BAY A

    5.FREQUENT BRAKE FAILURE IN 10 TON OVERHEAD CRANE. B

    6.PROBLEM TO EOT CRANE OPERATOR DURING THE SHRINK FIT ASSEMBLING. C

    7.PROBLEM IN INTERNAL GRINDING IN CENTER LATHES. A

    8.PROBLEM IN GAUGE PLATE THICKNESS MACHINING. A

    9.PROBLEM IN CARRIAGE MOVEMENT WIRING SYSTEM IN LC.125 LATHES B

    10.PROBLEM OF REMOVING THE TURNING CHIPS IN HEAVY DUTY LATHES. B

    IDENTIFICATION OF PROBLEMS

    9

  • IDENTIFICATION OF PROBLEMS

    A – CAN BE SOLVED BY OUR Q.C. : 8 PROBLEMS

    B – NEED SUPPORT FROM OTHER DEPARTMENT : 9 PROBLEMS

    C– CAN BE SOLVED BY OUR MANAGENENT : 3 PROBLEMS

    11. PROBLEM IN OFFSET SETTING OF SPLIT JOBS IN FACE PLATE LATHE. A

    12. PROBLEM IN STORAGE OF RAW MATERIALS. B

    13. PROBLEM IN ROOF LEAKAGE OF THE WORKSHOP SHED. C

    14. PROBLEM IN CUTTING TOOL PREPARATION. C

    15. PROBLEM IN MEASURING OF OUTSIDE DIAMETER OFJOBS MORE THAN 1000 mm. A

    16. PROBLEM IN AUTO FEED ARRANGEMENT OF LATHE TAILSTOCK

    SPINDLE MOVEMENT. B

    17. PROBLEM IN SETTING THE CAM WHEEL FOR MACHINING AT FACE PLATE LATHE A

    18. PROBLEM IN LABYRINTH MACHINING. B

    19. PROBLEM IN DRILL BIT REGRINDING B

    20. PROBLEM IN AUTO FEED SYSTEM IN FACE PLATE LATHE. B

    10

  • SELECTING THE “A” GRADE PROBLEMS

    BY RATING METHOD

    I

    F – FREQUENCY, I – IMPORTANCE, FE – FEASIBILITY

    1 – LOW, 2 – MODERATE, 3 – HIGH, 4 – VERY HIGH,

    ON : 13.04.2018

    SL.

    NO.

    PROBLEM

    RATING

    LEADERDY

    LEADER

    MEMBERS

    TOTALPRIO-

    RITY

    1 2 3

    F IF

    EF I

    F

    EF I

    F

    EF I

    F

    EF I

    F

    E

    1PROBLEM IN SUPPORTING FEED SHAFT IN

    L.C.125 LATHES2 4 3 2 3 2 2 3 3 2 4 2 2 3 2 39 V

    2PROBLEM IN SETTING CAMWHEEL IN

    FACEPLATE LATHE3 3 2 3 2 2 2 2 1 2 2 2 2 3 2 33 VIII

    3PROBLEM IN GAUGE PLATE THICKNESS

    MACHINING.3 3 3 3 2 3 3 4 4 4 2 3 4 2 3 46 II

    4PROBLEM IN INTERNAL GRAINDING IN

    CENTRE LATHES2 3 2 2 3 2 2 3 2 2 2 3 2 3 3 36 VI

    5PROBLEMIN SHIFTING OF JOBS FROM BAY TO

    BAY.2 3 2 2 4 3 2 3 2 2 2 2 2 3 1 35 VII

    6

    PROBLEM IN INNER SPLINES

    MACHINING OF PIPE SLOTTING

    POWER TRANSMISSION GEARS.

    4 4 4 4 4 3 4 4 4 3 4 4 4 4 4 58

    7PROBLEM IN OFFSET SETTING OF SPLIT

    JOBS IN FACE PLATE LATHE2 3 3 2 4 3 2 3 2 2 3 3 2 4 2 40 IV

    8PROBLEM IN MEASURING JOBS OF OUTSIDE

    DIAMETER MORE THEN 1000 mm.2 4 2 3 4 3 3 3 2 2 4 3 4 3 2 44 III

    I

    11

  • SI.

    NO.

    PROBLEM / TOPICS

    THEME NATURE

    1PROBLEM IN SUPPORTNG OF

    FEED SHAFT IN L.C.125

    LATHES_ _ _ __ III

    2PROBLEM IN INTERNAL

    GRINDING IN CENTER LATHS. _ _ IV

    3

    PROBLEM IN INNER

    SPLINES MACHINING OF

    PIPE SLOTTING POWER

    TRANSMISSION GEARS.

    _I

    4PROBLEM IN MEASURING

    JOBS OF OUTSIDE DIAMETER

    MORE THEN 1000.mm_ _ _ V

    5PROBLEM IN OFFSET SETTING

    OF SPLIT JOBS IN FACE PLATE

    LATHE_ _ VI

    6PROBLEM IN GAUGE PLATE

    THICKNESS MACHINING _ _ II

    PROBLEM SELECTION MATRIX

    ON:13.04.2018

    12

  • TOPIC

    PROBLEM IN INNER SPLINES

    MACHINING OF PIPE SLOTTING

    POWER TRANSMISSION GEARS

    13

  • DATE OF BEGINNING : 13. 04. 2018DATE OF COMPLETION : 20. 07. 2018PROJECT NO : 39.

    PROJECT : PROBLEM IN INNER SPLINES MACHINING

    OF PIPE SLOTTING POWER TRANSMISSION GEARS

    DEPT : MACHINE SHOPQC NAME : EXCELLENT

    FOLLOW UP / REVIEW10

    REGULAR IMPLEMENTATION9

    TRIAL IMPLEMENTATION8

    7

    DEVELOPING SOLUTION6

    ANALYSING ROOT CAUSES5

    IDENTIFING CAUSES

    DATA ANALYSING3

    DEFINING THE PROBLEM2

    7SELECTION OF PROBLEM1

    MONTHSL.

    NO.

    .ACTIVITY

    ACTIVITY PLANING CHART

    LEADER: K.NATARAJAN

    Dy. LEADER : A.SIVAKUMAR

    WEEK

    APRIL-18 MAY-18 JUNE-18 JULY-18

    I III I I III II II

    IV III III IIIIV IV IV

    12

    6

    4

    4

    6

    MEMBER’S NAME:

    RM.MUNIAPPAN

    M.MURUGANANDHAM

    M.JUSTUS

    MEETING DAY : FRIDAY, TIME : I shift 12.00 TO 01pm, II shift. 08.30 TO 09.30 pm.

    FORCEING RESISTANCE

    4

    T

    T-Target

    2

    3

    FACILITATOR: R.KALAIARASAN

    II

    7

    63

    TOTAL DAYS 114

    14

  • DATA COLLECTION-ITHE DETAILS OF PIPE SLOTTING POWER TRANSMISSION

    GEARS COMPLETED

    COLLECTED FROM WORK ORDER REGISTER 2018-19.

    15

    MONTHWORK ORDER NO., QUANTITY

    APRIL MAY-17 0199,0200 6

    JUNE JULY-17 0346,0347 12

    AUG. – SEP. -17 0441,0476,0478 8

    OCT. – DEC. -17 0561,0599,0600,0699 8

    JAN. -MARCH-18 0766,0804,0822 10

    TOTAL 44

  • 16

    MINING OPERATION IN NLC

    16

  • UNDERSTANDING THE PROBLEM

    IN OUR NLC MINE I, MINE IA, MINE II, MINE II-EXP, TPS I, TPS II, TPS I-EXP, TPS II-EXP ARE

    THE IMPORTANT PRODUCTION UNITS NEYVELI.

    FROM THE ABOVE PLANTS VARIOUS TYPES OF WORKS COME TO OUR WORKSHOP FOR

    RECONDITION, MODIFICATION, AND PRODUCTION.

    WE CARRIED OUT VARIOUS KINDS OF JOBS SUCCESSFULLY LIKE CAM WHEEL, DRIVE

    SHAFTS, 20’’SLOTTED PIPES BUSHES, HOUSINGS, PIPE, SLEEVES, LABRINGTH, HOLLOW SHAFTS ETC..

    IN OUR MINES GROUND WATER CONTROL IS AN IMPORTANT PROCESS .FOR THE ABOVE

    PROCESS DRILLED MORE THAN 150 BOREWELLS AND DISCHARGE THE GROUND WATER

    BY HEAVY DUTY PUMPS 24X7 ROUND THE CLOCK.

    IF THE WATER PUMPING HAD STOPPED MINES FULLY DROWNING BY WATER.SO WE

    PRESERVE THE STANDBY PROPERLY.

    TO MAKING BOREWELLS PLAIN STEEL PIPES,SLOTTED PIPES ARE MANUFACTURE IN OUR

    WORKSHOP.

    SLOTTED PIPES ARE MANUFACTURED IN TWO PIPE SLOTTING MACHINES IN OUR

    WORKSHOP.

    IN THE PIPE SLOTTING MACHINES 11 NOS. OF SPUR GEARS ARE USED TO TRANSMIT THE

    POWER TO SLOT CUTTER SPINDLE.

    DUE TO CONTINIOUS WORKING POWER TRANSMISSION GEARS WERE DAMAGED AND

    REQUIRE REPLACEMENT.

    17

  • UNDERSTANDING THE PROBLEM

    IN OUR MACHINE SHOP WE MANUFACTURING THE REQUIRED GEARS.

    IN THE GEARS INNER SPLINES MACHINING WORK CARRIED OUT IN SLOTTING MACHINE.

    THERE IS ONLY ONE SLOTTING MACHINE IN OUR WORK SHOP.

    VARRIOUS OTHER WORKS LIKE INNER KEYWAY MACHINING,LUBRICATION GROOVES OF

    GUNMETAL BUSHES, RECONDITIONING WORNOUT GEARS, INNER SQUARE MACHINING

    WORK ALSO CARRIOUT IN THE SLOTTING MACHINE.

    INNER SPLINES MACHINING WAS VERY LABOURIOUS AND CHALLENGING TO US. IT TAKES

    MORE TIME.

    SO WE WERE UNABLE TO DELEVER THE PIPE SLOTTING GEARS WITHIN TIME.

    SO, WE SELECT THE PROBLEM AS OUR CASE STUDY

    18

  • SLOTTED PIPES

    19

  • MANUFACTURING OF SLOTTED PIPES

    20

    POWER TRANSNISION GEARS

  • PIPE SLOTTING POWER TRANSMISSION GEAR CLAMPED IN SLOTTING MACHINE TABLE FOR INNER SPLINES

    MACHINING

    21

    SLOTTING

    MACHINE

  • 22

    MARKINGMARKED GEARS

  • PROCESS FLOW DIAGRAM FOR PIPE SLOTTING POWER TRANSMISSION GEAR INNER SPLINES MACHINING

    ( BEFORE IMPLEMENTATION )

    23

    JOB ALLOCATION

    START

    JOB RECEIVED

    TURNING

    LATHE

    AVAILA

    -BILITY

    JOB

    WAITINGNO

    TEETH MACHINING

    MILLING

    AVAILA-

    BILITY

    JOB

    WAITING

    NO

    JOB ALLOCATION

    END

    SPLINES MACHINING

    MARKING

    SETTING

    NOT OKOK

    INSPEC

    - TION

    YES

    YES

    NOT OKOK

  • WAY OF THINKING

    SAFETY

    TECHNIQUES-

    TOOLS-

    TIME-

    METHOD

    --

    MAN POWER

    CU

    ST

    OM

    ER

    SA

    TIS

    FA

    CT

    ION

    CO

    ST

    RE

    DU

    CT

    ION

    WO

    RK

    SIM

    PLIF

    ICA

    TIO

    N

    MU

    RA

    [DIS

    CR

    EPA

    NC

    Y]

    MU

    RI

    [ST

    RA

    IN]

    MU

    DA

    (WA

    ST

    E]

    QUALITY

    CHARACTERS

    3’MU’ AIM

    ON : 20.04.2018

    REDEFINING THE PROBLEM

    --

    ---

    --

    -

    -

    --

    24

  • CUSTOMER SATISFACTION

    WORK SIMPLIFICATION

    COST REDUCTION

    25

  • BRAIN STORMING - I

    ON : 20.04.2018.

    ( TO FIND OUT THE POSSIBLE CAUSES )

    26

    ONLY ONE SLOTTING MACHINE.

    OLD MACHINE.

    MORE MAN POWER.

    DIFFICULT TO SETTING.

    LABOURIOUS OPERATION.

    MORE MACHINING TIME.

    MORE NO. OF WORK ORDERS.

    VARIOUS TYPES OF JOBS.

    OPERATOR FATIQUE.

    FREQUENT ADJUSTMENT OF STROKE LENGTH.

    MORE MARKING TIME.

    NO TEMPLATE TO MARKING

    NO FIXTURE TO HOLD THE JOB.

    MANUAL TABLE ROTATION.

    OPERATOR ABSENTEESM

  • DATA COLLECTION-II

    THE FOLLOWING DATA SHOWS THE AVERAGE TIME TAKEN TO COMPLETE THE INNER

    SPLINES MACHINING OF PIPE SLOTTING POWER TRANSMISSION GEAR .

    FROM : 21.04.2018 TO: 23.04.2018 NO.OF JOBS: 03

    27

    Sl.

    NoACTIVITIES

    TIME IN MINUTS

    PER JOBPERCENTAGE

    1 MARKING 30 Min 8.5%

    2 PREPARATION 45 Min 12.5%

    3 JOB SETTING 60 Min 17.O%

    4 MACHINE SETTING 30 Min 8.5%

    5 JOB RESETTING 20 Min 5.5%

    6 MACHINING 90 Min 25.5%

    7 TOOL GRINDING 30 Min 8.5%

    8 TOOL CHANGING 20 Min 5.5%

    9

    OTHERS

    ( LOADING & UNLOADING,

    MACHINE CLEANING)

    30 Min 8.5%

    TOTAL 355 Min 100%

  • 0%

    10%

    20%

    30%

    40%

    50%

    60%

    70%

    80%

    90%

    100%

    X

    X

    X

    X

    X

    X

    XX

    XT

    IME

    IN

    PE

    RC

    EN

    TA

    GE

    100%

    91.5%

    86.5%

    80.5%

    72%

    63.5%

    55%

    42.5%

    25.5%

    80/20 LINE

    VITAL FEW

    Y

    OT

    HE

    RS

    TO

    OL

    CH

    AN

    GIN

    G

    TO

    OL

    GR

    IND

    ING

    JO

    B

    RE

    SE

    TT

    ING

    MA

    CH

    INE

    SE

    TT

    ING

    MA

    RK

    ING

    PR

    EPA

    RA

    TIO

    N

    JO

    B S

    ET

    TIN

    G

    MA

    CH

    ININ

    G

    CAUSES

    PARETO DIAGRAMBEFORE IMPLEMENTATION

    ON: 24.04.2018

    USEFULL MANY

    28

    25.5%

    12.5%8.5%8.5% 8.5%

    5.5% 5.5%8.5%

    17%

  • CAUSE AND EFFECT DIAGRAMFOR PROBLEM OF PIPE SLOTTING POWER TRANSMISSION GEAR

    INNER SPLINES MACHINING

    PROBLEM OF

    PIPE SLOTTING

    POWER TRANSMISSION

    GEAR INNER SPLINES

    MACHINING

    METHOD

    MORE

    SETTING TIME

    NO FIXTURE

    MORE MAN POWER

    ONE MACHINE

    ONLY

    MORE No. OF

    WORKORDERS

    HARD MATERIALMACHINE NOT

    AVAILABLE

    STEEL METAL

    UNABLE TO USE

    OTHER MACHINE

    SPECIFIC

    OPERATION

    OPERATOR

    FATIGUEMORE

    MACHINING

    TIME

    FREQUENT

    RESESETTING

    MAN

    MACHINE MATERIAL

    EFFECTMANUAL CLAMPING

    OLD MACHINE

    FREQUENT

    STROKE

    ADJUSTMENT

    POOR CLAMPING

    FREQUENT

    RESETTING

    SMALL BORE

    NATURE OF THE JOB

    NO JIG

    MORE NO. OF

    ROTATION

    NATURE OF

    THE JOB

    ON :04.05.2018

    29

  • BRAIN STORMING - II

    ON :04.05.2018(TO FIND OUT THE SOLUTIONS)

    30

    SPECIAL FIXTURE MAY BE PURCHASED.

    PURCHASE A NEW SLOTTING MACHINE. SPECIAL TYPE MULTI POINT TOOL MAY BE PURCHASED

    MANUFACTURE A SPECIAL JIG.

  • SL.

    NO.SUGGESTIONS ADVANTAGE DISADVANTAGE

    1PURCHASE A NEW SLOTTING

    MACHINE.

    1.EASY TO MEET

    REQUIREMENTS.

    1. MORE COSTLY .

    2.MORE TIMING.

    3.NOT ECONOMICAL.

    2SPECIAL FIXTURE MAY BE

    PURCHASED.

    1.EASY TO HOLD

    ON SLOTTING

    MACHINE TABLE.

    2.EASY TO MEET

    REQUIREMENTS.

    1.TEDIOUS

    PROCEDURE.

    2.MORE TIMING.

    3.MORE COST.

    3SPECIAL TYPE MULTI POINT

    TOOL MAY BE PURCHASED.

    1.EASY TO HOLD IN

    TOOL POST.

    1.MORE COST.

    2.TEDIOUS

    PROCEDURE.

    3.MORE TIMING.

    4MANUFACTURE A SPECIAL JIG.

    1.EASY TO MEET

    REQUIREMENTS.

    2.SAVE TIME &

    MAN POWER. NIL

    FOR PROBLEM OF PIPE SLOTTING POWER TRANSMISSION GEAR

    INNER SPLINES MACHINING

    31

  • Sl.

    No.RECOMMENDATIONS EFFECT COST TIME PRIORITY

    1SPECIAL TYPE SLOTTING

    MACHINE MAY BE

    PURCHASED

    MORE MORE MORE III

    2 SPECIAL TYPE FIXTURE MAY

    BE PURCHASEDMORE MORE MORE II

    3 SPECIAL TYPE MULTI POINT

    TOOL MAY BE PURCHASEDLESS MORE MORE IV

    4 SPECIAL TYPE JIG MAY BE

    MANUFACTURED BY OUR Q.CMORE LESS LESS

    E.C.T. OPTION CHARTFOR PROBLEM OF PIPE SLOTTING POWER TRANSMISSION

    GEAR INNER SPLINES MACHINING

    I

    ON :11.05.2018.

    32

  • [SEQUENTIAL TYPE]

    FOR MANUFACTURING A JIG

    TO DESIGN AS

    PER REQUIREMENT

    TO COLLECT MATERIAL

    NOT O.K O.K

    FABRICATE

    TEST

    TO DISCUSS WITH UNIT HEAD

    P.D.P.C

    SUITABLE JIG

    MANUFACTURED

    DECIDED TO MANUFACTURE

    JIG BY Q.C

    AGREED FOR THE

    INTRODUCTION OF JIG NOT AGREED

    TO COLLECT

    SUPPORTING DATA

    33

  • ACTION PLAN

    DOCHECK

    DESIGNING THE JIG

    FIX THE JIG AT SLOTTING

    MACHINE TABLE

    MACHINED INNER SPLINES

    SUCCESSFULLY. FOUND IT

    SUITABLE.

    COLLECTING THE

    MATERIALS, MACHINING

    AND WELDING DONE. JIG

    MANUFACTURED.

    P.D.C.A.CHART

    STARTED ON : 14.05.2018 COMPLETED ON: 25.05.2018

    TOTAL NO. OF DAYS : 12.

    FROM : 14.05.2018

    TO : 15.05.2018

    FROM : 16.05.2018

    TO : 18.05.2018

    FROM : 21.05.2018

    TO: 23.05.2018

    FROM : 25.05.2018

    PUT IN TO REGULAR

    OPERATION.

    34

  • THE 20mm THICK BOTTOM PLATE WAS

    MACHINED FOR 245mm DIA AND TWO

    SLOTS (22mm WIDTH 30MM LENGTH) ARE

    MADE IN THE PLATE OPPOSITE TO

    EACH OTHER FOR CLAMPING

    PURPOSE. BOTTOM SIDE TWO

    TENENTS ARE FIXED FOR PROPER

    SEATING THE JIG IN THE CENTRE OF

    THE MACHINE TABLE ACCURATELY.

    GUIDE PLATE

    CLAMPING BOLT

    JIG CLAMPING

    BOLT

    A HOLLOW PIPE OF 170mm HEIGHT X

    140mm OUTER DIA X 124.2 mm INNER

    DIA WAS MACHINED AND WELDED

    OVER THE BOTTOM PLATE. TWO

    NUMBERS OF M20 BOLT PLACED

    OPPOSITE TO EACH OTHER PROVIDED

    ON TOP SIDE OF THE HOLLOW PIPE

    FOR CLAMPING THE WORK PIECE AND

    GUIDE PLATE.

    A TOP GUIDE PLATE 20mm THICK

    HAVING TWO SLOTS OPPOSITE EACH

    OTHER, IT WAS PLACED ON TOP OF

    THE HOLLOW PIPE. IN THE GUIDE

    PLATE EIGHT SLOTS ARE (6mm DEPTH

    X10mm WIDTH) MACHINED FOR

    GUIDING THE CUTTING TOOL.

    TENENTS

    GUIDE PLATE

    IMPLEMENTATION

    35

  • IMPLEMENTATION

    36

    GUIEDE PLATE

    CLAMPING BOLT

    JIG CLAMPING

    BOLT

    SLOTS FOR GUIDING

    THE CUTTING TOOL

    COMPLETED

    GEARS

    LIFTING PLATE

  • 37

    GUIDE PLATE

    TENENTS

  • 38

  • RECURRENCE PREVENTION MEASURES

    39

    THE JIG, WE HAVE MADE IS SIMPLE TO USE. IT REQUIRES LITTLE

    MAINTENANCE.

    ALL THE PRECAUTIONARY MEASURES WERE CONSIDERED AT THE

    DESIGN AND FABRICATED THE JIG TO ENSURE FOOL PROOF AND

    FAIL SAFE.

    A WORKING METHOD OF THE JIG WAS CLEARLY DEMONSTATED TO

    ALL OPERATORS AND SUPERVISORS.WORKING MANUAL ALSO KEPT

    WITH OUR GM’S OFFICE FOR FUTURE REFERANCE.

    A SEPARATE PLACE IS RESERVED FOR KEEPING THE JIG,

    WHEN NOT BEING USED.

    AN INSTRUCTION BOARD IS DISPLAYED NEAR THE SLOTTING

    MACHINE FOR OPERATOR REFERENCE.

  • REVISED DATA COLLECTION

    THE FOLLOWING TIME STUDY WAS TAKEN AFTER IMPLEMENTATION

    FROM: 01.06.2018 TO :06.06.2018 NO. OF JOBS:06.

    40

    Sl.

    NoACTIVITIES

    TIME IN MINUTES

    PER JOBPERCENTAGE

    1 MARKING NIL NIL

    2 PREPARATION NIL NIL

    3 JOB SETTING 18 Min. 5%

    4 MACHINE SETTING 10 Min 3%

    5 JOB RESETTING NIL NIL

    6 MACHINING 30 Min 8.5%

    7 TOOL GRINDING 10 Min 3%

    8 TOOL CHANGING 7 Min 2%

    9

    OTHERS

    A] LOADING & UNLOADING

    B] MACHINE CLEANING

    20 Min 5.5%

    TOTAL 95 Min 27%

  • X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    TIM

    E I

    N P

    ER

    CE

    NT

    AG

    E

    100%

    91.5%

    86.5%

    80.5%

    72%

    63.5%

    55%

    42.5%

    25.5%

    80/20 LINE

    Y

    17%

    8.5% 8.5%8.5%8.5%

    12.5%

    5.5% 5.5%

    TIM

    E I

    N P

    ER

    CE

    NT

    AG

    E

    X

    CAUSES

    Y

    +

    + ++ + + + +

    +

    8.5%5% 5.5%

    3% 3% 2%0% 0% 0%

    73%

    27%

    21.5%

    27%

    21.5%21.5%

    13.5%16.5%

    19.5%

    SOLVED

    ( AFTER IMPLEMENTATION )ON : 06.06.2018

    COMPARATIVE RESULT OF THE STUDY

    ( BEFORE IMPLEMENTATION )

    40

  • PROCESS FLOW CHART FOR INNER

    SPLINES MACHINING

    JOB ALLOCATION

    START

    JOB RECEIVED

    TURNING

    LATHE

    AVAILA-

    BILITY

    JOB

    WAITINGNO

    TEETH MACHINING

    MILLING

    AVAILA-

    BILITYJOB

    WAITING

    NO

    JOB ALLOCATION

    SETTING

    END

    INNER SPLINES

    MACHINING

    ( AFTER IMPLEMENTATION )

    INSPECTION

    41

  • FOLLOW UP ACTIVITY

    43

    FOLLOW

    UP

    PERIOD

    TROUBLE

    IDENTIFIEDREASON RECTIFICATION

    25.05.2018

    TO

    20.07.2018

    CLEANING INSIDE

    OF THE JIG

    NO WAY TO

    REMOVE

    SCRAPS

    HOLES PROVIDED

    BOTH SIDES FOR

    CLEANING

  • DATE OF BEGINING : 13 . 04 . 2018DATE OF COMPLETION : 20 . 07 . 2018

    PROJECT NO : 39.

    PROJECT: PROBLEM IN INNER SPLINES MACHINING OF PIPE SLOTTING POWER TRANSMISSION GEARS.

    .

    DEPT : MACHINE SHOPQC NAME : EXCELLENT

    FOLLOW UP / REVIEW10

    REGULAR IMPLEMENTATION9

    TRIAL IMPLEMENTATION8

    7

    DEVELOPING SOLUTION6

    ANALYSING ROOT CAUSES5

    IDENTIFING CAUSES

    DATA ANALYSING3

    DEFINING THE PROBLEM27SELECTION OF PROBLEM1

    MONTHSL.

    NO.ACTIVITY

    MILE STONE CHART

    LEADER: K.NATARAJAN

    Dy. LEADER : A.SIVAKUMAR

    WEEK

    APRIL-18 MAY-18 JUNE-18 JULY-18

    I III I I III II IIIV III III IIIIV IV IV

    12

    6

    4

    4

    6

    MEMBER’S NAME:

    RM.MUNIAPPAN

    M.MURUGANANDHAM

    M.JUSTUS

    MEETING DAY : FRIDAY, TIME : I shift 12.00 TO 01pm, II shift. 08.30 TO 09.30 pm.

    FORCEING RESISTANCE

    4

    T

    ACTIVITY

    T-TARGET, A- ACTUAL

    2

    3

    FACILITATOR: R.KALAIARASAN

    II

    7

    63

    TOTAL DAYS

    61

    A

    1

    9

    2

    5

    6

    5

    2

    4

    99114

    4

    44

  • SL.

    No.AIM ACHIEVEMENT

    1 WORK SIMPLIFICATION ACHIEVED

    2 COST REDUCTION ACHIEVED

    3 CUSTOMER SATISFACTION ACHIEVED

    45

  • Sl.

    No.DESCRIPTION

    COST IN

    Rs.

    1 300 mm Dia X 20 mm PLATE (1No.) 300.00

    2 200 mm X 150 mm X 20 mm PLATE (1No.) 250.00

    3150 mm OD X 120 mm ID X 200 mm LENGTH

    HOLLOW PIPE (1No.)400.00

    4 130 mm Dia X 16 mm PLATE (1 No.) 150.00

    5 30 mm X25 mm X 100 mm PLATE 150.00

    6 20 mm Dia X 100 mm LENGTH ROD 50.00

    7 M24 BOLT 100 mm LENGTH (2No.s) 60.00

    8 22 mm X 10 mm X 30 LENGTH KEY (2 No.s) 40.00

    9 MACHINING AND WELDING CHARGES 1,000.00

    TOTAL 2,400.00

    COST OF IMPLEMENTATION

    45

  • COST BENEFIT ANALYSIS

    DETAILSIMPLEMENTATION

    BEFORE AFTER

    MAN DAYS UTILISED FOR SPLAINS

    MACHINING OF PIPE SLOTTING

    POWER TRANSMISION GEAR 1 No.

    01 0.33

    TIME SAVED PER JOB = 0.67 MAN DAYS

    No. OF JOBS PER YEAR = 44 Nos.

    MAN DAYS SAVED PER ANNUM = 29.5 MAN DAYS

    CHARGE PER MAN HOUR = Rs. 956

    ( INCLUDING SUPERVISING,OVERHEAD CHARGES )

    TOTAL SAVINGS PER ANNUM (956X8X29.5) = Rs. 2,25,616.00

    IMPLEMENTATION COST (DEDECTION) = Rs. 2,400.00

    2,23,216.00

    NET SAVINGS Rs.2,23,216.00

    46

  • TANGIBLE BENEFITS

    TIME SAVED IS 29.5 MAN DAYS / ANNUM

    MONEY SAVED IS Rs.2,23,216 / ANNUM

    PRODUCTIVITY IMPROVED BY 300%

    INTANGIBLE BENEFITS

    # PROBLEM SOLVING SKILLS

    # CREATIVITY

    # Q.C. TOOLS UNDERSTANDING

    AND APPLICATION

    # JOB KNOWLEDGE

    # RELATIONSHIP BETWEEN

    SUPERIORS AND WORKERS

    # LEADER SHIP SKILL

    # COMMUNICATION SKILL

    # TEAM WORK

    ALL ARE

    IMPROVED

    48

  • BEFORE IMPLEMENTATION

    AFTER IMPLEMENTATION

    LEGEND: 5 POINT SCALE

    1. POOR

    2. FAIR

    3. GOOD

    4. VERY GOOD

    5. EXCELLENT

    INTANGIBLE BENEFITS RADAR CHART

    4948

  • 50

    CUSTOMER APPRECIATION CERTIFICATE

  • 51

    UNIT HEAD CERTIFICATE

  • 52

    FINANCE DEPARTMENT CERTIFICATE

  • CONCLUSION

    53

    BY MAKING A SPECIAL JIG WE WERE ABLE TO IMPROVE THE

    PRODUCTIVITY AND ACCURACY. MARKING FULLY

    ELIMINATED. THROUGH THIS PROCESS WE WERE ABLE TO

    MACHINING INNER SPLINES OF PIPE SLOTTING POWER

    TRANSMISION GEARS WITH ENHANCED PRODUCTIVITY WITH

    REQUIRED QUALITY. ALSO THIS IMPROVEMENT RESULTED IN

    A SAVINGS OF RS.2,23,216 / ANNUM AND ALSO

    IMPROVED THE PRODUCTIVITY BY 300%.

  • FUTURE PLAN

    WE HAVE PLANNED TO SOLVE THE FOLLOWING PROBLEMS

    ALREADY SHOWN IN OUR PROBLEM SELLECTION MATRIX

    PROBLEM IN SUPPORTNG OF FEED SHAFT IN L.C.125 LATHES.

    PROBLEM IN SHIFTING JOBS FROM BAY TO BAY.

    PROBLEM IN MEASURING JOBS OF OUTSIDE DIAMETER

    MORE THEN 1000.m.m.

    PROBLEM IN GAUGE PLATE THICKNESS MACHINING.

    PROBLEM IN INTERNAL GRAINDING IN CENTRE LATHES.

    54

  • 55

    OUR SINCERE THANKS TO

    NLC INDIA LIMITED, NEYVELI.

    GENERAL MANAGER, CENTRAL WORK SHOPS AND MSS.

    Dy.GENERAL MANAGER,LEANING AND DEVELOPMENT CENTER.

    QCFI CHENNAI CHAPTER.

    HONOURABLE JUDGES AND COMMITTEE,CCQC 2018.

  • PLEASE

    56