certificate 4 in building bcgbc4004a. general notes site clearing billed in m 2 & includes...
TRANSCRIPT
Identify and produce estimated costs for projects
CERTIFICATE 4 IN BUILDING BCGBC4004A
GROUNDWORKS
General Notes
Site clearing billed in m2 & includes trees ≤0.5m girth measured 0.5m above ground
Tree removal billed starting at >0.5m ≥1m girth and every 0.5m girth thereafter
Surface excavation is billed in m³with the area stated in m2
Differing widths of trench excavation may be billed as one item starting at ≤ 1m deep and 1m increments thereafter
Pier holes are billed in m with the volume stated in m3
GROUNDWORKS
Page 19&20
Page 19&20
Page 19&20
Page 16
Y=3.4
X=0.3
X=3.1
Y=3.4
OR16.00 + X/Y x rise=16.00 + 0.3/3.4 x rise=16.03
Page 17
Page 17
Page 18
Page 22&23
A
B
1 2
43
5
67