Page 1: CERN Status and Plans

CERN IT Department

CH-1211 Genève 23

Switzerlandwww.cern.ch/

it

CERN Status and Plans

Maria Girone, CERN IT-DM

Page 2: CERN Status and Plans

CERN IT Department

CH-1211 Genève 23

Switzerlandwww.cern.ch/

it

Slide 2

• CERN Physics DB Services Readiness– Current Resource Allocation & Usage – Alarm and Problem Escalation & Handling – New Requests

• Streams • Archive DBs

• Plans

Outline

Page 3: CERN Status and Plans

CERN IT Department

CH-1211 Genève 23

Switzerlandwww.cern.ch/

it

Slide 3

Physics Database Services Review

• Note:– Alice online, integration, standby and archive DBs are

deployed on dual-core servers. Warranty extended for DBs at CC (to be replaced in Q1/Q2 2010)

– CMS online uses 4-core servers

Exp Online (Standby)

Offline (Standby)

Validation Archive

ALICE 6-nodes (Y) On PDBR No No

ATLAS 3-nodes (Y) 5-nodes (N) Two 2-nodes 3-nodes

CMS 6-nodes (Y) 4-nodes (Y) Two 2-nodes 3-nodes

LHCb 4-nodes (Y) 3-nodes (Y) 2-node No

WLCG 4-nodes (Y) Two 2-nodes No

Page 4: CERN Status and Plans

CERN IT Department

CH-1211 Genève 23

Switzerlandwww.cern.ch/

it

Slide 4

ATLR (ATLAS Offline)

Page 5: CERN Status and Plans

CERN IT Department

CH-1211 Genève 23

Switzerlandwww.cern.ch/

it

Slide 5

ATONR (ATLAS Online)

Page 6: CERN Status and Plans

CERN IT Department

CH-1211 Genève 23

Switzerlandwww.cern.ch/

it

Slide 6

• Clear trend observed of increase in resource usage for ATLR. Actions taken:

1. Application review with developers

2. ATLAS_Dashboard migration to WLCGR

3. Panda and DQ2 to dedicated nodes (node 3 and node 5 – node 5 added)

4. Reallocation of TAGS to a dedicated DB (Archive DB)

ATLR: High Load Handling

Page 7: CERN Status and Plans

CERN IT Department

CH-1211 Genève 23

Switzerlandwww.cern.ch/

it

Slide 7

ATLR: High load Issue

Page 8: CERN Status and Plans

CERN IT Department

CH-1211 Genève 23

Switzerlandwww.cern.ch/

it

Slide 8

CMSR (CMS Offline)

Page 9: CERN Status and Plans

CERN IT Department

CH-1211 Genève 23

Switzerlandwww.cern.ch/

it

Slide 9

CMSONR

Page 10: CERN Status and Plans

CERN IT Department

CH-1211 Genève 23

Switzerlandwww.cern.ch/

it

Slide 10

LCGR

Page 11: CERN Status and Plans

CERN IT Department

CH-1211 Genève 23

Switzerlandwww.cern.ch/

it

Slide 11

• Alarms: – GGUS handled by CERN and Tier1 site ROCs– For CERN there will be a piquet DB (being finalized now)

• Experiments and Physics DB contacts

https://twiki.cern.ch/twiki/bin/view/PDBService/PhysicsDatabasesS

ection

Ex: recent LHCb streams replication

• “Team tickets” [email protected] and• [email protected] for Distributed DB

Operations

Ex: consultancy, interventions scheduling, problems

Alarms and Problem Handling

Page 12: CERN Status and Plans

CERN IT Department

CH-1211 Genève 23

Switzerlandwww.cern.ch/

it

Slide 12

• 7 DBAs supporting the DB services

• Online DB and Offline DB support is 24x7

• Stream set-up support is 8x7

• Archive DB support ?

On-call team

Page 13: CERN Status and Plans

CERN IT Department

CH-1211 Genève 23

Switzerlandwww.cern.ch/

it

Slide 13

• ATLAS: – consolidation of ATLR to critical offline applications (Cool, Panda,

DQ2) – Standby DB for ATLR – Dedicated resources to TAGS (expected increase of ~11TB/year

for event TAGS, ~8TB/year for MC TAGS) on a ATLAS Archive DB

• CMS – Freeze a few times per year the state of the production  database

for use of re-reconstruction on a dedicated CMS Archive DB

• Till new hardware arrives archive DBs are deployed on old hardware, with limited space allocation of order of 1TB. Can be increased relaxing on-disk backups (tape backups are in place )

Work in Progress

Page 14: CERN Status and Plans

CERN IT Department

CH-1211 Genève 23

Switzerlandwww.cern.ch/

it

Slide 14

• Prepare the move of production DB from RHEL4 to RHEL5 – Most of validation and test DBs are already on RHEL5 – Some validation DBs will be left on the current production DB

OS version for patch update validation

• Started to study new features of 11gR2 within the openlab program of work with Oracle (see tomorrow) with the aim of upgrading to 11g during the 2010-2011 shutdown

Medium Term Plans - End of Run 2010

Page 15: CERN Status and Plans

CERN IT Department

CH-1211 Genève 23

Switzerlandwww.cern.ch/

it

Slide 15

• The Physics Database Services have grown significantly in the last few years – Service Size– Service Quality – User Appreciation

• A robust, scalable and performing service has been built

• Close collaboration with the experiments is even more important now as the real LHC workload is coming