CERTIFICATE Certified that the undersigned have proposed the appropriate and need based activities required in the watershed project area with active participation of beneficiaries along with consultation of Watershed Committees (WCs). Approval of watershed project plan and DPR, s as been obtained from WC, Gram Sabha. The plan and DPR document of IWMP XVII project, at P.S. Banera District Bhilwara is technically sound, viable and appropriate for implementation during the period 2011-12 to 2017-18. We recommend that this plan be sanctioned and put to implementation. Signature Signature Signature Signature Signature Signature Chairman/ Secretary WC WDT members Junior Engineer P.S. Banera Assistant Engineer & PIA P.S. Banera Project Manager,WCDC Distt. Bhilwara 1 Smt. Rekha Vyas 2 Sh. Kailash Kumawat 3 Sh. Satya Narayan Jat

Upload: others

Post on 19-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

CERTIFICATE

Certified that the undersigned have proposed the appropriate and need based activities

required in the watershed project area with active participation of beneficiaries along with

consultation of Watershed Committees (WCs). Approval of watershed project plan and DPR, s as

been obtained from WC, Gram Sabha. The plan and DPR document of IWMP XVII project, at P.S.

Banera District Bhilwara is technically sound, viable and appropriate for implementation during the

period 2011-12 to 2017-18.

We recommend that this plan be sanctioned and put to implementation.

Signature Signature Signature Signature Signature Signature

Chairman/ Secretary

WC WDT members Junior

Engineer

P.S. Banera

Assistant

Engineer & PIA

P.S. Banera

Project

Manager,WCDC

Distt. Bhilwara

1 Smt. Rekha Vyas 2 Sh. Kailash Kumawat 3 Sh. Satya Narayan Jat

Page 2: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

2

GOVERNMENT OF RAJASTHAN RURAL DEVELOPMENT & PANCHAYATI RAJ DEPARTMENT

(WATERSHED DEVELOPMENT & SOIL CONSERVATION)

NAME OF PROJECT : IWMP XVII

EFFECTIVE AREA OF PROJECT : 5578 Ha

COST /HA : 12000/-

COST OF PROJECT : 669. 36 Lacks

BLOCK : BANERA

DISTRICT : BHILWARA

PIA

ASSISTANT ENGINEER

W.D. & S.C., P.S. – BANERA

PROJECT MANAGER,

WCDC W.D. & S.C.,

DISTRICT - BHILWARA

Page 3: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

3

Detail of Project 1. Name of Project : IWMP XVII

2. Sanction No. & date of Project : F.18 (I-51) WDSC/ IWMP/ 2011-12/ 4800-5087/ 5-8-12

3. Macro & Micro Nos : 1/ 1,2,3,4,5,6

4. Deviation from Project Sanctioned :

Items As per Project Sanctioned As proposed in DPR

Project Name No. Of Gram Panchyat No. of Village No. Of Gram Panchyat No. of Village

IWMP XVII 4 7 4 6

Items As per Project Sanctioned As proposed in DPR Project Area 6078 Ha 5578 Ha Macro/Micro No 1/ 1,2,3,4,5,6 1/ 1,2,3,4,5,6

Name of Gram Panchayats Dabla, Gharta, Kundiya Kalan, Kasoriya,

Dabla, Gharta, Kundiya Kalan, Kasoriya,

Name of Villages Dabla, Gharta, Kundiya Khurd, Kundiya Kalan, Jasoriya,, Kasoriya, Vijaypur

Dabla, Gharta, Kundiya Kalan, Jasoriya, Kasoriya, Vijaypur

Project Cost (Rs in Lakhs) 729.36 Lacks 669. 36 Lacks

Page 4: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

4

DPR TEMPLATE Index

S.No Topics Page no.

1 Chapter

1 Location 6

2 General Features of watershed (Cost and Area details) 6

3 Climatic and Hydrological information 7

4 Other Development Schemes in the project area 9

5 Details of infrastructure in the project areas 10

6 Institutional arrangements (WCDC, PIA, WDT, WC) 11

2 Chapter Basic Data, Analysis and Scope

7 1.1 Demography Details 16

8 1.2 Development Indicators 22

9 1.3 Land use 22

10 1.4 Agriculture status and Productivity Gap Analysis 24

11 1.5 Horticulture/Vegetable/Floriculture status 26

12 1.6 Land holding pattern 27

13 1.7 Livestock status With Per Capita Production 28

14 1.8 Fodder status 28

15 1.9 Farm Implements 29

16 1.10 NREGS Status 29

17 1.11 Migration details 30

18 1.12 Livelihood Details. 30

19 1.13 Existing SHG 31

20 1.14 Ground Water details 31

21 1.15 Drinking Water Status 32

22 1.16 Water use efficiency 32

23 1.17 Slope details 32

24 1.18 Water Budgeting 33

25 1.19 Soil Details 34

26 1.20 Soil erosion status 34

3 Chapter Proposed Development Plan 35

4 Chapter Activity wise Total Abstract of cost 48

5 Chapter Annual Action Plan 50

Page 5: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

5

27 1.21 Project fund

28 1.22 Convergence Plan

6 Chapter Project outcomes 53

7 Technical designs and estimates for proposed activities 55

8 Enclosures 56

29 8 .1 Maps

30 8.2 Documents of Agreements:

31 Proceedings of gram sabha for EPA approval

32 Proceedings of gram sabha Resolution for committee constitution

33 Documents related to PRA exercise

34 Proceedings of gram sabha for DPR approval

35 Proceedings of Panchayat Samiti General body for DPR approval

36 Proceedings of Zila Parishad Standing Committee for DPR approval

Page 6: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

6

CHAPTER – I

INTRODUCTION

Location.

IWMP-XVII Banera Project is located in Banera Block, of Bhilwara district. The project area is

between the latitudes 74035’0”E to 74055’0” E and 25025’0” N to 25045’0”N longitudes. It is at a

distance of 45 km from its Block head quarters and 67 Kms from the district head quarters. There

are 6 no. of habitations in the Project area and other details are given below.

General features of watershed

Macro/micro Name of Gram

Panchayat

Name of

Villages

Covered

Census code of

villages

Total Area Of

Village

Area in

W/S

1/2, 1/3, 1/4,

1/5, 1/6

Dabla Dabla 02824900 2202 1407

Total 2202 1407 1/5 Gharta Gharta 02825000 1274 667

Total 1274 667 1/1 Kundiya Kalan Kundiya Kalan 02825800 3130 220

Total 3130 220 1/1, 1/2, 1/3 Kasoriya Jasoriya 02824800 1407 1407 1/1, 1/2, 1/3 Kasoriya 02824700 1383 1383

1/1, Vijaypur 02824600 494 494 Total 3284 3284

Total Area 9890 5578

S.No. Name of Project(as per GOI) IWMP-XVII

(a) Name of Catchment Banas (b) Name of watershed area(local name) IWMP-XVII © Project Area 6078 Ha (d) Net treatable Area 5578 Ha e) Cost of Project 669. 36 Lacks f) Cost/hectare 12000/- g) Year of Sanction 2011-12 h) Watershed Code 070901 i) No. of Gram Panchayats in project area 4 No. j) No. of villages in project area 6 No. k) Type of Project Other l) Elevation (metres) 395-406m

m) Major streams 13.50 km n) Slope range (%) 0-3%

Page 7: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

7

The watershed falls in Agro climatic Zone IV. The soil texture is Loamy. The average rainfall is

61.3 cm. The temperatures in the area are in the range between 25-45 centigrade during summer

and 4-17 centigrade during winter. The major crops in the area are Maize, Urad, Moonge, Wheat,

Gram and Mustard. 70.5% land is under cultivation 0.02% land fallow, 29.47% land is wasteland.

17.69% land is irrigated through well & tube well.

611 No of households are BPL (31.36% households) 526 are landless households (27%

households) and 1229 household are small and marginal farmers (63.09%household). Average

land holding in the area is 2.01 ha. 52.83% area is single cropped area and 17.69% is double

cropped. The main source of irrigation is Well & Tube Well. The average annual rainfall (10 years)

in the area is 613 mm. The Major streams in the Watershed are 13.50 km. The major festivals in

the village are Dashera, Deepawali & Holi. At present those villages of project area is having

6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic and Hydrological information

Year Average Annual Rainfall(mm) 1 2003 448 2 2004 966 3 2005 414 4 2006 901 5 2007 487 6 2008 512 7 2009 226 8 2010 806 9 2011 681 10 2012 687

Total 6128 Av. = 613 mm

Page 8: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

8

2. Average Monthly rainfall (last ten years)

Year JUNE JULY AUG SEPT 1 2001 40.00 180.00 140.00 70.00 2 2002 36.00 140.00 95.00 45.00

3 2003 22.00 110.00 90.00 65.00

4 2004 23.00 162.00 256.00 34.00 5 2005 34.00 196.00 57.00 203.00

6 2006 39.00 118.00 254.00 28.00

7 2007 97.00 192.00 79.00 45.00 8 2008 95.00 158.00 83.00 54.00

9 2009 19.00 204.00 147.00 0.00

10 2010 1.00 101.00 115.00 99.00

i) 15 minute duration 36

ii) 30 minute duration 64

iii) 60 minute duration 81

3. Temperature (Degree C)

Season Max Min i) Summer Season 45 25

ii) Winter Season 17 4

iii) Rainy Season 38 17

4. Potential Evaporation Transpiration (PET) (mm/day)

Season PET

i) Summer 15

ii) Winter 5

iii) Rainy 8

5. Runoff

i) Peak Rate (cum/hr) 1784960 cum/hr

ii) Total run off volume of rainy season (ha.m.)

5 years 10 years In-Year

iii) Time of return of maximum flood 0 0 0

iv) Periodicity of Drought in village area Yes Yes No

Page 9: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

9

Other Development Schemes in the project area

S.No Scheme Name of the department

Key interventions under the Scheme

Targeted Beneficiaries

Provisions under the Scheme

1 MNREGS Z.P. Bhilwara CVH 1221 114.774

2 MNREGS Z.P. Bhilwara CVH (Other) 386 36.284

3 MNREGS Z.P. Bhilwara Farm Pond 16 12.256

4 MNREGS Z.P. Bhilwara Open Contour Trench 100 10.300

5 MNREGS Z.P. Bhilwara Road Side Plantation 8 9.760

6 ANIMAL HUSBANDRY Z.P. Bhilwara eqxhZikyu 64 96.000

7 FISHARIES DEPTT. Z.P. Bhilwara eNyh ikyu 21 105.000

8 SOCIAL WALFAIR Z.P. Bhilwara mPp f’k{kk 358 35.800

9 RUDSET/ILFS Z.P. Bhilwara rduhdh izf’k{k.k 623 62.300

10 SOCIAL WALFAIR Z.P. Bhilwara lkekftd lgk;rk 483 16.905

11 ANIMAL HUSBANDRY Z.P. Bhilwara i'kq chek ;kstuk 2681 10.724

12 ANIMAL HUSBANDRY Z.P. Bhilwara A.H. Camp 10 2.400

13 HORTICULTURE Z.P. Bhilwara Qynkj ikS/kkjksi.k 15.2 4.560

14 MNREGS Z.P. Bhilwara df̀"k Hkwfe(cvh Pro.)sc/st/BPL

Alu 1221 25.641

15 MNREGS Z.P. Bhilwara d̀f"k Hkwfe (cvh Pro.) Other

Alu 931 19.551

16 OTHERS Z.P. Bhilwara tSfod ckM+ 110.7 17.380

17 HORTICULTURE Z.P. Bhilwara Qwyksa dh [ksrh 57.6 13.824

18 HORTICULTURE Z.P. Bhilwara elkyk [ksrh 21.6 5.033

19 HORTICULTURE Z.P. Bhilwara vkS"k/kh;k ikSa/kksa dh [ksrh 11.7 1.755

20 MNREGS Z.P. Bhilwara ulZjh LFkkiuk (25000 Forest

Plant/- Family) 12 3.000

21 AGRICULTURE Z.P. Bhilwara ftIle ls Hkwfe lq/kkj 78 0.548

22 AGRICULTURE Z.P. Bhilwara flapkbZ gsrq ikbZi ykbZu 92 13.800

23 AGRICULTURE Z.P. Bhilwara fLaizDyj flLVe 31 13.770

24 AGRICULTURE Z.P. Bhilwara fMªi flapkbZ ;kstuk 43 18.144

25 AGRICULTURE Z.P. Bhilwara df̀"k ;a= ¼Lis;j½ 129 6.450

26 AGRICULTURE Z.P. Bhilwara ikS/k laj{k.k ;a= 110 1.100

27 MNREGS Z.P. Bhilwara uhe mRiknu 10 0.050

28 HORTICULTURE Z.P. Bhilwara xzhu gkml LFkkiuk 2 2.700

29 HORTICULTURE Z.P. Bhilwara ckal mRiknu 10 0.792

Total 660.601

Page 10: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

10

Details of infrastructure in the project areas

Parameters Status (i) No. of villages connected to the main road by an all-

weather road 6 no.

(ii) No. of villages provided with electricity 6 no.

(iii) No. of households without access to drinking water Nil

(iv) No. of educational institutions : (P) 8 no.

(S) 4 no.

(HS) 4 no.

(VI) 0 Primary(P)/ Secondary(S)/ Higher Secondary(HS)/

vocational institution(VI) (v) No. of villages with access to Primary Health Centre 4 no.

(vi) No. of villages with access to Veterinary Dispensary 4 no.

(vii) No. of villages with access to Post Office 4 no.

(viii) No. of villages with access to Banks 1 no.

(ix) No. of villages with access to Markets/ mandis 0 no.

(x) No. of villages with access to Agro-industries 0 no.

(xi) Total quantity of surplus milk 6500 Lit.

(xii) No. of milk collection centres (U)

0 no.

(S)

4 no.

(PA)

0 no.

(O)

0 no. (e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))

(xiii) No. of villages with access to Anganwadi Centre 4 no.

(xiv) Any other facilities with no. of villages (please specify)

4 no. Rajeev Gandhi Seva Kendra

(xv) Nearest KVK Bhilwara (xvi) cooperative society 2 no. (xvii) NGOs Nil (xviii) Credit institutions

(i) Bank 1 no. (ii) Cooperative Society 2 no.

(xix) Agro Service Centre's 0 no.

Page 11: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

11

Institutional arrangements (SLNA, WCDC, PIA, WDT, WC, Secretary) WCDC Details

PIA particulars

WDT Particulars:

2 3

S.No Particulars Details of WCDC

1. PM ,WCDC Sh. Ghanshyam Dad

2. Address with contact no., website Zila Parisad Bhilwara

3. Telephone 01482-239398

4. Fax ----

5. E-mail [email protected]

1 2 3

S.No Particulars Details of PIA

6. Name of PIA Sh. R. C. Sodani

7. Designation A.En

8. Address with contact no., website Panchyat Samiti Banera

9. Telephone 95303-02550

10. Fax

11. E-mail [email protected]

1 2 3 4 5 6 7 8

S.No

Name Of WDT member

M/F Age Qualification Experience

in watershed (Yrs)

Description of professional

training

Role/ Function

1 Smt Rekha Vyas F 30 B.A. MSW in

Sociology 6 Year 3 Month in Ajmer Social Scientist

2 Sh. Kailash Kumahar M 25 B.A. in Animal

Husbandry 6 Month 3 Days in Ajmer Animal Husbandry

3 Sh. Satya Narayan Jat M 30 Secinor Sec. in

Agriculture 6 Year 1Month in

Udaypur / 3 Month in Ajmer

Agriculture

Page 12: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

12

Details of Watershed Committees (WC)

S.N. Name of WCs

Date of Gram

Sabha for WC

Designation Name M/F SC/ST/OBC/General

Landless/MF/SF/

BF Name of UG/SHG Educational

qualification

1

DAB

LA

14@

07@20

12

President / Sarpanch Sh. Kanheyya Lal Rao M SC MF

2 Secretary Sh. Jai Pradeep Singh S/o randhir singh Rathore M GENRAL BF SHG 12

3 Member Smt. Durga Devi Purawat F GENRAL MF SHG 5

4 Sh. Ganga Singh S/o pratap Singh Rathore M GENRAL BF Production System Users Group 8

5 Sh. Pradhuman Singh S/o Randhir Singh Rathore M GENRAL BF Non-Arable Users

Group 12

6 Sh. Shankar Giri M OBC SF SHG 5

7 Sh. Veer Bhan Singh M GENRAL MF Dhanop Mataji SHG 10

8 Smt. Manju Devi Daroga F OBC SF Dhanop Mataji SHG Educated

9 Smt. Samta Chamaar F SC SF Drainage Line

Treatment Users Group

Educated

10 Smt. Gulabi Bairwa F SC SF Kali SHG Un Educated

11 Smt. Bhawari Devi F OBC SF Ramdev Baba SHG Educated

12 Sh. Mithu Singh Rajput M GENRAL MF Drainage Line

Treatment Users Group

10

13 Sh. Gordhan Purwat M GENRAL MF Arable Users Group 10

14 Sh. Mukesh Bairwa M SC SF Drainage Line

Treatment Users Group

5

15 Sh. Ram Dayal Sharma M GENRAL MF SHG 12

16 Sh. Bhag Chandra Sharma M GENRAL MF SHG 10

Page 13: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

13

Details of Watershed Committees (WC)

S.N. Name of WCs

Date of Gram

Sabha for WC

Designation Name M/F SC/ST/OBC/General

Landless/MF/SF/

BF Name of UG/SHG Educational

qualification

1

GA

RTA

13@

07@

2012

President / Sarpanch Smt. Ramu Devi Khatik F SC MF

2 Secretary Sh. Shankar Lal S/o Sawar Godha M OBC MF Arable Users Group 10

3 Member Sh. Ghewer Chandra Bafna M GENRAL MF Non-Arable Users Group 12

4 Member Sh. Jetthu S/o Dhanna Gurjar M OBC MF Production System Users Group 8

5 Member Sh. Raghu Nandan Vaishnav M OBC MF Arable Users Group 10

6 Member Sh. Bhag Chandra Jat M OBC MF Drainage Line

Treatment Users Group

5

7 Member Sh. Kanheyya Lal Khati M OBC MF SHG 5

8 Member Sh. Mukesh Khatik M SC MF Drainage Line

Treatment Users Group

8

9 Member Sh. Shiv Raj Goura M SC SF Non-Arable Users Group 10

10 Member Sh. Panna Lal Chamaar M SC SF Animal Husbandry UN Educated

11 Member Sh. Dalel Singh Rajput M GENRAL MF Animal Husbandry 12

12 Member Smt. Sohni W/o Panna Chamaar F SC SF Arable Users Group Un Educated

13 Member Smt. Durga Devi Sain F OBC SF Laxmi SHG 5

14 Member Sh. Madan Gopal Pareek M GENRAL MF SHG 10

15 Member Sh. Madhu Lal Jat M OBC SF House Hold Users Group 10

16 Member Sh. Jeev Raj M SC SF House Hold Users Group 5

17 Member Sh. Sukh Dev Goura M SC SF House Hold Users Group 5

18 Member Sh. Jagdish Kalal M OBC SF Animal Husbandry 10

Page 14: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

14

Details of Watershed Committees (WC)

S.N. Name of WCs

Date of Gram

Sabha for WC

Designation Name M/F SC/ST/OBC/General

Landless/MF/SF/

BF Name of UG/SHG Educational

qualification

1

KU

ND

IA K

ALA

N

09@

07@

2012

President / Sarpanch Smt. Ratni Devi Verma F SC MF

2 Secretary Sh. Nemichand S/o Mangu Khatik M SC MF Production System Users Group 10

3 Member Sh. Narayan Gadri M OBC SF Arable Users Group 5

4 Sh. Bhairu Lal Sain M OBC SF Arable Users Group 5

5 Sh. Heera Nath Bairagi M OBC SF Non-Arable Users Group 8

6 Sh. Satyanarayan talor M OBC SF Drainage Line

Treatment Users Group

10

7 Sh. Srawan S/o Uda Gadri M OBC SF Drainage Line

Treatment Users Group

Educated

8 Sh. Srawan S/o Bala Gurjar M OBC SF Production System Users Group Educated

9 Smt. Durga W/o Rampal Bairwa F SC SF Drainage Line

Treatment Users Group

Educated

10 Sh. Gopal Mali M OBC SF Drainage Line

Treatment Users Group

8

11 Smt. Manju Varma F OBC SF Meera SHG 5

12 Smt. Kanchan Balai F SC SF Meera SHG Un Educated

13 Sh. Uda Bairwa M SC SF Production System Users Group 5

14 Sh. Sukha S/o Balu Bairwa M SC SF Non-Arable Users Group 5

15 Smt. Alol Balai F SC SF Meera SHG Educated

Page 15: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

15

Details of Watershed Committees (WC)

S.N. Name of WCs

Date of Gram

Sabha for WC

Designation Name M/F SC/ST/OBC/General

Landless/MF/SF/ BF

Name of UG/SHG Educational qualification

1

KA

SOR

IA

11@

07@

2012

President / Sarpanch Sh. Bhag Chand Balai M SC MF

2 Secretary Sh. Omprakash S/o Birbal Upadhyay M GENRAL MF Drainage Line Treatment Users Group 12

3 Member Sh. Shanti Lal M OBC MF Drainage Line Treatment Users Group 8

4 Smt. Mani Devi W/o Gopal Gurjar F OBC MF Drainage Line Treatment Users Group Un Educated

5 Smt. Kundana Devi W/o Gajanand Ojha F GENRAL MF Production System Users Group 10

6 Sh. Panna Lal S/o Choga Jat M OBC MF Arable Users Group 8

7 Smt Leela Devi F OBC MF Mataji SHG Un Educated

8 Smt. Chanta Devi Vaishnav F OBC MF Jai Hanuman SHG 10

9 Sh. Pappu Lal S/o Ram Lal Gurjar M OBC MF Non-Arable Users Group 5

10 Sh. Harji Lal S/o Ladu Kumhar M OBC MF Production System Users Group 5

11 Sh. Sawra S/o Panchu Gurjar M OBC MF Production System Users Group 8

12 Sh. Kishan S/o Jeevan Bhil M SC MF SHG 5

13 Sh. Bhairu S/o Rama Bairwa M SC MF SHG Un Educated

14 Smt. Santoki W/o Debi Dholi F SC SF Non-Arable Users Group Un Educated

15 Sh. Mulchand S/o Jagnnath Upadhyay M GENRAL SF Production System Users Group 10

16 Sh. Ghisu S/o Nanu Gurjar M OBC MF Arable Users Group 12

17 Sh. Ghisu S/o Ramchandra Kumhar M OBC SF Drainage Line Treatment Users Group 5

18 Sh. Misri S/o Mula Gurjar M OBC SF Drainage Line Treatment Users Group 5

19 Smt. Jiwani Devi F OBC SF Dev Narayan SHG Un Educated

Page 16: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

16

Problems and scope of improvement in the project area

The socio economic conditions of the area can be improved through increased production which

can be achieved through expansion in cultivated area and productivity enhancement. 503 ha land

is arable wasteland and 78 ha is fallow can be brought under cultivation.

987 ha is only irrigated and with efforts this can be increased to 1150 ha. The productivity gap of

major crops in the area as compared with district and with areas in the same agro climatic zones

indicate potential to increase the productivity. The demonstration of improved package of

practices, improved varieties, increased irrigation facilities and soil conservation measures under

the project can bridge this gap. Due to small land holdings in the area focus of the project would

be on diversification in agriculture (horticulture, vegetables, green houses, Agro forestry, fodder

crops)and diversification in Livelihoods(Agriculture, Animal husbandry, self employment)

6726 Quintal fodder scarcity can be met out through Pasture development .Improved animal

Husbandry practices can increase the productivity of livestock. 2550 no of persons migrate due to lack of employment at village level, this migration can be checked through creation of employment

opportunities in the project area through increase in production and diversification in agriculture

and Livelihoods as mentioned above.

1. Soil Erosion Soil of Banera is moderately to severely erode mainly by rivers and nallahs, mostly during the

rainy months. Besides, stagnation of water has given rise to the problem of salinity and alkalinity.

2. socio-Demographic Profile

The project area consists of a total

population of 6317 with nearly 25% of

the population belonging to the

Scheduled Caste and 5% of the

population Scheduled Tribe

communities. The sex ratio in the area

is 868. The area has a low level of

literacy of 40% as compared to 60%

at the State level. With the female

literacy rate being a mere 13%, the

status of literacy in the area is one of

the indicators of the deplorable plight

of the women in the area.

Table 3: Demographic Profile of Jahazpur Project Area

POPULATION

Total population 6317

Male Population (%) 53.52

Female Population (%) 46.48

Sex ratio (female per thousand males) 868

% Population of Scheduled Caste 25.17

% Population of Scheduled Tribe 4.90

Literacy rate Total (percent) 40.02

Literacy rate male (percent) 27.04

Literacy rate female (percent) 12.98

Source: Government of Rajasthan and Census of India

Page 17: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

17

Figure 2: Mean Income from different sources Source: Baseline Survey (2012)

3. Livelihood Profile

Agriculture and animal husbandry have been central to the livelihoods of the people living in this

area. Frequent occurrences of drought in the recent years has however, increased the

vulnerability of the farming communities. Increased pressure on land, decline in the productivity of

agricultural land combined with shrinking of forests and common pasture land has threatened the

viability of farming as a primary livelihood option in the area.

Only 45% of the income is derived from farming and the people have to resort to other options for

sustaining their families. Low levels of literacy, absence of programmes for developing skills

particularly in the non-farm sector and limited

access to basic infrastructural facilities and

services has impinged on the people’s right to

choose the best livelihood option. Migration can be

seen as a prominent phenomenon with nearly 40%

of the income coming from migration. Launch

of MGNERGA has helped in generating

employment in the area with about 12% of the

income of the people being derived from

working on MGNREGA sites.

4. Agriculture

Land and water resources have been the key drivers of farm based production systems which

form the predominant source of livelihoods of the people in this area. The area is characterized by

land based economy. Land has also been crucial in defining the social and political relations of the

people in the area. 22% of the households are landless while 63% are small and marginal farmers.

With very low landholdings and subject to vagaries of nature agriculture remains a high risk-low

input-low output activity.

The area mostly has sandy loam to clay loam soil where the percolation of water ranges from

good to medium. Most of the soil is calcareous while in some patches, saline and alkaline soil is

also found. The soil is moderately to severely eroded mainly by rivers and nallahs. Substitution of

organic fertilizer with chemical fertilizer has further worsened the soil quality. The nature of

agriculture and farming practices is also strongly conditioned by the availability of water. Depletion

in the surface as well as ground water resources has adversely affected agriculture. Some of the

villages in the area have access to canal and tank irrigation; wells are the most common source of

irrigation. The farmers mostly use engine to draw water for irrigation from wells. Besides, flood

irrigation is a common practice that can be found in the area.

Page 18: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

18

Kharif is the main cropping season in the area. Major cereals grown during Kharif include maize,

bajra and jowar. Crop production during Rabi remains limited to such farmlands which have

access to irrigation. Wheat is the main cereal crop grown during Rabi. Besides cereal crops,

pulses, fodder crops like rajka and oilseeds such as groundnut and mustard are also cultivated in

the area. Over the years, the agricultural practices have undergone a remarkable change in the

area. Besides the traditional plough, tractors are also being increasingly used. Chemical fertilizer

is used intensively. The types of seeds, pesticide and fertilizer across the different villages in the

area are detailed in the tables below:

S.No

Genrel Use of quantity by Farmer Recomnded by Agriculture Deptt.

Name of crop

Seed sowing kg/Ha

Fertilizer Seed sowing kg/Ha

Fertilizer Remarks.

Uriya DAP Potas Uriya DAP Potas

1 Wheat 143 45 45 - 100 - 120 80 40 20

2 Chana 115 - - - 75 - 80 15 25 -

3 Sarso 5 38 18 - 4. - 5 60 40 -

4 maize 25 75 25 - 20 - 25 100-120 50 40

5 Urad 32 27 27 12 15 - 20 50 30 30

6 Moonge 32 28 28 12 15 - 20 50 30 30

7 Cotton 11 34 11 - 15 - 18 50 25 -

8 Ground nut 86 - 38 - 80 - 100 20 60 30

9 Til 4 - - 7 3. - 4 20 10 10

10 Bajra 4 45 17 - 4. - 5 90 30 -

Reasons for law productivity:-

A. Due to high seed rate for showing of crop Instead of recommended seed rate.

B. Use of local variety of seeds.

C. Duration intensity of Rainfall is enough below high the avaivelity.

D. Lack of availability of good Quality seeds & Fertilizer is not available proper time.

E. Method of showing is not proper.

Page 19: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

19

5. Livestock

Agriculture supplemented with livestock keeping forms the basis of sustenance for the farmers in

this area. Crop residue and grazing provides fodder and forage to livestock. Livestock keeping on

the other hand acts as a drought power and source of energy, nutrition and manure. The symbiotic

relation between the two systems is clearly visible and change in one has a direct impact on the

other. As per the baseline survey, livestock rearing contributes 11% of the income of the people in

the area.

The livestock composition shows that smaller ruminants are more than the larger ruminants.

However, the number of cows is much higher than other animals in the area. Degradation of

common grazing lands and frequent occurrences of drought in the recent years has raised serious

questions pertaining to fodder security in the area. Loss of vegetative cover as a result of high

degrees of soil erosion and overgrazing has adversely affected the productivity of these common

grazing lands. Changes in the cropping pattern along with the substitution of organic fertilizer with

chemical fertilizer reduced the fertility of the soil as well as the quality of fodder available from crop

residue. Further, frequent occurrences of drought leading to crop failure also affected the fodder

availability from crop residue which has increased the pressure on the already overexploited

common grazing land. The factors mentioned above have not only led to a decline in the

productivity of the livestock but have also increased instances of distress sale of livestock.

S.No Name of Animal Av. milk production

(Lit. per day)

Actual milk production (Lit.

per day)

Remarks.

1 Cow Indigenous 2 - 3 4 - 5

2 Cow Hybrid 7 - 8 10 - 12

3 Buffalo 5 - 6 12 - 15

Reasons for gap in milk production

A. Deficiency of vitamin and minerals.

B. Lack of management and awareness.

C. Lack of health treatment in proper way.

Page 20: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

20

5. Migration

In an economy which largely demands skilled manpower, lack of skill enhancement opportunities is an added disadvantage for the people in this area. Most of the people in the area who have resorted to non-farm employment end up as daily wage earners in the nearby cities. The ones who migrate to cities have to leave their families back in the village as their earning in the city is not able to substitute returns from farm but only supplement it. As per the baseline survey, about 40% of the Population in the area migrate. Migration to cities and towns is usually in mining and quarrying, construction and in some small trading and manufacturing work.

Table 10: Households Migrating

Total

Population

No of Person

Migration Dabla 1235 499

Gharta 491 198

Kundiya Kalan 1250 505

Jasoriya 936 378

Kasoriya 1853 748

Vijaypur 552 222

Total 6317 2550 Source: Baseline Survey (2012)

Page 21: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

21

Base Line Survey Format for IWMP MIS website Project Name : IWMP-XVII Total Geographical Area of Project (Lakh Hectares) : 0.06078 Treatable Area 0.05578 ha. : Wasteland (Lakh Hectares) 0.01644 Rainfed Agricultural Land

(Lakh Hectares) 0.02947

Total Cropped Area (Lakh Hectares) 0.03934 Net Sown Area (Lakh Hectares)

0.03431

Total no. of Water Storage Structure 33 Total No. of Water Extracting Units

256

Total storage capacity of water storage structures (cubic meters)

120528

No. of Household 1948 no. SC 490 ST 92

Others 1366

Total Population of the project Area 6317 No. of Household of

Landless people 526

Total no. of BPL Household 611 No. of Small Farmer’s Household

495

No. of person-days of Seasonal Migration 2550 no. - 300 days No. of Marginal

Farmer’s Household 734

Depth of Ground Water (meters) below Ground level Pre- monsoon 12.20 m Post-monsoon 11.50 m

No. of person-days of Seasonal Migration

2550 no. - 300 days

Page 22: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

22

CHAPTER – II Socio economic Features, Problems and Scope Table 2.1 Population & Household Details:

Total Population Male Female Total SC ST 3381 2936 6317 1590 310

Household Details BPL

household L. Less Small

Farmer M.

Farmer Total

household SC household ST household 611 526 495 734 1948 490 92

Table 2.2 Development indicators

S. No. Development Indicators State Project Area 1 Per capita income (Rs.) 16260 14700 2 Poverty ratio 0.22 0.31 3 Literacy (%) 0.604 40 4 Sex Ratio 921 868 5 infant mortality rate 331 338 6 Maternal mortality ratio 60 68

The above table indicates (poor, average, good) socio economic conditions.

Table 2.3 Land Use

Land Use Total area in Ha.

Private Panchayat Government Community Total Agriculture Land 3934 0 0 0 3934 Temporary fallow 503 0 0 0 503 Permanent Fallow 78 783 758 0 1619 Cultivated Rainfed 2947 0 0 0 2947 Cultivated irrigated 987 0 0 0 987 Net Sown Area 3431 0 0 0 3431 Net Area sown more than once 484 0 0 0 484

Forest Land 0 0 25 0 25 Waste Land 78 783 758 0 1619 Pastures 0 783 0 0 783 Others 0 0 0 0 0

Page 23: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

23

The project area has 503 ha of cultivable wasteland . 1619 ha of fallow land (total 5578 ha) can be

brought under cultivation if some irrigation source can be provided through Construction of WHS

like Khadin, Tanka, Farm ponds etc. and also through demonstration of rainfed varieties of crops.

Construction of WHS can also increase in area under irrigation which is only 17.69%

1644 ha. (29.47 % of the project area) is under wastelands and can be brought under vegetative

cover, with reasonable effort. Activities like Earthen check dams, Vegetative filter strip, V-ditches,

staggered trenches, WHS (Johad) Afforestation of wastelands and Pasture development will be

taken up on these lands.

Pasture development the land use table shows that there is 783 hectare pasture land (14.03%).

This emphasizes the need for taking up pastureland development works through sowing of

promising species of grasses and plantation

The table 2.4a shows that only 987 ha is (17.69%) is double cropped area. Also the crop rotation

shows that fallow lands are there. This indicates that there is scope for change in crop rotation in

fields where there are fallow lands through Soil and Water conservation measures, crop

demonstration and diversification in agriculture.

Soil and Water conservation measures besides putting fallow lands under cultivation can

change the area under single cropping to double and multiple cropping.

Table 2.4.b Abstract of cropped Area(ha)

Area under Single crop 2947 Area under Double crop 987 Area under Multiple crop 0

Page 24: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

24

Table 2.4 .a Agriculture and Horticulture status and fuel availability.

Cropping Status

S No.

Season Crop sown Rainfed Irrigated Total

Varieties Area (ha)

Production (kg/ha)

Productivity (kg/ha)

Area (ha)

Production (kg/ha)

Productivity (kg/ha)

Area (ha)

Production (kg/ha)

1 Kharif Maize Mukta / NK-30 / Seed tek 457 755878 1654 0 0 0 457 755878

Udad TAU-1 653 222020 340 0 0 0 653 222020

Moonge RNG-902 468 163800 350 0 0 0 468 163800

Cotton RG-5 477 100170 210 0 0 0 477 100170

Jwar 15 / Amarnath 2000 353 225920 640 0 0 0 353 225920

2 Rabi Wheat Lokman / 3077 0 0 0 334 926850 2775 334 926850

Chana Dabahed Yellow 0 0 0 235 197400 840 235 197400

Mustard Pionear Highbrid / T-59 / Poosa Von 0 0 0 148 158360 1070 148 158360

3 Zaid 0 0 0 0 0 0 0 0 0

Total 2408 1467788 717 717 3125 2750398

Page 25: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

25

Table 2.4.c Productivity Gap Analysis (The table can also be given in bar chart form)

Analysis of the above table indicate that besides national gap there is wide gap in productivity

within state and even within same agro climatic zones.

The reasons for this variation are

The farmers are using Local varieties on show in table of each crop. Whereas the

recommended varieties on show in table will increase the yield of crop.

Name of the crop

India Highest Average Yield in

Rajasthan

District Project Area Deficiency in productivity comparison with District

Wheat 2619 2837 2892 2775 117

Gram 808 622 873 840 33 Mustered 1177 1121 1177 1070 107

Maize 1258 1433 1687 1654 33 Bajra 802 767 977 0 0 Urad 387 413 358 340 18

Moonge 317 362 364 350 14 Rice 1710 1650 0 0 0

Ground nut 1650 1533 1204 1110 94 Cotton 362 342 232 210 22 Jwar 552 541 679 640 39

Page 26: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

26

S. N. Name of Crop varieties of Crop

(Farmers are using)

varieties of Crop

(Can Increase of Production)

1 Wheat Lokman 3077 / 1482 / 4037

2 Gram Dabahed Yellow 888 / RAG / 636

3 Mustered Pionear Highbrid / T-59 / Poosa Von Bio-902 / T-59

4 Maize Mukta / NK-30 / Seed tek Ganga-5 / Navjyot / Kanchan

5 Bajra Pioneer Hybrid

6 Urad TAU-1

7 Moonge RNG-902 K-851 / ML-337 / Poosa Baisakhi

8 Til Pratap / RT-46

9 Ground nut AK-1224 / KL-24

10 Cotton RG-5 BT Cotton / Bikanery Narma

11 Jwar 15 / Amarnath 2000 HPB-1 / HPB-2 / CSS-49

Lack of Availability of good quality seeds of desired crop and variety in adequate quantities

and time to the farmers.

Availability of water for cultivation(17.69% is irrigated table)

The productivity gap and reasons of it indicate potential to increase the productivity through crop

demonstration. Crop demonstrations would be carried out on improved crops/ varieties, improved

agronomic practices. INM, IPM, Mixed cropping, distribution of fodder seed mini kit. Demonstration

of improved methods and economics of fodder crops cultivation and also distribution foundation

seeds of Forage Crops for further multiplication, introduction of fodder crops in the existing crop

rotations.

Table 2.5 Existing area under horticulture/Vegetables/Floriculture (ha)

Activity Area Species Varieties Recommended varieties Production

Horticulture 12 Anar Sindura Ganesh 25 Kg/ Plant 3 Neebu Kagji Kagji Beeju 30 Kg/ Plant 1 Papaya Honey Deu Taiwan 40 Kg/ Plant Vegetables 0 0 0 0 0 Floriculture 0 0 0 0 0 Medicinal Plants 0 0 0 0 0

Page 27: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

27

Table 2.6 Land holding Pattern in project area

Type of Farmer

Total House holds

Land holding (ha) irrigation source wise Land holding (ha)Social group wise

Irrigated (source)

Rainfed Pvt. Waste Land

Total General SC ST OBC BPL

(i) Large farmer 426 220 658 17 895 189 225 42 439 0

(ii) Small farmer 495 291 868 23 1182 249 297 56 580 0

(iii) Marginal farmer 734 476 1421 38 1935 408 487 91 949 0

(iv) Landless person 293 0 0 0 0 0 0 0 0 0

(V) No. of BPL households

611 0 0 0 0 0 0 0 0 0

Total 2558 987 2947 78 4012 846 1009 189 1968 0

55.88% land holdings belong to small and marginal farmers who own 77.69% of total cultivated

area. Horticulture/vegetables could be more economical to Small and Marginal farmers with

irrigation source. For Large farmers with no irrigation facility Horticulture/vegetables will be

promoted in a part of land with farm pond/Tanka construction.

The following activities will be more beneficial for small land holdings and for diversification and

income for large farmers.

Horticulture plantation, Medicinal and Aromatic Crops, floriculture: As discussed earlier .

Horticulture/vegetables could be more economical to Small and marginal farmers with irrigation

source. Also the project area has good potential for medicinal & aromatic crops like Sonamukhi,

Isabgol, Ashwagandha, Khus, and Mehandi etc.

Agro forestry plantation: To increase the income of farmers and also for shelter belt plantation

as wind velocity is high in the project area.

Setting of Vermi Compost Units - Keeping in view the side effect of residues of chemicals and

fertilizers on human health the emphasis would be on cultivation of organic produce through

motivating farmers and providing assistance for production of organic input, vermi compost.

Production and distribution of quality seed – There is need to ensure that good quality seed is

available for cultivators for which adequate seed production would be initiated in watershed areas

with the assistance of private sector and agriculture department technologies

Sprinklers and pipelines for efficient water management practices emphasis on demonstration of

sprinklers with adequate financial support and convergence/private partnership.

Establishment of Green House - For growing off season vegetables seedlings and other

horticultural crops under controlled atmospheric conditions of green house.

Page 28: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

28

Establishment of nurseries: Most of the planting material is procured from other parts of the

State/ country. The procurement of planting material from distant places causes damage to the

planting material and often results in untimely supply. Hence nursery development activity can be

promoted in the area.

Innovative hi-tech/ export oriented activities: innovative hi-tech/ export oriented projects like

mushroom cultivation, floriculture, etc which are in negligible existence at present, can be

implemented by individual farmers / private companies.

Drip irrigation Drip irrigation will be promoted in all horticulture plantations, vegetables, green

houses and in nurseries for rational use of irrigation higher yields and quality produce.

Table 2.7 Livestock Status - animals/milk production / average yield.

S.No.

Description of animals

Population in No.

Yield(milk/mutton/Wool)

Equ. cow units

Dry matter requirement per day ( 7Kg per

animal.) Kilogram

Total requirement in Quintal per year.

1 Cows Indigenous 2527 4548 17689 64565 Hybrid 151 630 1057 3858

2 Buffaloes 1679 5035 11753 42898 3 Goat 1195 0 598 4186 15279 4 Sheep 928 0 464 3248 11855 5 Ox & Bull 110 0 770 2811 6 Poultry 0 0 NA 0 0 7 Piggery 0 0 NA 0 0

Total 6590 10213 38703 141266

In spite of the large number of livestock, production is less hence increase in productivity

across all species, is a major challenge. To enhance production of unproductive cattle and

improve the productivity following activities will be taken up:-

,Demonstration of improved methods of conservation and utilization of Forage crops are proposed.

Table 2.8 Existing area under fodder (ha) S.No Item Unit Area/Quantity

1 Existing Cultivable area under Fodder Ha 3934 2 Production of Green fodder Quintal/year 95390 3 Production of Dry fodder Quintal/year 0 4 Area under Pastures Ha 783+78 5 Production of fodder Quintal/year 39150 6 Existing area under Fuel wood Ha 0 7 Supplementary feed Kgs/ day 0 8 Silage Pits No 0 9 Availability of fodder quintals 134540 10 Deficiency/excess of fodder quintals 6726

Page 29: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

29

The table above shows there is fodder deficiency (Requirement is 141266 Quantity and

availability 134540 Quantity)

To minimize the large and expanding gap between feed and fodder resource availability and

demand there is need for

Increase in area under fodder crops

Increase in productivity of fodder crops

Development of pastures

And reduction in large number of livestock production through replacement by few but

productive animals. Table 2.9 Agriculture implements

Farm mechanization and seed banks: As discussed earlier 77.69% land holdings belong to

small and marginal farmers of total cultivated area owning of big farm implements by individual

farmers is not economical so SHG would be promoted to buy farm implements and rent to

farmer Table 2.10 -NREGA Status - No. of Card Holder, activities taken so far, employment status.

S. No Implements Nos. 1 Tractor 175 2 Sprayers - manual / power 167 / 18 3 Cultivators/Harrows 136 4 Seed drill 88 5 Any Other (Tractor Mounten Trally) 175

Sr. no.

Gram Panchayat Name of village Total No .of job cards

Employment Status

Activity taken up so far

1 Dabla Dabla 1079 885 Apna khet-Apna

kam yojna, Gravel Road, Earthen Dam, Pasture

Dovelpment Work.

2 Gharta Gharta 859 713 3 K. Kalan K. Kalan 1228 1044 4 Kasoriya Kasoriya 1048 880 5 Jasoriya 604 489 6 vijaypur 493 409

Page 30: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

30

Table 2.11 Migration Details Name of village

No. of persons migrating

No. of days per year of migration

Major reason(s) for

migrating

Distance of destination of

migration from the

village (km)

Occupation during

migration

Income from such occupation (Rs. in lakh)

Dabla 499

10 Month Employment 130 Km

Service in private

industries at Bhilwara

H.Q.

0.60 Lack per year

Gharta 198 Kundiya Kalan 505

Jasoriya 378 Kasoriya 748 Vijaypur 222

Total 2550 The migration can be check by creation of employment opportunities, enhancing farm level economy, increases the income of the people engaged in animal husbandry by dairy, poultry and marketing and value addition. (As discussed earlier) and diversification in livelihoods.

The existing livelihoods Village are given below

Table 2.12 (a)Major activities (On Farm)

Name of activity No of House holds Average annual income from the

Cultivators 1422 0.50-0.60 Lack per year Dairying 32 0.36-0.40 Lack per year Poultry 0 0 Piggery 0 0 Landless Agri. Laborers 526 0.25-0.30 Lack per year

Table 2.12(b)Major activities (Off Farm)

Name of activity Households/individuals Average annual income from the Artisans 0 0.25-0.30 Lack per year Carpenter 18 0.35-0.40 Lack per year Blacksmith 7 0.50-0.60 Lack per year Leather Craft 5 0.40-0.45 Lack per year Porter 0 Mason 12 0.60-0.70 Lack per year Others specify (Cycle Repair ,STD,Craft etc)

8 0.50-0.60 Lack per year

The efforts for increase in income through off farm activities will be made under livelihood component through assistance to SHG or individuals.

Page 31: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

31

Table 2.13( a ) Status of Existing SHG

S.No Name of SHG Members Activity involved

Monthly income

Fund available

Assistance available

Source of assistance

Training received

1 Dhanop Mataji SHG 10 - 600 600 - - - 2 Hanuman SHG 11 - 550 1100 - - - 3 Kali SHG 10 - 500 1000 - - - 4 Ramdev SHG 10 - 1000 1000 - - - 5 Mataji SHG 10 - 500 500 - - - 6 JAi Hanuman SHG 10 - 500 500 - - - 7 Dev Narayan SHG 10 - 600 600 - - - 8 Laxmi SHG 11 - 550 1100 - - - 9 Subh Laxmi SHG 10 - 500 500 - - - 10 Laxmi SHG 11 - 550 550 - - - 11 Meera SHG 10 - 500 500 - - - 12 Shailani SHG 10 - 500 1000 - - - 13 Bajrang SHG 10 - 500 1000 - - -

The table indicates existence of number of groups in the area also these need to be strengthened through trainings and financial assistance. II. Technical Features Table 2.14 Ground Water S.No Source No. Functional

depth Dry Area

irrigated Water availability(days)

i) Dug wells 133 60 feet 46 131 200-220 ii) Shallow tube wells 74 150-220 ft 36 0 240-270 iii) Pumping sets 63 120-200 ft 0 0 240-270 iv) Deep Tube Wells 49 80 feet 13 180 240-270 Total 319 95 311

Page 32: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

32

Table 2.15 Availability of drinking water

S.No

Name of the village

Drinking water requirement Ltrs/day

Present availability of drinking water Ltrs/day

No. of drinking water sources available

No. functional

No. requires repairs

No. defunct

1 Dabla 37050 24083 3 2 0 1 2 Gharta 14730 9280 2 2 0 0

3 Kundiya Kalan

37500

24375

3 3 0 0

4 Jasoriya 28080 17455 4 3 0 1

5 Kasoriya 55590 33962 4 4 0 0

6 Vijaypur 16560 9936 3 2 0 1

Table 2.16 Water Use efficiency

Name of major crop

Area (Hectare) through water

saving devices(Drip/Spri

nklers)

through water conserving agronomic practices#

Any other (pl. specify) Total

Wheat 25 PVC Pipe The tables above indicate need for judicious use of available Water. Encouraging optimum use of water through installation of sprinklers on every operational wells Table 2.17 Slope details.

Slope of Watershed S.No. Slope percentage Area in hectares

1 0 to 3% 5557 2 3 to 8% 20 3 8 to 25% 0 4 > 25% 0

As most of the area has slope less than 3% construction of contour bunds can solve the problem

of water erosion in agriculture fields and protect washing of top soil and manures/fertilisers.

Page 33: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

33

Table 2.18 Water Budgeting Good Catchments – Normally a funnel shaped catchment in hilly terrain with less vegetation. Average Catchment – Catchment in the plains where there is no dense growth of vegetation. Bad Catchment – Catchment with dense growth of vegetation & highly permeable top soil & sub

soil. Total available runoff (cum) use Stranges table Rain fall 613 mm

Type of Catchment Area in ha. Yield of runoff from catchment per ha.(cum.) use Stranges table

Total Runoff in cum

Good 783 1229 962307

Average 861 920 792120

Bad 3934 613 2411542

Total 5578 4165969 Runoff trapped in existing structures S.No. Name No. Storage Capacity (cum)

i) WHS(earthen) 27 89492 ii) Khadin/Talab 6 31036 iii) Farm Ponds 0 0 iv) Tanka 0 0 v) Anicuts 0 0 Total 33 120528

Runoff to beTrapped in proposed structures: S.No. Name No. Storage Capacity (cum)

i) WHS(earthen) 54 56700 ii) Khadin/Talab 0 0 iii) Farm Ponds 25 12500 iv) Tanka 0 0 v) Anicuts 4 13500 vi) Small check Dam 14 2250 Total 97 84950

% Runoff trapped = total runoff trapped x100/ Total available Balance runoff = 4.93% cum. Height of all the structures proposed is between 0.60 metre to 1.50 metre. There is no structures whose water impounding height is more than 2 metre.

Page 34: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

34

Table 2.19 Soil details Soil Profile Loamy S.No. Major Soil Classes Area in hectares

1 Fine loam 612 2 Silt loam 4966

Soil Depth : B Depth (Cms.) Area in hectares

1 0.00 to 7.50 1644 2 7.50 to 45.00 3934 3 > 45.00 Nil

C Soil fertility Status Kg/ha Recommended N 127 100 Kg/Ha P 17.9 25.0 Kg/Ha K 182 350 Kg /Ha Micronutrients PPM Magnet

The analysis of table shows need to improve and maintain soil fertility. Soil health card to every

farmer every crop season will be provided, which will include the recommendation for Application

micro nutrient and fertilizers

Table 2.20 Erosion details

Erosion status in project Area

Cause

Type of

erosion

Area affected

(ha)

Run off(mm/ year)

Average soil loss (Tonnes/ ha/ year)

Water erosion a Sheet 4250

121

15.25

b Rill 920 c Gully 408

Sub-Total 5578 Wind erosion 0 Total for project 5578 121 15.25

The need is:

To check land degradation To reduce excessive biotic pressure by containing the number and increase of livestock To check cultivation on sloping lands without adequate precautions of soil and water

conservation measures To discourage cultivation along susceptible nallah beds To check Faulty agriculture techniques To check Uncontrolled grazing and developed cattle tracks To check Deforestation of steep slopes

Page 35: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

35

(For Flat Land watershed projects) To check erosive velocity of runoff, store Runoff, to arrest silt carried by runoff and to recharge Ground Water structures life Earthen check dams, gully plugs, Bank Stabilisation, Loose stone check Dams, Gabions, Earthen embankment (Nadi) and Anicuts would be taken up.

CHAPTER - III Proposed Development Plan:

The Activities are indicative addition /deletion in activities will be as per local conditions

A) Preparatory phase activities Capacity Building Trainings and EPA

The IEC activities like Kalajathas, Group meetings, door to door campaign, slogans and

wall writings etc. were carried out in all the habitations of 1/ 1,2,3,4,5,6 Micro Watershed.

A series of meetings were conducted with GP members, community and discussed

about the implementation of IWMP programme. User groups were also formed.

Grama Sabhas were conducted for approval of EPA (Village), for selecting the

watershed committee and approval of DPR.

S.no Name of the Gram Panchayat Date on which Grama Sabha approved EPA

1 Dabla 14-07-2012

2 Gharata 13-07-2012

3 Kundiya Kalan 09-07-2012

4 Kasoriya 11-07-2012

Page 36: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

36

1 4 5 6 7 8 9 10 11

S. No.

Names of village

Amount earmarked

for EPA Entry Point Activities planned Estimated

cost Expenditure

incurred Balance Expected outcome

Actual outcome

1 Dabla 6.7536

1. V~;wcosy fctyh eksVj] iu?kV o fjpktZ LVªDpj LFkkiuk xzke iapk;r Hkou ds ikl 2. V~;wcosy fctyh eksVj] iu?kV o fjpktZ LVªDpj LFkkiuk lkoZtfud LFky ukfd;k dk cM+ 3. V~;wcosy fctyh eksVj] iu?kV o fjpktZ LVªDpj LFkkiuk lkoZtfud LFky Mkcyh ukNh ds ikl 4. V~;wcosy fctyh eksVj] iu?kV o fjpktZ LVªDpj LFkkiuk lkoZtfud LFky catkjks dk [ksM+k

6.7536 0 6.7536

Avaible of drinking water in proper way for

Villagers

Will be furnished

after completion

of work.

2 Gharata 3.2016 1. V~;wcosy fctyh eksVj] iu?kV o fjpktZ LVªDpj LFkkiuk lkoZtfud LFky xqtZjksa dk [ksM+k 2. V~;wcosy fctyh eksVj] iu?kV o fjpktZ LVªDpj LFkkiuk lkoZtfud LFky Hkhyksa dk [ksM+k

3.2016 0 3.2016

3 Kundiya kalan 1.056 1. V~;wcosy fctyh eksVj] iu?kV o fjpktZ LVªDpj LFkkiuk

cSjok lekt eksgYyk gfjiqjk [ksM+k 1.056 0 1.056

4 Kasoriya 15.7632

1. V~;wcosy fctyh eksVj] iu?kV o fjpktZ LVªDpj LFkkiuk lxl th ds LFkku ds ikl pekjksa dk eksgYyk 2. V~;wcosy fctyh eksVj] iu?kV o fjpktZ LVªDpj LFkkiuk ljk; ds ikl Hkhyksa dk ekSgYyk 3. V~;wcosy fctyh eksVj] iu?kV o fjpktZ LVªDpj LFkkiuk y{ehukjk;.k th ds eafnj ds ikl 4. V~;wcosy fctyh eksVj] iu?kV o fjpktZ LVªDpj LFkkiuk >ksifM+;ksa esa eksgjh ds ikl 5. V~;wcosy fctyh eksVj] iu?kV o fjpktZ LVªDpj LFkkiuk Ldwy ds ikl nwnk ck dk [ksM+k 6. V~;wcosy fctyh eksVj] iu?kV o fjpktZ LVªDpj LFkkiuk vkaxuckM+h ds ikl 7. V~;wcosy fctyh eksVj] iu?kV o fjpktZ LVªDpj LFkkiuk ikS- ds ikl 8. V~;wcosy fctyh eksVj] iu?kV o fjpktZ LVªDpj LFkkiuk jkensoth ds eafnj ds ikl 9. gS.Miai LFkkiuk Hkhyksa dh cLrh esa 10. gS.Miai LFkkiuk /kqokyk ukMk ds ikl 11. gS.Miai LFkkiuk dkyk ukMk ds ikl

15.7632 0 15.7632

The PRA exercise was carried out in all the villages on the dates shown below:

S.no Name of the village/Habitation Date on which PRA

conducted

1 Dabla 10-01-13

2 Gharata 11-01-13

3 Kundiya kalan 12-01-13

4 Kasoriya 13-01-13

Transact walk were carried out involving the community for Social mapping, Resource

mapping. Detailed discussions and deliberations with all the primary stakeholders were carried

out.

Socio-economic survey was carried out during 1-6-2012 to 31-12-2012 period covering all the

households and primary data on demography, Land holdings, Employment status, Community

activities etc. was collected as mentioned in chapter 2.

Page 37: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

37

.CAPACITY BUILDING Table- List of approved Training Institutes@ for Capacity Building in the project area 1 2 3 4 5 6 7 8

S. No.

Name of Stakeholders

Name of the Training Institute

Full Address with contact no., website & e-mail

Name & Designation of the

Head of Institute

Type of Institute#

Area(s) of specializatio

n$

Accredita-tion details

1 PIAs IGPRS Jaipur / ([email protected]) Director IGPRS Jaipur GOR W/S

NIRD Jaipur Course Cordinator Chaupal NIRM Jaipur

GOI GIS Base

2 WDTs PRTC Ajmer/ IGPRS Jaipur / SAMTI Jaipur

Training Cordinator PTC Ajmer/ State Agriculture Management Institute, Durgapur, Director- SAMI Jaipur

Cordinator PTC Ajmer, Director SAMI Jaipur

GOR

w/s development

works

K.V.K. / Arjiya / Bhilwara Dairy

M.D. Bhilwara Dairy/ Senior Scientist K.V.K. Bhilwara/ Senior Scientist Arjiya

M.D. Bhilwara Dairy Research Institutes

3 UGs Rajeev Gandhi seva Kendra on Gram panchayat

Gram Panchayat Head Quarter Gram Panchayat Head Quarter

GOR

4 SHGs Rajeev Gandhi seva Kendra on Gram panchayat

GOR

5 WCs Rajeev Gandhi seva Kendra on Gram panchayat

GOR

6 GPs Rajeev Gandhi seva Kendra on Gram panchayat

GOR

7 Community Rajeev Gandhi seva Kendra on Gram panchayat

GOR

8 PM/SLNA NIRD Director General, NIRD Rajendra Nagar, Hyedrabad, Pin-500030

Director General Hyedrabad

GOI

# Central govt. Dept./ State govt. Dept./ Autonomous Body/ Research Institutes/ Universities/ Others (pl. specify) $ Capacity Building/ Agriculture/ Horticulture/ Animal Husbandry/ Pisciculture/ Remote Sensing/ Water conservation/ Ground water/ Forestry/

livelihoods/ entrepreneurship development/ others (pl. specify) @ The training institutes must fulfil the conditions mentioned in the operations guidelines.

Page 38: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

38

Table- Capacity Building activities in the project (PHYSICAL & FINANCIAL) *4% OF TOTAL PROJECT COST. IWMP-XVII BANERA

Table- Capacity Bulding activities in the project (PHYSICAL & FINANCIAL) *4% OF TOTAL PROJECT COST.

1 2 3 4 5 6

S. No.

Project Stackholders Total No. of

Persons

Total No. of

Training

Rate per Trainnin

g

UNIT Total Am

No. of Person to be trained during project period

No. of Training to be organized during project period

No. of Person days to be trained during project period

I Year II Year

III Year IV Year

V Year

Total I Year II Year

III Year IV Year

V Year

Total I Year II Year

III Year

IV Year

V Year

Total

A State level trainning

1 PIAs (2X5300=10600) 3 days 2 12 10600 No 1.272 4 8 8 4 0 24 2 4 4 2 0 12 12 24 24 12 0 72

2 WDTs(4X5300=21200) 3 days 4 15 21200 No 3.180 8 16 16 8 12 60 2 4 4 2 3 15 24 48 48 24 36 180

B Disst. level trainning

1 PIAs (2X5600=11200) 4 days 2 12 11200 No 1.344 6 6 6 6 0 24 3 3 3 3 0 12 24 24 24 24 0 96

2 WDTs(4X5600=22400) 4 days 4 13 22400 No 2.906 8 12 16 16 0 52 2 3 4 4 0 13 32 48 64 64 0 208

Total WCDC 52 8.702 26 42 46 34 12 160 9 14 15 11 3 52 92 144 160 124 36 556

3 Ugs (one days) 25 8 6800 No 0.544 50 75 75 0 0 200 2 3 3 0 0 8 50 75 75 0 0 200

4 SHGs 159 x 3=477 (one days) 477 16 6800 No 1.088 30 60 60 0 10 160 3 6 6 0 1 16 30 60 60 0 10 160

5 WCs (one days) 15 8 6800 No 0.544 30 45 45 0 0 120 2 3 3 0 8 30 45 45 0 0 120

6 GPs (one days) 30 9 6800 No 0.612 60 120 90 0 0 270 2 4 3 0 0 9 60 120 90 0 0 270

7 Community (one days) 30 8 6800 No 0.544 60 90 90 0 0 240 2 3 3 8 60 90 90 0 0 240

8 EXPOSURE TOUR (INTER STATE) 6 days

50 4 150000 No 6.000 0 50 50 50 50 200 1 1 1 1 4 0 300 300 300 300 1200

9 EXPOSURE TOUR (OUTER STATE) 6 days

50 4 210500 No 8.406 0 200 0 0 0 200 4 0 4 0 1200 0 0 0 1200

Total PIA

C PM/SLNA (6X5300=31800) 6 1 31800 No 0.3347 0 6 0 0 0 6 0 1 0 0 0 1 0 6 0 0 0 6

11 TOTAL PHYSICAL 1 0 6 0 0 0 6 0 1 0 0 0 1 0 6 0 0 0 6

12 TOTAL FINANCIAL 0.335 2.17 13.81 5.23 3.36 2.20

Page 39: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

39

669.36 IWMP-XVII BANERA

Total Budget

Table- Capacity Bulding activities in the project (PHYSICAL & FINANCIAL) *4% OF TOTAL PROJECT COST.

S. No.

Project Stackholders Total No. of

Persons

Total No. of

Training

Rate per Trainning

UNIT Total Am

Year wise Amount vifergation

Lacks I Year II Year III Year IV Year V Year Total

WCDC 8.7017

A State level trainning Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

1 PIAs (2X5300=10600) 3 days

2 12 10600 No 1.272 2 0.212 4 0.424 4 0.424 2 0.212 0 0 12 1.272

2 WDTs(4X5300=21200) 3 days

4 15 21200 No 3.180 2 0.424 4 0.848 4 0.848 2 0.424 3 0.636 15 3.18

B Disst. level trainning

1 PIAs (2X5600=11200) 4 days

2 12 11200 No 1.344 3 0.336 3 0.336 3 0.336 3 0.336 0 0.000 12 1.344

2 WDTs(4X5600=22400) 4 days

4 13 22400 No 2.906 2 0.448 3 0.672 4 0.896 4 0.89 0 0.000 13 2.906

0.000 Total WCDC 12 52 8.702 9 1.420 14 2.280 15 2.504 11 1.862 3 0.636 52 8.702

PIA 17.74

3 Ugs (one days) 30 8 6800 No 0.544 2 0.14 3 0.204 3 0.204 0 0 0 0 8 0.544

4 SHGs 159 x 3=477 (one days)

30 16 6800 No 1.088 3 0.20 6 0.408 6 0.408 0 0 1 0.068 16 1.088

5 WCs (one days) 30 8 6800 No 0.544 2 0.14 3 0.204 3 0.204 0 0 0 8 0.544

6 GPs (one days) 30 9 6800 No 0.612 2 0.14 4 0.272 3 0.204 0 0 0 0 9 0.612

7 Community (one days) 30 8 6800 No 0.544 2 0.14 3 0.204 3 0.204 0 0 8 0.544

8 EXPOSURE TOUR (INTER STATE) 6 days

50 4 150000 No 6.000 0 1 1.500 1 1.5 1 1.5 1 1.5 4 6.000

9 EXPOSURE TOUR (OUTER STATE) 6 days

50 4 210500 No 8.406 0 4 8.406 0 0 0 0 4 8.406

0.000 Total PIA 250 57 17.738 11 0.748 24 11.198 19 2.724 1 1.500 2 1.568 57 17.738

SLNA 0.3347

C PM/SLNA (6X5300=31800)

6 1 31800 No 0.3347 0 0 1 0.3347 0 0 0 0 0 1 0.3347

11 TOTAL PHYSICAL 110 20 39 34 12 5 110

26.774 12 TOTAL FINANCIAL 26.775 2.168 13.813 5.228 3.362 2.204 26.775

Page 40: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

40

Table- Education & Communication (IEC) activies in the project area (1% of total Project cost.) TOTAL AMOUNT 6.4152 IWMP-XV ASIND

1 2 3 4 5

S. No. Activity Executing

agency

allocation out of 1% of total Project cost

Allocation in Lacks

I Year II Year III Year

IV Year

V Year Total

1 tyxzg.k {ks= xfrfof/k;kas dks n’kkZrk gqvk POP / CLAY / WOOD / PLASTIC ls cuk gqvk ekWMyA MhLiys cksMZs@IysxDlh cksMZ@

PIA 0.96228 0.000 0.310 0.351 0.301 0.000 0.962

2 okWy isfUVax&tyxzg.k xfrfof/k;ksa] y{;ks o izkfIr vkfn dks n’kkZrh gqbZ A

PIA 0.32076 0.000 0.321 0.000 0.000 0.000 0.321

3 tyxzg.k fodkl laca/kh eqfnzr iEiysVl@fyQ ysVl@pkVZ@iksLVj@vkfnA

PIA 0.32076 0.000 0.321 0.000 0.000 0.000 0.321

4 Ukkjk ys[ku PIA 1.2830 0.516 0.767 0.000 0.000 0.000 1.283

5 lQyrk dh dgkuh;ksa dh ohfM;ksaxzkQh@QksVksxzkQh@ y?kqfQYe ,oa d"̀kdks ls lk{kjkrdkj @ okrkZ A

PIA 1.28 0.000 0.300 0.000 0.340 0.640 1.280

6 lkaLdf̀rd R;kSgkj @ esys vkfn ds volj ij iznZ’kuh @ uqDdM+ @ukVd dViqryh izn’kZu

PIA 0.96228 0.000 0.502 0.460 0.000 0.000 0.962

7 jkf= xks"Bh@Hkw laj{k.k lIrkg @ psruk jSyh

PIA 1.2830 0.000 0.811 0.472 0.000 0.000 1.283 8 tyxzg.k fodkl dk lans’k nsus okys lkaLd̀frd dk;ZØe

9 d̀"kd fnol dk vk;kstu ,oa {ks= Hkze.k fnol dk vk;kstu bR;kfn

dqy 1.00 6.4152 0.516 3.332 1.283 0.641 0.640 6.412

Page 41: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

41

P.D. COR LTD. JAIPUR was assigned the work of preparing various thematic layers using Cartosat-1 and LISS-3 imageries for Creation, development and management of geo-spatial

database depicting present conditions of land (terrain), water and vegetation with respect to

watershed under different ownerships at village level

Various thematic layers provided by P.D. COR LTD. JAIPUR are:

Delineation of Macro/Micro watershed boundaries. Digitised Khasara maps of the villages falling in project area. Network of Drainage lines, existing water bodies, falling in the project area. Base maps (transport network, village/boundaries, and settlements). Land Use / Land cover map. Contours at 1 meter interval, slope map ( in delineated watershed projects)

Based on GIS thematic layers, Field visits , PRA and analysis of benchmark data (as

discussed in chapter 2) final Treatment plan on revenue map for implementation has been

framed. Thus each intervention identified has been marked on revenue map (map enclosed

in DPR as annexure-1).The GIS based intervention map, PRA based intervention map are

annexed as.

B) Livelihood Action Plan (LAP):

An awareness programme has been undertaken at Gram Sabha for communication &

sensitization of the target beneficiaries. Livelihood Action Plan is a pre requisite for availing the

funds under the livelihood component. LAP has been prepared by the PIA in consultation with

WDT, WC & the members of SHG, SC/ST, women, landless/ asset less households. Details of

funds available & their utilisation are as under:

(i) Total project cost Rs.669.36 Lacks.

(ii) Funds available under livelihood component is 9% of total project cost= Rs. 60.24 Lacks.

(a) Seed money for SHGs as revolving fund = Rs. 36.742 Lacks.

(Minimum 60% of livelihood component)

No. Of SHG to be formed (147+11) Nos.

No of persons (members) in SHGs 1580 Nos.

(b) Seed money for enterprising individuals = Rs. 6.00 Lacks

(Minimum 10% of livelihood component)

-- No of persons identified as enterprising individuals 24 Nos.

Page 42: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

42

List of persons & Proposed Activities.

S.No Watershed Committee No of Person Activity Proposed

1 Dabla 6 1. Carpentary

2. Black Smith

3. Dairy

4. kumahari

5. Readymade garment

6. Stitching

2 Gharta 3

3 Kundiya Kalan 1

4 Kasoriya 14

Total 24

(c) Funds for Enterprising SHG/Federations of SHG

(Maximum 30 % of livelihood activities)= Rs. 17.50 Lacks

The funding for major livelihood activities will enable the enterprising SHGs/SHG federation to

avail a composite loan for undertaking major livelihood activities or to upscale activities as

recommended by the WC & approved by WCDC in consultation with line departments.

Details of enterprising SHG/federation are given below:

S.No. Watershed

Committee

No. of SHG/ SHG

federation

Project

Name

Project Cost in

lacs

Grant in aid

50% of

project cost

or 2 lacs

whichever is

less

Bank loan

1 Dabla 3 Dairy 13.50 5.25 8.25 2 Gharta 1 Dairy 4.50 1.75 2.75 3 Kundiya Kalan 0 Dairy 0 0 0 4 Kasoriya 6 Dairy 27.00 10.50 16.50 Total 10 45.00 17.50 27.50

* Details of project activities can be prepared in coming years after formation of SHG federation or

as the case may be.

Page 43: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

43

C) Production Plan:

An awareness programme has been undertaken at Gram Sabha for communication &

sensitization of the target beneficiaries. Production System & micro enterprises Action Plan is pre-

requisite for availing the funds under the Production System & micro enterprises component.

Production plan has been prepared by the PIA in consultation with WDT, WC & the members of

Users Group. Details of funds available & their utilisation are as under:

(iii) Total project cost Rs. 669.36 Lacks.

(iv) Funds available under Production System & Micro enterprises component is 10% of total

project cost= Rs. 66.936 Lacks.

List of persons & Proposed Activities for production system

S.No No. of Person Activities Proposed

1 Crop Demonstration

1. Kharif

2. Rabi

3. Fodder

487 No. / 194 Ha

310 No. / 124 Ha

708 No. / 171 Ha

2 Agro forestry

1. CVH with Aluvira

CVH with Aluvira & Karonda

583 Ha

25 Ha

3 30 Ha Horticulture

4 30 No. Nedap Compost

5 1026 No. / 45 Ha Vegetable Kit

6 5 No. Vermi compost

(viii) Funds for Animal Husbandry activities 7.463 lacks.

Details of is Animal Husbandry activities given below:

S.No. Name of Activity Quantity Unit

cost Total Cost

Project Convergance Project Convergance 1 A.I. 2060 0 0.0015 3.09 0 2 Animal

Husbandry Camp

0 10 0.24 0 2.40

3 Fodder Demos. 708 0 0.01 7.08 0 4 Manger 190 0 0.008 1.52 0

Total 11.69 2.40

Page 44: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

44

Awareness Programme -Slogan Wall Painting,

Scientific Animal Husbandry Practices ; Seminars / Debates / Pamphlet distribution/ Stickers/ Chetana Rally

Broadcasting / Telecasting Film Show

Visit- intra/ inter/ out of State/ Abroad

Fortnightly Meetings with Livestock keeper to discuss and decide all breedable females to be covered.

Creation Of Disease Free Zone: Livestock’s health coverage

Establishment of Pashudhan Seva Kendra (PSK) (Convergence with peer department)

Deworming to reduce worm load and enhance disease resistance. (Convergence with peer department)

Distribution of mineral mixture. (Convergence with peer department)

Free of Cost Vaccination in IWMP area Livestock for H.S., B.Q., F.M.D., PPR, ETV and Sheep Pox.

Ensure Hygenic measures to check Zonosis.(DAH/ IWMP)

Construction of Animal Sheds with Manger and Portable Manger With accessories

Provision of Cattle Water Troughs.

Infertility Management: To ensure Livestock’s Productivity

Expansion of AI Coverage/ reduction in no.of infertile females.

PCPD+ COMBAT INFERTILITY+ CAMPS INFERTILITY RLDB+ CAMPS INFERTILITY SC COMPONENT

Breed Improvement: To ensure Livestock’s Productivity enhancement

A.I. (Convergence with peer department)

Incentive based Mass Castration at Door Step of Scrub Bulls to Check ND Recycling.

Registration of bulls (Convergence with peer department)

Bull / Buck Distribution for NS-.Gir, Murrah And Sirohi /Jamunapari Breed Bulls/ Bucks Should Be Distributed For 3yrs 6 (3 In Each Iwmp Area, Where Ever A.I. Facility Is Not Available Round’s O Clock. On 100% Subsidized Rate To WC.

Financial Incentive to the Inseminator for Calf Borns.

Convergence with peer Department/DAH/Agriculture/ATMA/ Board/ Trust/ Goseva

An Assistance to control Malnutrition: Protein Supplementation

Page 45: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

45

Feed & fodder production enhancement.

ANNUAL ACTION PLAN : PIA will prepare annual action plan in the month of January indicating

outgoing liabilities as well as new projects which they wish to take during next financial years & will

submit to PM(WCDC). These plans will be placed for approval at P.S. (Standing Committee of

Production and Agriculture) & Z.P. (Standing Committee of Production) level every year. While

preparing Annual Action Plan (AAP) if rates of labour or material in DPR increased or decreased

changed rates will be applicable for preparing AAP & the effect of same can be met by converging

the remaining works with other schemes.

Page 46: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

46

Proposed Development Plan

Activity

Unit

Unit C

ost

Dabla Gharta Kundiya Kalan Kasoriya Total

Quantity

Total Cost

Cost from

Project Fund

Convergence Fund

Beneficiary Contribution

Quantity

Total Cost

Cost from

Project Fund

Convergence Fund

Beneficiary Contribution

Quantity

Total Cost

Cost from

Project Fund

Convergence Fund

Beneficiary Contribution

Quantity

Total Cost

Cost from

Project Fund

Convergence Fund

Beneficiary Contribution

Total Cost

Cost from

Project Fund

Convergence Fund

Beneficiary Contribution

Admn. 66.936 66.936 0 0 Monitoring 6.694 6.694 0 0 Evaluation 6.694 6.694 0 0 EPA 6.754 6.754 0 0 3.202 3.202 0 0 1.056 1.056 0 0 15.763 15.763 0 0 26.775 26.775 0 0 I & CB 33.468 33.468 0 0 DPR 6.694 6.694 0 0 Total (A) 6.754 6.754 0 0 3.202 3.202 0 0 1.056 1.056 0 0 15.763 15.763 0 0 147.261 147.261 0 0 (B) Natural resource management (56%) Conservation measures for arable land(private land)

Earthen Bund 0.6mh Ha 698 59.912 22.500 37.412

2.25 283

23.942 10.500 13.442

1.05 120

10.368 3.600 6.768

0.36 1659 143.311 49.875 93.436

4.9875 237.533 86.475 151.058

8.6475

Weste Weir No No 10 1.380 1.380 0.000 0.138 8 1.104 1.104 0.000 0.1104 4 0.552 0.552 0.000 0.0552 18 2.484 2.484 0.000 0.2484 5.520 5.52 0 0.552

Tanka/Khet talai No 6 4.482 4.482 0.000 0.4482 5 3.777 2.241 1.536 0.2241 8 6.102 1.494 4.608 0.1494 22 16.602 10.458 6.144 1.0458 30.963 18.675 12.288 1.8675

Bank Stabilisation/ Peripheral Bunds KM 2 0.790 0.790 0.000

0 1 0.790 0.790 0.000

0 1 0.790 0.790 0.000

0 1 1.580 1.580 0.000

0 3.950 3.95 0

0

Weste Weir No No 3 0.471 0.471 0.000 0 2 0.314 0.314 0.000 0 2 0.314 0.314 0.000 0 2 0.314 0.314 0.000 0 1.413 1.413 0 0

Conservation measures for non arable land

0

Pasture Development (Govt.) Ha 30 23.256 23.256 0.000

0 20

15.504 15.504 0.000

0 0 0.000 0.000 0.000

0 100 77.521 77.521 0.000

0 116.281 116.281 0

0

Pasture Development (Pvt.) Ha 16 1.104 1.104 0.000

0 14 0.966 0.966 0.000

0 6 0.414 0.414 0.000

0 15 1.035 1.035 0.000

0 3.519 3.519 0

0

V - ditch Ha 150 15.050 9.900 5.150 0 50 4.950 4.950 0.000 0 0 0.000 0.000 0.000 0 200 20.000 14.850 5.150 0 40.000 29.7 10.3 0 Water Harvesting Structure No 7 14.000 14.000 0.000

0 1 2.000 2.000 0.000

0 1 2.000 2.000 0.000

0 10 20.000 20.000 0.000

0 38.000 38 0

0

Road Site Plantation KM 3 3.645 0.595 3.050 0 2 2.425 0.595 1.830 0 3 3.630 1.190 2.440 0 3 3.630 1.190 2.440 0 13.330 3.57 9.76 0

Drainage line treatment 0

Masonary Check Dam No 5 2.112 2.112 0.000 0 2 0.858 0.858 0.000 0 1 0.430 0.430 0.000 0 6 2.520 2.520 0.000 0 5.920 5.92 0 0

WHS (1.00) No 24 6.000 6.000 0.000 0 3 3.000 3.000 0.000 0 2 2.000 2.000 0.000 0 13 13.000 13.000 0.000 0 24.000 24 0 0 WHS (2.00) No 11 4.000 4.000 0.000 0 1 2.000 2.000 0.000 0 1 2.000 2.000 0.000 0 7 14.000 14.000 0.000 0 22.000 22 0 0 Medium Masonary Structure No 5 3.960 3.960 0.000

0 0 0.000 0.000 0.000

0 0 0.000 0.000 0.000

0 3 11.858 11.858 0.000

0 15.818 15.818 0

0

Total (B) 970 140.16 94.55 45.61 2.84 392.00 61.63 44.82 16.81 1.38 149 28.60 14.78 13.82 0.56 2059 327.86 220.69 107.17 6.28 558.25 374.841 183.406 11.07

( C ) (C) Lively Hood Activities (9%)

Page 47: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

47

Production measures for arable land

Revolving Fund to SHG (60% minimum) No 0.25 34 8.492 8.492 0.000 0 19 4.750 4.750 0.000 0 8 2.000 2.000 0.000 0 86 21.500 21.500 0.000 0 36.742 36.742 0 0 Enterprising invidual (10%Maximum) No 0.25 6 1.500 1.500 0.000 0 3 0.750 0.750 0.000 0 1 0.250 0.250 0.000 0 14 3.500 3.500 0.000 0 6.000 6 0 0 SHG or federation of SHGs individual (30% minimum) No 1.75 3 5.25 5.25 0.000 0 1 1.75 1.75 0.000 0 0 0 0 0.000 0 6 10.5 10.5 0.000 0 17.500 17.5 0 0

Total (C) 43 15.242 15.242 0.0 0 23 7.25 7.25 0.0 0 9 2.25 2.25 0.0 0 106 35.5 35.5 0.0 0 60.242 60.242 0 0

(D) Production System activities (10%)

A.I. No 0.002 760 1.14 1.14 0.000 0.228 220 0.33 0.33 0.000 0.066 240 0.36 0.36 0 0.072 840 1.26 1.26 0.000 0.252 3.090 3.09 0 0.618 A.H. camp No 0.24 8 1.92 0 1.920 0 8 1.92 0 1.920 0 8 1.92 0 1.92 0 8 1.92 0 1.920 0 7.680 0 7.68 0 Manger No 0.008 60 0.48 0.48 0.000 0.096 40 0.32 0.32 0.000 0.064 25 0.2 0.2 0 0.04 65 0.52 0.52 0.000 0.104 1.520 1.52 0 0.304 Kharif No 130 3.000 3.000 0.000 0.6 66 1.509 1.509 0.000 0.3018 22 0.500 0.500 0 0.1 269 6.230 6.230 0.000 1.246 11.239 11.239 0 2.2478 Rabi No 78 2.000 2.000 0.000 0.4 39 1.000 1.000 0.000 0.2 26 0.660 0.660 0 0.132 167 4.253 4.253 0.000 0.8506 7.913 7.913 0 1.5826 Fodder No 0.01 180 1.800 1.800 0.000 0.36 60 0.600 0.600 0.000 0.12 0 0.000 0.000 0 0 468 4.680 4.680 0.000 0.936 7.080 7.08 0 1.416

Horticulture plantation Ha 10 5.400 2.400 3.000 0.48 4 2.160 0.960 1.200 0.192 1 0.540 0.240 0.3 0.048 15 3.660 3.600 0.060 0.72 11.760 7.2 4.56 1.44

Nedap Compost No 10 0.200 0.200 0.000 0.04 10 0.200 0.200 0.000 0.04 0 0.000 0.000 0 0 10 0.200 0.200 0.000 0.04 0.600 0.6 0 0.12

Vegetables No 263 2.630 2.630 0.000 0.526 75 0.750 0.750 0.000 0.15 38 0.380 0.380 0 0.076 650 6.500 6.500 0.000 1.3 10.260 10.26 0 2.052 Vermi compost No 0 0.000 0.000 0.000 0 0 0.000 0.000 0.000 0 0 0.000 0.000 0 0 5 1.200 1.200 0.000 0.24 1.200 1.2 0 0.24

poultry No 28 42.000 0.000 42.000 0 12

18.000 0.000 18.000 0 12

18.000 0.000 18 0 12 18.000 0.000 18.000 0 96.000 0 96

0

Alovira on Farm Bunding Ha 693 14.413 2.200 12.213 0.44 278 5.773 1.300 4.473 0.26 120 2.500 0.300 2.2 0.06 1644 34.131 7.860 26.271 1.572 56.817 11.66 45.157

2.332

Alovira + Karonda on Farm Bunding Ha 5 1.034 1.034 0.000 0.2068 5 1.035 1.035 0.000 0.207 0 0.000 0.000 0 0 15 3.106 3.106 0.000 0.6212 5.175 5.175 0 1.035

Total (D) 2225 76.017 16.884 59.133 3.3768 817

33.597 8.004 25.593 1.6008 492 25.06 2.64 22.42 0.528 4168 85.66 39.409 46.251 7.8818 220.334 66.937 153.397

13.3874

(E) Consolidation 20.081 20.081 0 0

Grand Total 3238 238.18 133.43 104.75 6.21 1232.00

105.68 63.28 42.40 2.99 650 56.97 20.73 36.24 1.09 6333 464.78 311.36 153.42 14.16 1006.17 669.362 336.803 24.45

Signatures

Project Manager, WCDC Distt. ------------------

Page 48: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

48

CHAPTER -I V Activity wise Total Abstract of cost

xfrfof/k dk uke

TOTAL TARGET From W/S Other Scheme

Beneficiary Contribution Name of Other Scheme

HkkSfrd y{; ;wfuV w/s+other HkkSfrd

y{; nj foRrh; y{;

HkkSfrd y{; nj

foRrh; y{;

iz'kklfud ykxr 66.936 66.936 0.000 eksfuVfjax 6.694 6.694 0.000 boksY;q'ku 6.694 6.694 0.000 izos'k fcUnq xfrfof/k 26.774 26.774 0.000

laLFkku o {kerk fuekZ.k 33.468 33.468 0.000

foLr̀r ifj;kstuk izfrosnu 6.694 6.694 0.000 mi;ksx 147.259 0 147.259 0 0.000

tyxzg.k fodkl dk;Z pj.k df̀"k Hkwfe dk;Z ¼vflafpr½ 0.000 CVH(NRM) Ha.SC/ST/BPL 1221 Ha 114.774 1221 0.094 114.774 0 MNREGS

CVH(NRM) Ha. Other 1539 Ha 122.759 1153 0.075 86.475 386 0.094 36.284 8.647 Weste Weir No 40 No 5.520 40 0.138 5.520 0 0.000 0.552 Farm Pond No. 41 No 30.931 25 0.747 18.675 16 0.766 12.256 1.868 MNREGS ¼vdf̀"k Hkwfe½ pjkxkg fodkl Ha. 150 Ha 116.282 150 0.775 116.282 0 0.000 0

pjkxkg fodkl Ha.(Private Farmer) 51 Ha 3.519 51 0.069 3.519 0 0.000 0

Nadi in P.D. Area & weste land 19 No 38.000 19 2.000 38.000 0 0.000 0

Open Contour Trench Ha 400 Ha 40.000 300 0.099 29.700 100 0.103 10.300 0 MNREGS

Road Side Plantation 11 Km 13.330 3 1.190 3.570 8 1.220 9.760 0 MNREGS ukyk mipkj dk;Z Bank Stabelization 2.5 Km 3.950 2.5 1.580 3.950 0 0.000 0.000 0 MNREGS Weste Weir No 9 No 1.413 9 0.157 1.413 0 0.000 0 Masonery Check Dam 14 No 5.898 14 0.420 5.898 0 0.000 0 MNREGS WHS (1.00) 24 24.000 24 1.000 24.000 0 0.000 0 MNREGS WHS (2.00) 11 22.000 11 2.000 22.000 0 0.000 0 MNREGS Medium Masonary Structure 4 No 15.840 4 3.960 15.840 0 0.000 0 MNREGS

mi;ksx 558.216 1806 374.842 1731 183.374 Lively Hood Activities

Lo;a lgk;rk lewg (R/F.) 147 No 36.742 147 0.25 36.742 0 0 W/S R.F. to Indivisual enterencure 24 No 6.000 24 0.25 6.000 0 0 W/S

Grant in Add. to Fedration 10 No 17.500 10 1.75 17.500 0 0.000 0 W/S

eqxhZikyu 64 No 96.000 0.000 64 1.50 96.000 0 ANIMAL HUSBANDRY eNyh ikyu 21 No 105.000 0.000 21 5.00 105.000 0 FISHARIES DEPTT. mPp f’k{kk 358 No 35.800 0.000 358 0.10 35.800 0 SOCIAL WALFAIR rduhdh izf’k{k.k 623 No 62.300 0.000 623 0.10 62.300 0 RUDSET/ILFS lkekftd lgk;rk 483 No 16.905 0.000 483 0.04 16.905 0 SOCIAL WALFAIR i'kq chek ;kstuk 2681 No 10.724 0.000 2681 0.004 10.724 0 ANIMAL HUSBANDRY

mi;ksx 386.971 60.242 326.729 Production System Activities 0.00

A.I. 2060 No 3.090 2060 0.0015 3.090 0 0 0.000 0.618 ANIMAL HUSBANDRY A.H.CAMP 10 No 2.400 0 0.240 0.000 10 0 2.400 0 ANIMAL HUSBANDRY

Page 49: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

49

Manger 190 Ha 1.520 190 0.008 1.520 0 0 0.000 0.304 [kjhQ No 11.239 487 11.239 0 2.248 jch No 7.913 310 7.913 0 1.583 pkjk izn'kZu 708 Ha 7.080 708 0.010 7.080 0 0.000 0.000 1.416 HORTICULTURE Qynkj ikS/kkjksi.k 30.2 Ha 11.760 30 0.240 7.200 15.2 0.300 4.560 1.44 HORTICULTURE oehZ dEiksLV 5 No 1.200 5 0.240 1.200 0 0.000 0.000 0.24 AGRICULTURE usMsi dEiksLV 30 No 0.600 30 0.020 0.600 0 0.000 0.000 0.12 MNREGS lCth fdVzl 1026 No 10.260 1026 0.010 10.260 0 0.000 0.000 2.052 HORTICULTURE df̀"k Hkwfe (cvh Pro.)sc/st/BPL Alu

1221 Ha 25.641 1221 0.021 25.641 0 MNREGS

df̀"k Hkwfe (cvh Pro.) Other Alu

1514 Ha 31.211 583 0.020 11.660 931 0.021 19.551 2.332 MNREGS

df̀"k Hkwfe (cvh Pro.) Other Alu+Kar 25 Ha 5.175 25 0.207 5.175 0 0.210 0.000 1.035 MNREGS

tSfod ckM+ 111 Ha 17.380 110.7 0.157 17.380 0 OTHERS Qwyksa dh [ksrh 58 Ha 13.824 57.6 0.24 13.824 0 HORTICULTURE elkyk [ksrh 22 Ha 5.033 21.6 0.233 5.033 0 HORTICULTURE vkS"k/kh;k ikSa/kksa dh [ksrh 12 Ha 1.755 11.7 0.15 1.755 0 HORTICULTURE ulZjh LFkkiuk (25000 Forest Plant/- Family) 12 No 3.000 12 0.25 3.000 0 MNREGS

ftIle ls Hkwfe lq/kkj 78 Ha 0.548 78 0.007 0.548 0 AGRICULTURE flapkbZ gsrq ikbZi ykbZu 92 No 13.800 92 0.15 13.800 0 AGRICULTURE fLaizDyj flLVe 31 Ha 13.770 31 0.45 13.770 0 AGRICULTURE fMªi flapkbZ ;kstuk 43 Ha 18.144 43 0.42 18.144 0 AGRICULTURE df̀"k ;a= ¼Lis;j½ 129 No 6.450 129 0.05 6.450 0 AGRICULTURE ikS/k laj{k.k ;a= 110 No 1.100 110 0.01 1.100 0 AGRICULTURE uhe mRiknu 10 No 0.050 10 0.005 0.050 0 MNREGS xzhu gkml LFkkiuk 2 Ha 2.700 2 1.5 2.700 0 HORTICULTURE ckal mRiknu 10 Ha 0.792 10 0.08 0.792 0 HORTICULTURE

Total 217.435 66.937 150.498 dUlksfyM+s'ku pj.k 20.081 20.081

GRAND TOTAL 1329.96 669.36 660.60 24.45 *Tentative and will vary during execution according to beneficiary

Signatures Project Manager, WCDC

Distt. -------------------

Page 50: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

50

CHAPTER – V Annual Action Plan : The project period can vary from 4 to 7 years and accordingly the table given below be prepared. Also the activities mentioned below are indicative and can vary from project to project. Also this if PIA feels necessary to make it GP Wise it can add pages. Through Project Fund

daz- la- xfrfof/k dk uke

o"kZokj ;kstuk

dqy ;ksx y{;

2011 - 12 2012 - 13 2013 - 14 2014 - 15 2015 - 16 2016 - 17

izFke o"kZ f)rh; o"kZ r`rh; o"kZ prqFkZ o"kZ iape o"kZ NBoh o"kZ

izfr'kr ek=k nj As Per Annx. ykxr

HkkSfrd y{;

foRrh; y{;

HkkSfrd y{;

foRrh; y{;

HkkSfrd y{;

foRrh; y{; HkkSfrd y{;

foRrh; y{; HkkSfrd y{;

foRrh; y{; HkkSfrd y{;

foRrh; y{; HkkSfrd foRrh;

1 iz'kklfud ykxr 10% 66.936 4.016 19.411 16.734 13.387 13.387 66.936

(I.) WDT lnL;ks dk ekuns; 19.980 2.220 4.440 4.440 4.440 4.440 19.980

(II.) tyxzg.k desVh ds lfpoks dk ekuns; 5.760 1.440 1.440 1.440 1.440 5.760

(III.) Loa; lsodks dk ekuns; 5.760 1.440 1.440 1.440 1.440 5.760

(IV.) dk;kZy; O;; ¼thi dk fdjk;k½ 35.436 1.796 12.091 9.414 6.067 6.067 35.436

mi;ksx 66.936 0 0.000 0 4.016 0 19.411 0 16.734 0 13.387 0 13.387 0 66.936 2 eksfuVfjax 6.694 3.012 1.673 0.669 1.339 6.694 3 boksY;q'ku 6.694 0.669 2.677 0.0000 3.3468 6.694 mi;ksx 13.387 3.681 4.351 0.669 4.6855 0 13.387 1 izos'k fcUnq xfrfof/k 4% 26.774 0.000 1 lksyj ykbZV 25 23400 5.850 5.850 5.850 2 20.924 20.92 20.924

mi;ksx 26.774 0.000 26.774 0.000 0.000 0.000 0.000 26.774

2 laLFkku o {kerk fuekZ.k 5% 33.468 33.468

mi;ksx 33.468 0.000 2.677 17.403 6.694 3.347 3.347 33.468

6 foLrr̀ ifj;kstuk izfrosnu 1% 6.694 6.694 6.694

mi;ksx 6.694 0.000 6.694 0.000 0.000 0.000 6.694 7 tyxzg.k dk;Z pj.k 0.000

1 tyxzg.k fodkl dk;Z pj.k 56% 374.842 0.000 0.000 133.872 167.34 73.630 0.000 374.842

(I.) df̀"k Hkwfe dk;Z ¼vflafpr½

(i) CVH(NRM) Ha. Sc/st/BPL 0.000 0.000 0 0.000 0 0.000 0 0.000 0.000 0 0.000

CVH(NRM)Ha. Other 1153 7500 86.475 0.000 0.000 373 27.975 425 31.875 355 26.625 0.000 1153 86.475

Page 51: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

51

(ii) West weir Na. 40 13800 5.520 0.000 0.000 14 1.932 20 2.760 6 0.828 0.000 40 5.520 (iii) Farm Pond No. 25 74700 18.675 0.000 9 6.723 10 7.470 6 4.482 0.000 25 18.675 (II.) ¼vd̀f"k Hkwfe½ 0 0 0 0 0 0.000

(i) pjkxkg fodkl Ha.(NRM) 150 77521 116.282 0.000 60 46.513 67 51.939 23 17.830 0.000 150 116.282

(ii) pjkxkg fodkl Ha.(Production) 150 0 0.000 47 0.000 66 0.000 37 0.000 0.000 150 0.000

(iii) Nadi in P.D. Area 19 200000 38.000 6 12.000 10 20.000 3 6.000 0.000 19 38.000

(iv) pjkxkg fodkl Ha.(Private farmer) 51 6900 3.519 15 1.035 28 1.932 8 0.552 0.000 51 3.519

(v) Open Contour Trench 300 9900 29.700 100 9.900 145 14.355 55 5.445 0.000 300 29.700

(vi) Bank Stabelization 2.5 158000 3.950 0.2 0.316 1.5 2.370 0.8 1.264 0.000 3 3.950 (vii) West weir Na. 9 15700 1.413 0.000 0.000 3 0.471 3 0.471 3 0.471 0.000 9 1.413

(viii) Road side Plantation 3 119000 3.570 1.45 1.726 1.45 1.726 0.1 0.119 0.000 3 3.570

(IV.) ukyk mipkj dk;Z 0 0 0 0 0 0.000

(i) Masanery Check Dam( 14 42000 5.898 7 2.933 4 1.694 3 1.271 0.000 14 5.898

(ii) WHS (1.00) 24 100000 24.000 8 8.000 13 13.000 3 3.000 0.000 24 24.000 (iii) WHS (2.00) 11 200000 22.000 0.000 0.000 5 10.000 5 10.000 1 2.000 0.000 11 22.000 (iv) WHS (3.00) 4 396000 15.840 0.000 1 3.960 2 7.920 1 3.960 0.000 4 15.840

mi;ksx 0.00 374.842 0.000 0.000 133.483 167.511 73.847 0.000 1956 374.842 2 Lively Hood Activities 9% 60.242 6.694 20.081 20.081 13.387 60.242

(i) Lo;a lgk;rk lewg (R/F.) 147 25000 36.742 0.000 17 4.25 45 11.25 57 14.25 28 6.992 147 36.742

(ii) R.F. to Indivisual enterencure 24 25000 6.000 0.000 1 0.250 6 1.500 7 1.750 10 2.500 24 6.000

(iii) Grant in Add. to Fedration 10 200000 17.5 1 1.75 4 7 2 3.5 3 5.25 10 17.500

mi;ksx 60.242 0.00 0.00 6.25 19.75 19.50 14.74 181 60.242

3 Production System Activities 10% 66.936 13.387 23.428 23.428 6.694 66.936 (I.) A.I. No 2060 150 3.090 470 0.705 590 0.885 620 0.930 380 0.570 2060 3.090 (ii) A.H. CAMP No 0 24000 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000

(iii.) Manger No 190 800 1.520 50 0.400 50 0.400 50 0.400 40 0.320 190 1.520 (iv.) [kjhQ No 1308 11.239 321 3.064 326 2.872 343 3.459 318 1.844 1308 11.239 (v.) jch No. 643 7.913 156 1.978 161 1.98 182 2.797 144 1.158 643 7.913 (vi.) pkjk izn'kZu 708 1000 7.080 128 1.280 197 1.970 197 1.970 186 1.860 708 7.080 (vii.) Qynkj ikS/kkjksi.k Ha. 30 24000 7.200 7 1.680 9 2.160 10 2.400 4 0.960 30 7.200

(viii) oehZ dEiksLV No 5 24000 1.200 0 0.000 2 0.480 3 0.720 0 0.000 5 1.200 (IX) usMsi dEiksLV No 30 2000 0.600 2 0.040 9 0.180 13 0.260 6 0.120 30 0.600

Page 52: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

52

(X) fdpu xkMZu No 1026 1000 10.260 160 1.600 400 4.000 348 3.480 118 1.180 1026 10.260

(XI.) df̀"k Hkwfe (cvh Pro.) Other 583 2000 11.660 73 1.460 251 5.020 233 4.660 26 0.520 583 11.660

(XII) df̀"k Hkwfe (cvh Pro.) Other 25 20700 5.175 4 0.828 11 2.277 7 1.449 3 0.621 25 5.175

mi;ksx 0.00 66.937 0.000 0.000 13.035 22.224 22.525 9.153 6608 66.937

10 dUlksfyM+s'ku pj.k 20.081 20.081 20.081 dqy ;ksx 669.36 0.00 40.16 193.26 237.26 133.28 65.40 8745 669.36

Signatures Project Manager, WCDC

Distt. -------------------

Page 53: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

53

CHAPTER – V Annual Action Plan : The project period can vary from 4 to 7 years and accordingly the table given below be prepared. Also the activities mentioned below are indicative and can vary from project to project. Also this if PIA feels necessary to make it GP Wise it can add pages. Through Convergence Plan

daz- la- xfrfof/k dk uke

o"kZokj ;kstuk

dqy ;ksx y{;

2011 - 12 2012 - 13 2013 - 14 2014 - 15 2015 - 16 2016 - 17

izFke o"kZ f)rh; o"kZ r`rh; o"kZ prqFkZ o"kZ iape o"kZ NBoh o"kZ

izfr'kr ek=k nj As Per Annx. ykxr HkkSfrd

y{; foRrh; y{;

HkkSfrd y{;

foRrh; y{;

HkkSfrd y{;

foRrh; y{;

HkkSfrd y{;

foRrh; y{;

HkkSfrd y{;

foRrh; y{;

HkkSfrd y{;

foRrh; y{; HkkSfrd foRrh;

7 tyxzg.k dk;Z pj.k

1 tyxzg.k fodkl dk;Z pj.k

(I.) df̀"k Hkwfe dk;Z ¼vflafpr½

(i) CVH(NRM) Ha. Sc/st/BPL 1607 9400 151.058 0.000 0.000 535 50.290 536 50.384 536 50.384 0 0.000 1607 151.058

(ii) Farm Pond 16 76600 12.256 0.000 0.000 6 4.596 5 3.830 5 3.830 0 0.000 16 12.256

(iii) Open Contour Trench Ha 100 10300 10.300 0.000 0.000 34 3.502 33 3.399 33 3.399 0 0.000 100 10.300

(iv) Road Side Plantation 8 122000 9.760 0.000 0.000 3 3.660 3 3.660 2 2.440 0 0.000 8 9.760

mi;ksx 183.374 0.000 0.000 62.048 61.273 60.053 0.000 1731 183.374

2 Lively Hood Activities

(i) eqxhZikyu 64 150000 96.000 13 19.500 13 19.500 13 19.500 13 19.500 12 18.000 64 96.000

(ii) eNyh ikyu 21 500000 105.000 5 25.000 4 20.000 4 20.000 4 20.000 4 20.000 21 105.000

(iii) mPp f’k{kk 358 10000 35.800 72 7.200 72 7.200 72 7.200 71 7.100 71 7.100 358 35.800

(iv) rduhdh izf’k{k.k 623 10000 62.300 125 12.500 125 12.500 125 12.500 124 12.400 124 12.400 623 62.300

(v) lkekftd lgk;rk 483 3500 16.905 97 3.395 97 3.395 97 3.395 96 3.360 96 3.360 483 16.905

(vi) i'kq chek ;kstuk 2681 400 10.724 537 2.148 536 2.144 536 2.144 536 2.144 536 2.144 2681 10.724

(vii) Other 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000

mi;ksx 326.729 0.00 69.74 64.74 64.74 64.50 63.00 4230 326.729

3 Production System Activities

(I.) A.H. CAMP 10 24000 2.400 2 0.480 2 0.480 2 0.480 2 0.480 2 0.480 10 2.400

(ii) Qynkj ikS/kkjksi.k Ha. 15.2 30000 4.560 3.2 0.960 3 0.900 3 0.900 3 0.900 3 0.900 15.2 4.560

(ii) df̀"k Hkwfe (cvh Pro.) Other 1221 2100 25.641 245 5.145 244 5.124 244 5.124 244 5.124 244 5.124 1221 25.641

(iii) df̀"k Hkwfe (cvh Pro.) Other 931 2100 19.551 187 3.927 186 3.906 186 3.906 186 3.906 186 3.906 931 19.551

(iv) tSfod ckM+ 110.7 15700 17.380 22 3.476 22 3.476 22 3.476 22 3.476 22 3.476 111 17.380

(v) Qwyksa dh [ksrh 57.6 24000 13.824 12 2.765 12 2.765 12 2.765 12 2.765 12 2.765 58 13.824

Page 54: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

54

(vi) elkyk [ksrh 21.6 23300 5.033 4 1.007 4 1.007 4 1.007 4 1.007 4 1.007 22 5.033

(vii) vkS"k/kh;k ikSa/kksa dh [ksrh 11.7 15000 1.755 2 0.351 2 0.351 2 0.351 2 0.351 2 0.351 12 1.755

(viii) ulZjh LFkkiuk (25000 Forest Plant/- Family) 12.0 25000 3.000 3 0.750 3 0.750 2 0.500 2 0.500 2 0.500 12 3.000

(ix) ftIle ls Hkwfe lq/kkj 78.3 700 0.548 16 0.110 16 0.110 16 0.110 16 0.110 16 0.110 78 0.548

(x) flapkbZ gsrq ikbZi ykbZu 92.0 15000 13.800 19 2.850 19 2.850 18 2.700 18 2.700 18 2.700 92 13.800

(xi) fLaizDyj flLVe 30.6 45000 13.770 6 2.790 6 2.745 6 2.745 6 2.745 6 2.745 31 13.770

(xii) fMªi flapkbZ ;kstuk 43.2 42000 18.144 9 3.629 9 3.629 9 3.629 9 3.629 9 3.629 43 18.144

(xiii) df̀"k ;a= ¼Lis;j½ 129.0 5000 6.450 26 1.290 26 1.290 26 1.290 26 1.290 26 1.290 129 6.450

(xiv) ikS/k laj{k.k ;a= 110.0 1000 1.100 22 0.220 22 0.220 22 0.220 22 0.220 22 0.220 110 1.100

(xv) uhe mRiknu 10.0 500 0.050 2 0.010 2 0.010 2 0.010 2 0.010 2 0.010 10 0.050

(xvi) xzhu gkml LFkkiuk 1.8 150000 2.700 1 1.500 0.8 1.200 0 0.000 0 0.000 0 0.000 2 2.700

(xvii) ckal mRiknu 9.9 8000 0.792 2 0.160 2 0.160 2 0.160 2 0.160 2 0.152 10 0.792

(xviii) 0.00 148.098 0.000 30.939 30.492 28.892 28.892 28.884 2896 150.498

dqy ;ksx 658.20 0.00 100.68 157.28 154.90 153.45 91.89 8857 660.60

Signatures Project Manager

Distt. -------------------

Page 55: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

55

CHAPTER – VI EXPECTED OUT COMES 1 2 3 4 5 6

S. No. Item Unit of measurement

Pre-project Status

Expected Post-project Status Remarks

1 Status of water table (Depth to Ground water level)

Meters 12.20 11.50

2 Ground water structures repaired/ rejuvenated

No. - -

3 Quality of drinking water Description ALK LINE PURE WATER 4 Availability of drinking water Description 60-65% 80-90% Work in EPA Activity 5 Change in irrigated Area Ha 987 1150 6 Change in cropping/ land use pattern Description 7 Area under agricultural crop Ha I Area under single crop Ha 2947 3100 Ii Area under double crop Ha 987 1150 Iii Area under multiple crop Ha - - 8 Change in cultivated Area Ha 9 yield of major crops of area

Yield of Bajra Kg/ha - - Yield of Wheat Kg/ha 2775 2850 Yield of Gram Kg/ha 840 880 Yield of Mustard Kg/ha 1070 1150

10 production of major crops of area

Production of Bajra ton - - Production of Wheat ton 926.850 951.9 Production of Gram ton 158.360 170.20 Production of Mustard ton 197.400 206.80

11 Area under vegetation Ha 0 9 12 Area under horticulture Ha 16 31 13 Area under fuel Ha 0 150 14 Area under Fodder Ha 3934 4250 15 Fodder production Q 95390 103052 16 Milk production Litres/day 10213 12500 17 SHGs Active No. 13 158 18 No. of enterprising individuals No. 0 24 19 Income for capita per year Rs. in lacs 14700 15500 20 Migration No. 2550 Check 21 SHG Federations formed No. 0 12

Page 56: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

56

Critical Assumption

No severe droughts/ unexpected floods/ natural disasters

Adequate funds are allocated for the same and released on time.

There is no significant pest/ disease attack, and if so, then it will have been contained before

irreversible damage is done.

Adverse market conditions do not persist long.

Sound macro-economic and growth conditions continue and the benefits are widely distributed

particularly in the rural areas.

Facilitating agencies and resource providers have the required competent staff so that timely

and appropriate technical advice and services are provided to farmers whenever required.

The Capacity Building Plan is implemented, monitored and modified to address evolving needs

and feedback from participants.

Means of Verification of indicators

Baseline surveys like household income ,expenditure, health and nutrition etc at the beginning,

mid-term and end of the project period

Annual participatory assessment by communities during project period.

Regular project monitoring reports prepared by project monitoring teams/ agencies.

Membership and other Records, Minutes of Meetings maintained by the SHGs, WCs/

Individual beneficiaries/project-related village and local bodies/PRIs.

External review missions

Data maintained by Government department (Revenue, Agriculture, Groundwater, Irrigation,

Animal Husbandry

Page 57: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

57

CHAPTER VII TECHNICAL DESIGNS AND ESTIMATES

Technical designs and estimates for proposed activities.

For Estimates GKN of the districts should be used. For Production System activities, rates

provided by the Department are to be used & if not vailable than rates of Agriculture/Horticulture/

Animal Husbandry should be used.

For Livelihood activities, project norms provided by the Department is to be used & if not available

than cost norms of NABARD, NRLM etc can be used.

Page 58: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

58

CHAPTER - VIII Enclosures -

b. Location –District, block, village, watershed location map

c. Map of Banera (IWMP-XVII) Project (Watershed Boundary demarcation in cadastral

& Topo Sheet)

d. PRA Map (along with photos & paper drawing)

e. Treatment map (Indicate proposed works)

f. Cadastral Map on watershed boundary

g. Information on Soils, Soil fertility, Land capability, Soil chemical problems like

salinity, alkalinity

h. Land Use Land Cover map

i. Information on existing water harvesting structures & well inventory along with GPS

co-ordinates.

j. High resolution, latest Remote Sensing Satellite data

Documents of Agreements: Proceedings of gram sabha for EPA approval

Proceedings of gram sabha Resolution for committee constitution

Proceedings of gram sabha for DPR approval

Proceeding of Standing Committee of P.S. for DPR approval.

Proceeding of Standing Committee of Z.P. for DPR approval.

Assistant Engineer, PIA

WD&SC P.S.-----------

Project Manager, WCDC

WD&SC.Distt.--------------

Page 59: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

:-:-:-:-:-

Latitude :-Longitude :-

:-:- 3.96 Lack

=1 Catch ment Area = 950 Ha.2 Maxmium Rain fall intencity = 6 cm./hr.3 General nature of catchment Area

a. Agricultural land = 550b. Pasture Land = 400 Ha.

4 Height of crest above G.L. = 1.5 M.5 Flood lift = 1.56 Free board = 0.47 Top width of Head wall = 1.28 Bottom width of Head wall = 2.709 Width of concrete Bed = 2.7010 Length of crest = 10 M.11 Percentage slope of land = 0.0212 No. of well benifited = 013 Cost of Project = 396000.00

a. Labour component = 182000.00b. Material component = 214000.00c. Contingency = 11520

Rates are as per BSR (GKN) 2012, Bhilwara

IWMP XVII WATERSHED PROJECT

Name of Site

Macro/Micro No.

GPS position

Name of samiti

Village - DablaTehsil - Banera, District - Bhilwara, State: Rajasthan, India

Basic Data of Project

Type of Structure

Cost of Anicut

DablaR.R.Stone masonary structure

Panchayat Samity Banera

Estimate of AnicutName of Gram Panchayat Dabla

Page 60: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

Catch ment Area 950 Ha.Maxmium Rain fall intencity 6 Cm/hrGeneral nature of catchment AreaAgricultural land 550Pasture Land 400Height of crest above G.L. 1.5Length of crest 10Percentage slope of land 0.02No. of well benifitedNo of farmer benifitedS.C.S.T.OthersTotal 0Area to be benifitedS.C. 0S.T. 0Others 0Total 0Circle Bhilwara

Page 61: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

:-:-

A.I Available crest length 10 Mii Total catchment Area 950 Ha. As per G.T.Sheetiii Peak Runoff Ratea By Rational Method Use when catchment is <1300Ha.

Qp = 0.0276 CIA Q=Run off in m3/sec.C= Coefficient of runoff 0.3

K = L3/2/H1/2 I= Intensity of rain fall in cm/hr. 6K = 297881.41 A= Catchment Area in Ha. 950

Tc = 0.0195K0.77 L=Maxmium length of travel by runoff water in m. 11000Tc = 319.92 H= Difference in elevation between most remote 15

Name of SiteDabla0

Name of Village

IWMP XVII WATERSHED PROJECT Village - Dabla

Tehsil - Banera, District - Bhilwara, State: Rajasthan, India

Design calculation of anicut

Tc = 319.92 H= Difference in elevation between most remote 15 point and and outlet point in meter

Qp= 0.0276 0.30 X 6 X 950Qp = 47.20

b By weir formula

Q = 1.71Lh3/2

47.20 = 1.71 10 h3/2

h 1.97Say h= 1.5

3 Free Board hw= Wave height in meter

Fb= 1.5hw Df= Fetch length in meter 450 Meter.1.5X0.014(Df)

1/2

Fb= 0.45Say Fb= 0.4

B. STRUCTURAL DESGIN1 Head walla Height of Head wall H= 1.5b Top width( Tw) = h P= Sp.ht. Of masonary 2.3b Top width( Tw) = h P= Sp.ht. Of masonary 2.3

(P-1)1/2

Tw= 1.32Top width= 1.2

C. Bottom width Bw Tw+0.8H2.40

So Bottom Width= 2.70 Meter2 Head wall extension

a Length= H+h+1+Fb1.5 + 1.5 + 1 + = 4.00 Meter

= 4b Height of Head Extensionwall = H+h+Fb

1.5 + 1.5 + 0.4 = 3.4 Meterc Top width 0.6 Meterd Bottom Width= 0.5(H+h) = 0.5( 1.5 + 1.5 )= 1.50 Meter

contd..

Bw=

But as per site condition

Page 62: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

3 Side walla Length= 1.75H+0.75h+0.45 = 4.2

But as per site condition= 4.0 Meterb Height:

At H.W.End= H+h+Fb 1.5 + 1.5 + 0.4 = 3.4 MeterAt W.W.End= h+fb = 1.5 + 0.4 = 1.9 Meter

c Top width= 0.6 Meterd Bottom width=

At H.W.End= 0.6+0.4(H+h) 1.8 MeterAt W.W.End= 0.6+0.4(1.5h) 1.5 Meter

But taken as= 1.2 Meter4 Wing wall

a Height h+Fb 1.5 + 0.4 = 1.9 Meterb Length= 2.25h 2.25 X 1.5 = 3.38 Meter Say 1.5c Top width 0.6 Meter

Bottom width of wing wall 0.6 Meter5 Apron

a Length= 10 Meterb Width= H+h+Fb 1.5 + 1.5 + 0.4 3.4 Meter Say 2c Thickness 0.8 Meterc Thickness 0.8 Meter

6 Toe walla Length= 10 Meterb Width= 0.3 Meterc Height= 0.2 Meter

Page 63: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

C= Coefficient of runoff 0.3I= Intensity of rain fall in cm/hr. 6A= Catchment Area in Ha. 950L=Maxmium length of travel by runoff water in m. 11000H= Difference in elevation between most remote 15H= Difference in elevation between most remote 15 point and and outlet point in meterh= Head over the crest in mtr. 1.97 1.5Df= Fetch length in meter 450Fb =Free board 0.45 0.4Top width Tw= 1.32 1.2Height of cerst 1.5Bottom Width of Head wall Bw 2.4 2.7Lenth of Head wall extension= 4.00 4Length of side wall= 4.20 4Bottom Width of Side wall 1.8 1.2

1.5Length of wing wall 3.38 1.5

Page 64: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

:-:-

FREE BODY DIAGRAM

a= 1.2b= 2.70H= 1.5h= 1.5

a

Name of VillageName of Site

Dabla

IWMP XVII WATERSHED PROJECT Village - Dabla

Tehsil - Banera, District - Bhilwara, State: Rajasthan, India

0

H

bb/3 2b/3

cw(H+H)

Specific Wt. Of masonary P = 2.3 T/m3

W(H+h)

X

W1 W2

U

fa

H/3

fbH/3

Specific Wt. Of masonary P = 2.3 T/m3

Specific Wt. of water w = 1 T/m3

Cofficient of uplift pressure c = 0.6cofficient of friction atbed surface and creep length = 0.75Weight of Dam-: =Weight of Dam-:

W1= aHPW1= T 4.14 T

b-a 2.5875 T2

W= W1+W2= 4.14 + 2.5875 = 6.7275 TWater pressure

At Depth h= P1 = wh = 1 X 1.5 = 1.5 T/m2

At Depth H+h= P2 = w(H+h) =1( 1.50 + 1.5 ) = 3.0 T/m2

Force aching due to water pressure I.e. Net horizontal

Water force P1+ P2 2 = 3.375 T/m2

Horizontal water pressure at depth h =Fa= wHh= = 2.25 TAt depth H+h = Fb= P2-P1 = 1.125 T

2Force due to water column at crest F3 = wha= = 1.8 T

H

HP=W2=

H=P=

Page 65: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

:-:-

1 Safety against over turningOver turning moment Mo = H H 2

2 3 31.5 1.5 22 3 3

Mo= 6.624

Name of VillageName of Site

Dabla0

STABILITY CHECKS

IWMP XVII WATERSHED PROJECT Village -Dabla

Tehsil - Banera , District - Bhilwara, State: Rajasthan, India

2.702.25 1.125+

bFa + Fb + u

+ 2.43

Mo= 6.624Restoring Moment Mr = W1 (b-a/2) + W2 (b-a)2/3 + F3 (b-a/2)

Mr=Mr= 8.694 + 2.588 + 3.780 = 15.1

Mr 15.062Mo 6.624

Structure is safe against over turning

2 Safety against Rupture from tension

Net Vertical Pressure V = W1+W2+F3-U4.14 + 2.5875 + 1.8 - 2.43 = 6.098

Position of resultant where it cut the baseExcess moment(Mr-Mo) 15.06 - 6.624

6.098

TRUE

3 Safety against crusing

Eccentricity e = b/2-X-0.034

Crusting stress at the toe of theHead wallPc= V (1+_6e/b)

Factor of safety = 2.274 >1.5 Hence

1.38X= Net vertical force = =

Pc= V (1+_6e/b)b

Pc= 2.0888889Pc<<20 Hence it is safe

4 Safety against sliding

Net vertical Force V= 6.0975 TRestorin force = uV = 0.78 X 6.0975 (u=0.65 to 0.75)

4.7621475 TSliding force Net horizontal force= Fa+Fb

2.25 + 1.125 = 3.375 TFactor of safety = Restoring force 4.762

Sliding force 3.375

Hence it is safe

= = 1.411 >1.3 Hence

Page 66: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

IWMP XVII WATERSHED PROJECT Village - Dabla

Tehsil - Banera, District - Bhilwara, State: Rajasthan, India

PLAN AND SECTION OF ANICUT

:-:-

Ac

4 10.0 4

H.W.Ext.H.W. 1.2

1.2c

S.W.0.6

B 4.0 B

Name of Site

1.50

0.6

0Name of Village Dabla

APRON 2

1.5T.W. 0.3

W.W .

W.W

PLAN1.5A

PLAN

Page 67: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

Tehsil - Banera, District - Bhilwara, State: Rajasthan, IndiaVillage - Dabla

IWMP XVII WATERSHED PROJECT

1.9

1.2

1.5

1.9

0.152.7

2

BED LEVEL

20.3

SECTION ON A-A'

0.6

3.4

B.L.1.2

2

1.2

2

C-C' SECTION ON H.W.Ext.B-B' SECTION OF S.W.

Page 68: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

:-:-:-:-:-

Latitude :-Longitude :-

:-:- 3.96 Lack

=1 Catch ment Area = 950 Ha.2 Maxmium Rain fall intencity = 6 cm./hr.3 General nature of catchment Area

a. Agricultural land = 550b. Pasture Land = 400 Ha.

4 Height of crest above G.L. = 1.5 M.5 Flood lift = 1.56 Free board = 0.47 Top width of Head wall = 1.28 Bottom width of Head wall = 2.709 Width of concrete Bed = 2.7010 Length of crest = 10 M.11 Percentage slope of land = 0.0212 No. of well benifited = 013 Cost of Project = 396000.00

a. Labour component = 182000.00b. Material component = 214000.00c. Contingency = 11520

Rates are as per BSR (GKN) 2012, Bhilwara

IWMP XVII WATERSHED PROJECT

Name of Site

Macro/Micro No.

GPS position

Name of samiti

Village - DablaTehsil - Banera, District - Bhilwara, State: Rajasthan, India

Basic Data of Project

Type of Structure

Cost of Anicut

DablaR.R.Stone masonary structure

Panchayat Samity Banera

Estimate of AnicutName of Gram Panchayat Dabla

Page 69: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

Catch ment Area 950 Ha.Maxmium Rain fall intencity 6 Cm/hrGeneral nature of catchment AreaAgricultural land 550Pasture Land 400Height of crest above G.L. 1.5Length of crest 10Percentage slope of land 0.02No. of well benifitedNo of farmer benifitedS.C.S.T.OthersTotal 0Area to be benifitedS.C. 0S.T. 0Others 0Total 0Circle Bhilwara

Page 70: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

:-:-

A.I Available crest length 10 Mii Total catchment Area 950 Ha. As per G.T.Sheetiii Peak Runoff Ratea By Rational Method Use when catchment is <1300Ha.

Qp = 0.0276 CIA Q=Run off in m3/sec.C= Coefficient of runoff 0.3

K = L3/2/H1/2 I= Intensity of rain fall in cm/hr. 6K = 297881.41 A= Catchment Area in Ha. 950

Tc = 0.0195K0.77 L=Maxmium length of travel by runoff water in m. 11000Tc = 319.92 H= Difference in elevation between most remote 15

Name of SiteDabla0

Name of Village

IWMP XVII WATERSHED PROJECT Village - Dabla

Tehsil - Banera, District - Bhilwara, State: Rajasthan, India

Design calculation of anicut

Tc = 319.92 H= Difference in elevation between most remote 15 point and and outlet point in meter

Qp= 0.0276 0.30 X 6 X 950Qp = 47.20

b By weir formula

Q = 1.71Lh3/2

47.20 = 1.71 10 h3/2

h 1.97Say h= 1.5

3 Free Board hw= Wave height in meter

Fb= 1.5hw Df= Fetch length in meter 450 Meter.1.5X0.014(Df)

1/2

Fb= 0.45Say Fb= 0.4

B. STRUCTURAL DESGIN1 Head walla Height of Head wall H= 1.5b Top width( Tw) = h P= Sp.ht. Of masonary 2.3b Top width( Tw) = h P= Sp.ht. Of masonary 2.3

(P-1)1/2

Tw= 1.32Top width= 1.2

C. Bottom width Bw Tw+0.8H2.40

So Bottom Width= 2.70 Meter2 Head wall extension

a Length= H+h+1+Fb1.5 + 1.5 + 1 + = 4.00 Meter

= 4b Height of Head Extensionwall = H+h+Fb

1.5 + 1.5 + 0.4 = 3.4 Meterc Top width 0.6 Meterd Bottom Width= 0.5(H+h) = 0.5( 1.5 + 1.5 )= 1.50 Meter

contd..

Bw=

But as per site condition

Page 71: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

3 Side walla Length= 1.75H+0.75h+0.45 = 4.2

But as per site condition= 4.0 Meterb Height:

At H.W.End= H+h+Fb 1.5 + 1.5 + 0.4 = 3.4 MeterAt W.W.End= h+fb = 1.5 + 0.4 = 1.9 Meter

c Top width= 0.6 Meterd Bottom width=

At H.W.End= 0.6+0.4(H+h) 1.8 MeterAt W.W.End= 0.6+0.4(1.5h) 1.5 Meter

But taken as= 1.2 Meter4 Wing wall

a Height h+Fb 1.5 + 0.4 = 1.9 Meterb Length= 2.25h 2.25 X 1.5 = 3.38 Meter Say 1.5c Top width 0.6 Meter

Bottom width of wing wall 0.6 Meter5 Apron

a Length= 10 Meterb Width= H+h+Fb 1.5 + 1.5 + 0.4 3.4 Meter Say 2c Thickness 0.8 Meterc Thickness 0.8 Meter

6 Toe walla Length= 10 Meterb Width= 0.3 Meterc Height= 0.2 Meter

Page 72: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

C= Coefficient of runoff 0.3I= Intensity of rain fall in cm/hr. 6A= Catchment Area in Ha. 950L=Maxmium length of travel by runoff water in m. 11000H= Difference in elevation between most remote 15H= Difference in elevation between most remote 15 point and and outlet point in meterh= Head over the crest in mtr. 1.97 1.5Df= Fetch length in meter 450Fb =Free board 0.45 0.4Top width Tw= 1.32 1.2Height of cerst 1.5Bottom Width of Head wall Bw 2.4 2.7Lenth of Head wall extension= 4.00 4Length of side wall= 4.20 4Bottom Width of Side wall 1.8 1.2

1.5Length of wing wall 3.38 1.5

Page 73: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

:-:-

FREE BODY DIAGRAM

a= 1.2b= 2.70H= 1.5h= 1.5

a

Name of VillageName of Site

Dabla

IWMP XVII WATERSHED PROJECT Village - Dabla

Tehsil - Banera, District - Bhilwara, State: Rajasthan, India

0

H

bb/3 2b/3

cw(H+H)

Specific Wt. Of masonary P = 2.3 T/m3

W(H+h)

X

W1 W2

U

fa

H/3

fbH/3

Specific Wt. Of masonary P = 2.3 T/m3

Specific Wt. of water w = 1 T/m3

Cofficient of uplift pressure c = 0.6cofficient of friction atbed surface and creep length = 0.75Weight of Dam-: =Weight of Dam-:

W1= aHPW1= T 4.14 T

b-a 2.5875 T2

W= W1+W2= 4.14 + 2.5875 = 6.7275 TWater pressure

At Depth h= P1 = wh = 1 X 1.5 = 1.5 T/m2

At Depth H+h= P2 = w(H+h) =1( 1.50 + 1.5 ) = 3.0 T/m2

Force aching due to water pressure I.e. Net horizontal

Water force P1+ P2 2 = 3.375 T/m2

Horizontal water pressure at depth h =Fa= wHh= = 2.25 TAt depth H+h = Fb= P2-P1 = 1.125 T

2Force due to water column at crest F3 = wha= = 1.8 T

H

HP=W2=

H=P=

Page 74: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

:-:-

1 Safety against over turningOver turning moment Mo = H H 2

2 3 31.5 1.5 22 3 3

Mo= 6.624

Name of VillageName of Site

Dabla0

STABILITY CHECKS

IWMP XVII WATERSHED PROJECT Village -Dabla

Tehsil - Banera , District - Bhilwara, State: Rajasthan, India

2.702.25 1.125+

bFa + Fb + u

+ 2.43

Mo= 6.624Restoring Moment Mr = W1 (b-a/2) + W2 (b-a)2/3 + F3 (b-a/2)

Mr=Mr= 8.694 + 2.588 + 3.780 = 15.1

Mr 15.062Mo 6.624

Structure is safe against over turning

2 Safety against Rupture from tension

Net Vertical Pressure V = W1+W2+F3-U4.14 + 2.5875 + 1.8 - 2.43 = 6.098

Position of resultant where it cut the baseExcess moment(Mr-Mo) 15.06 - 6.624

6.098

TRUE

3 Safety against crusing

Eccentricity e = b/2-X-0.034

Crusting stress at the toe of theHead wallPc= V (1+_6e/b)

Factor of safety = 2.274 >1.5 Hence

1.38X= Net vertical force = =

Pc= V (1+_6e/b)b

Pc= 2.0888889Pc<<20 Hence it is safe

4 Safety against sliding

Net vertical Force V= 6.0975 TRestorin force = uV = 0.78 X 6.0975 (u=0.65 to 0.75)

4.7621475 TSliding force Net horizontal force= Fa+Fb

2.25 + 1.125 = 3.375 TFactor of safety = Restoring force 4.762

Sliding force 3.375

Hence it is safe

= = 1.411 >1.3 Hence

Page 75: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

IWMP XVII WATERSHED PROJECT Village - Dabla

Tehsil - Banera, District - Bhilwara, State: Rajasthan, India

PLAN AND SECTION OF ANICUT

:-:-

Ac

4 10.0 4

H.W.Ext.H.W. 1.2

1.2c

S.W.0.6

B 4.0 B

Name of Site

1.50

0.6

0Name of Village Dabla

APRON 2

1.5T.W. 0.3

W.W .

W.W

PLAN1.5A

PLAN

Page 76: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

Tehsil - Banera, District - Bhilwara, State: Rajasthan, IndiaVillage - Dabla

IWMP XVII WATERSHED PROJECT

1.9

1.2

1.5

1.9

0.152.7

2

BED LEVEL

20.3

SECTION ON A-A'

0.6

3.4

B.L.1.2

2

1.2

2

C-C' SECTION ON H.W.Ext.B-B' SECTION OF S.W.

Page 77: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

:-:-

General features of anicut-:Height of crest= 1.5 M.Length of Crest 10 M.Depth of foundation for H.W. = 2.0 M. 1.5 M.Bottom width of H.W. = 2.7 M. 1.9 M.

1.2 M. Bottom width of Wing wall= 0.9 M.Length of H.W.Ext = 4.0 M. Depth of foundation for Wing wall = 1.0 M.Height of H.W.Ext. at H.W. = 3.4 M. 0.15 M.Top Width of H.W.Ext.= 0.6 M. Top & Bottom width of Toe wall= 0.30 M.Bottom width for H.W.Ext. 1.5 M. Depth of foundation for Toe wall = 0.9 M.Depth of foundation for H.W.Ext.= 1.5 M. 0.8 M.Length of side wall= 4.0 M. 2.0 M.Bottom Width of S.W. 1.20 M.Height of side wall at W.W.End= 1.9 M.Depth of foundation for side wall = 2.0 M.

S.No. No L B H1

2 Total

30 X 7.0 = 210 Sqm.

3

1 30 2 0.3 18

Total 18 Cum.

4

2 30 5 2 600 Cum.5

Total

Berm Cutting 0.00 Cum.H.W. 1 X 10 X 2.9 X 2.0 = 58.00H.W.Ext 2 X 4.0 X 1.5 X 1.5 = 18.00 Cum.S.W. 2 X 4.0 X 1.20 X 2.0 = 19.20 Cum.W.W. 2 X 1.5 X 0.9 X 0.90 = 2.43 Cum.Apron 1 X 10 X 2.0 X 0.75 = 15.00 Cum.T.W. 1 X 10 X 0.30 X 0.9 = 2.70 Cum.

Total 115.331 40% 46.132 30% 34.60

3 30% 34.60

Width of Apron =

Dag belling 5cm. To 7.5cm deep ( As per item no.156page 15 of G.K.N.2012 BSR of Bhilwara circle

contd..

Top of H.W =Height of Wing wall=Length of wing wall=

Cutting and clearing of ordinary jungle includling bushesshrubs and disposal as per instructrion of engineerincharge (As per item no.95 page 10 of G.K.N.2012BSR of Bhilwara circle

Quantity

Earth work excavation for foundation in dry or moist soilincluding ramming of bottom scrapping of sides dipodalof soil intial lift up to 1.5 m and lead up to 30M( As peritem no.2 page 1 of G.K.N.2012 BSR of Bhilwara circle

Excavation in Hard soil (2B)Excavation in ordinary murram (189C)Excavation in Simple rock (2C)

IWMP XVII WATERSHED PROJECT Village - Dabla

Item

Benching of the base and depositing the excavatedmaterial for bund for bund canal dressing etc. allcomponents (As per item no.200B page 18 ofG.K.N.2012 BSR of Bhilwara circle

Earth work excavation for bund in hard dry or moist soilincluding laying in layer of 15cm. Breaking of clodsdressing to require profile with manual compactionincluding intial lift up to 1.5 m and lead up to 30M. ( Asper item no.188B page 17 of G.K.N.2012 BSR ofBhilwara circle

Height of Toewall=

Thickness of Apron=

Tehsil - Banera, District - Bhilwara, State: Rajasthan, India

Name of VillageName of Site

Dabla0

DETAILED ESTIMATE OF ANICUT

Page 78: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

page 15 of G.K.N.2012 BSR of Bhilwara circle

6

H.W. 1 X 10.0 X 2.9 X 0.3 = 8.70 Cum.H.W.Ext 2 X 4 X 1.5 X 0.3 = 3.60 Cum.S.W. 2 X 4 X 1.20 X 0.3 = 2.88 Cum.W.W. 2 X 1.5 X 0.9 X 0.3 = 0.81 Cum.Apron 1 X 10.0 X 2.0 X 0.3 = 6.00 Cum.T.W. 1 X 10.0 X 0.30 X 0.3 = 0.90 Cum.

Total 22.897

H.W. 1 X 10.0 X 2.7 X 1.7 = 45.90 Cum.H.W.Ext 2 X 4.0 X 1.5 X 1.2 = 14.40 Cum.

S.W. 2 X 4.0 X 1.20 X 1.7 = 16.32 Cum.

W.W. 2 X 1.5 X 0.9 X 0.6 = 1.62 Cum.

T.W. 1 X 10.0 X 0.15 X 0.6 = 0.90 Cum.

Total 79.14 Cum.8

H.W. 1 X 10.0 X 1.95 X 1.5 = 29.25 Cum.H.W.Ext 2 X 4.0 X 1.05 X 3.4 = 28.56 Cum.S.W. 2 X 4.0 X 0.9 X 2.65 = 19.08 Cum.W.W. 2 X 1.5 X 0.9 X 1.9 = 5.13 Cum.

T.W. 1 X 10.0 X 0.30 X 0.15 = 0.45 Cum.

Total 82.47 Cum.9

Apron 1 X 10.0 X 2.0 X 0.45 9.00 Cum.Total 9.00 Cum.

10

H.W. 1 X 10.0 X 1.2 X 0.05 = 0.60 Cum.H.W.Ext 2 X 4.0 X 0.6 X 0.05 = 0.24 Cum.S.W. 2 X 4.0 X 0.6 X 0.05 = 0.24 Cum.W.W. 2 X 1.5 X 0.9 X 0.05 = 0.14 Cum.T.W. 1 X 10.0 X 0.30 X 0.05 = 0.15 Cum.

Total 1.37 Cum.11

H.W. 1 X 10.0 X 2.12 = 21.21 Sqm.Total 21.21 Sqm.

12

H.W. 1 X 10.0 X 5.2 = 52.00H.W.Ext. 2 X 4.0 X 4.0 = 32.00S.S 2 X 4.0 X 4.0 = 32.00W.W. 2 X 1.5 X 2.5 = 7.50T.W. 2 X 10.0 X 0.2 = 3.00

Total = 126.50

131 20 2 40.00

Sqm

Stone Kharanja in cement mortar 1:6 for bed and floorincluding cpaction etc. complete apron( As per itemno.190 page 17 of G.K.N.2012 BSR of Bhilwara circle

Random rubble stone masonary for Super structure for wall above 30 cm. Thick in cement sand mortar(1:6)( As per item no.190A page 17 of G.K.N.2012 BSR of Bhilwara circle

Providing and laying of cement concrete well mixed incement mortar 1:2:4 laying in position completeexcluding curing with maxmium size of aggregate up to20 mm.etc. complete ( As per item no.194 page 17 ofG.K.N.2012 BSR of Bhilwara circle

Dry stone pitching of Hammer dressed witch packing ofvoids of small stone including all lifts in require profile(23 cm depth) ( As per item no.198 page 18 ofG.K.N.2012 BSR of Bhilwara circle

25 m.m thick plastering on new surface in cement mortar(1:4)( As per item no.70A page 8 of G.K.N.2012 BSR ofBhilwara circle

Flush pointing in cement motar (1:3)( As per item no.74Apage 8 of G.K.N.2012 BSR of Bhilwara circle

Providing and laying of cement concrete well mixed incement mortar 1:4:8 laying in position completeexcluding curing with maxmium size of aggregate up to50 mm. ( As per item no.191 page 17 of G.K.N.2012BSR of Bhilwara circle

Random rubble stone masonary for foundation & plinth cement sand mortar(1:6) for above 30 cm. Thick wall( As per item no.190A page 17 of G.K.N.2012 BSR of Bhilwara circle

Page 79: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

:-:-

Quatity UnitLabour [LC+MC]Total

1 Labour cost Total Cost

0.00 Cum. 1.00 1.00 0.00 0

2

210 Sqm. 1.36 1.36 285.60 285.63

18 Cum. 85.00 85.00 1530.00 15304

600 Cum. 85.00 85.00 51000.00 510005

115.33 Cum. 0

46.13 Cum. 91.00 91.00 4198.01 4198.01

34.60 Cum. 99.00 99.00 3425.30 3425.3034.60 Cum. 134.00 134.00 4636.27 4636.266

6

22.89 Cum. 320 1705.00 7324.80 39027.45

779.14 Cum. 357 1265.00 28252.98 100112.1

8

82.47 Cum. 357 1265.00 29441.79 104324.559

9.00 Cum. 357 1265.00 3213.00 1138510

Abstract of Cost of Anicut

Name of VillageName of Site

Dabla0

Rate Amount

Cutting and clearing of ordinary jungleincludling bushes shrubs and disposal as perinstructrion of engineer incharge (As per itemno.95 page 10 of G.K.N.2012 BSR of Bhilwaracircle

Stone Kharanja in cement mortar 1:6 for bedand floor including cpaction etc. completeapron( As per item no.190 page 17 ofG.K.N.2012 BSR of Bhilwara circle

Benching of the base and depositing theexcavated material for bund for bund canaldressing etc. all components (As per itemno.200B page 18 of G.K.N.2012 BSR ofBhilwara circle

Earth work excavation for bund in hard dry ormoist soil including laying in layer of 15cm.Breaking of clods dressing to require profilewith manual compaction including intial lift upto 1.5 m and lead up to 30M. ( As per itemno.188B page 17 of G.K.N.2012 BSR ofBhilwara circle

Excavation in Simple rock (2C)

Providing and laying of cement concrete wellmixed in cement mortar 1:4:8 laying in positioncomplete excluding curing with maxmium sizeof aggregate up to 50 mm. ( As per itemno.191 page 17 of G.K.N.2012 BSR ofBhilwara circle

Random rubble stone masonary for foundation& plinth cement sand mortar(1:6) for above 30cm. Thick wall( As per item no.190A page 17of G.K.N.2012 BSR of Bhilwara circle

Random rubble stone masonary for Superstructure for wall above 30 cm. Thick in cementsand mortar(1:6)( As per item no.190A page17 of G.K.N.2012 BSR of Bhilwara circle

S.No.Item

IWMP XVII WATERSHED PROJECT Village - Dabla

Tehsil - Banera, District - Bhilwara, State: Rajasthan, India

Dag belling 5cm. To 7.5cm deep ( As per itemno.156 page 15 of G.K.N.2012 BSR ofBhilwara circle

Providing and laying of cement concrete wellmixed in cement mortar 1:2:4 laying in positioncomplete excluding curing with maxmium sizeof aggregate up to 20 mm.etc. complete ( As per item no.194 page 17 of

Earth work excavation for foundation in dry ormoist soil including ramming of bottomscrapping of sides dipodal of soil intial lift up to1.5 m and lead up to 30M( As per item no.2page 1 of G.K.N.2012 BSR of Bhilwara circle

Excavation in Hard soil (2B)

Excavation in ordinary murram (189C)

Page 80: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

1.37 Cum. 316 2638.00 431.34 3600.87

11 21.21 Sqm. 40.1 49.10 850.65 1041.5683

12126.50 Sqm. 68.9 138.00 8715.85 17457

13

40.00 Sqm. 105.5 203.00 4220.00 8120Total 147525.588 350143.72

33871.8751 33871.875181397.464 384015.59

Say Rs 181397 384016Contingency 3% 11520

TOTAL 181397 395536Total Cost rounded of 396000

Labour cost 182000Meterial cost 214000

Flush pointing in cement motar (1:3)( As per item no.74A page 8 of G.K.N.2012 BSR of Bhilwara circle

Je Hkkx esa 22.96 % etnwjh esa of̀) ds dkj.k vfrfjDr tksMuk

etc. complete ( As per item no.194 page 17 ofG.K.N.2012 BSR of Bhilwara circle

25 m.m thick plastering on new surface incement mortar (1:4)( As per item no.70A page8 of G.K.N.2012 BSR of Bhilwara circle

Dry stone pitching of Hammer dressed witchpacking of voids of small stone including all liftsin require profile (23 cm depth) ( As per itemno.198 page 18 of G.K.N.2012 BSR ofBhilwara circle

Page 81: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

Quantity Cement Sand Aggrigate StoneCum / Sqm Begs Cum Cum Cum

1 Cement Concrete (1:4:8) 22.890 73.25 10.76 21.52 _2 Plaster in C.C. (1:4) 126.500 21.51 4.05 _ _3 Massonary in Cement mortar (1:6) 161.610 226.25 69.17 _ 177.774 Pointing in Cement 21.213 0.87 0.09 _ _5 Stone Kharanja in cement mortar (1:6) 9.000 12.6 3.375 _ 10.86 Cement concrete coping(1:2:4) 1.37 7.97 0.61 1.237 Dry Stone Pitching 40.000 _ _ _ 44.00

TOTAL 342.45 88.05 22.75 232.57 Say Bags 343

or 17.15 MT.

1 Cement 17.15 MT.2 Sand 88.05 Cum.3 Stones 232.57 Cum.4 Aggregates 22.75 Cum.

Material Statement

ITEMS.No.

IWMP XVII WATERSHED PROJECT Village - Dabla

Tehsil - Banera, District - Bhilwara, State: Rajasthan, India

Name of Village :-Name of Site :-

Dabla0

Page 82: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

:-:-:-:-:-

Latitude :-Longitude :-

:-:- 3.62 Lack

=1 Catch ment Area = 550 Ha.2 Maxmium Rain fall intencity = 6 cm./hr.3 General nature of catchment Area

a. Agricultural land = 350b. Pasture Land = 200 Ha.

4 Height of crest above G.L. = 1.5 M.5 Flood lift = 1.56 Free board = 0.47 Top width of Head wall = 1.28 Bottom width of Head wall = 2.709 Width of concrete Bed = 2.7010 Length of crest = 8 M.11 Percentage slope of land = 0.0212 No. of well benifited = 013 Cost of Project = 362000.00

a. Labour component = 170000.00b. Material component = 192000.00c. Contingency = 10533

Rates are as per BSR (GKN) 2012, Bhilwara

IWMP XVII WATERSHED PROJECT

Name of Site

Macro/Micro No.

GPS position

Name of samiti

Village - KasoriyaTehsil - Banera, District - Bhilwara, State: Rajasthan, India

Basic Data of Project

Type of Structure

Cost of Anicut

KasoriyaR.R.Stone masonary structure

Panchayat Samity Banera

Estimate of AnicutName of Gram Panchayat Kasoriya

Page 83: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

Catch ment Area 550 Ha.Maxmium Rain fall intencity 6 Cm/hrGeneral nature of catchment AreaAgricultural land 350Pasture Land 200Height of crest above G.L. 1.5Length of crest 8Percentage slope of land 0.02No. of well benifitedNo of farmer benifitedS.C.S.T.OthersTotal 0Area to be benifitedS.C. 0S.T. 0Others 0Total 0Circle Bhilwara

Page 84: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

:-:-

A.I Available crest length 8 Mii Total catchment Area 550 Ha. As per G.T.Sheetiii Peak Runoff Ratea By Rational Method Use when catchment is <1300Ha.

Qp = 0.0276 CIA Q=Run off in m3/sec.C= Coefficient of runoff 0.3

K = L3/2/H1/2 I= Intensity of rain fall in cm/hr. 6K = 29047.38 A= Catchment Area in Ha. 550

Tc = 0.0195K0.77 L=Maxmium length of travel by runoff water in m. 1500Tc = 53.29 H= Difference in elevation between most remote 4

Design calculation of anicut

Name of SiteKasoriya0

Name of Village

IWMP XVII WATERSHED PROJECT Village - Kasoriya

Tehsil - Banera, District - Bhilwara, State: Rajasthan, India

Tc = 53.29 H= Difference in elevation between most remote 4 point and and outlet point in meter

Qp= 0.0276 0.30 X 6 X 550Qp = 27.32

b By weir formula

Q = 1.71Lh3/2

27.32 = 1.71 8 h3/2

h 1.59Say h= 1.5

3 Free Board hw= Wave height in meter

Fb= 1.5hw Df= Fetch length in meter 350 Meter.1.5X0.014(Df)

1/2

Fb= 0.39Say Fb= 0.4

B. STRUCTURAL DESGIN1 Head walla Height of Head wall H= 1.5b Top width( Tw) = h P= Sp.ht. Of masonary 2.3b Top width( Tw) = h P= Sp.ht. Of masonary 2.3

(P-1)1/2

Tw= 1.32Top width= 1.2

C. Bottom width Bw Tw+0.8H2.40

So Bottom Width= 2.70 Meter2 Head wall extension

a Length= H+h+1+Fb1.5 + 1.5 + 1 + = 4.00 Meter

= 4b Height of Head Extensionwall = H+h+Fb

1.5 + 1.5 + 0.4 = 3.4 Meterc Top width 0.6 Meterd Bottom Width= 0.5(H+h) = 0.5( 1.5 + 1.5 )= 1.50 Meter

Bw=

But as per site condition

contd..

Page 85: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

3 Side walla Length= 1.75H+0.75h+0.45 = 4.2

But as per site condition= 4.0 Meterb Height:

At H.W.End= H+h+Fb 1.5 + 1.5 + 0.4 = 3.4 MeterAt W.W.End= h+fb = 1.5 + 0.4 = 1.9 Meter

c Top width= 0.6 Meterd Bottom width=

At H.W.End= 0.6+0.4(H+h) 1.8 MeterAt W.W.End= 0.6+0.4(1.5h) 1.5 Meter

But taken as= 1.2 Meter4 Wing wall

a Height h+Fb 1.5 + 0.4 = 1.9 Meterb Length= 2.25h 2.25 X 1.5 = 3.38 Meter Say 1.5c Top width 0.6 Meter

Bottom width of wing wall 0.6 Meter5 Apron

a Length= 8 Meterb Width= H+h+Fb 1.5 + 1.5 + 0.4 3.4 Meter Say 2c Thickness 0.8 Meterc Thickness 0.8 Meter

6 Toe walla Length= 8 Meterb Width= 0.3 Meterc Height= 0.2 Meter

Page 86: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

C= Coefficient of runoff 0.3I= Intensity of rain fall in cm/hr. 6A= Catchment Area in Ha. 550L=Maxmium length of travel by runoff water in m. 1500H= Difference in elevation between most remote 4H= Difference in elevation between most remote 4 point and and outlet point in meterh= Head over the crest in mtr. 1.59 1.5Df= Fetch length in meter 350Fb =Free board 0.39 0.4Top width Tw= 1.32 1.2Height of cerst 1.5Bottom Width of Head wall Bw 2.4 2.7Lenth of Head wall extension= 4.00 4Length of side wall= 4.20 4Bottom Width of Side wall 1.8 1.2

1.5Length of wing wall 3.38 1.5

Page 87: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

:-:-

FREE BODY DIAGRAM

a= 1.2b= 2.70H= 1.5h= 1.5

a

Name of VillageName of Site

Kasoriya

IWMP XVII WATERSHED PROJECT Village - Kasoriya

Tehsil - Banera, District - Bhilwara, State: Rajasthan, India

0

H

bb/3 2b/3

cw(H+H)

Specific Wt. Of masonary P = 2.3 T/m3

W(H+h)

X

W1 W2

U

fa

H/3

fbH/3

Specific Wt. Of masonary P = 2.3 T/m3

Specific Wt. of water w = 1 T/m3

Cofficient of uplift pressure c = 0.6cofficient of friction atbed surface and creep length = 0.75Weight of Dam-: =Weight of Dam-:

W1= aHPW1= T 4.14 T

b-a 2.5875 T2

W= W1+W2= 4.14 + 2.5875 = 6.7275 TWater pressure

At Depth h= P1 = wh = 1 X 1.5 = 1.5 T/m2

At Depth H+h= P2 = w(H+h) =1( 1.50 + 1.5 ) = 3.0 T/m2

Force aching due to water pressure I.e. Net horizontal

Water force P1+ P2 2 = 3.375 T/m2

Horizontal water pressure at depth h =Fa= wHh= = 2.25 TAt depth H+h = Fb= P2-P1 = 1.125 T

2Force due to water column at crest F3 = wha= = 1.8 T

H

HP=W2=

H=P=

Page 88: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

:-:-

1 Safety against over turningOver turning moment Mo = H H 2

2 3 31.5 1.5 22 3 3

Mo= 6.624

Name of VillageName of Site

Kasoriya0

STABILITY CHECKS

IWMP XVII WATERSHED PROJECT Village -Kasoriya

Tehsil - Banera , District - Bhilwara, State: Rajasthan, India

2.702.25 1.125+

bFa + Fb + u

+ 2.43

Mo= 6.624Restoring Moment Mr = W1 (b-a/2) + W2 (b-a)2/3 + F3 (b-a/2)

Mr=Mr= 8.694 + 2.588 + 3.780 = 15.1

Mr 15.062Mo 6.624

Structure is safe against over turning

2 Safety against Rupture from tension

Net Vertical Pressure V = W1+W2+F3-U4.14 + 2.5875 + 1.8 - 2.43 = 6.098

Position of resultant where it cut the baseExcess moment(Mr-Mo) 15.06 - 6.624

6.098

TRUE

3 Safety against crusing

Eccentricity e = b/2-X-0.034

Crusting stress at the toe of theHead wallPc= V (1+_6e/b)

Factor of safety = 2.274 >1.5 Hence

1.38X= Net vertical force = =

Pc= V (1+_6e/b)b

Pc= 2.0888889Pc<<20 Hence it is safe

4 Safety against sliding

Net vertical Force V= 6.0975 TRestorin force = uV = 0.78 X 6.0975 (u=0.65 to 0.75)

4.7621475 TSliding force Net horizontal force= Fa+Fb

2.25 + 1.125 = 3.375 TFactor of safety = Restoring force 4.762

Sliding force 3.375

Hence it is safe

= = 1.411 >1.3 Hence

Page 89: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

PLAN AND SECTION OF ANICUT

IWMP XVII WATERSHED PROJECT Village - Kasoriya

Tehsil - Banera, District - Bhilwara, State: Rajasthan, India

:-:-

Ac

4 8.0 4

H.W.Ext.H.W. 1.2

1.2c

S.W.0.6

B 4.0 B

KasoriyaName of Site

1.50

0.6

0Name of Village

APRON 2

1.5T.W. 0.3

W.W .

W.W

PLAN1.5A

PLAN

Page 90: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

IWMP XVII WATERSHED PROJECT

Tehsil - Banera, District - Bhilwara, State: Rajasthan, IndiaVillage - Kasoriya

1.9

1.2

1.5

1.9

0.152.7

2

BED LEVEL

20.3

SECTION ON A-A'

0.6

3.4

B.L.1.2

2

1.2

2

C-C' SECTION ON H.W.Ext.B-B' SECTION OF S.W.

Page 91: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

1 Name of w/s :- P.S Banera DISTT. BHILWARA ( RAJ.)

2 Name of work :- CONTRUCTION OF MASONARY WALL No-6 AT-Branch No-3 Name of Village:- 1 Available crest length 8 M2 Hight of structure 0.60 M3 Top Width 0.75 M4 Bottom Width 1.23 M5 Depth of foundation taking as 1.20 M6 Width of Basin 1.50 M7 Depth of Basin 0.6 M8 Head wall Extension 2 M

S.No. PARTICULAR No. LENGTH WIDTH HT/DEPTH

Qty Rate Total Amount

Labour Rate

L.Amount

1 Excavation in hard soildry or most&disposal ofexcavated material withinintial lead of 30 m and

CONTRUCTION OF MASONARY WALL IWMP-XVII

Kasoriya

DETAILED ESTIMATE

intial lead of 30 m andliftof 1.5m includingdressing etc complete(As per item no.2B page1 of G.K.N.2012 BSR ofBhilwara circle H.W. 1 8.00 1.23 1.20 11.81H.W.E 2 2.00 0.60 1.20 2.88Apron 1 8.00 1.50 0.60 7.20

Total (cu.m) 21.89Total Excavation Total 21.89 91.00 1991.81 91.00 1991.81

2 cement concrete wellmixed in cementmortar(1:4:8) laid inposition completeincluding curingAggregate size upto40mm. (As per itemno.191 page 17 ofG.K.N.2012 BSR ofBhilwara circle H.W 1 8.00 1.23 0.30 2.95H.W.E 2 2.00 0.60 0.30 0.72Apron 1 8.00 1.50 0.20 2.40

Total 6.07 1705 10352.76 320.00 1943.04Total 6.07 1705 10352.76 320.00 1943.043

Random rubble stonemasonary in cement sandmortar(1:8) for foundation(As per item no.190Bpage 17 of G.K.N.2012BSR of Bhilwara circle

H.W. 1 8.00 1.23 0.90 8.86H.W.E 2 2.00 0.60 0.90 2.16Apron 1 8.00 1.50 0.30 3.60

Total 14.62 1180 17246.88 357.00 5217.914 Random rubble stone

masonary in cement sandmortar(1:6) for supperstructure (As per itemno.190A page 17 ofG.K.N.2012 BSR ofBhilwara circleH.W. 1 8.00 0.99 0.60 4.75H.W.E 2 2.00 0.60 0.60 1.44

Total 6.19 1265 7832.88 357.00 2210.54

Page 92: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

5Cement plaster includingsmooth finishing incement mortar(1:4)25mm thick (As peritem no.70A page 8 ofG.K.N.2012 BSR ofBhilwara circle

H.W. 2 8.00 0.60 9.60H.W. 1 8.00 0.80 6.40H.W.E 4 2.00 0.60 4.80H.W.E 2 2.00 0.60 2.40Apron 1 0.60 0.30 0.18

Total 23.38 138 3226.44 68.90 1610.88

6Cement concrete copingin cement mortar 1:2:412 mm thick (As per itemno.194 page 17 ofG.K.N.2012 BSR ofBhilwara circle

H.W. 1 8.00 0.75 0.075 0.45H.W.E 2 2.00 0.60 0.08 0.18H.W.E 2 2.00 0.60 0.08 0.18Apron 1 4.00 1.23 0.075 0.37

Total 1.00 2638 2635.36 316.00 315.68GRAND TOTAL 43286.13 13289.87

3051.35 3051.3546337.48 16341.22

METARIAL 29996.26LABOUR 16341.22

TOTAL 46337.48GRAND TOTAL 46337

Add 3% Contingency Charges 1390TOTAL Rs. 47728Say 47800

S.no Particular Qty. Cement Sand Aggregate Stone Bags Cum 50mm 20mm Cum

1 Cement concrete (1:4:8)40 mm 6.07 19.43 2.73 5.46

2 R R stone masonary (1:8)Foundation/ Superstructure (cum) 20.81 29.1 6.24 22.9

3 Cement plaster (1:4) 25

Je Hkkx es 22.96 % etnwjh esa of̀) ds dkj.k vfrfjDr tksMuk

MATERIAL CONSUMPTION STAEMENT

3 Cement plaster (1:4) 25mm thick 23.38 5.24 0.75

4 Raised &cut pointing 5 Stone kharanja in cement

mortar (1:6)6 Cement concrete coping

in cement mortar 1:2:4.50 mm thick 1.00 6.39 0.45 0.90

7 Dry stone pitching TOTAL 60.2 10.17 6.36 22.9

SAY 60 BAGS 3.01 MT0.75

0.60G.L G.L

0.075

0.30 0.601.20

0.200.3 2.00

1.23

2.

1.23

Page 93: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

1 Name of w/s :- P.S Banera DISTT. BHILWARA ( RAJ.)

2 Name of work :- CONTRUCTION OF MASONARY WALL No-5 AT-Branch No-3 Name of Village:- 1 Available crest length 6 M2 Hight of structure 0.80 M3 Top Width 0.75 M4 Bottom Width 1.39 M5 Depth of foundation taking as 1.20 M6 Width of Basin 1.50 M7 Depth of Basin 0.6 M8 Head wall Extension 2 M

S.No. PARTICULAR No. LENGTH WIDTH HT/DEPTH

Qty Rate Total Amount

Labour Rate

L.Amount

1 Excavation in hard soildry or most&disposal ofexcavated material withinintial lead of 30 m and

CONTRUCTION OF MASONARY WALL IWMP-XVII

Kasoriya

DETAILED ESTIMATE

intial lead of 30 m andliftof 1.5m includingdressing etc complete(As per item no.2B page1 of G.K.N.2012 BSR ofBhilwara circle H.W. 1 6.00 1.39 1.20 10.01H.W.E 2 2.00 0.60 1.20 2.88Apron 1 6.00 1.50 0.60 5.40

Total (cu.m) 18.29Total Excavation Total 18.29 91.00 1664.21 91.00 1664.21

2 cement concrete wellmixed in cementmortar(1:4:8) laid inposition completeincluding curingAggregate size upto40mm. (As per itemno.191 page 17 ofG.K.N.2012 BSR ofBhilwara circle H.W 1 6.00 1.39 0.30 2.50H.W.E 2 2.00 0.60 0.30 0.72Apron 1 6.00 1.50 0.20 1.80

Total 5.02 1705 8562.51 320.00 1607.04Total 5.02 1705 8562.51 320.00 1607.043

Random rubble stonemasonary in cement sandmortar(1:8) for foundation(As per item no.190Bpage 17 of G.K.N.2012BSR of Bhilwara circle

H.W. 1 6.00 1.39 0.90 7.51H.W.E 2 2.00 0.60 0.90 2.16Apron 1 6.00 1.50 0.30 2.70

Total 12.37 1180 14591.88 357.00 4414.664 Random rubble stone

masonary in cement sandmortar(1:6) for supperstructure (As per itemno.190A page 17 ofG.K.N.2012 BSR ofBhilwara circleH.W. 1 6.00 1.07 0.80 5.14H.W.E 2 2.00 0.60 0.80 1.92

Total 7.06 1265 8925.84 357.00 2518.99

Page 94: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

5Cement plaster includingsmooth finishing incement mortar(1:4)25mm thick (As peritem no.70A page 8 ofG.K.N.2012 BSR ofBhilwara circle

H.W. 2 6.00 0.80 9.60H.W. 1 6.00 0.80 4.80H.W.E 4 2.00 0.80 6.40H.W.E 2 2.00 0.60 2.40Apron 1 0.60 0.30 0.18

Total 23.38 138 3226.44 68.90 1610.88

6Cement concrete copingin cement mortar 1:2:412 mm thick (As per itemno.194 page 17 ofG.K.N.2012 BSR ofBhilwara circle

H.W. 1 6.00 0.75 0.075 0.34H.W.E 2 2.00 0.60 0.08 0.18H.W.E 2 2.00 0.60 0.08 0.18Apron 1 2.00 1.39 0.075 0.21

Total 0.73 2638 1915.19 316.00 229.42GRAND TOTAL 38886.07 12045.20

2765.58 2765.5841651.64 14810.78

METARIAL 26840.87LABOUR 14810.78

TOTAL 41651.64GRAND TOTAL 41652

Add 3% Contingency Charges 1250TOTAL Rs. 42901Say 43000

S.no Particular Qty. Cement Sand Aggregate Stone Bags Cum 50mm 20mm Cum

1 Cement concrete (1:4:8)40 mm 5.02 16.07 2.26 4.52

2 R R stone masonary (1:8)Foundation/ Superstructure (cum) 19.42 27.2 5.83 21.4

3 Cement plaster (1:4) 25

Je Hkkx es 22.96 % etnwjh esa of̀) ds dkj.k vfrfjDr tksMuk

MATERIAL CONSUMPTION STAEMENT

3 Cement plaster (1:4) 25mm thick 23.38 5.24 0.75

4 Raised &cut pointing 5 Stone kharanja in cement

mortar (1:6)6 Cement concrete coping

in cement mortar 1:2:4.50 mm thick 0.73 4.65 0.33 0.65

7 Dry stone pitching TOTAL 53.1 9.16 5.17 21.4

SAY 53 BAGS 2.66 MT

0.75

0.80G.L G.L

0.075

0.30 0.601.20

0.200.3 2.00

2.

0.3 2.001.39

Page 95: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

1 Name of w/s :- P.S Banera DISTT. BHILWARA ( RAJ.)

2 Name of work :- CONTRUCTION OF MASONARY WALL No-4 AT-Branch No-3 Name of Village:- 1 Available crest length 7 M 488002 Hight of structure 0.80 M3 Top Width 0.75 M4 Bottom Width 1.39 M5 Depth of foundation taking as 1.20 M6 Width of Basin 1.50 M7 Depth of Basin 0.6 M8 Head wall Extension 2 M

S.No. PARTICULAR No. LENGTH WIDTH HT/DEPTH

Qty Rate Total Amount

Labour Rate

L.Amount

1 Excavation in hard soildry or most&disposal ofexcavated material within

CONTRUCTION OF MASONARY WALL

IWMP-XVII

Kasoriya

DETAILED ESTIMATE

excavated material withinintial lead of 30 m andliftof 1.5m includingdressing etc complete(As per item no.2B page1 of G.K.N.2012 BSR ofBhilwara circle H.W. 1 7.00 1.39 1.20 11.68H.W.E 2 2.00 0.60 1.20 2.88Apron 1 7.00 1.50 0.60 6.30

Total (cu.m) 20.86Total Excavation Total 20.86 91.00 1897.90 91.00 1897.90

2 cement concrete wellmixed in cementmortar(1:4:8) laid inposition completeincluding curingAggregate size upto40mm. (As per itemno.191 page 17 ofG.K.N.2012 BSR ofBhilwara circle H.W 1 7.00 1.39 0.30 2.92H.W.E 2 2.00 0.60 0.30 0.72Apron 1 7.00 1.50 0.20 2.10Apron 1 7.00 1.50 0.20 2.10

Total 5.74 1705 9785.00 320.00 1836.483

Random rubble stonemasonary in cement sandmortar(1:8) for foundation(As per item no.190Bpage 17 of G.K.N.2012BSR of Bhilwara circle

H.W. 1 7.00 1.39 0.90 8.76H.W.E 2 2.00 0.60 0.90 2.16Apron 1 7.00 1.50 0.30 3.15

Total 14.07 1180 16599.06 357.00 5021.924 Random rubble stone

masonary in cement sandmortar(1:6) for supperstructure (As per itemno.190A page 17 ofG.K.N.2012 BSR ofBhilwara circleH.W. 1 7.00 1.07 0.80 5.99H.W.E 2 2.00 0.60 0.80 1.92

Total 7.91 1265 10008.68 357.00 2824.58

Page 96: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

5Cement plaster includingsmooth finishing incement mortar(1:4)25mm thick (As peritem no.70A page 8 ofG.K.N.2012 BSR ofBhilwara circle

H.W. 2 7.00 0.80 11.20H.W. 1 7.00 0.80 5.60H.W.E 4 2.00 0.80 6.40H.W.E 2 2.00 0.60 2.40Apron 1 0.60 0.30 0.18

Total 25.78 138 3557.64 68.90 1776.24

6Cement concrete copingin cement mortar 1:2:412 mm thick (As per itemno.194 page 17 ofG.K.N.2012 BSR ofBhilwara circle

H.W. 1 7.00 0.75 0.075 0.39H.W.E 2 2.00 0.60 0.08 0.18H.W.E 2 2.00 0.60 0.08 0.18Apron 1 3.00 1.39 0.075 0.31

Total 0.89 2638 2338.59 316.00 280.13GRAND TOTAL 44186.86 13637.26

3131.11 3131.1147317.97 16768.37

METARIAL 30549.60LABOUR 16768.37

TOTAL 47317.97GRAND TOTAL 47318

Add 3% Contingency Charges 1420TOTAL Rs. 48738Say 48800

S.no Particular Qty. Cement Sand Aggregate Stone Bags Cum 50mm 20mm Cum

1 Cement concrete (1:4:8)40 mm 5.74 18.36 2.58 5.17

2 R R stone masonary (1:8)Foundation/ Superstructure (cum) 21.98 30.8 6.59 24.2

3 Cement plaster (1:4) 25

Je Hkkx es 22.96 % etnwjh esa of̀) ds dkj.k vfrfjDr tksMuk

MATERIAL CONSUMPTION STAEMENT

3 Cement plaster (1:4) 25mm thick 25.78 5.77 0.82

4 Raised &cut pointing 5 Stone kharanja in cement

mortar (1:6)6 Cement concrete coping

in cement mortar 1:2:4.50 mm thick 0.89 5.67 0.40 0.80

7 Dry stone pitching TOTAL 60.6 10.40 5.96 24.2

SAY 61 BAGS 3.03 MT

0.75

0.80G.L G.L

0.075

0.30 0.601.20

0.200.3 2.00

2.

0.3 2.001.39

Page 97: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

1 Name of w/s :- P.S Banera DISTT. BHILWARA ( RAJ.)

2 Name of work :- CONTRUCTION OF MASONARY WALL No-3 AT-Branch No-3 Name of Village:- 1 Available crest length 7 M2 Hight of structure 0.60 M3 Top Width 0.75 M4 Bottom Width 1.23 M5 Depth of foundation taking as 1.20 M6 Width of Basin 1.50 M7 Depth of Basin 0.6 M8 Head wall Extension 2 M

S.No. PARTICULAR No. LENGTH WIDTH HT/DEPTH

Qty Rate Total Amount

Labour Rate

L.Amount

1 Excavation in hard soildry or most&disposal ofexcavated material withinintial lead of 30 m and

CONTRUCTION OF MASONARY WALL IWMP-XVII

Kasoriya

DETAILED ESTIMATE

intial lead of 30 m andliftof 1.5m includingdressing etc complete(As per item no.2B page1 of G.K.N.2012 BSR ofBhilwara circle H.W. 1 7.00 1.23 1.20 10.33H.W.E 2 2.00 0.60 1.20 2.88Apron 1 7.00 1.50 0.60 6.30

Total (cu.m) 19.51Total Excavation Total 19.51 91.00 1775.59 91.00 1775.59

2 cement concrete wellmixed in cementmortar(1:4:8) laid inposition completeincluding curingAggregate size upto40mm. (As per itemno.191 page 17 ofG.K.N.2012 BSR ofBhilwara circle H.W 1 7.00 1.23 0.30 2.58H.W.E 2 2.00 0.60 0.30 0.72Apron 1 7.00 1.50 0.20 2.10

Total 5.40 1705 9212.12 320.00 1728.96Total 5.40 1705 9212.12 320.00 1728.963

Random rubble stonemasonary in cement sandmortar(1:8) for foundation(As per item no.190Bpage 17 of G.K.N.2012BSR of Bhilwara circle

H.W. 1 7.00 1.23 0.90 7.75H.W.E 2 2.00 0.60 0.90 2.16Apron 1 7.00 1.50 0.30 3.15

Total 13.06 1180 15409.62 357.00 4662.064 Random rubble stone

masonary in cement sandmortar(1:6) for supperstructure (As per itemno.190A page 17 ofG.K.N.2012 BSR ofBhilwara circleH.W. 1 7.00 0.99 0.60 4.16H.W.E 2 2.00 0.60 0.60 1.44

Total 5.60 1265 7081.47 357.00 1998.49

Page 98: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

5Cement plaster includingsmooth finishing incement mortar(1:4)25mm thick (As peritem no.70A page 8 ofG.K.N.2012 BSR ofBhilwara circle

H.W. 2 7.00 0.60 8.40H.W. 1 7.00 0.80 5.60H.W.E 4 2.00 0.60 4.80H.W.E 2 2.00 0.60 2.40Apron 1 0.60 0.30 0.18

Total 21.38 138 2950.44 68.90 1473.08

6Cement concrete copingin cement mortar 1:2:412 mm thick (As per itemno.194 page 17 ofG.K.N.2012 BSR ofBhilwara circle

H.W. 1 7.00 0.75 0.075 0.39H.W.E 2 2.00 0.60 0.08 0.18H.W.E 2 2.00 0.60 0.08 0.18Apron 1 3.00 1.23 0.075 0.28

Total 0.85 2638 2243.62 316.00 268.76GRAND TOTAL 38672.86 11906.94

2733.83 2733.8341406.69 14640.77

METARIAL 26765.92LABOUR 14640.77

TOTAL 41406.69GRAND TOTAL 41407

Add 3% Contingency Charges 1242TOTAL Rs. 42649Say 42700

S.no Particular Qty. Cement Sand Aggregate Stone Bags Cum 50mm 20mm Cum

1 Cement concrete (1:4:8)40 mm 5.40 17.29 2.43 4.86

2 R R stone masonary (1:8)Foundation/ Superstructure (cum) 18.66 26.1 5.60 20.5

3 Cement plaster (1:4) 25

Je Hkkx es 22.96 % etnwjh esa of̀) ds dkj.k vfrfjDr tksMuk

MATERIAL CONSUMPTION STAEMENT

3 Cement plaster (1:4) 25mm thick 21.38 4.79 0.68

4 Raised &cut pointing 5 Stone kharanja in cement

mortar (1:6)6 Cement concrete coping

in cement mortar 1:2:4.50 mm thick 0.85 5.44 0.38 0.77

7 Dry stone pitching TOTAL 53.6 9.10 5.63 20.5

SAY 54 BAGS 2.68 MT

0.75

0.60G.L G.L

0.075

0.30 0.601.20

0.200.3 2.00

2.

0.3 2.001.23

Page 99: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

1 Name of w/s :- P.S Banera DISTT. BHILWARA ( RAJ.)

2 Name of work :- CONTRUCTION OF MASONARY WALL No-2 AT-Branch No-3 Name of Village:- 1 Available crest length 5 M2 Hight of structure 0.60 M3 Top Width 0.75 M4 Bottom Width 1.23 M5 Depth of foundation taking as 1.20 M6 Width of Basin 1.50 M7 Depth of Basin 0.6 M8 Head wall Extension 2 M

S.No. PARTICULAR No. LENGTH WIDTH HT/DEPTH

Qty Rate Total Amount

Labour Rate

L.Amount

1 Excavation in hard soildry or most&disposal ofexcavated material within

CONTRUCTION OF MASONARY WALL

IWMP-XVII

Kasoriya

DETAILED ESTIMATE

excavated material withinintial lead of 30 m andliftof 1.5m includingdressing etc complete(As per item no.2B page1 of G.K.N.2012 BSR ofBhilwara circle H.W. 1 5.00 1.23 1.20 7.38H.W.E 2 2.00 0.60 1.20 2.88Apron 1 5.00 1.50 0.60 4.50

Total (cu.m) 14.76Total Excavation Total 14.76 91.00 1343.16 91.00 1343.16

2 cement concrete wellmixed in cementmortar(1:4:8) laid inposition completeincluding curingAggregate size upto40mm. (As per itemno.191 page 17 ofG.K.N.2012 BSR ofBhilwara circle H.W 1 5.00 1.23 0.30 1.85H.W.E 2 2.00 0.60 0.30 0.72Apron 1 5.00 1.50 0.20 1.50Apron 1 5.00 1.50 0.20 1.50

Total 4.07 1705 6930.83 320.00 1300.803

Random rubble stonemasonary in cement sandmortar(1:8) for foundation(As per item no.190Bpage 17 of G.K.N.2012BSR of Bhilwara circle

H.W. 1 5.00 1.23 0.90 5.54H.W.E 2 2.00 0.60 0.90 2.16Apron 1 5.00 1.50 0.30 2.25

Total 9.95 1180 11735.10 357.00 3550.374 Random rubble stone

masonary in cement sandmortar(1:6) for supperstructure (As per itemno.190A page 17 ofG.K.N.2012 BSR ofBhilwara circleH.W. 1 5.00 0.99 0.60 2.97H.W.E 2 2.00 0.60 0.60 1.44

Total 4.41 1265 5578.65 357.00 1574.37

Page 100: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

5Cement plaster includingsmooth finishing incement mortar(1:4)25mm thick (As peritem no.70A page 8 ofG.K.N.2012 BSR ofBhilwara circle

H.W. 2 5.00 0.60 6.00H.W. 1 5.00 0.80 4.00H.W.E 4 2.00 0.60 4.80H.W.E 2 2.00 0.60 2.40Apron 1 0.60 0.30 0.18

Total 17.38 138 2398.44 68.90 1197.48

6Cement concrete copingin cement mortar 1:2:412 mm thick (As per itemno.194 page 17 ofG.K.N.2012 BSR ofBhilwara circle

H.W. 1 5.00 0.75 0.075 0.28H.W.E 2 2.00 0.60 0.08 0.18H.W.E 2 2.00 0.60 0.08 0.18Apron 1 1.00 1.23 0.075 0.09

Total 0.55 2638 1460.13 316.00 174.91GRAND TOTAL 29446.31 9141.08

2098.79 2098.7931545.10 11239.88

METARIAL 20305.23LABOUR 11239.88

TOTAL 31545.10GRAND TOTAL 31545

Add 3% Contingency Charges 946TOTAL Rs. 32491Say 32500

S.no Particular Qty. Cement Sand Aggregate Stone Bags Cum 50mm 20mm Cum

1 Cement concrete (1:4:8)40 mm 4.07 13.01 1.83 3.66

2 R R stone masonary (1:8)Foundation/ Superstructure (cum) 14.36 20.1 4.31 15.8

3 Cement plaster (1:4) 25

Je Hkkx es 22.96 % etnwjh esa of̀) ds dkj.k vfrfjDr tksMuk

MATERIAL CONSUMPTION STAEMENT

3 Cement plaster (1:4) 25mm thick 17.38 3.89 0.56

4 Raised &cut pointing 5 Stone kharanja in cement

mortar (1:6)6 Cement concrete coping

in cement mortar 1:2:4.50 mm thick 0.55 3.54 0.25 0.50

7 Dry stone pitching TOTAL 40.5 6.94 4.16 15.8

SAY 41 BAGS 2.03 MT

0.75

0.60G.L G.L

0.075

0.30 0.601.20

0.200.3 2.00

2.

0.3 2.001.23

Page 101: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

1 Name of w/s :- P.S Banera DISTT. BHILWARA ( RAJ.)

2 Name of work :- CONTRUCTION OF MASONARY WALL No-1 AT-Branch No-3 Name of Village:- 1 Available crest length 6 M2 Hight of structure 0.60 M3 Top Width 0.75 M4 Bottom Width 1.23 M5 Depth of foundation taking as 1.20 M6 Width of Basin 1.50 M7 Depth of Basin 0.6 M8 Head wall Extension 2 M

CONTRUCTION OF MASONARY WALL

IWMP-XVII

Kasoriya

DETAILED ESTIMATE

S.No. PARTICULAR No. LENGTH WIDTH HT/DEPTH

Qty Rate Total Amount

Labour Rate

L.Amount

1 Excavation in hard soildry or most&disposal ofexcavated material withinintial lead of 30 m andliftof 1.5m includingdressing etc complete(As per item no.2B page1 of G.K.N.2012 BSR ofBhilwara circle H.W. 1 6.00 1.23 1.20 8.86H.W.E 2 2.00 0.60 1.20 2.88Apron 1 6.00 1.50 0.60 5.40

Total (cu.m) 17.14Total Excavation Total 17.14 91.00 1559.38 91.00 1559.38

2 cement concrete wellmixed in cementmortar(1:4:8) laid inposition completeincluding curingAggregate size upto40mm. (As per item40mm. (As per itemno.191 page 17 ofG.K.N.2012 BSR ofBhilwara circle H.W 1 6.00 1.23 0.30 2.21H.W.E 2 2.00 0.60 0.30 0.72Apron 1 6.00 1.50 0.20 1.80

Total 4.73 1705 8071.47 320.00 1514.883

Random rubble stonemasonary in cement sandmortar(1:8) for foundation(As per item no.190Bpage 17 of G.K.N.2012BSR of Bhilwara circle

H.W. 1 6.00 1.23 0.90 6.64H.W.E 2 2.00 0.60 0.90 2.16Apron 1 6.00 1.50 0.30 2.70

Total 11.50 1180 13572.36 357.00 4106.214 Random rubble stone

masonary in cement sandmortar(1:6) for supperstructure (As per itemno.190A page 17 ofno.190A page 17 ofG.K.N.2012 BSR ofBhilwara circleH.W. 1 6.00 0.99 0.60 3.56H.W.E 2 2.00 0.60 0.60 1.44

Total 5.00 1265 6330.06 357.00 1786.43

Page 102: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

5Cement plaster includingsmooth finishing incement mortar(1:4)25mm thick (As peritem no.70A page 8 ofG.K.N.2012 BSR ofBhilwara circle

H.W. 2 6.00 0.60 7.20H.W. 1 6.00 0.80 4.80H.W.E 4 2.00 0.60 4.80H.W.E 2 2.00 0.60 2.40Apron 1 0.60 0.30 0.18

Total 19.38 138 2674.44 68.90 1335.28

6Cement concrete copingin cement mortar 1:2:412 mm thick (As per itemno.194 page 17 ofno.194 page 17 ofG.K.N.2012 BSR ofBhilwara circle

H.W. 1 6.00 0.75 0.075 0.34H.W.E 2 2.00 0.60 0.08 0.18Apron 1 2.00 1.23 0.075 0.18

Total 0.70 2638 1851.88 316.00 221.83GRAND TOTAL 34059.58 10524.01

2416.31 2416.3136475.90 12940.33

METARIAL 23535.57LABOUR 12940.33

TOTAL 36475.90GRAND TOTAL 36476

Add 3% Contingency Charges 1094TOTAL Rs. 37570Say 37600

S.no Particular Qty. Cement Sand Aggregate Stone Bags Cum 50mm 20mm Cum

1 Cement concrete (1:4:8)

MATERIAL CONSUMPTION STAEMENT

Je Hkkx es 22.96 % etnwjh esa of̀) ds dkj.k vfrfjDr tksMuk

1 Cement concrete (1:4:8)40 mm 4.73 15.15 2.13 4.26

2 R R stone masonary (1:8)Foundation/ Superstructure (cum) 16.51 23.1 4.95 18.2

3 Cement plaster (1:4) 25mm thick 19.38 4.34 0.62

4 Raised &cut pointing 5 Stone kharanja in cement

mortar (1:6)6 Cement concrete coping

in cement mortar 1:2:4.50 mm thick 0.70 4.49 0.32 0.63

7 Dry stone pitching TOTAL 47.1 8.02 4.89 18.2

SAY 47 BAGS 2.35 MT

0.75

0.60G.L G.L0.60G.L G.L

0.075

0.30 0.601.20

0.200.3 2.00

1.23

Page 103: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

1 Name of w/s :- P.S Banera DISTT. BHILWARA ( RAJ.)

2 Name of work :- CONTRUCTION OF MASONARY WALL No-7 AT-Branch No-3 Name of Village:- 1 Available crest length 6 M2 Hight of structure 0.80 M3 Top Width 0.75 M4 Bottom Width 1.39 M5 Depth of foundation taking as 1.20 M6 Width of Basin 1.50 M7 Depth of Basin 0.6 M8 Head wall Extension 2 M

S.No. PARTICULAR No. LENGTH WIDTH HT/DEPTH

Qty Rate Total Amount

Labour Rate

L.Amount

1 Excavation in hard soildry or most&disposal ofexcavated material within

CONTRUCTION OF MASONARY WALL

IWMP-XVII

Kundiya kalan

DETAILED ESTIMATE

excavated material withinintial lead of 30 m andliftof 1.5m includingdressing etc complete(As per item no.2B page1 of G.K.N.2012 BSR ofBhilwara circle H.W. 1 6.00 1.39 1.20 10.01H.W.E 2 2.00 0.60 1.20 2.88Apron 1 6.00 1.50 0.60 5.40

Total (cu.m) 18.29Total Excavation Total 18.29 91.00 1664.21 91.00 1664.21

2 cement concrete wellmixed in cementmortar(1:4:8) laid inposition completeincluding curingAggregate size upto40mm. (As per itemno.191 page 17 ofG.K.N.2012 BSR ofBhilwara circle H.W 1 6.00 1.39 0.30 2.50H.W.E 2 2.00 0.60 0.30 0.72Apron 1 6.00 1.50 0.20 1.80Apron 1 6.00 1.50 0.20 1.80

Total 5.02 1705 8562.51 320.00 1607.043

Random rubble stonemasonary in cement sandmortar(1:8) for foundation(As per item no.190Bpage 17 of G.K.N.2012BSR of Bhilwara circle

H.W. 1 6.00 1.39 0.90 7.51H.W.E 2 2.00 0.60 0.90 2.16Apron 1 6.00 1.50 0.30 2.70

Total 12.37 1180 14591.88 357.00 4414.664 Random rubble stone

masonary in cement sandmortar(1:6) for supperstructure (As per itemno.190A page 17 ofG.K.N.2012 BSR ofBhilwara circleH.W. 1 6.00 1.07 0.80 5.14H.W.E 2 2.00 0.60 0.80 1.92

Total 7.06 1265 8925.84 357.00 2518.99

Page 104: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

5Cement plaster includingsmooth finishing incement mortar(1:4)25mm thick (As peritem no.70A page 8 ofG.K.N.2012 BSR ofBhilwara circle

H.W. 2 6.00 0.80 9.60H.W. 1 6.00 0.80 4.80H.W.E 4 2.00 0.80 6.40H.W.E 2 2.00 0.60 2.40Apron 1 0.60 0.30 0.18

Total 23.38 138 3226.44 68.90 1610.88

6Cement concrete copingin cement mortar 1:2:412 mm thick (As per itemno.194 page 17 ofG.K.N.2012 BSR ofBhilwara circle

H.W. 1 6.00 0.75 0.075 0.34H.W.E 2 2.00 0.60 0.08 0.18H.W.E 2 2.00 0.60 0.08 0.18Apron 1 2.00 1.39 0.075 0.21

Total 0.73 2638 1915.19 316.00 229.42GRAND TOTAL 38886.07 12045.20

2765.58 2765.5841651.64 14810.78

METARIAL 26840.87LABOUR 14810.78

TOTAL 41651.64GRAND TOTAL 41652

Add 3% Contingency Charges 1250TOTAL Rs. 42901Say 43000

S.no Particular Qty. Cement Sand Aggregate Stone Bags Cum 50mm 20mm Cum

1 Cement concrete (1:4:8)40 mm 5.02 16.07 2.26 4.52

2 R R stone masonary (1:8)Foundation/ Superstructure (cum) 19.42 27.2 5.83 21.4

3 Cement plaster (1:4) 25

Je Hkkx es 22.96 % etnwjh esa of̀) ds dkj.k vfrfjDr tksMuk

MATERIAL CONSUMPTION STAEMENT

3 Cement plaster (1:4) 25mm thick 23.38 5.24 0.75

4 Raised &cut pointing 5 Stone kharanja in cement

mortar (1:6)6 Cement concrete coping

in cement mortar 1:2:4.50 mm thick 0.73 4.65 0.33 0.65

7 Dry stone pitching TOTAL 53.1 9.16 5.17 21.4

SAY 53 BAGS 2.66 MT

0.75

0.80G.L G.L

0.075

0.30 0.601.20

0.200.3 2.00

2.

0.3 2.001.39

Page 105: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

1 Name of w/s :- P.S Banera DISTT. BHILWARA ( RAJ.)

2 Name of work :- CONTRUCTION OF MASONARY WALL No-8 AT-Branch No-3 Name of Village:- 1 Available crest length 6 M 430002 Hight of structure 0.80 M3 Top Width 0.75 M4 Bottom Width 1.39 M5 Depth of foundation taking as 1.20 M6 Width of Basin 1.50 M7 Depth of Basin 0.6 M8 Head wall Extension 2 M

S.No. PARTICULAR No. LENGTH WIDTH HT/DEPTH

Qty Rate Total Amount

Labour Rate

L.Amount

1 Excavation in hard soildry or most&disposal ofexcavated material within

CONTRUCTION OF MASONARY WALL

IWMP-XVII

Gharta

DETAILED ESTIMATE

excavated material withinintial lead of 30 m andliftof 1.5m includingdressing etc complete(As per item no.2B page1 of G.K.N.2012 BSR ofBhilwara circle H.W. 1 6.00 1.39 1.20 10.01H.W.E 2 2.00 0.60 1.20 2.88Apron 1 6.00 1.50 0.60 5.40

Total (cu.m) 18.29Total Excavation Total 18.29 91.00 1664.21 91.00 1664.21

2 cement concrete wellmixed in cementmortar(1:4:8) laid inposition completeincluding curingAggregate size upto40mm. (As per itemno.191 page 17 ofG.K.N.2012 BSR ofBhilwara circle H.W 1 6.00 1.39 0.30 2.50H.W.E 2 2.00 0.60 0.30 0.72Apron 1 6.00 1.50 0.20 1.80Apron 1 6.00 1.50 0.20 1.80

Total 5.02 1705 8562.51 320.00 1607.043

Random rubble stonemasonary in cement sandmortar(1:8) for foundation(As per item no.190Bpage 17 of G.K.N.2012BSR of Bhilwara circle

H.W. 1 6.00 1.39 0.90 7.51H.W.E 2 2.00 0.60 0.90 2.16Apron 1 6.00 1.50 0.30 2.70

Total 12.37 1180 14591.88 357.00 4414.664 Random rubble stone

masonary in cement sandmortar(1:6) for supperstructure (As per itemno.190A page 17 ofG.K.N.2012 BSR ofBhilwara circleH.W. 1 6.00 1.07 0.80 5.14H.W.E 2 2.00 0.60 0.80 1.92

Total 7.06 1265 8925.84 357.00 2518.99

Page 106: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

5Cement plaster includingsmooth finishing incement mortar(1:4)25mm thick (As peritem no.70A page 8 ofG.K.N.2012 BSR ofBhilwara circle

H.W. 2 6.00 0.80 9.60H.W. 1 6.00 0.80 4.80H.W.E 4 2.00 0.80 6.40H.W.E 2 2.00 0.60 2.40Apron 1 0.60 0.30 0.18

Total 23.38 138 3226.44 68.90 1610.88

6Cement concrete copingin cement mortar 1:2:412 mm thick (As per itemno.194 page 17 ofG.K.N.2012 BSR ofBhilwara circle

H.W. 1 6.00 0.75 0.075 0.34H.W.E 2 2.00 0.60 0.08 0.18H.W.E 2 2.00 0.60 0.08 0.18Apron 1 2.00 1.39 0.075 0.21

Total 0.73 2638 1915.19 316.00 229.42GRAND TOTAL 38886.07 12045.20

2765.58 2765.5841651.64 14810.78

METARIAL 26840.87LABOUR 14810.78

TOTAL 41651.64GRAND TOTAL 41652

Add 3% Contingency Charges 1250TOTAL Rs. 42901Say 43000

S.no Particular Qty. Cement Sand Aggregate Stone Bags Cum 50mm 20mm Cum

1 Cement concrete (1:4:8)40 mm 5.02 16.07 2.26 4.52

2 R R stone masonary (1:8)Foundation/ Superstructure (cum) 19.42 27.2 5.83 21.4

3 Cement plaster (1:4) 25

Je Hkkx es 22.96 % etnwjh esa of̀) ds dkj.k vfrfjDr tksMuk

MATERIAL CONSUMPTION STAEMENT

3 Cement plaster (1:4) 25mm thick 23.38 5.24 0.75

4 Raised &cut pointing 5 Stone kharanja in cement

mortar (1:6)6 Cement concrete coping

in cement mortar 1:2:4.50 mm thick 0.73 4.65 0.33 0.65

7 Dry stone pitching TOTAL 53.1 9.16 5.17 21.4

SAY 53 BAGS 2.66 MT

0.75

0.80G.L G.L

0.075

0.30 0.601.20

0.200.3 2.00

2.

0.3 2.001.39

Page 107: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

1 Name of w/s :- P.S Banera DISTT. BHILWARA ( RAJ.)

2 Name of work :- CONTRUCTION OF MASONARY WALL No-9 AT-Branch No-3 Name of Village:- 1 Available crest length 7 M 427002 Hight of structure 0.60 M3 Top Width 0.75 M4 Bottom Width 1.23 M5 Depth of foundation taking as 1.20 M6 Width of Basin 1.50 M7 Depth of Basin 0.6 M8 Head wall Extension 2 M

S.No. PARTICULAR No. LENGTH WIDTH HT/DEPTH

Qty Rate Total Amount

Labour Rate

L.Amount

1 Excavation in hard soildry or most&disposal ofexcavated material within

CONTRUCTION OF MASONARY WALL

IWMP-XVII

Gharta

DETAILED ESTIMATE

excavated material withinintial lead of 30 m andliftof 1.5m includingdressing etc complete(As per item no.2B page1 of G.K.N.2012 BSR ofBhilwara circle H.W. 1 7.00 1.23 1.20 10.33H.W.E 2 2.00 0.60 1.20 2.88Apron 1 7.00 1.50 0.60 6.30

Total (cu.m) 19.51Total Excavation Total 19.51 91.00 1775.59 91.00 1775.59

2 cement concrete wellmixed in cementmortar(1:4:8) laid inposition completeincluding curingAggregate size upto40mm. (As per itemno.191 page 17 ofG.K.N.2012 BSR ofBhilwara circle H.W 1 7.00 1.23 0.30 2.58H.W.E 2 2.00 0.60 0.30 0.72Apron 1 7.00 1.50 0.20 2.10Apron 1 7.00 1.50 0.20 2.10

Total 5.40 1705 9212.12 320.00 1728.963

Random rubble stonemasonary in cement sandmortar(1:8) for foundation(As per item no.190Bpage 17 of G.K.N.2012BSR of Bhilwara circle

H.W. 1 7.00 1.23 0.90 7.75H.W.E 2 2.00 0.60 0.90 2.16Apron 1 7.00 1.50 0.30 3.15

Total 13.06 1180 15409.62 357.00 4662.064 Random rubble stone

masonary in cement sandmortar(1:6) for supperstructure (As per itemno.190A page 17 ofG.K.N.2012 BSR ofBhilwara circleH.W. 1 7.00 0.99 0.60 4.16H.W.E 2 2.00 0.60 0.60 1.44

Total 5.60 1265 7081.47 357.00 1998.49

Page 108: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

5Cement plaster includingsmooth finishing incement mortar(1:4)25mm thick (As peritem no.70A page 8 ofG.K.N.2012 BSR ofBhilwara circle

H.W. 2 7.00 0.60 8.40H.W. 1 7.00 0.80 5.60H.W.E 4 2.00 0.60 4.80H.W.E 2 2.00 0.60 2.40Apron 1 0.60 0.30 0.18

Total 21.38 138 2950.44 68.90 1473.08

6Cement concrete copingin cement mortar 1:2:412 mm thick (As per itemno.194 page 17 ofG.K.N.2012 BSR ofBhilwara circle

H.W. 1 7.00 0.75 0.075 0.39H.W.E 2 2.00 0.60 0.08 0.18H.W.E 2 2.00 0.60 0.08 0.18Apron 1 3.00 1.23 0.075 0.28

Total 0.85 2638 2243.62 316.00 268.76GRAND TOTAL 38672.86 11906.94

2733.83 2733.8341406.69 14640.77

METARIAL 26765.92LABOUR 14640.77

TOTAL 41406.69GRAND TOTAL 41407

Add 3% Contingency Charges 1242TOTAL Rs. 42649Say 42700

S.no Particular Qty. Cement Sand Aggregate Stone Bags Cum 50mm 20mm Cum

1 Cement concrete (1:4:8)40 mm 5.40 17.29 2.43 4.86

2 R R stone masonary (1:8)Foundation/ Superstructure (cum) 18.66 26.1 5.60 20.5

3 Cement plaster (1:4) 25

Je Hkkx es 22.96 % etnwjh esa of̀) ds dkj.k vfrfjDr tksMuk

MATERIAL CONSUMPTION STAEMENT

3 Cement plaster (1:4) 25mm thick 21.38 4.79 0.68

4 Raised &cut pointing 5 Stone kharanja in cement

mortar (1:6)6 Cement concrete coping

in cement mortar 1:2:4.50 mm thick 0.85 5.44 0.38 0.77

7 Dry stone pitching TOTAL 53.6 9.10 5.63 20.5

SAY 54 BAGS 2.68 MT

0.75

0.60G.L G.L

0.075

0.30 0.601.20

0.200.3 2.00

2.

0.3 2.001.23

Page 109: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

1 Name of w/s :- P.S Banera DISTT. BHILWARA ( RAJ.)

2 Name of work :- CONTRUCTION OF MASONARY WALL No-10 AT-Branch No-3 Name of Village:- 1 Available crest length 5 M 325002 Hight of structure 0.60 M3 Top Width 0.75 M4 Bottom Width 1.23 M5 Depth of foundation taking as 1.20 M6 Width of Basin 1.50 M7 Depth of Basin 0.6 M8 Head wall Extension 2 M

S.No. PARTICULAR No. LENGTH WIDTH HT/DEPTH

Qty Rate Total Amount

Labour Rate

L.Amount

1 Excavation in hard soildry or most&disposal ofexcavated material within

CONTRUCTION OF MASONARY WALL

IWMP-XVII

Dabla

DETAILED ESTIMATE

excavated material withinintial lead of 30 m andliftof 1.5m includingdressing etc complete(As per item no.2B page1 of G.K.N.2012 BSR ofBhilwara circle H.W. 1 5.00 1.23 1.20 7.38H.W.E 2 2.00 0.60 1.20 2.88Apron 1 5.00 1.50 0.60 4.50

Total (cu.m) 14.76Total Excavation Total 14.76 91.00 1343.16 91.00 1343.16

2 cement concrete wellmixed in cementmortar(1:4:8) laid inposition completeincluding curingAggregate size upto40mm. (As per itemno.191 page 17 ofG.K.N.2012 BSR ofBhilwara circle H.W 1 5.00 1.23 0.30 1.85H.W.E 2 2.00 0.60 0.30 0.72Apron 1 5.00 1.50 0.20 1.50Apron 1 5.00 1.50 0.20 1.50

Total 4.07 1705 6930.83 320.00 1300.803

Random rubble stonemasonary in cement sandmortar(1:8) for foundation(As per item no.190Bpage 17 of G.K.N.2012BSR of Bhilwara circle

H.W. 1 5.00 1.23 0.90 5.54H.W.E 2 2.00 0.60 0.90 2.16Apron 1 5.00 1.50 0.30 2.25

Total 9.95 1180 11735.10 357.00 3550.374 Random rubble stone

masonary in cement sandmortar(1:6) for supperstructure (As per itemno.190A page 17 ofG.K.N.2012 BSR ofBhilwara circleH.W. 1 5.00 0.99 0.60 2.97H.W.E 2 2.00 0.60 0.60 1.44

Total 4.41 1265 5578.65 357.00 1574.37

Page 110: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

5Cement plaster includingsmooth finishing incement mortar(1:4)25mm thick (As peritem no.70A page 8 ofG.K.N.2012 BSR ofBhilwara circle

H.W. 2 5.00 0.60 6.00H.W. 1 5.00 0.80 4.00H.W.E 4 2.00 0.60 4.80H.W.E 2 2.00 0.60 2.40Apron 1 0.60 0.30 0.18

Total 17.38 138 2398.44 68.90 1197.48

6Cement concrete copingin cement mortar 1:2:412 mm thick (As per itemno.194 page 17 ofG.K.N.2012 BSR ofBhilwara circle

H.W. 1 5.00 0.75 0.075 0.28H.W.E 2 2.00 0.60 0.08 0.18H.W.E 2 2.00 0.60 0.08 0.18Apron 1 1.00 1.23 0.075 0.09

Total 0.55 2638 1460.13 316.00 174.91GRAND TOTAL 29446.31 9141.08

2098.79 2098.7931545.10 11239.88

METARIAL 20305.23LABOUR 11239.88

TOTAL 31545.10GRAND TOTAL 31545

Add 3% Contingency Charges 946TOTAL Rs. 32491Say 32500

S.no Particular Qty. Cement Sand Aggregate Stone Bags Cum 50mm 20mm Cum

1 Cement concrete (1:4:8)40 mm 4.07 13.01 1.83 3.66

2 R R stone masonary (1:8)Foundation/ Superstructure (cum) 14.36 20.1 4.31 15.8

3 Cement plaster (1:4) 25

Je Hkkx es 22.96 % etnwjh esa of̀) ds dkj.k vfrfjDr tksMuk

MATERIAL CONSUMPTION STAEMENT

3 Cement plaster (1:4) 25mm thick 17.38 3.89 0.56

4 Raised &cut pointing 5 Stone kharanja in cement

mortar (1:6)6 Cement concrete coping

in cement mortar 1:2:4.50 mm thick 0.55 3.54 0.25 0.50

7 Dry stone pitching TOTAL 40.5 6.94 4.16 15.8

SAY 41 BAGS 2.03 MT

0.75

0.60G.L G.L

0.075

0.30 0.601.20

0.200.3 2.00

2.

0.3 2.001.23

Page 111: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

1 Name of w/s :- P.S Banera DISTT. BHILWARA ( RAJ.)

2 Name of work :- CONTRUCTION OF MASONARY WALL No-11 AT-Branch No-3 Name of Village:- 1 Available crest length 7 M2 Hight of structure 0.80 M3 Top Width 0.75 M4 Bottom Width 1.39 M5 Depth of foundation taking as 1.20 M6 Width of Basin 1.50 M7 Depth of Basin 0.6 M8 Head wall Extension 2 M

S.No. PARTICULAR No. LENGTH WIDTH HT/DEPTH

Qty Rate Total Amount

Labour Rate

L.Amount

1 Excavation in hard soildry or most&disposal ofexcavated material within

CONTRUCTION OF MASONARY WALL

IWMP-XVII

Dabla

DETAILED ESTIMATE

excavated material withinintial lead of 30 m andliftof 1.5m includingdressing etc complete(As per item no.2B page1 of G.K.N.2012 BSR ofBhilwara circle H.W. 1 7.00 1.39 1.20 11.68H.W.E 2 2.00 0.60 1.20 2.88Apron 1 7.00 1.50 0.60 6.30

Total (cu.m) 20.86Total Excavation Total 20.86 91.00 1897.90 91.00 1897.90

2 cement concrete wellmixed in cementmortar(1:4:8) laid inposition completeincluding curingAggregate size upto40mm. (As per itemno.191 page 17 ofG.K.N.2012 BSR ofBhilwara circle H.W 1 7.00 1.39 0.30 2.92H.W.E 2 2.00 0.60 0.30 0.72Apron 1 7.00 1.50 0.20 2.10Apron 1 7.00 1.50 0.20 2.10

Total 5.74 1705 9785.00 320.00 1836.483

Random rubble stonemasonary in cement sandmortar(1:8) for foundation(As per item no.190Bpage 17 of G.K.N.2012BSR of Bhilwara circle

H.W. 1 7.00 1.39 0.90 8.76H.W.E 2 2.00 0.60 0.90 2.16Apron 1 7.00 1.50 0.30 3.15

Total 14.07 1180 16599.06 357.00 5021.924 Random rubble stone

masonary in cement sandmortar(1:6) for supperstructure (As per itemno.190A page 17 ofG.K.N.2012 BSR ofBhilwara circleH.W. 1 7.00 1.07 0.80 5.99H.W.E 2 2.00 0.60 0.80 1.92

Total 7.91 1265 10008.68 357.00 2824.58

Page 112: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

5Cement plaster includingsmooth finishing incement mortar(1:4)25mm thick (As peritem no.70A page 8 ofG.K.N.2012 BSR ofBhilwara circle

H.W. 2 7.00 0.80 11.20H.W. 1 7.00 0.80 5.60H.W.E 4 2.00 0.80 6.40H.W.E 2 2.00 0.60 2.40Apron 1 0.60 0.30 0.18

Total 25.78 138 3557.64 68.90 1776.24

6Cement concrete copingin cement mortar 1:2:412 mm thick (As per itemno.194 page 17 ofG.K.N.2012 BSR ofBhilwara circle

H.W. 1 7.00 0.75 0.075 0.39H.W.E 2 2.00 0.60 0.08 0.18H.W.E 2 2.00 0.60 0.08 0.18Apron 1 3.00 1.39 0.075 0.31

Total 0.89 2638 2338.59 316.00 280.13GRAND TOTAL 44186.86 13637.26

3131.11 3131.1147317.97 16768.37

METARIAL 30549.60LABOUR 16768.37

TOTAL 47317.97GRAND TOTAL 47318

Add 3% Contingency Charges 1420TOTAL Rs. 48738Say 48800

S.no Particular Qty. Cement Sand Aggregate Stone Bags Cum 50mm 20mm Cum

1 Cement concrete (1:4:8)40 mm 5.74 18.36 2.58 5.17

2 R R stone masonary (1:8)Foundation/ Superstructure (cum) 21.98 30.8 6.59 24.2

3 Cement plaster (1:4) 25

Je Hkkx es 22.96 % etnwjh esa of̀) ds dkj.k vfrfjDr tksMuk

MATERIAL CONSUMPTION STAEMENT

3 Cement plaster (1:4) 25mm thick 25.78 5.77 0.82

4 Raised &cut pointing 5 Stone kharanja in cement

mortar (1:6)6 Cement concrete coping

in cement mortar 1:2:4.50 mm thick 0.89 5.67 0.40 0.80

7 Dry stone pitching TOTAL 60.6 10.40 5.96 24.2

SAY 61 BAGS 3.03 MT

0.75

0.80G.L G.L

0.075

0.30 0.601.20

0.200.3 2.00

2.

0.3 2.001.39

Page 113: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

1 Name of w/s :- P.S Banera DISTT. BHILWARA ( RAJ.)

2 Name of work :- CONTRUCTION OF MASONARY WALL No-12 AT-Branch No-3 Name of Village:- 1 Available crest length 8 M2 Hight of structure 0.60 M3 Top Width 0.75 M4 Bottom Width 1.23 M5 Depth of foundation taking as 1.20 M6 Width of Basin 1.50 M7 Depth of Basin 0.6 M8 Head wall Extension 2 M

S.No. PARTICULAR No. LENGTH WIDTH HT/DEPTH

Qty Rate Total Amount

Labour Rate

L.Amount

1 Excavation in hard soildry or most&disposal ofexcavated material within

CONTRUCTION OF MASONARY WALL

IWMP-XVII

Dabla

DETAILED ESTIMATE

excavated material withinintial lead of 30 m andliftof 1.5m includingdressing etc complete(As per item no.2B page1 of G.K.N.2012 BSR ofBhilwara circle H.W. 1 8.00 1.23 1.20 11.81H.W.E 2 2.00 0.60 1.20 2.88Apron 1 8.00 1.50 0.60 7.20

Total (cu.m) 21.89Total Excavation Total 21.89 91.00 1991.81 91.00 1991.81

2 cement concrete wellmixed in cementmortar(1:4:8) laid inposition completeincluding curingAggregate size upto40mm. (As per itemno.191 page 17 ofG.K.N.2012 BSR ofBhilwara circle H.W 1 8.00 1.23 0.30 2.95H.W.E 2 2.00 0.60 0.30 0.72Apron 1 8.00 1.50 0.20 2.40Apron 1 8.00 1.50 0.20 2.40

Total 6.07 1705 10352.76 320.00 1943.043

Random rubble stonemasonary in cement sandmortar(1:8) for foundation(As per item no.190Bpage 17 of G.K.N.2012BSR of Bhilwara circle

H.W. 1 8.00 1.23 0.90 8.86H.W.E 2 2.00 0.60 0.90 2.16Apron 1 8.00 1.50 0.30 3.60

Total 14.62 1180 17246.88 357.00 5217.914 Random rubble stone

masonary in cement sandmortar(1:6) for supperstructure (As per itemno.190A page 17 ofG.K.N.2012 BSR ofBhilwara circleH.W. 1 8.00 0.99 0.60 4.75H.W.E 2 2.00 0.60 0.60 1.44

Total 6.19 1265 7832.88 357.00 2210.54

Page 114: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

5Cement plaster includingsmooth finishing incement mortar(1:4)25mm thick (As peritem no.70A page 8 ofG.K.N.2012 BSR ofBhilwara circle

H.W. 2 8.00 0.60 9.60H.W. 1 8.00 0.80 6.40H.W.E 4 2.00 0.60 4.80H.W.E 2 2.00 0.60 2.40Apron 1 0.60 0.30 0.18

Total 23.38 138 3226.44 68.90 1610.88

6Cement concrete copingin cement mortar 1:2:412 mm thick (As per itemno.194 page 17 ofG.K.N.2012 BSR ofBhilwara circle

H.W. 1 8.00 0.75 0.075 0.45H.W.E 2 2.00 0.60 0.08 0.18H.W.E 2 2.00 0.60 0.08 0.18Apron 1 4.00 1.23 0.075 0.37

Total 1.00 2638 2635.36 316.00 315.68GRAND TOTAL 43286.13 13289.87

3051.35 3051.3546337.48 16341.22

METARIAL 29996.26LABOUR 16341.22

TOTAL 46337.48GRAND TOTAL 46337

Add 3% Contingency Charges 1390TOTAL Rs. 47728Say 47800

S.no Particular Qty. Cement Sand Aggregate Stone Bags Cum 50mm 20mm Cum

1 Cement concrete (1:4:8)40 mm 6.07 19.43 2.73 5.46

2 R R stone masonary (1:8)Foundation/ Superstructure (cum) 20.81 29.1 6.24 22.9

3 Cement plaster (1:4) 25

Je Hkkx es 22.96 % etnwjh esa of̀) ds dkj.k vfrfjDr tksMuk

MATERIAL CONSUMPTION STAEMENT

3 Cement plaster (1:4) 25mm thick 23.38 5.24 0.75

4 Raised &cut pointing 5 Stone kharanja in cement

mortar (1:6)6 Cement concrete coping

in cement mortar 1:2:4.50 mm thick 1.00 6.39 0.45 0.90

7 Dry stone pitching TOTAL 60.2 10.17 6.36 22.9

SAY 60 BAGS 3.01 MT

0.75

0.60G.L G.L

0.075

0.30 0.601.20

0.200.3 2.00

2.

0.3 2.001.23

Page 115: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

1 Name of w/s :- P.S Banera DISTT. BHILWARA ( RAJ.)

2 Name of work :- CONTRUCTION OF MASONARY WALL No-13 AT-Branch No-3 Name of Village:- 1 Available crest length 7 M2 Hight of structure 0.60 M3 Top Width 0.75 M4 Bottom Width 1.23 M5 Depth of foundation taking as 1.20 M6 Width of Basin 1.50 M7 Depth of Basin 0.6 M8 Head wall Extension 2 M

S.No. PARTICULAR No. LENGTH WIDTH HT/DEPTH

Qty Rate Total Amount

Labour Rate

L.Amount

1 Excavation in hard soildry or most&disposal ofexcavated material within

CONTRUCTION OF MASONARY WALL

IWMP-XVII

Dabla

DETAILED ESTIMATE

excavated material withinintial lead of 30 m andliftof 1.5m includingdressing etc complete(As per item no.2B page1 of G.K.N.2012 BSR ofBhilwara circle H.W. 1 7.00 1.23 1.20 10.33H.W.E 2 2.00 0.60 1.20 2.88Apron 1 7.00 1.50 0.60 6.30

Total (cu.m) 19.51Total Excavation Total 19.51 91.00 1775.59 91.00 1775.59

2 cement concrete wellmixed in cementmortar(1:4:8) laid inposition completeincluding curingAggregate size upto40mm. (As per itemno.191 page 17 ofG.K.N.2012 BSR ofBhilwara circle H.W 1 7.00 1.23 0.30 2.58H.W.E 2 2.00 0.60 0.30 0.72Apron 1 7.00 1.50 0.20 2.10Apron 1 7.00 1.50 0.20 2.10

Total 5.40 1705 9212.12 320.00 1728.963

Random rubble stonemasonary in cement sandmortar(1:8) for foundation(As per item no.190Bpage 17 of G.K.N.2012BSR of Bhilwara circle

H.W. 1 7.00 1.23 0.90 7.75H.W.E 2 2.00 0.60 0.90 2.16Apron 1 7.00 1.50 0.30 3.15

Total 13.06 1180 15409.62 357.00 4662.064 Random rubble stone

masonary in cement sandmortar(1:6) for supperstructure (As per itemno.190A page 17 ofG.K.N.2012 BSR ofBhilwara circleH.W. 1 7.00 0.99 0.60 4.16H.W.E 2 2.00 0.60 0.60 1.44

Total 5.60 1265 7081.47 357.00 1998.49

Page 116: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

5Cement plaster includingsmooth finishing incement mortar(1:4)25mm thick (As peritem no.70A page 8 ofG.K.N.2012 BSR ofBhilwara circle

H.W. 2 7.00 0.60 8.40H.W. 1 7.00 0.80 5.60H.W.E 4 2.00 0.60 4.80H.W.E 2 2.00 0.60 2.40Apron 1 0.60 0.30 0.18

Total 21.38 138 2950.44 68.90 1473.08

6Cement concrete copingin cement mortar 1:2:412 mm thick (As per itemno.194 page 17 ofG.K.N.2012 BSR ofBhilwara circle

H.W. 1 7.00 0.75 0.075 0.39H.W.E 2 2.00 0.60 0.08 0.18H.W.E 2 2.00 0.60 0.08 0.18Apron 1 3.00 1.23 0.075 0.28

Total 0.85 2638 2243.62 316.00 268.76GRAND TOTAL 38672.86 11906.94

2733.83 2733.8341406.69 14640.77

METARIAL 26765.92LABOUR 14640.77

TOTAL 41406.69GRAND TOTAL 41407

Add 3% Contingency Charges 1242TOTAL Rs. 42649Say 42700

S.no Particular Qty. Cement Sand Aggregate Stone Bags Cum 50mm 20mm Cum

1 Cement concrete (1:4:8)40 mm 5.40 17.29 2.43 4.86

2 R R stone masonary (1:8)Foundation/ Superstructure (cum) 18.66 26.1 5.60 20.5

3 Cement plaster (1:4) 25

Je Hkkx es 22.96 % etnwjh esa of̀) ds dkj.k vfrfjDr tksMuk

MATERIAL CONSUMPTION STAEMENT

3 Cement plaster (1:4) 25mm thick 21.38 4.79 0.68

4 Raised &cut pointing 5 Stone kharanja in cement

mortar (1:6)6 Cement concrete coping

in cement mortar 1:2:4.50 mm thick 0.85 5.44 0.38 0.77

7 Dry stone pitching TOTAL 53.6 9.10 5.63 20.5

SAY 54 BAGS 2.68 MT

0.75

0.60G.L G.L

0.075

0.30 0.601.20

0.200.3 2.00

2.

0.3 2.001.23

Page 117: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

1 Name of w/s :- P.S Banera DISTT. BHILWARA ( RAJ.)

2 Name of work :- CONTRUCTION OF MASONARY WALL No-14 AT-Branch No-3 Name of Village:- 1 Available crest length 6 M2 Hight of structure 0.60 M3 Top Width 0.75 M4 Bottom Width 1.23 M5 Depth of foundation taking as 1.20 M6 Width of Basin 1.50 M7 Depth of Basin 0.6 M8 Head wall Extension 2 M

S.No. PARTICULAR No. LENGTH WIDTH HT/DEPTH

Qty Rate Total Amount

Labour Rate

L.Amount

1 Excavation in hard soildry or most&disposal ofexcavated material within

CONTRUCTION OF MASONARY WALL

IWMP-XVII

Dabla

DETAILED ESTIMATE

excavated material withinintial lead of 30 m andliftof 1.5m includingdressing etc complete(As per item no.2B page1 of G.K.N.2012 BSR ofBhilwara circle H.W. 1 6.00 1.23 1.20 8.86H.W.E 2 2.00 0.60 1.20 2.88Apron 1 6.00 1.50 0.60 5.40

Total (cu.m) 17.14Total Excavation Total 17.14 91.00 1559.38 91.00 1559.38

2 cement concrete wellmixed in cementmortar(1:4:8) laid inposition completeincluding curingAggregate size upto40mm. (As per itemno.191 page 17 ofG.K.N.2012 BSR ofBhilwara circle H.W 1 6.00 1.23 0.30 2.21H.W.E 2 2.00 0.60 0.30 0.72Apron 1 6.00 1.50 0.20 1.80Apron 1 6.00 1.50 0.20 1.80

Total 4.73 1705 8071.47 320.00 1514.883

Random rubble stonemasonary in cement sandmortar(1:8) for foundation(As per item no.190Bpage 17 of G.K.N.2012BSR of Bhilwara circle

H.W. 1 6.00 1.23 0.90 6.64H.W.E 2 2.00 0.60 0.90 2.16Apron 1 6.00 1.50 0.30 2.70

Total 11.50 1180 13572.36 357.00 4106.214 Random rubble stone

masonary in cement sandmortar(1:6) for supperstructure (As per itemno.190A page 17 ofG.K.N.2012 BSR ofBhilwara circleH.W. 1 6.00 0.99 0.60 3.56H.W.E 2 2.00 0.60 0.60 1.44

Total 5.00 1265 6330.06 357.00 1786.43

Page 118: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

5Cement plaster includingsmooth finishing incement mortar(1:4)25mm thick (As peritem no.70A page 8 ofG.K.N.2012 BSR ofBhilwara circle

H.W. 2 6.00 0.60 7.20H.W. 1 6.00 0.80 4.80H.W.E 4 2.00 0.60 4.80H.W.E 2 2.00 0.60 2.40Apron 1 0.60 0.30 0.18

Total 19.38 138 2674.44 68.90 1335.28

6Cement concrete copingin cement mortar 1:2:412 mm thick (As per itemno.194 page 17 ofG.K.N.2012 BSR ofBhilwara circle

H.W. 1 6.00 0.75 0.075 0.34H.W.E 2 2.00 0.60 0.08 0.18H.W.E 2 2.00 0.60 0.08 0.18Apron 1 2.00 1.23 0.075 0.18

Total 0.70 2638 1851.88 316.00 221.83GRAND TOTAL 34059.58 10524.01

2416.31 2416.3136475.90 12940.33

METARIAL 23535.57LABOUR 12940.33

TOTAL 36475.90GRAND TOTAL 36476

Add 3% Contingency Charges 1094TOTAL Rs. 37570Say 37600

S.no Particular Qty. Cement Sand Aggregate Stone Bags Cum 50mm 20mm Cum

1 Cement concrete (1:4:8)40 mm 4.73 15.15 2.13 4.26

2 R R stone masonary (1:8)Foundation/ Superstructure (cum) 16.51 23.1 4.95 18.2

3 Cement plaster (1:4) 25

Je Hkkx es 22.96 % etnwjh esa of̀) ds dkj.k vfrfjDr tksMuk

MATERIAL CONSUMPTION STAEMENT

3 Cement plaster (1:4) 25mm thick 19.38 4.34 0.62

4 Raised &cut pointing 5 Stone kharanja in cement

mortar (1:6)6 Cement concrete coping

in cement mortar 1:2:4.50 mm thick 0.70 4.49 0.32 0.63

7 Dry stone pitching TOTAL 47.1 8.02 4.89 18.2

SAY 47 BAGS 2.35 MT

0.75

0.60G.L G.L

0.075

0.30 0.601.20

0.200.3 2.00

2.

0.3 2.001.23

Page 119: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

1-

2- ;kstuk dk uke&

Je dqy Je dqy

1txay dh lQkbZ] lk/kkj.k ouLifr rFkk>kfM+;ksa dks dkVus lfgrA 1 40 40 1600

oxZ eh-1.36 1.36 2176 2176

2 5 ls 7 lseh xgjkbZ dk Mkxcsfyax dk;Z 4 25 100izfr jfuax

eh 1.00 1.00 100 100

3

caUM ds vk/kkj dh csfpax ,ao Msªflaxvkfn 30 eh- izkjfEHkd yhM o 1-5 eh-mBku lfgr dBksj feV~Vh esa

1 60 8 0.30 144

?ku eh-

77.60 85.00 11174.4 12240

4 uhao] [kkbZ] ijukyk esa 1-5 xgjkbZ rdfeêh dh [kqnkbZ djuk] ry dks dwVuk]ikuh Mkyuk] cxy dks laokjuk] [kqnhfeêh dks ckgj fudkyuk] uhao Hkjus dsckn [kkyh LFkkuksa dks iqu% feêh ls HkjukrFkk cph gqbZ feêh dks 50 ehVj dh nwjhrd fuLrkj.k djukA

(625+225)/2X1.60=680.00 Cum 680.00 ?ku eh-

A- l[r] fpduh] dadj feêh esa 40 izfr- vkSlr 272.00

?ku eh-91.00 91.00 24752.00 24752.00

B- eqjZe 60 izfr- vkSlr 408.00 ?ku eh- 99.00 99.00 40392.00 40392.00

dk;kZy; iapk;r lfefr & cusMk ftyk HkhyokMkAMODEL ESTIMATE OF FARM POND

Øa-la- dk;Z dk fooj.k la0 yEckbZ pkSMkbZ xgjkbZ

dk;Z dk uke &QkeZ iks.M+ fuekZ.k dk;Z xzke & xzke iapk;r &

bdkbZ nj jkf'k

IWMP

ek=k

Page 120: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

5 vfrfjDr fy¶V dk dk;Z 170.00 ?ku eh- 11.00 11.00 1870.00 1870.00

6 vfrfjDr yhM dk dk;Z 170.00 ?ku eh- 33.80 33.80 5746.00 5746.00

7 lw[ks iRFkj dh fpukbZ ls osLV oh;jfuekZ.k dk;Z10x(2.20+1.00)/2x0.9=14.40 cum 1.00 14.40

?ku eh-

285.00 729.00 4104.00 10497.60

Total 90314.40 97773.60

contingency 3% 2709.43 2933.21Grant Total 93023.83 100706.81

93023.83 100706.81

Total Cost

25

25.00

15

1.6

Cross- Section

15

1.60

93100.00

Isometric View

Page 121: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

Name of village :- P.S . - Banera DISTT. Bhilwara

Lc Total Lc Total1 Jungal Clearence work 1 40 40 1600 Sqm 1.36 1.36 2176.00 2176.00

2 5-7 Cm Dagballing Work 4 34 136 Rmt 1 1 136.00 136.00

3 Benching of Base under Earthen Bund in hard soil.

1 60 6 0.3 108 Cum 85 85 9180.00 9180.00

4 E/W for bind / embankmentin dry or mosit soil includinglaying on layers 1.5cmBreaking of clods sort ing ofgrass pabbles ete anddressing in requred profilewhen compacted manually orby plain roller with initial leadof 30mt and lift 1.5 mt

Rate Amount

NADI IN P. D. BLOCK

Width Depth Qty.S.no Particular No Length Unit

of 30mt and lift 1.5 mt(exeluding charges ofwaterring and compaction)Hard soil

Size (1156+576)/2x1.60= 1385 Cum

1385.00 Cum

(A) In Hard Soil (40%) 554 Cum 91 91 50414.00 50414.00

(B) In Ordinary Murram (60%) 831 Cum 99 99 82269.00 82269.00

5 Add. Extra Lift one times 346.25 Cum 11 11 3808.75 3808.75

6 Add. Extra Lead one times 346.25 Cum 33.8 33.8 11703.25 11703.25

7 Weste WeirAs per Estimate No 10340.41 34815.48

TOTAL 170027.41 194502.48Contingency 3% 5835.07Grant Total 170027.41 200337.55

3434.00

24

1.60

Cross- Section

1.60 24

Isometric View

Page 122: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

1 Name of village :- P.S . - Banera DISTT. Bhilwara

2 Name of work :- CONTRUCTION OF NADI WITH WASTEWEIR Design

1 Available crest length 4.00 M2 Total catchment area 20.00 Ha3 Hight of structure 0.30 MA Design discharge (By flood discharge method) 0.35 A HYDROLIC DESIGN

Peak rate of run off in cum/sec.=Q = C I A C= 0.40

36 Catchment Area 20.00 HaQ = 1.78 cumsec K = L3

H L= 1200.00 M

Say 2.00 cumsec H= 4.00 MK 20784.61Tc=0.0195K0.77

41.18I = 8.00 cm/hr.

B HYDROLIC DESIGN

ESTIMATE OF WESTE WEIR

B HYDROLIC DESIGNQ = 1.71L(h)3/2 L = 4.00 mt length available at siteh =[Q/1.71L]2/3

h = 0.44 Say = 0.35 Taking free board as 0.3 MTotal d = 0.65

C. STRUCTURAL DESIGN (I) Top width of Head wall

h /(p-1)0.5 0.31 0.31 say = 0.30 M(as per site condition where h = 0.35 m p = 2.30 0.35p Specific gravty of stone masnory in cm = 2.3

(ii) Bottom width of head wallb = 0.8H+T.W+.3 0.84 Say = 1.60 MH =heigth of head wall in meters = 0.3 m 0.30 M

(iii) Length of head wall extension H +d + 1 1.95 1.95 Md = h+free board = 0.65 0.65 Mbut as per side condition L/S M 1.5 R/S M 1.5 3.00 M

(iv) Heigth of Head wall extensionH + d = 0.95 M

(v) Botton width of HW ext. side wall & wing wall0.5(H+h)= 0.33 0.60 M

(vi) Top width of HW ext0.4H= 0.12 0.60 M

(vii) APRON WIDTH =H+d 0.95 0.95 M

(viii) Thickness of Basin =0.60m(incloding concreting) (viii) Thickness of Basin =0.60m(incloding concreting) (ix) Height of side wall

H+d = 0.95 0.95 M (x) Height of side wall =1.5h at W W joints

1.5h = 0.53 0.50 M

Page 123: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

(xi) Length of side wall = B. W. of H. W -B.W of H W E+Apron width+ width of toe wall2.40

(xii) Length of wing wall = 2.25 h= 0.79 0.80 M (xiii) Height of the wing wall = 0.53 0.60 M (xiv) Top width of Head wall ext site wall wing wall = 0.60mt (xv) Width of toe wall= 0.45 M (xvi) Height of toe wall = 0.30 M (xvii) Height of wing wall at wing end = 0.60 M (xviii) Bottem width of the side wall &wing wall taking as per Bottom width

of the head wall ext as in item no.5= m 0.60 M (xix) Depth of foundation taking as 1.00 M

Page 124: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

STABILITY CHECK'S a Top width of anicut = 0.30 m b Bottm width of anicut = 1.60 m w1 + w2self weight of anicut p1 Pressure due to water besswall p2 Horizontal water pressure p3 Up lift pressure h Food heigth = 0.35 m H heigth of anicut = 0.30 m L considening one metre = 1 S 2.3 C 0.6

Forces acting on a over flow gravity damForces and momrnt calculation'sconsidening one metre length of ancut and taking Restoring moment as positive (+ ve) and overturning momentas negative (-ve)moment taken at B

s. no. Forcesv- vertical forces

H- horizontal forces

Force acting at a distance from B

moment at B 2x5 + ve -ve

1 w1 = a x H xLxS0.21 0.21 2.20 0.460.21 0.21 2.20 0.46

2 w2 = 1/2x(b-a)xHxLxS0.45 0.45 1.13 0.51

3 p1 =wh x H0.11 0.11 0.90 0.09

4 p2 =wH2/2 x H0.05 0.05 0.60 0.03

5 p3 =cxwbx(H+h)/20.17 0.17 1.80 0.31

TOTAL 0.48 0.15 0.96 0.43 Em=mr-mo

0.53 CHECKS IN OVERTURNINGFactor of satety agaist overturning Emr/Emo =+m/-m = Restoning moment/overturning moment

2.22it is more than 1.50 hance structure is safe against overturning SLINDINGFactor of safety against slindingEv/Eh = 3.22it is more than 1.0 hance structure is safe against slindingRUPTURE (safety against tension at the bese)X Relne Position of resultant measured from toe x = Em/Ev = 1.10e = b/2 - X -0.30Ev/b (1+6e/b) -0.81Ev/b (1-6e/b) 1.42P max = -0.81P max = -0.81P min = 1.42

Page 125: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

Name of work :-Nadi with weste weir S.Noitem no.Particular Qty. Per

Lc Total Lc Total1 2,(b)1 Excavation in hard soil dry or

most&disposal of excavatedmaterial within intial lead of30 m and liftof 1.5m includingdressing etc complete 40% 6.83 cum 91 91.00 621.71 621.712

2 2(c ),1 Excavation in ordinarymurram or earth mixed withbajri and kankar or boulderdry or most&disposal ofexcavated material withinintial lead of 30 m and liftof1.5m including dressing etccomplete 60% 10.25 cum 99 99.00 1014.55 1014.552

3 192,17 cement concrete well mixedin cement mortar(1:4:8) laidin position complete includingcuring Aggregate size upto40mm. HB 5.29 cum 320 1705.00 1693.44 9022.86

ABSTRACT OF COST

Rate Amount

40mm. HB 5.29 cum 320 1705.00 1693.44 9022.864 27,3 Random rubble stone

masonary in cement sandmortar(1:6) for foundation 9.81 cum 357 1265.00 3501.46 12407.12

5 28,3 Random rubble stonemasonary in cement sandmortar(1:6) forsuper structure 6.02 cum 357 1265.00 2150.57 7620.36

6 70,8 Cement plaster includingsmooth finishing in cementmortar (1:4)25mm thick 16.50 cum 68.9 138.00 1136.85 2277

7 40(ii),4 Cement concrete coping incement mortar1:2:4.100mmthick 0.70 cum 316 2638.00 221.83 1851.876

TOTAL 10340.41 34815.48

Prepared by checked by Approved by

Page 126: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

S.No. PARTICULAR No. LENGTH BREADTHHT/DEPTH QUANTITY1 Total Excavation

H.W. 1.00 4.00 1.60 1.00 6.40H.W.E. 2.00 1.50 0.60 1.00 1.80S.W. 2.00 2.40 0.60 1.00 2.88wing wall 2.00 0.80 0.60 1.00 0.96Toe wall 1.00 4.00 0.45 0.90 1.62Apron 1.00 4.00 0.95 0.90 3.42

Total (cu.m) 17.082 Excavation in hard soil dry or

most&disposal of excavatedmaterial within intial lead of30 m and liftof 1.5m includingdressing etc complete 10%ofTotalExcavation

Total 6.833 Excavation in ordinary

murram or earth mixed withbajri and kankar or boulderdry or most&disposal ofexcavated material withinintial lead of 30 m and liftof

DETAILED ESTIMATE

intial lead of 30 m and liftof1.5m including dressing etccomplete 30% of TotalExcavation

Total 10.254 cement concrete well mixed

in cement mortar(1:4:8) laidin position complete includingcuring Aggregate size upto50mm. HB Total ExcavationH.W.

1.00 4.00 1.60 0.30 1.92H.W.E. 2.00 1.50 0.60 0.30 0.54S.W. 2.00 2.40 0.60 0.30 0.86Wing Wall 2.00 0.80 0.60 0.30 0.29Toe Wall 1.00 4.00 0.45 0.30 0.54Apron 1.00 4.00 0.95 0.30 1.14

Total 5.29

Page 127: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

5 Random rubble stonemasonary in cement sandmortar(1:6) for foundation H.W. 1.00 4.00 1.30 0.70 3.64H.W.E. 2.00 1.50 0.60 0.70 1.26S.W. 2.00 2.40 0.60 0.70 2.02Wing Wall 2.00 0.80 0.60 0.70 0.67Toe Wall 1.00 4.00 0.45 0.60 1.08Apron 1.00 4.00 0.95 0.30 1.14

Total 9.816 Random rubble stone

masonary in cement sandmortar(1:6) forsuper structure

H.W. 1.00 4.00 0.80 0.30 0.96H.W.E 2.00 1.50 0.60 0.95 1.71S.W. 2.00 1.40 0.60 0.78 1.30

2.00 1.00 0.60 0.95 1.142.00 0.00 0.60 0.48 0.00

Wing Wall 2.00 0.80 0.60 0.95 0.91Total 6.02

7 Cement plaster includingsmooth finishing in cementmortar (1:4)25mm thickmortar (1:4)25mm thickH.W. 1.00 4.00 0.30 1.20

1.00 4.00 0.60 2.401.00 4.00 0.30 1.20

S.W. 2.00 0.30 0.65 0.392.00 1.30 0.80 0.392.00 1.40 0.78 2.172.00 0.95 0.30 0.57

Wing Wall 2.00 0.80 0.60 0.962.00 0.60 0.60 0.72

H.W.E. 1.00 3.00 0.50 1.50Toe Wall 1.00 4.00 0.30 1.20Apron 1.00 4.00 0.95 3.80

Total 16.508 Cement concrete coping in

cement mortar1:2:4. 100 mmthickH.W. 1.00 4.00 0.30 0.08 0.09S.W. 2.00 3.00 0.60 0.08 0.27Wing Wall 2.00 0.80 0.60 0.08 0.07H.W.E. 1.00 3.00 0.60 0.08 0.14Toe.Wall 1.00 4.00 0.45 0.08 0.14Apron 0.00 4.00 0.95 0.10 0.00

Total 0.70

Page 128: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

NAME OF WORK : Nadi with weste weir S.no Particular Qty. Cement Sand Aggregate Stone Bags Cum 50mm 20mm Cum

1 Cement concrete (1:4:8) mmHB (cum) 4.05,0.43,0.86 5.29 21.43 2.28 4.55

2 R R stone masonary (1:6)Foundation/ Super structure(cum) 1.40, 0.30, 1.10 15.83 22.16 4.75 17.42

3 Cement plaster (1:6)25 mmthick (sqm) 0.153 0.03 16.50 2.52 0.50

4 Raised &cut pointing (sqm)0.0.32, 0.0043

5 Stone kharanja in cementmortar (1:6)(cum)1.80, 0.375, 1.20

6 Cement concrete coping incement mortar1:2:4. 100 mmthick 7.33,0.40,0.78 0.70 5.15 0.28 0.55

7 Dry stone pitching TOTAL 51.27 7.80 5.10 17.42

MATERIAL CONSUMPTION STAEMENT

TOTAL 51.27 7.80 5.10 17.42SAY 51 BAGS 2.56 MT

0.35 P30.30

P1

0.30 w1 1.45 P2 0.15

0.10 w2

0.650.30

0.39

1.60

0.53 1.07

Page 129: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

PLAN1.5 4.00 1.5

2.40

0.450.80

0.650.30

0.30 0.50G.L G.L

0.30 0.901.00

0.30

0.30 0.60

2.0.30

0.3 0.951.60

0.60

0.600.95

0.50G.L G.L

1.00 1.00

0.3 0.30.60

S.W.& H.Ex- X- Sec. W.W. X- Sec.

X-Section

0.60

Page 130: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

Name of village :- P.S . - Banera DISTT. Bhilwara

Lc Total Lc Total1 Jungal Clearence work 1 50 50 2500 Sqm 1.36 1.36 3400.00 3400.00

2 5-7 Cm Dagballing Work 4 40 160 Rmt 1 1 160.00 160.00

3 Benching of Base under Earthen Bund in hard soil.

1 100 8 0.3 240 Cum 85 85 20400.00 20400.00

4 E/W for bind / embankmentin dry or mosit soil includinglaying on layers 1.5cmBreaking of clods sort ing ofgrass pabbles ete anddressing in requred profilewhen compacted manuallyor by plain roller with initiallead of 30mt and lift 1.5 mt

Depth Qty. Unit Rate Amount

NADI IN P. D. BLOCK

S.no Particular No Length Width

lead of 30mt and lift 1.5 mt(exeluding charges ofwaterring and compaction)Hard soil

(1600+900)/2x1.60=2000 Cum

2000.00 Cum(A) In Hard Soil (40%) 800 Cum 91 91 72800.00 72800.00

(B) In Ordinary Murram (60%) 1200 Cum 99 99 118800.00 118800.00

5 Add. Extra Lift one times 500 Cum 11 11 5500.00 5500.00

6 Add. Extra Lead one times 500 Cum 33.8 33.8 16900.00 16900.00

7 Weste WeirAs per Estimate No 15921.77 51635.60

TOTAL 253881.77 289595.60Contingency 3% 8687.87Grant Total 253881.77 298283.47

4040.00

30

1.60

Cross- Section

1.60 30

Isometric ViewIsometric View

Page 131: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

1 Name of village :- P.S . - Banera DISTT. Bhilwara

2 Name of work :- CONTRUCTION OF NADI WITH WASTEWEIR Design

1 Available crest length 6.00 M2 Total catchment area 20.00 Ha3 Hight of structure 0.60 MA Design discharge (By flood discharge method) 0.52 A HYDROLIC DESIGN

Peak rate of run off in cum/sec.=Q = C I A C= 0.40

36 Catchment Area 20.00 HaQ = 1.78 cumsec K = L3

H L= 1200.00 M

Say 2.00 cumsec H= 4.00 MK 20784.61Tc=0.0195K0.77

41.18I = 8.00 cm/hr.

B HYDROLIC DESIGN

ESTIMATE OF WESTE WEIR

B HYDROLIC DESIGNQ = 1.71L(h)3/2 L = 6.00 mt length available at siteh =[Q/1.71L]2/3

h = 0.34 Say = 0.35 Taking free board as 0.3 MTotal d = 0.65

C. STRUCTURAL DESIGN (I) Top width of Head wall

h /(p-1)0.5 0.31 0.31 say = 0.30 M(as per site condition where h = 0.35 m p = 2.30 0.35p Specific gravty of stone masnory in cm = 2.3

(ii) Bottom width of head wallb = 0.8H+T.W+.3 1.08 Say = 1.60 MH =heigth of head wall in meters = 0.6 m 0.60 M

(iii) Length of head wall extension H +d + 1 2.25 2.25 Md = h+free board = 0.65 0.65 Mbut as per side condition L/S M 1.5 R/S M 1.5 3.00 M

(iv) Heigth of Head wall extensionH + d = 1.25 M

(v) Botton width of HW ext. side wall & wing wall0.5(H+h)= 0.48 0.60 M

(vi) Top width of HW ext0.4H= 0.24 0.60 M

(vii) APRON WIDTH =H+d 1.25 1.25 M

(viii) Thickness of Basin =0.60m(incloding concreting) (viii) Thickness of Basin =0.60m(incloding concreting) (ix) Height of side wall

H+d = 1.25 1.25 M (x) Height of side wall =1.5h at W W joints

1.5h = 0.53 0.50 M

Page 132: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

(xi) Length of side wall = B. W. of H. W -B.W of H W E+Apron width+ width of toe wall2.70

(xii) Length of wing wall = 2.25 h= 0.79 0.80 M (xiii) Height of the wing wall = 0.53 0.60 M (xiv) Top width of Head wall ext site wall wing wall = 0.60mt (xv) Width of toe wall= 0.45 M (xvi) Height of toe wall = 0.30 M (xvii) Height of wing wall at wing end = 0.60 M (xviii) Bottem width of the side wall &wing wall taking as per Bottom width

of the head wall ext as in item no.5= m 0.60 M (xix) Depth of foundation taking as 1.00 M

Page 133: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

STABILITY CHECK'S a Top width of anicut = 0.30 m b Bottm width of anicut = 1.60 m w1 + w2self weight of anicut p1 Pressure due to water besswall p2 Horizontal water pressure p3 Up lift pressure h Food heigth = 0.35 m H heigth of anicut = 0.60 m L considening one metre = 1 S 2.3 C 0.6

Forces acting on a over flow gravity damForces and momrnt calculation'sconsidening one metre length of ancut and taking Restoring moment as positive (+ ve) and overturning momentas negative (-ve)moment taken at B

s. no. Forcesv- vertical forces

H- horizontal forces

Force acting at a distance from B

moment at B 2x5 + ve -ve

1 w1 = a x H xLxS0.41 0.41 2.20 0.910.41 0.41 2.20 0.91

2 w2 = 1/2x(b-a)xHxLxS0.90 0.90 1.13 1.01

3 p1 =wh x H0.21 0.21 0.90 0.19

4 p2 =wH2/2 x H0.18 0.18 0.60 0.11

5 p3 =cxwbx(H+h)/20.35 0.35 1.80 0.62

TOTAL 0.97 0.39 1.92 0.92 Em=mr-mo

1.01 CHECKS IN OVERTURNINGFactor of satety agaist overturning Emr/Emo =+m/-m = Restoning moment/overturning moment

2.09it is more than 1.50 hance structure is safe against overturning SLINDINGFactor of safety against slindingEv/Eh = 2.48it is more than 1.0 hance structure is safe against slindingRUPTURE (safety against tension at the bese)X Relne Position of resultant measured from toe x = Em/Ev = 1.04e = b/2 - X -0.24Ev/b (1+6e/b) -0.30Ev/b (1-6e/b) 1.51P max = -0.30P max = -0.30P min = 1.51

Page 134: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

Name of work :-Nadi with weste weir S.Noitem no.Particular Qty. Per

Lc Total Lc Total1 2,(b)1 Excavation in hard soil dry or

most&disposal of excavatedmaterial within intial lead of30 m and liftof 1.5m includingdressing etc complete 2.48 cum 91 91.00 225.50 225.498

2 2(c ),1 Excavation in ordinarymurram or earth mixed withbajri and kankar or boulderdry or most&disposal ofexcavated material withinintial lead of 30 m and liftof1.5m including dressing etccomplete 7.43 cum 99 99.00 735.97 735.966

3 2(d ),1Excavation in disintegratedrock and or soft rock or hardbankar or compacted murrumdry or moist includingdressing&disposal of

ABSTRACT OF COST

Rate Amount

dressing&disposal ofexeavated matarual with intiallead of 30m and lift of 1.5m

14.87 cum 134 134.00 1992.31 1992.3124 192,17 cement concrete well mixed

in cement mortar(1:4:8) laidin position complete includingcuring Aggregate size upto40mm. HB 7.74 cum 320 1705.00 2476.80 13196.7

5 27,3 Random rubble stonemasonary in cement sandmortar(1:6) for foundation 13.53 cum 357 1265.00 4830.21 17115.45

6 28,3 Random rubble stonemasonary in cement sandmortar(1:6) forsuper structure 9.72 cum 357 1265.00 3468.97 12292.005

7 70,8 Cement plaster includingsmooth finishing in cementmortar (1:4)25mm thick 27.96 cum 68.9 138.00 1926.10 3857.79

8 40(ii),4 Cement concrete coping incement mortar1:2:4.100mmthick 0.84 cum 316 2638.00 265.91 2219.877

TOTAL 15921.77 51635.60

Prepared by checked by Approved by

Page 135: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

S.No. PARTICULAR No. LENGTH BREADTHHT/DEPTH QUANTITY1 Total Excavation

H.W. 1.00 6.00 1.60 1.00 9.60H.W.E. 2.00 1.50 0.60 1.00 1.80S.W. 2.00 2.70 0.60 1.00 3.24wing wall 2.00 0.80 0.60 1.00 0.96Toe wall 1.00 6.00 0.45 0.90 2.43Apron 1.00 6.00 1.25 0.90 6.75

Total (cu.m) 24.782 Excavation in hard soil dry or

most&disposal of excavatedmaterial within intial lead of30 m and liftof 1.5m includingdressing etc complete 10%ofTotalExcavation

Total 2.483 Excavation in ordinary

murram or earth mixed withbajri and kankar or boulderdry or most&disposal ofexcavated material withinintial lead of 30 m and liftof

DETAILED ESTIMATE

intial lead of 30 m and liftof1.5m including dressing etccomplete 30% of TotalExcavation

Total 7.434

Excavation in disintegratedrock and or soft rock or hardbankar or compacted murrumdry or moist includingdressing&disposal ofexeavated matarual with intiallead of 30m and lift of 1.5m60% of Total Excavation

Total 14.87

5 cement concrete well mixedin cement mortar(1:4:8) laidin position complete includingcuring Aggregate size upto50mm. HB Total ExcavationH.W.

1.00 6.00 1.60 0.30 2.88H.W.E. 2.00 1.50 0.60 0.30 0.54S.W. 2.00 2.70 0.60 0.30 0.97S.W. 2.00 2.70 0.60 0.30 0.97Wing Wall 2.00 0.80 0.60 0.30 0.29Toe Wall 1.00 6.00 0.45 0.30 0.81Apron 1.00 6.00 1.25 0.30 2.25

Total 7.74

Page 136: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

6 Random rubble stonemasonary in cement sandmortar(1:6) for foundation H.W. 1.00 6.00 1.30 0.70 5.46H.W.E. 2.00 1.50 0.60 0.70 1.26S.W. 2.00 2.70 0.60 0.70 2.27Wing Wall 2.00 0.80 0.60 0.70 0.67Toe Wall 1.00 6.00 0.45 0.60 1.62Apron 1.00 6.00 1.25 0.30 2.25

Total 13.537 Random rubble stone

masonary in cement sandmortar(1:6) forsuper structure

H.W. 1.00 6.00 0.80 0.60 2.88H.W.E 2.00 1.50 0.60 1.25 2.25S.W. 2.00 1.70 0.60 0.93 1.89

2.00 1.00 0.60 1.25 1.502.00 0.00 0.60 0.63 0.00

Wing Wall 2.00 0.80 0.60 1.25 1.20Total 9.72

8 Cement plaster includingsmooth finishing in cementmortar (1:4)25mm thickmortar (1:4)25mm thickH.W. 1.00 6.00 0.60 3.60

1.00 6.00 0.90 5.401.00 6.00 0.30 1.80

S.W. 2.00 0.30 0.65 0.392.00 1.30 0.95 0.392.00 1.70 0.93 3.152.00 1.25 0.30 0.75

Wing Wall 2.00 0.80 0.60 0.962.00 0.60 0.60 0.72

H.W.E. 1.00 3.00 0.50 1.50Toe Wall 1.00 6.00 0.30 1.80Apron 1.00 6.00 1.25 7.50

Total 27.969 Cement concrete coping in

cement mortar1:2:4. 100 mmthickH.W. 1.00 6.00 0.30 0.08 0.14S.W. 2.00 3.30 0.60 0.08 0.30Wing Wall 2.00 0.80 0.60 0.08 0.07H.W.E. 1.00 3.00 0.60 0.08 0.14Toe.Wall 1.00 6.00 0.45 0.08 0.20Apron 0.00 6.00 1.25 0.10 0.00

Total 0.8410 E/W for bind / embankment in10 E/W for bind / embankment in

dry or mosit soil including layingon layers 1.5cm Breaking ofclods sort ing of grass pabblesete and dressing in requredprofile when compactedmanually or by plain roller withinitial lead of 30mt and lift 1.5 mt(exeluding charges of waterringand compaction) Hard soil 1340 1340.00

Total 1340.00

Page 137: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

NAME OF WORK : Nadi with weste weir S.no Particular Qty. Cement Sand Aggregate Stone Bags Cum 50mm 20mm Cum

1 Cement concrete (1:4:8) mmHB (cum) 4.05,0.43,0.86 7.74 31.35 3.33 6.66

2 R R stone masonary (1:6)Foundation/ Super structure(cum) 1.40, 0.30, 1.10 23.25 32.55 6.97 25.57

3 Cement plaster (1:6)25 mmthick (sqm) 0.153 0.03 27.96 4.28 0.84

4 Raised &cut pointing (sqm)0.0.32, 0.0043

5 Stone kharanja in cementmortar (1:6)(cum)1.80, 0.375, 1.20

6 Cement concrete coping incement mortar1:2:4. 100 mmthick 7.33,0.40,0.78 0.84 6.17 0.34 0.66

7 Dry stone pitching TOTAL 74.34 11.48 7.31 25.57

MATERIAL CONSUMPTION STAEMENT

TOTAL 74.34 11.48 7.31 25.57SAY 74 BAGS 3.72 MT

0.35 P30.30

P1

0.60 w1 1.45 P2 0.30

0.20 w2

0.950.60

0.57

1.60

0.53 1.07

Page 138: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

PLAN1.5 6.00 1.5

2.70

0.450.80

0.650.30

0.60 0.50G.L G.L

0.30 0.901.00

0.30

0.30 0.60

2.0.30

0.3 1.251.60

0.60

0.601.25

0.50G.L G.L

1.00 1.00

0.3 0.30.60

S.W.& H.Ex- X- Sec. W.W. X- Sec.

X-Section

0.60

Page 139: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

Name of work:-No of plants:- 150 Spacing 0.6

S.no.

Item Quantity Unit Lc Total Lc TotalAloevera plantation

1 Cost of Aloevera Plant Including Transporting,Loading & unloading.(3.75+0.94+0.297+0.3715=5.36)

150 Per Plant 0 5.36 0.00 804.00

2 Plantation work of plant 150X0.6=90Rmt

90 Per Rmt 9.97 9.97 897.30 897.30

Total 897.30 1701.30206.02 206.021103.3 1907.32

Add. 0.03% Contengency charge 57Total Amount 1965

1103861

1965 Per Ha

Labour AmMeterial AmTotal Am

MODEL ESTIMATE OF ALOVERA PLANTATION District - Bhilwara, State - Rajasthan, India

Aloevera plantation

Rate Amount

Je Hkkx es 22.96 % etnwjh esa of̀) ds dkj.k vfrfjDr tksMuk

Page 140: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

W/SName of work:-No of plants:- 150 Spacing 2 m

S.no.

Item Quantity Unit Lc Total Lc TotalKaronda Fencing

1 E/w Excavation for pit in hard soilin top of bund + 10% extra fordifferent position

150 No 6.8 6.8 1020.00 1020.00

2 Cost of Karonda Plant Including Transporting,Loading & unloading. (6+2=8)

150 Per Plant 0 8.00 0.00 1200.00

3 Plantation work of plant 150 Per Plant 9.97 9.97 1495.50 1495.50

4 Watering Charges (three year) 3x5=15Nox150=2250 Nox15=33750

A Cost of water including Transporting

33750 4000 Per Litre

0 450.00 0.00 3796.88

B Watering charges (150X3X5=2250) 2250 Per Plant 1.85 1.85 4162.50 4162.50

5 Treatment of pitA Cost of FYM 150 Per Plant 0 2.00 0.00 300.00

B Cost of Andosulphane 150 Per Plant 0 0.50 0.00 75.00

C Cost of Clorophyropas 2ml per plant

0.30 Per Litre 0 280.00 0.00 84.00

D Labour charge for treatment (0.55+0.27=0.82)

150 Per Plant 0.82 0.82 123.00 123.00

6 Weeding & Hoeing of plant in three year 2x3=6No x150 =900

900 Per Plant 1.2 1.20 1080.00 1080.00

Total 7881.00 13336.887 Gap filling 20% 1576.20 2667.38

Total 9457.20 16004.25

Aloevera plantation8 Cost of Aloevera Plant Including

Transporting,Loading & unloading.150 Per Plant 0 5.36 0.00 804.00

9 Plantation work of plant (1 m X 1m) 150 Per Rmt 9.97 9.97 1495.50 1495.50

Total 1495.50 2299.50Grand Total 10952.7 18303.75

2514.7 2514.7413467 20818.5

Say Rs 13467 20818Add. 0.03% Contengency charge 625

Total Amount 21443

134677976

21443 Per Ha

Labour AmMeterial AmTotal Am

MODEL ESTIMATE OF AGRO FORESTY District - Bhilwara, State - Rajasthan, India

Karonda fencing

Rate Amount

Je Hkkx es 22.96 % etnwjh esa of̀) ds dkj.k vfrfjDr tksMuk

Page 141: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

MODEL ESTIMATE

Name of work :-Bank Stabilization through construction of earthen bund

Height 0.80 mt.Bottom width 2.90 mt.

Top width 0.50 mt.X-Section 1.36 sqm.

Estimate For 100 M Length

S.N. Item Unit Quantity Rate ( Rs./unit) Amount Rs.Lab. total Lab. total

1 Jungal clearance by cuttingordinary vegetation and bushes(As per BSR 2011 , page no 10, item no 95)

sqm 400.00 1.36 1.36 544.00 544.00

2 Dag balling work sqm 400.00 1.00 1.00 400.00 400.00

(As per BSR 2011 , page no 14, item no 156)

3

cum 136.000 85.00 85.00 11560.00 11560.004 Vegetative measures L-S 350 350.00

Total 12454.00 12454.002859.44 2859.44

15313.44 15313.44Add 3% Contingency 459.40

15772.84

Total Amount 15772.84 Say 15800.00Labour Componant 15313.44 OR 158/-Per MMaterial Componant 459.40

Earth work for bund /embankment in dry or moist soil including laying in layers of 15cms. Break- ing of clods,sorting of grass, pebbles etc.and dressing in requried profile with manual compaction in hard soil. (As per BSR 2011 , page no 17, item no 188 b) (0.50+2.00)/2*0.75

Total Am.

Add.22.96% in Rising Labour Rate

Page 142: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

DESIGN OF SEMI PUCCA BUND

Block - A

Elevation differenceSlope = x 100

Horizental length

S = 24 1001750

S = 1.37 %S 2

V.I = 3 x 0.3

V.I = 0.74 m H.I = 55 m

Height of bund =Re xV.I Re = 10 cm

50 V. I =0.74 m

H = 0.38 m SAY 0.40 m ,Free board = 0.35 m Total height = 0.75 m

Block B & C

Total height = 0.75 m

Page 143: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

A Cross section of bund- 0.64 sqm Top Width 0.4

B Length per Ha-100 RMT Bottom Width 2.15

Height 0.5S.no. Item Quantity Unit Labour

Rate Total Rate

Labour Amount

Total Amount

1 Dug belling work up to 5-7 cm depth 400 Rm 0.88 0.88 352.00 352.00

2 Earth work in hard soil forconstruction of bund includingramming compaction and dressing upto the lead of 50m and lift 1.5 m Asper page No 1 Item No

64 Cum 73.8 81.00 4723.20 5184.00

MODEL ESTIMATE OF ARABLE LAND (SEMI PUCCA BUND )

per page No 1 Item No 3 Prepare pallets with composition of

grass seed , fine soil and water 3 Kgs 16.3 16.80 48.90 50.40

4 Sowing of seed on bunds 300 Rm 0.52 0.52 156.00 156.005 Material transportation like water,

soil, manure etc. for pallets makingLS 0.00 50.00

6 Grass seed 0.00Stylohemata 1 LS 0 40.00 0.00 40.00Dhaman 2 LS 0 82.00 0.00 164.00

Total 5280.10 5996.402262.52 2262.52

7542.62 8258.92Add. 6% waterman & Aaya 42.98

7542.62 8301.90249.06

8551Grand TotalContingency @ 3%

Add. 30% Reduction in Task for NREGS

Page 144: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

A Cross section of bund- 0.64 Sqm Top Width 0.4

B Length - 100 Rmt Bottom Width 2.15

Height 0.5S.no. Item Quantity Unit Labour

Rate Total Rate

Labour Amount

Total Amount

1Dug belling work up to 5-7 cm depth 4x100=400m As per item no.156 page 15 of G.K.N.2012 BSR of Bhilwara circle

400 Rm 1 1 400 400

2 Earth work in hard soil for construction of bund including ramming compaction and dressing up to the lead of 50m and lift 1.5 m 0.64x100=64 cum As per item no.188B page 17 of G.K.N.2012 BSR of Bhilwara circle

64 Cum 85 85 5440 5440

Total 5840.00 5840.001340.86 1340.864

MODEL ESTIMATE OF ARABLE LAND (SEMI PUCCA BUND )

Je Hkkx es 22.96 % etnwjh esa of̀) ds dkj.k vfrfjDr tksMuk 1340.86 1340.8647180.86 7180.864

Say Rs 7181 71812157396

Say am 7396

Per Rmt 60/-Avarage length per Rm/Ha = 125 Rm 7500

Say am 0.075

0.4

Contingency @ 3%Grand Total

Per Ha Cost

Je Hkkx es 22.96 % etnwjh esa of̀) ds dkj.k vfrfjDr tksMuk

1.5:1

0.50 2:1

. 0.4

. 0.42.15

1.6

Page 145: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

1-

2- ;kstuk dk uke&

Je dqy Je ;ksx

1 uhao] [kkbZ] ijukyk esa 1-5 xgjkbZ rd feêh dh [kqnkbZdjuk] ry dks dwVuk] ikuh Mkyuk] cxy dks laokjuk][kqnh feêh dks ckgj fudkyuk] uhao Hkjus ds ckn

Øa-la- dk;Z dk fooj.k la0 iSnsa dk {ks=Qy

vkSlr {ks=Qy

xgjkbZ jkf'kek=k bdkbZ nj

iSans dh pkSM+kbZ 10 eh- & Åij dh pkSM+kbZ 20 eh- & xgjkbZ 2 ehVj Location- 0

dk;kZy; iapk;r lfefr] cusMk ] ftyk HkhyokMk fuekZ.k dk;Z gsrq foLr`r ykxr&vuqeku

dk;Z dk Ukke& QkeZ ikS.M fuekZ.k dk;Z xzke& xzke iapk;r&

Åij dk

{ks=Qy

[kqnh feêh dks ckgj fudkyuk] uhao Hkjus ds ckn[kkyh LFkkuksa dks iqu% feêh ls Hkjuk rFkk cph gqbZfeêh dks 50 ehVj dh nwjh rd fuLrkj.k djukA istu 1 vkbVe u 2

A- l[r] fpduh] dadj feêh esa 80 izfr- vkSlr 1 100 400 250 1.6 400 ?ku eh- 91.00 91.00 36400.00 36400.00B- fo?kfVr pV~Vku @eqjZe 20 izfr- vkSlr 1 100 400 250 0.4 100 ?ku eh- 134.00 134.00 13400.00 13400.002 vfrfjDr fy¶V dk dk;Z ist u 1 vkbVe u 3 1 100 156.25 128.125 0.5 64.06 ?ku eh- 11.00 11.00 704.69 704.693 vfrfjDr yhM dk dk;Z ist u 1 vkbVe u 4 1 100 400 250 1 250 ?ku eh- 33.80 33.80 8450.00 8450.00

Total 58954.69 58954.6913536 13535.996

72490.68 72490.6842174.7274665

SAY 74700725002200

ykxr Je en esa ykxr lkexzh en esa

dqy ;ksx

Total

dqy ;ksx

Je Hkkx es 22.96 % etnwjh esa of̀) ds dkj.k vfrfjDr tksMuk

74700dqy ;ksx

Page 146: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

Name of Work :- Continious contour trench Jal Grahan Vikash Samiti

W/STotal Area in Ha 1

Lc Total Lc Total

1 Marking of contour line through dumpy level 300 Per

metre 0.31 0.31 93.00 93.00

2Dug belling work for CCT up to 5-7 cm depth (As per BSR2011, P.no. 14, item no. 155a) (2X300=600)

600 Rm 1.00 1.00 600.00 600.00

Quantity of E/W (300Rmt X 0.2025=60.75 cum) 60.75 Cum 0.00 0.00

3 Excavation of hard soil for CCT as perBSR2012 40% 24.3 Cum 85.00 85.00 2065.50 2065.50

4 Excavation of murram for CCT as perBSR2012 60% 36.45 Cum 91.00 91.00 3316.95 3316.95

5 Sowing of local grass seed on bunds As per BSR2012 (3X300=900) 900 Rm 0.59 0.59 531.00 531.00

6 Grass seed 0.00 0.00A Spreeding of Grass seed 1 Ha 160 160 160.00 160.00B Making of pallets 12 Kg 18.9 18.9 226.80 226.80C Dhaman 12 Kg 0 83 0.00 996.00

Total cost for CCT 6993.25 7989.251605.65 1605.65

8598.90 9594.90

Contengency charge 3% 287.859882.75

SAY Amount 9900 Per Ha

Rate Amount

Total length of CCT per ha =300 rm/haCX= 0.2025 Cum

MODEL ESTIMATE OF OPEN CONTOUR TRENCH

Costing & Quantity Estimation of Contour trench

Je Hkkx esa 22.96 % etnwjh esa of̀) ds dkj.k vfrfjDr tksMuk

ItemS. No. Quantity Unit

Page 147: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

Name of Village :- Name of Panchayat :-

Name of Work :- Pasture Land Development (NRM)

1.00 Ha. Area for trenching, Size of trench 0.45 mt. Depth 0.45 mt. Width33.3 Mt. Contour to contour intervals 0.2025 Sqm cross section area of trench

80 MM / Hr. Rainfall intensity of area 0.002296 Mt. trenching length required in one hectare of landSay CCT/ha. 300.0060 Rmt. Length of Ditch cum bund fencing per ha.

278 Plants to be planted in one hectare Say 300 36.001.20 Mt. Depth of cattle protection trench, Top width 1.5 Bottom width 0.91.44 Sqm cross section area of DCB 60.00

S.no Particular Unit Quantity Labour Rate

Total Rate

Labour Cost Total Amount

(A) Ditch cum bund1 Dug belling work up to 5 to 7 cm depth. (4X60=240) Rmt. 240 1.00 1.00 240 240.002 Excavation of Ditch cum bund fencing Cum 86.43 Hard Soil 40% (60X1.44X0.4=34.56) Cum 34.56 91 91 3144.96 3144.964 Ordinary Murram 30% (60X1.44X0.3=25.92) Cum 25.92 99 99 2566.08 2566.085 Disintric Rock 30% (60X1.44X0.3=25.92) Cum 25.92 134 134 3473.28 3473.28

(B) Thor fencing work6 Excavation for thor fencing size 0.15x0.15x60 m Cum 1.35 91 91 122.85 122.85

(C) Counter Trench7 Layout ( by A-farm or dumpy level) for contouring. Rmt. 300 0.31 0.31 93 93.00

8Dug belling work up to 5 to 7 cm depth forcontouring. (2X300=600) Rmt. 600 1.00 1.00 600 600.00

40%Contour trench Excavation in 40 % Hard soil fortrenching. (1X300X0.2025X0.40=24.30) Cum 24.3 91 91.00 2211.3 2211.30

60%Contour trench Excavation in 60 % Ordinary Murramfor trenching. (1X300X0.2025X0.60=36.45) Cum 36.45 99 99.00 3608.55 3608.55

(D) Pits Work40% Pit digging in hard soil of size 45x45x45 Cm. Per pit 120 7.48 7.48 897.6 897.6060% Pit digging in moorm soil of size 45x45x45 Cm. Per pit 180 14.74 14.74 2653.2 2653.20

9Ring making of 1.0 Mt. Radius & 30 Cm. width X 20Cm. Depth. Per plant 300 2.40 2.40 720 720.00Note:- All Rates Apply Gramin kary Nirdesika 2011 Total Rs.20,331 Rs.20,331

Total Rs.20,331 203314667.96 4667.96

24998.78 24998.78Contengency 3% 750

Total Amount 25749

Je Hkkx es 22.96 % etnwjh esa of̀) ds dkj.k vfrfjDr tksMuk

Rmt. Length of Ditch cum bund fencing per ha.Total C P T

Panchayat samity Banera, District - Bhilwara, State - Rajasthan,

Costing & Quantity Estimation of Pasture Land Development

2.5 x 2.5 mt. Spacing

Page 148: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

Name of Village :- Name of Panchayat :-

Name of Work :- Pasture Land Development

1 Ha. Area for P.D, 60 Rmt. Length of Ditch cum bund fencing per ha.

277.8 Plants to be planted in one hectare Say 300 36.00

S.no Particular Unit Quantity Labour Rate

Total Rate

Labour Cost

Total Amount

(A) Thor fencing work1 Supply and cutting of 80 cm thor sticks. (7N0 Danda /-

Ha)Per 100 stick 420 74.3 174 312.06 730.80

2 Transportation cost of thor sticks through bullock cart from 5 km distance, loading & unloading.

Per 100 stick 420 100 100 420 420.00

3 Rehandling work of thor sticks up to 200 to 500mt distance. Per 100 stick 420 76.5 76.5 321.3 321.30

4 Planting of Thor sticks. Rmt. 60 6.93 6.93 415.8 415.80(B) Plantation work5 Treatment of pit by FYM & Endosulphane (25gm per pit) Per pit 300 0.82 0.82 246 246.00

6 Cost of Endosulphane (As per market Rate) Per Kg 7.50 0.00 32.00 0 240.007 Cost of cloropairyphose 0.3x0.6=1.8 lit Per litre 1.80 0.00 280.00 0 504.008 Cost of FYM Per Kg 300.00 0.00 2.00 0 600.009 Cost of saplings Per plant 300 0 5.00 0 1500.0010 Transportation Cost of saplings from 10 km distance. Per 1000 Plant 0.3 196 1444.00 58.8 433.2011 Planting of plant with Rehandling work 100m distance,

mixing of soil with FYM,Endosalphane & filling of pit.cuttingof polythine bag & planting with doing compact soil.

Per pit 300 7.40 7.40 2220 2220.00

12 Planting of Aloevera plant on top of contour trench 0.60mspacing with complete work.600x0.6=360 Rmt

Per Rmt 360 9.97 9.97 3589.2 3589.20

13 Cost of Aloevera including transport 10 Km + LoadingUnloading + Rehandling50%(3.75+0.94+0.297+0.3715=5.36)

Per plant 600 0 5.36 0 3216.00

6 x 6 mt. Spacing

Panchayat samity Banera, District - Bhilwara, State - Rajasthan,

(Production)Costing & Quantity Estimation of Pasture Land Development

Page 149: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

14 Watering to the plant with 15 liters per plant for first yearthree times,second year five times & third year five timeswith mixing cloropairyphose.(2ml per pit) (300X13=3900)

Per plant 3900 1.85 1.85 7215 7215.00

15 Transportation Cost of water up to 5 kmdistance.(300X13X15=58500)

Per 4000 Litre 58500.00 0 450.00 0 6581.25

16 Weeding & Hoeing (300X2X3=1800) Per plant 1800 1.20 1.20 2160 2160.0017 Ploughing by tractor cultivator and grass seed broadcasting

(seed rate 6 to 8 kgs/ha) cost of seed not includedHa. 0.80 284.00 959.00 227.2 767.20

18 Grass seed As per forest BSR 2004-2005 page no-12.

100% Dhaman Kg. 12 0 82.00 0 984.0019 Making pallets of mixture of fine soil, grass seed, manure

etc (seed rate 6 to 8 kgs/ha) cost of seed not includedKg. 12.00 18.90 18.90 226.8 226.80

20 Sowing of grass seed pallets on bunds in two rows. Rmt. 720 0.59 0.59 424.8 424.8021 Sowing of tree seed on ridges. Rmt. 300.00 0.59 0.59 177 177.0022 Sowing of tree seed on bund (Desi Babool,neem &

jetropha). Rmt. 180 0.59 0.59 106.2 106.20

23 Tree seed As per forest BSR 2004-2005 page no-12.Deshibabool Kg. 0.40 0.00 18.00 0 7.20

Kher Kg. 0.40 0.00 19.00 0 7.60Neem Kg. 0.40 0.00 39.00 0 15.60

Kumath Kg. 0.40 0.00 33.00 0 13.2024 One man chokidar for three year (within 25 Ha) No 43.80 135.00 135.00 5913 5913.0025 Gap filling in Second year (20%) 3097.8 4985.73

Note:- All Rates Apply Gramin kary Nirdesika 2011 Total Rs.27,131 Rs.44,021 Rs.27,131 Rs.44,021

Total Rs.27,131 44020.88

6229.268 6229.26833360.228 50250.148

Add.3% Contengencey 1507.50Grand Total 51757.65

Total Cost/ Ha Labour Cost/ Ha

Material Cost/ Ha

51758 33360 18397

77506NRM Part 25749Production 51758

Total Cost of Pasture Dovelopment

Je Hkkx es 22.96 % etnwjh esa of̀) ds dkj.k vfrfjDr tksMuk

Page 150: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

Name of Village :- Name of Panchayat :-

Name of Work :- Pasture Land Development

1 Ha. Area for P.D, 400 Rmt. Length of Thore fencing per ha.400 Plants to be planted in one hectare Say 400

S.no Particular Unit Quantity Labour Rate

Total Rate

Labour Cost

Total Amount

(A) Thor fencing work1 Excavation for thor fencing size 0.15x0.15x60 m Cum 9.00 91 91 819.00 819.002 Supply and cutting of 80 cm thor sticks.(7 No Danda /-Ha) Per 100 stick 2800 74.3 174 2080.4 4872.00

3

Transportation cost of thor sticks through bullock cart from 5 km distance, loading & unloading. (70+30=100)

Per 100 stick 2800 100 100 2800 2800.00

4 Rehandling work of thor sticks up to 200 to 500mt distance. Per 100 stick 2800 76.5 76.5 2142 2142.00

5 Planting of Thor sticks. Rmt. 400 6.93 6.93 2772 2772.00Total 10613.40 13405.00

(B) Plantation work6 Planting of Aloevera plant on Boundary of field & (0.6mx0.6m)

spacing with complete work ( 400x0.6=240 Rmt)Per Rmt 240 9.97 9.97 2392.8 2392.8

7 Cost of Aloevera Including Transportation 10 Km + LoadingUnloading + Rehandling 50 %(3.75+0.94+0.297+0.3715=5.36)

Per plant 400 1 5.36 400 2144.00

8 Grass Seeding work (Dhaman Seed)12 kg/-Ha Per Kg 12 0 83.00 0 996.009 Making of Pallets Per Kg 12 18.9 18.90 226.8 226.8010 Spreeding of Grass Seed Per Ha 1 160 160.00 160 160.00

Note:- All Rates Apply Gramin kary Nirdesika 2012 Total Rs.3,180 Rs.5,920 Rs.3,180 Rs.5,920

Rs.13,793 Rs.19,325 3166.8728 3166.8728

16959.8728 22491.4728Add.3% Contengencey 674.74

Grand Total 23166.22

Total Cost/ Ha Labour Cost/ Ha

Material Cost/ Ha

23166 16960 6206Total Cost of Private Pasture Dovelopment 36571Cost From w/s scheme 23166Contribution From Farmer in terms of live fencing 13405

Je Hkkx es 22.96 % etnwjh esa of̀) ds dkj.k vfrfjDr tksMukGrand Total

ALOEVERA

Panchayat samity---------------------, District - Bhilwara, State - Rajasthan,

Costing & Quantity Estimation of Pasture Land Development

1.0 x 1.0 mt. Spacing

(Production)

Page 151: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

Name of Village :- Name of Panchayat :-

Name of Work :- Pasture Land Development

1 Ha. Area for P.D, 400 Rmt. Length of Thore fencing per ha.400 Plants to be planted in one hectare Say 400

S.no Particular Unit Quantity Labour Rate

Total Rate

Labour Cost

Total Amount

(A) Thor fencing work1 Excavation for thor fencing size 0.15x0.15x60 m Cum 9.00 0.88 0.88 7.92 7.922 Supply and cutting of 80 cm thor sticks.(7 No Danda /-Ha) Per 100 stick 2800 65.5 165 1834 4620.00

3

Transportation cost of thor sticks through bullock cart from 5 km distance, loading & unloading. (70+30=100)

Per 100 stick 2800 25.3 96.5 708.4 2702.00

4 Rehandling work of thor sticks up to 200 to 500mt distance. Per 100 stick 2800 65.5 67.4 1834 1887.20

5 Planting of Thor sticks. Rmt. 400 6.93 6.93 2772 2772.00Total 7156.32 11989.12

3066.48312 3066.48;ksx 10223 15055.60

tksMs+ 3 % ikuh okyk + vk;k 306.68 306.68;ksx 10529 15362.29

tksM+ 2 % dfUVu tsalh 307.25dqy ;ksx 15670

SAY 1570010530517015700

Panchayat samity-Banera, District - Bhilwara, State - Rajasthan,

Private Pasture MNREGS

Costing & Quantity Estimation of Pasture Land Development

ykxr Je en esa ykxr lkexzh en esa

dqy ;ksx

Jaivik Bad(Production)

1.0 x 1.0 mt. Spacing

Je Hkkx esa 30 % VkLd dh deh ds dkj.k vfrfjDr tksMuk

Page 152: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

Name of Village :- Name of Panchayat :-

Name of Work :- Pasture Land Development

1 Ha. Area for P.D, 400 Rmt. Length of Thore fencing per ha.400 Plants to be planted in one hectare Say 400

(A) Plantation work Unit Quantity Labour Rate

Total Rate

Labour Cost

Total Amount 1 Planting of Aloevera plant on Boundary of field & (0.6mx0.6m)

spacing with complete work ( 400x0.6=240 Rmt)Per Rmt 240 9.97 9.97 2392.8 2392.8

2 Cost of Aloevera Including Transportation 10 Km + LoadingUnloading + Rehandling 50 %(3.75+0.94+0.297+0.3715=5.36)

Per plant 400 1 5.36 400 2144.00

3 Grass Seeding work (Dhaman Seed)12 kg/-Ha Per Kg 12 0 82.00 0 984.004 Making of Pallets Per Kg 12 18.9 18.90 226.8 226.805 Spreeding of Grass Seed Per Ha 1 160 160.00 160 160.00

Note:- All Rates Apply Gramin kary Nirdesika 2012 Total Rs.3,180 Rs.5,908 Rs.3,180 Rs.5,908

Total Rs.3,180 5907.60

730.036 730.0363909.636 6637.636

Add.3% Contengencey 199.13Grand Total 6836.77

Total Cost/ Ha Labour Cost/ Ha

Material Cost/ Ha

6837 3910 2927Total Cost of Private Pasture Dovelopment 6837Cost From w/s scheme 6837

Je Hkkx es 22.96 % etnwjh esa of̀) ds dkj.k vfrfjDr tksMuk

Panchayat samity-Banera, District - Bhilwara, State - Rajasthan,

ALOEVERA NRM

Costing & Quantity Estimation of Pasture Land Development

1.0 x 1.0 mt. Spacing

Page 153: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

Je dqy Je dqy jk'kh

1dBksj feV`Vh esa [kMMk [kqnkbZ dk;Z 0-60 * 0.60 *0.60=0.216 CumX200 No =43.20 Cum

Per Cum43.20 73.8 81 3188.16 3499.2

2 dBksj feV`Vh esa fjax [kqnkbZ dk;Z Per Cum 118.69 73.8 81 8759.322 9613.89

3

xM`Mks esa Hkjus gsrq ckgj ls ihyh feV`Vh dz; dj ifjogu e; xM`Mks esa HkjkbZ vkSlru 20 izfr'kr xM`Mks esa 73.8+41.70=115.50 cum

Per Cum

8.64 73.8 115.5 637.632 997.92

4ikS/kk [kjhn ou foHkkx dh ulZjh ls nks o"kZ dk ikS/kk

izfr ikS/kk220 0 8 0.00 1760.00

5ikS/k ifjogu 20 fdeh- ls vf/kd nwjh ls

izfr ikS/kk220 172.6 2631 37.97 578.82

6[kqns gq, xM`Mks dks dhVuk'kd nok ls mipkjhr djuk A

izfr ikS/kk200 0.5 0.49 100.00 98.00

7 dhVuk'kd nok [kjhn dk;Z izfr ikS/kk 200 0.5 1 100.00 200.00

8 ikS/kkSa dk jksi.k izfr ikS/kk 200 3.2 3.2 640.00 640.00

9ty laj{k.k gsrq Fkkoyk cukuk 50 lseh- v/nZO;kl esaA

izfr Fkkoyk200 2.1 2.1 420.00 420.00

10ikS/kkSa dks ikuh fiykuk 20 yhVj izfr ikS/kk lkr ckjA 200X7=1400 No

izfr ikS/kk izfr lkr ckj 1400 1.55 1.55 2170.00 2170.00

11ikuh [kjhn e; ifjogu 200X7X20=28000 Lit.

izfr Vsadj / 4000 lit

7 0 450 0.00 3150.00

12o"kkZ fjrq esa ikS/kkS dh nks ckj funkbZ xqMkbZ djuk (2*200=400 No)

izfr ikS/kk400 1.1 1.1 440.00 440.00

13 Fkksj Qsaflx dk;Z fjx ds vUnj Rmt 1507 18 30 27126.00 45210.00

14ikS/kSds pkjks vksj rjQ 2 fe- ifjf/k daVhayh >kfM;ksa dh ckM yxkuk e; >kfM;ksa dks LFkkuh; Lrj ls dkVuk -

izfr ikS/kk200 7.2 7.2 1440.00 1440.00

dqy jkf'k 45059.09 70217.83

Je dqy Je dqy jk'kh

12f}rh; o"kZ iqu% jksi.k gsrq 20% jkf'k izFke o"kZ ds ;ksx dh 6590.43 10729.20

13 ikS/kkS dha iqfuax djuk A izfr ikS/kk 200 1.348 1.35 269.60 270.00

14o"kkZ fjrq esa ikS/kkS dh nks ckj funkbZ xqMkbZ djuk (2*200=400 No)

izfr ikS/kk400 1.1 1.1 440.00 440.00

15ikS/kkSa dks ikuh fiykuk 20 yhVj izfr ikS/kk lkr ckjA 200X7=1400 No

izfr ikS/kk izfr lkr ckj 1400 1.55 1.55 2170.00 2170.00

nj jk'kh

f}rh; o"kZ la/kkj.knj jk'kh

ESTIMATE OF ROAD SIDE PLANTATION WORK izFke o"kZ la/kkj.k

dz-l- fooj.k bZdkbZ ek=k

dz-l- fooj.k bZdkbZ ek=k

Page 154: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

16ikuh [kjhn e; ifjogu 200X7X20=28000 Lit.

izfr Vsadj / 4000 lit

7 0 450 0.00 3150.00

dqy jkf'k 9470.03 16759.20

Je dqy Je dqy jk'kh

17 ikS/kkS dha iqfuax djuk A izfr ikS/kk 200 1.348 1.35 269.60 270.00

18o"kkZ fjrq esa ikS/kkS dh nks ckj funkbZ xqMkbZ djuk (2*200=400 No)

izfr ikS/kk400 1.1 1.1 440.00 440.00

19ikS/kkSa dks ikuh fiykuk 20 yhVj izfr ikS/kk lkr ckjA 200X7=1400 No

izfr ikS/kk izfr lkr ckj 1400 1.55 1.55 2170.00 2170.00

20ikuh [kjhn e; ifjogu 200X7X20=28000 Lit.

izfr Vsadj / 4000 lit

7 0 450 0.00 3150.00

dqy jkf'k 2879.60 6030.00rhuks o"kZ dk dqy ;ksx 57408.71 93007.03

Total Cost/ Ha Labour Cost/ Ha

Material Cost/ Ha 57409

2460093007 57409 35598 35598

2460120067

2401122468Grand Total

Labour costAdd.30% reductionMeterialAdd.3% water,Aaya

r`rh; o"kZ la/kkj.k

TotalContengency 2%

nj jk'khdz-l- fooj.k bZdkbZ ek=k

Page 155: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

Je dqy Je dqy jk'kh

1dBksj feV`Vh esa [kMMk [kqnkbZ dk;Z 0-60 * 0.60 *0.60=0.216 CumX200 No =43.20 Cum

Per Cum43.20 91 91 3931.2 3931.2

2 dBksj feV`Vh esa fjax [kqnkbZ dk;Z Per Cum 118.69 91 91 10800.79 10800.79

3

xM`Mks esa Hkjus gsrq ckgj ls ihyh feV`Vh dz; dj ifjogu e; xM`Mks esa HkjkbZ vkSlru 20 izfr'kr xM`Mks esa 91+41.70=132.70 cum

Per Cum

8.64 91 132.7 786.24 1146.528

4ikS/kk [kjhn ou foHkkx dh ulZjh ls nks o"kZ dk ikS/kk

izfr ikS/kk220 0 8 0.00 1760.00

5ikS/k ifjogu 20 fdeh- ls vf/kd nwjh ls

izfr ikS/kk220 196 2654 43.12 583.88

6[kqns gq, xM`Mks dks dhVuk'kd nok ls mipkjhr djuk A

izfr ikS/kk200 0.55 0.55 110.00 110.00

7 dhVuk'kd nok [kjhn dk;Z izfr ikS/kk 200 0.5 1 100.00 200.00

8 ikS/kkSa dk jksi.k izfr ikS/kk 200 3.6 3.6 720.00 720.00

9ty laj{k.k gsrq Fkkoyk cukuk 50 lseh- v/nZO;kl esaA

izfr Fkkoyk200 2.4 2.4 480.00 480.00

10ikS/kkSa dks ikuh fiykuk 20 yhVj izfr ikS/kk lkr ckjA 200X7=1400 No

izfr ikS/kk izfr lkr

ckj

1400 1.85 1.85 2590.00 2590.00

11ikuh [kjhn e; ifjogu 200X7X20=28000 Lit.

izfr Vsadj / 4000 lit

7 0 450 0.00 3150.00

12o"kkZ fjrq esa ikS/kkS dh nks ckj funkbZ xqMkbZ djuk (2*200=400 No)

izfr ikS/kk400 1.2 1.2 480.00 480.00

13 Fkksj Qsaflx dk;Z fjx ds vUnj Rmt 1507 24 31 36168.00 46717.00

14ikS/kSds pkjks vksj rjQ 2 fe- ifjf/k daVhayh >kfM;ksa dh ckM yxkuk e; >kfM;ksa dks LFkkuh; Lrj ls dkVuk -

izfr ikS/kk200 8.2 8.2 1640.00 1640.00

dqy jkf'k 57849.35 74309.40Contengency 3% 2229.28

dqy jkf'k izFke o"kZ 76538.68

Je dqy Je dqy jk'kh

12f}rh; o"kZ iqu% jksi.k gsrq 20% jkf'k izFke o"kZ ds ;ksx dh 8618.46 11188.42

13 ikS/kkS dha iqfuax djuk A izfr ikS/kk 200 1.53 1.53 306.00 306.00

14o"kkZ fjrq esa ikS/kkS dh nks ckj funkbZ xqMkbZ djuk (2*200=400 No)

izfr ikS/kk400 1.2 1.2 480.00 480.00

bZdkbZ ek=k izFke o"kZ la/kkj.k

fooj.kdz-l-

f}rh; o"kZ la/kkj.knj

nj jk'kh

dz-l- fooj.k bZdkbZ ek=k

ESTIMATE OF ROAD SIDE PLANTATION WORK

jk'kh

Page 156: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

15ikS/kkSa dks ikuh fiykuk 20 yhVj izfr ikS/kk lkr ckjA 200X7=1400 No

izfr ikS/kk izfr lkr

ckj1400 1.85 1.85 2590.00 2590.00

16ikuh [kjhn e; ifjogu 200X7X20=28000 Lit.

izfr Vsadj / 4000 lit

7 0 450 0.00 3150.00

dqy jkf'k 11994.46 17714.42Contengency 3% 531.43

dqy jkf'k f}rh; o"kZ 11994.46 18245.85

Je dqy Je dqy jk'kh

17 ikS/kkS dha iqfuax djuk A izfr ikS/kk 200 1.53 1.53 306.00 306.00

18o"kkZ fjrq esa ikS/kkS dh nks ckj funkbZ xqMkbZ djuk (2*200=400 No)

izfr ikS/kk400 1.2 1.2 480.00 480.00

19ikS/kkSa dks ikuh fiykuk 20 yhVj izfr ikS/kk lkr ckjA 200X7=1400 No

izfr ikS/kk izfr lkr

ckj

1400 1.85 1.85 2590.00 2590.00

20ikuh [kjhn e; ifjogu 200X7X20=28000 Lit.

izfr Vsadj / 4000 lit

7 0 450 0.00 3150.00

3376.00 6526.00Contengency 3% 195.78

dqy jkf'k r`rh; o"kZ 3376.00 6721.7873219.81 101506.3116811.27 16811.26990031.08 118317.58

egk;ksx 118318Say Rs 1.19/-KM

rhuks o"kksZ dk dqy ;ksxJe Hkkx es 22.96 % etnwjh esa of̀) ds dkj.k vfrfjDr tksMuk

nj jk'kh

r`rh; o"kZ la/kkj.k

dz-l- fooj.k bZdkbZ ek=k

Page 157: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

30

S.No Activity No of Trainees Rates Total

Am (Rs) Reference. Remark

1

Daily Allowance for lodging / boarding for non-residential training within the district/state.

30 75/- per trainees/day 2250

Cir.No; 729-814. Dt 09.05.11 Dir. WDSC, Jaipur Item No 1

2

Honorium of Resource person 30

250/- per lecture (2 Hr /lecture/day)

1000Cir.No; 729-814. Dt 9.05.11 Dir. WDSC, Jaipur Item No 5

3

POL (two days jeep Hire Charges) 30 500/- per day 1000

Cir.No; 1147-1200. Dt 12.07.04 Dir. WDSC, Jaipur Item No 7

4

Literature & stationary 30 50/- per

trainees 1500Cir.No; 1147-1200. Dt 12.07.04 Dir. WDSC, Jaipur Item No 11

5

Seating arrangement (tent,matting,chairs,etc)

30 750/- 750Cir.No; 1147-1200. Dt 12.07.04 Dir. WDSC, Jaipur Item No 10

6

Miscellaneous charges 30 0 300

Cir.No; 1147-1200. Dt 12.07.04 Dir. WDSC, Jaipur Item No 12

7TOTAL Am 6800

DETAILED ESTIMATE OF ONE DAYS TRAININGTotal Member

Page 158: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

S.No Activity No of Trainees Rates

Total Am (Rs)

Reference. Remark

1

Daily Allowance for lodging / boarding for residential training within the district.

30 125/- per trainees/day 7500Cir.No; 729-814. Dt 9.05.11 Dir. WDSC, Jaipur Item No 2

2

Honorium of Resource person 30 250/- per lecture (2 Hr

/lecture/day) 2000Cir.No; 729-814. Dt 9.05.11 Dir. WDSC, Jaipur Item No 5

3

POL (three days jeep Hire Charges) 30 500/- per day 1500

Cir.No; 1147-1200. Dt 12.07.04 Dir. WDSC, Jaipur Item No 7

4

One Day Bus Hire Charge for side visit within 300 km

30 0.42/-per km / member 3780

5

Literature & stationary 30 100/- per trainees 3000Cir.No; 1147-1200. Dt 12.07.04 Dir. WDSC, Jaipur Item No 11

6

Seating arrangement (tent,matting,chairs,etc)

30 1500/- 1500Cir.No; 1147-1200. Dt 12.07.04 Dir. WDSC, Jaipur Item No 10

7

Miscellaneous charges 30 0 500

Cir.No; 1147-1200. Dt 12.07.04 Dir. WDSC, Jaipur Item No 12

8TOTAL AM 19780

DETAILED ESTIMATE OF TWO DAYS TRAINING

Page 159: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

S.No Activity No of Trainees Rates Total Am

(Rs) Remark

1 Meal Expenses 100 75/- per trainees/day 7500

2POL (two days Two jeep Hire Charges) 100 500/- per day 2000

3One Day small truck Hire Charge for Railly 100 1100/- per day 1100

4

Two day tractor Hire Charge for Railly min. 4 tractor

100 1000/- per day 8000

5Material for construction of model 100 L S 5000

6Literature & stationary for Exivation 100 100/- per trainees 10000

7

Seating arrangement (tent,matting,chairs, mike, etc)

100 2000/- 2000

8 Photography,Video 100 For one days 500 L.S

9 Purchase of Banner 100 20 No of Banner 4000 L.S

10 Expenditure for Break fast 100 75/- per trainees/day 7500

11 Water tanker for Drinking 100 500/- per day 1000

12 Miscellaneous charges 100 L.S 200013

TOTAL AM 50600

DETAILED ESTIMATE OF PADYATRA (Railly)

Page 160: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

S.No HEAD UNIT CHARGES UNIT No. OF

Participants Amount Rs Remarks

1Travelling Allowances & Local 1800 Km 50 90000

2Daily Allowances for loading & boarding of trainees 200x6 No 50 36000

3Stationery & training material (per trainees) 150 No 50 7500

4D.A. of Resource person with the tour (4x6=24 no) 250 No 24 6000

5POL (seven days jeep Hire Charges) 500 Per Day 7 Days 3500

6 Other Expenses 7000 L.S. 70007

TOTAL Am 150000

PRAPOSED ESTIMATE FOR EDUCATIONAL TOUR UNDER WATERSHED DEVLOPMENT PROGRAME

PARTICIPANTS-50DURATION-SEVEN NIGHT & SIX DAYS

TOTAL DISTANCE- 1800KM

Page 161: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

1 Name of village :- G.P.P.S Banera DISTT. BHILWARA ( RAJ.)

2 Name of work :- CONTRUCTION OF PAKA WESTE WEIR AT

Design

1 Available crest length 4.00 M

2 Total catchment area 1.00 Ha

WESTE WEIR FOR ARAIBLE LAND

3 Hight of structure 0.35 M

A Design discharge (By flood discharge method)

A HYDROLIC DESIGN

Peak rate of run off in cum/sec.=

Q = C I A C= 0.4036 Catchment Area 1.00 Ha

Q = 0.27 cumsec K = L3 H L= 75.00 M

Say 0.27 cumsec H= 0.80 MK 726.18Tc=0.0195K0.77

3.11I = 23.90 cm/hr.I = 23.90 cm/hr.

B HYDROLIC DESIGN

Q = 1.71L(h)3/2 L = 4.00 mt length available at site

h =[Q/1.71L]2/3

h = 0.11 Say = 0.10

Taking free board as 0.05 M

Total d = 0.15

Page 162: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

C. STRUCTURAL DESIGN

(I) Top width of Head wall

h /(p-1)0.5 0.09 0.09 say = 0.40 M(as per site condition where h = 0.10 m p = 2.30 0.10 M

p Specific gravty of stone masnory in cm = 2.3

(ii) Bottom width of head wall

b = h+H /(p-1)0.5 0.39 Say = 0.75 M

H =heigth of head wall in meters = 0.35 m 0.35 M

(iii) Length of head wall extension H +d + 1 1.50 1.50 M H +d + 1 1.50 1.50 Md = h+free board = 0.15 0.15 Mbut as per side condition L/S M 1.5 R/S M 1.5 3.00 M

(iv) Heigth of Head wall extensionH + d = 0.50 M

(v) Botton width of HW ext. side wall & wing wall0.5(H+h)= 0.23 0.45 M

(vi) Top width of HW ext0.4H= 0.14 0.40 M

(vii) Length of BasinL.B =0.75(H+d)+H 0.73 0.75 M

(viii) Thickness of Basin =0.60m(incloding concreting)

(ix) Height of side wall H+d = 0.50 0.50 M

(x) Height of side wall =1.5h at W W joints1.5h = 0.15 0.25 M

(xi) Length of side wall = B. W. of H. W -B.W of H W E+L.B+ width of toe wall

1.50

(xii) Length of wing wall = 2.25 h=0.23 0.00 M

(xiii) Height of the wing wall = 0.15 0.00 M

(xiv) Top width of Head wall ext site wall wing wall =

(xv) Width of toe wall= 0.3 M (xv) Width of toe wall= 0.3 M

Page 163: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

(xvi) Height of toe wall = 0.15 M

(xvii) Height of wing wall at wing end = 0.00 M

(xviii) Bottem width of the side wall &wing wall taking as per Bottom width

of the head wall ext as in item no.5= m 0.45 M

(xix) Depth of foundation taking as 0.60 M

Prepared by Checked by Approved by

Page 164: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

STABILITY CHECK'S

a Top width of anicut = 0.40 m

b Bottm width of anicut = 0.75 m w1 + w2 self weight of anicut

p1 Pressure due to water besswall

p2 Horizontal water pressure

p3 Up lift pressure

h Food heigth = 0.10 m H heigth of anicut = 0.35 m L considening one metre = 1 L considening one metre = 1 S 2.3 C 0.6

Forces acting on a over flow gravity damForces and momrnt calculation'sconsidening one metre length of ancut and taking Restoring moment as positive (+ ve) and overturning momentas negative (-ve)moment taken at B

s. no. Forcesv- vertical forces

H- horizontal forces

Force acting at a distance from B

moment at B 2x5 + ve -ve

1 w1 = a x H xLxS

0.32 0.32 2.20 0.712 w2 = 1/2x(b-a)xHxLxS

0.14 0.14 1.13 0.16

3 p1 =wh x H

0.04 0.04 0.90 0.030.04 0.04 0.90 0.03

4 p2 =wH2/2 x H

0.06 0.06 0.60 0.04

5 p3 =cxwbx(H+h)/2

0.09 0.09 1.80 0.17 TOTAL 0.37 0.10 0.87 0.24

Em=mr-mo0.63

Page 165: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

CHECKS IN OVERTURNING

Factor of satety agaist overturning

Emr/Emo =+m/-m = Restoning moment/overturning moment

3.64

it is more than 1.50 hance structure is safe against overturning

SLINDING

Factor of safety against slinding

Ev/Eh = 3.83

it is more than 1.0 hance structure is safe against slinding

RUPTURE (safety against tension at the bese)

X Relne Position of resultant measured from toe

x = Em/Ev = 1.71

e = b/2 - X -1.33

Ev/b (1+6e/b) -10.17

Ev/b (1-6e/b) 11.16

P max = -10.17

P min = 11.16

Page 166: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

Name of work :-WHS :-Waste weir S.No Particular Qty. Rate Per Amount Labour Rate L.Amount

1 Excavation in hard soil dry ormost&disposal of excavatedmaterial within intial lead of 30m and liftof 1.5m includingdressing etc complete (As peritem no.2 page 1 of G.K.N.2012 5.58 91.00 cum 507.78 91.00 507.78

2 cement concrete well mixed in

cement mortar(1:4:8) laid inposition complete includingcuring Aggregate size upto50mm. HB (As per item no.191page 17 of G.K.N.2012 BSR of 1.55 1705.00 cum 2647.01 320.00 496.8

ABSTRACT OF COST

Modal estimate of wasteweir in arale land

page 17 of G.K.N.2012 BSR of 1.55 1705.00 cum 2647.01 320.00 496.8 3

Random rubble stone masonaryin cement sand mortar(1:6) forfoundation (As per item no.190a page 17 of G.K.N.2012 BSRof Bhilwara circle

3.58 1265.00 cum 4525.54 357.00 1277.1675 4 Random rubble stone masonary

in cement sand mortar(1:6)forsuper structure (As per itemno.190 a page 17 ofG.K.N.2012 BSR of Bhilwaracircle 1.85 1265.00 cum 2333.93 357.00 658.665

5 Cement plaster including

smooth finishing in cementmortar (1:4)25mm thick (As peritem no.70a page 8 ofG.K.N.2012 BSR of BhilwaraG.K.N.2012 BSR of Bhilwaracircle 11.77 138.00 cum 1623.57 68.90 810.6085

6 Cement concrete coping in

cement mortar1:.2:4.100mmthick (As per item no.194 apage 17 of G.K.N.2012 BSR ofBhilwara circle 0.27 2638.00 cum 717.54 316.00 85.952

TOTAL 12355.36 3836.9737 Rehandling of cement beyond

100 m initial lead lead up to 200 0.88 85.00 75.11 85.00 75.1099525TOTAL 12430.47 3912.08295

TOTAL 12430.47 3912.08898.21 898.214246

13328.69 4810.2972METARIAL 8518.39 SAY 0.09LABOUR 4810.30 SAY 0.05TOTAL 13328.69Add 3% Contingency Charges 399.86

TOTAL Rs. 13728.55

Je Hkkx es 22.96 % etnwjh esa of̀) ds dkj.k vfrfjDr tksMuk

TOTAL Rs. 13728.55Say 13800

Page 167: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

NAME OF WORK : WASTE WEIR S.no Particular Qty. Cement Sand Aggregate Stone Bags Cum 50mm 20mm Cum

1 Cement concrete (1:3:6) mm HB(cum) 4.05,0.43,0.86 1.55 6.29 0.67 1.34

2 R R stone masonary (1:6)Foundation/ Super structure(cum) 1.40, 0.30, 1.10 5.42 7.59 1.63 5.96

3 Cement plaster (1:6)25 mmthick (sqm) 0.153 0.03 11.77 1.80 0.35

4 Raised &cut pointing (sqm)0.0.32, 0.0043

5 Stone kharanja in cementmortar (1:6)(cum) 1.80,0.375, 1.20

MATERIAL CONSUMPTION STATEMENT

0.375, 1.206 Cement concrete coping in

cement mortar1:1.5:3.75 mmthick 7.33,0.40,0.78 0.27 1.99 0.11 0.21

7 Dry stone pitching TOTAL 17.67 2.76 1.55 5.96

SAY 18 BAGS 0.88 MT

PLAN

1.5 4.00 1.5

1.40

0.3 0.5

0.15

0.40

0.400.40

0.40

0.35 0.25

G.L G.L

0.15

0.45

0.60

0.15

0.15

0.75

0.40

0.50

0.60

0.15

0.75

X-Section

G.L.

2.2.

0.15

0.45

S.W.& H.Ex- X- Sec.

Page 168: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

Name of work :- Weste WeirP,S, DISTT. BHILWARA

S.No. PARTICULAR No. LENGTH BREADTH HT/DEPTH QUANTITY1 Total Excavation

H.W. 1.00 4.00 0.75 0.60 1.80H.W.E. 2.00 1.50 0.45 0.60 0.81S.W. 2.00 1.50 0.45 0.60 0.81Toe wall 1.00 4.00 0.30 0.45 0.54Apron 1.00 4.00 0.75 0.45 1.35Wing Wall 2.00 0.50 0.45 0.60 0.27

Total (cu.m) 5.582

DETAILED ESTIMATE

2 Excavation in hard soil dry ormost&disposal of excavatedmaterial within intial lead of 30m and liftof 1.5m includingdressing etc complete 10%ofTotalExcavation

Total 5.585 cement concrete well mixed in

cement mortar(1:4:8) laid inposition complete includingcuring Aggregate size upto50mm. HB Total ExcavationH.W.

1.00 4.00 0.75 0.15 0.45H.W.E. 2.00 1.50 0.45 0.15 0.20S.W. 2.00 1.50 0.45 0.15 0.20Toe Wall 1.00 4.00 0.30 0.15 0.18Apron 1.00 4.00 0.75 0.15 0.45Wing Wall 2.00 0.50 0.45 0.15 0.07

Total 1.556 Random rubble stone masonary

in cement sand mortar(1:6) forin cement sand mortar(1:6) forfoundation H.W. 1.00 4.00 0.75 0.45 1.35H.W.E. 2.00 1.50 0.45 0.45 0.61S.W. 2.00 1.50 0.45 0.45 0.61Toe Wall 1.00 4.00 0.30 0.30 0.36Apron 1.00 4.00 0.75 0.15 0.45Wing Wall 2.00 0.50 0.45 0.45 0.20

Total 3.587

Random rubble stone masonaryin cement sand mortar(1:6)forsuper structure

H.W. 1.00 4.00 0.58 0.35 0.81H.W.E 1.00 3.00 0.40 0.50 0.60S.W. 2.00 1.05 0.40 0.25 0.21

2.00 0.30 0.40 0.50 0.122.00 0.05 0.40 0.25 0.01

Wing Wall 2.00 0.50 0.40 0.25 0.10

Total 1.85

Page 169: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

9 Cement plaster includingsmooth finishing in cementmortar (1:3)25mm thickH.W. 1.00 4.00 0.35 1.40

1.00 4.00 0.65 2.601.00 4.00 0.30 1.20

S.W. 2.00 0.40 0.15 0.122.00 0.35 0.33 0.122.00 1.05 0.25 0.532.00 0.75 0.30 0.45

H.W.E. 1.00 3.00 0.50 1.50Toe Wall 1.00 4.00 0.15 0.60Wing Wall 2.00 0.50 0.25 0.25Apron 1.00 4.00 0.75 3.00

Total 11.7711 Cement concrete coping in

cement mortar1:2:4.75 mmthickthickH.W. 1.00 4.00 0.40 0.05 0.08S.W. 2.00 1.80 0.40 0.05 0.07H.W.E. 1.00 3.00 0.40 0.05 0.06Toe.Wall 1.00 4.00 0.30 0.05 0.06

Total 0.2712 E/W for bind / embankment in

dry or mosit soil including layingon layers 1.5cm Breaking ofclods sort ing of grass pabblesete and dressing in requredprofile when compactedmanually or by plain roller withinitial lead of 30mt and lift 1.5mt (exeluding charges ofwaterring and compaction) Hardsoil

Total 013 Dry stone pitching hammer

dressing with packing of voidsdressing with packing of voidsfrom small stone including alllifts in reqired profile of depthof 20 to 23 cm 0

Total 0

Page 170: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

0.10 P3

0.40

P1

0.35 w1 0.55

P2 0.18

0.12 w2

0.45

0.35

0.27

0.75

0.25 0.50

Page 171: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

1 Name of village :- G.P.P.S Banera DISTT. BHILWARA ( RAJ.)

2 Name of work :- CONTRUCTION OF PAKA WESTE WEIR

Design

1 Available crest length 4.00 M

2 Total catchment area 1.00 Ha

3 Hight of structure 0.50 M

A Design discharge (By flood discharge method)

WESTE WEIR FOR BANK STAIBLISATION WORK

A Design discharge (By flood discharge method)

A HYDROLIC DESIGN

Peak rate of run off in cum/sec.=

Q = C I A C= 0.4036 Catchment Area 1.00 Ha

Q = 0.27 cumsec K = L3 H L= 75.00 M

Say 0.27 cumsec H= 0.80 MK 726.18Tc=0.0195K0.77

3.11I = 23.90 cm/hr.

B HYDROLIC DESIGN

Q = 1.71L(h)3/2 L = 4.00 mt length available at siteQ = 1.71L(h)3/2 L = 4.00 mt length available at siteh =[Q/1.71L]2/3

h = 0.11 Say = 0.10

Taking free board as 0.05 M

Total d = 0.15

Page 172: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

C. STRUCTURAL DESIGN

(I) Top width of Head wallh /(p-1)0.5 0.09 0.09 say = 0.40 M(as per site condition where h = 0.10 m p = 2.30 0.10 M

p Specific gravty of stone masnory in cm = 2.3

(ii) Bottom width of head wallb = h+H /(p-1)0.5 0.53 Say = 0.75 M

H =heigth of head wall in meters = 0.5 m 0.50 M

(iii) Length of head wall extension H +d + 1 1.65 1.65 Md = h+free board = 0.15 0.15 Mbut as per side condition L/S M 1.5 R/S M 1.5 3.00 M

(iv) Heigth of Head wall extension (iv) Heigth of Head wall extensionH + d = 0.65 M

(v) Botton width of HW ext. side wall & wing wall0.5(H+h)= 0.30 0.45 M

(vi) Top width of HW ext0.4H= 0.2 0.40 M

(vii) Length of BasinL.B =0.75(H+d)+H 0.99 1.00 M

(viii) Thickness of Basin =0.60m(incloding concreting)

(ix) Height of side wall H+d = 0.65 0.65 M

(x) Height of side wall =1.5h at W W joints1.5h = 0.15 0.25 M

(xi) Length of side wall = B. W. of H. W -B.W of H W E+L.B+ width of toe wall (xi) Length of side wall = B. W. of H. W -B.W of H W E+L.B+ width of toe wall

1.75

(xii) Length of wing wall = 2.25 h=0.23 0.00 M

(xiii) Height of the wing wall = 0.15 0.00 M

(xiv) Top width of Head wall ext site wall wing wall =

(xv) Width of toe wall= 0.3 M

(xvi)Height of toe wall = 0.15 M

Page 173: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

(xvii) Height of wing wall at wing end = 0.00 M

(xviii) Bottem width of the side wall &wing wall taking as per Bottom width

of the head wall ext as in item no.5= m 0.45 M

(xix)Depth of foundation taking as 0.60 M

Prepared by Checked by Approved by

Page 174: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

STABILITY CHECK'S

a Top width of anicut = 0.40 m

b Bottm width of anicut = 0.75 m w1 + w2self weight of anicut

p1 Pressure due to water besswall

p2 Horizontal water pressure

p3 Up lift pressure

h Food heigth = 0.10 m H heigth of anicut = 0.50 m L considening one metre = 1 S 2.3 C 0.6 C 0.6

Forces acting on a over flow gravity damForces and momrnt calculation'sconsidening one metre length of ancut and taking Restoring moment as positive (+ ve) and overturning momentas negative (-ve)moment taken at B

s. no. Forcesv- vertical forces

H- horizontal forces

Force acting at a distance from B

moment at B 2x5 + ve -ve

1 w1 = a x H xLxS0.46 0.46 2.20 1.01

2 w2 = 1/2x(b-a)xHxLxS0.20 0.20 1.13 0.23

3 p1 =wh x H0.05 0.05 0.90 0.05

4 p2 =wH2/2 x H0.13 0.13 0.60 0.080.13 0.13 0.60 0.08

5 p3 =cxwbx(H+h)/20.14 0.14 1.80 0.24

TOTAL 0.53 0.18 1.24 0.36 Em=mr-mo

0.88

Page 175: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

CHECKS IN OVERTURNING

Factor of satety agaist overturning

Emr/Emo =+m/-m = Restoning moment/overturning moment

3.41

it is more than 1.50 hance structure is safe against overturning

SLINDING

Factor of safety against slinding

Ev/Eh = 3.01

it is more than 1.0 hance structure is safe against slinding

RUPTURE (safety against tension at the bese)

X Relne Position of resultant measured from toe

x = Em/Ev = 1.67

e = b/2 - X -1.29

Ev/b (1+6e/b) -9.62

Ev/b (1-6e/b) 11.02

P max = -9.62

P min = 11.02

Page 176: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

Name of work :-Waste weir S.No Particular Qty. Rate Per Amount Labour Rate L.Amount

1Excavation in hard soil dry ormost&disposal of excavatedmaterial within intial lead of30 m and liftof 1.5m includingdressing etc complete As peritem no.2 page 1 ofG.K.N.2012 BSR of Bhilwaracircle

6.17 91.00 cum 561.02 91.00 561.015 2

cement concrete well mixedin cement mortar(1:4:8) laidin position complete includingcuring Aggregate size upto50mm. HBAs per item no.191

ABSTRACT OF COST

Modal estimate of wasteweir in arale land

50mm. HBAs per item no.191page 17 of G.K.N.2012 BSRof Bhilwara circle

1.74 1705.00 cum 2960.31 320.00 555.6 3 Random rubble stone

masonary in cement sandmortar(1:6) for foundationAsper item no.190A page 17of G.K.N.2012 BSR ofBhilwara circle 3.83 1265.00 cum 4843.37 357.00 1366.86

4 Random rubble stone

masonary in cement sandmortar(1:6) forsuperstructureAs per item no.191page 17 of G.K.N.2012 BSRof Bhilwara circle 2.57 1265.00 cum 3247.26 357.00 916.419

5 Cement plaster including

smooth finishing in cementmortar (1:4)25mm thickAsper item no.70A page 8 ofper item no.70A page 8 ofG.K.N.2012 BSR of Bhilwaracircle 13.44 138.00 cum 1854.03 68.90 925.67

6

Cement concrete coping incement mortar1:.2:4.100mmthickAs per item no.194Apage 17 of G.K.N.2012 BSRof Bhilwara circle

0.28 2638.00 cum 743.92 316.00 89.11 TOTAL 14209.89 4414.68

Je Hkkx esa 22.96 % etnwjh esa o`f) ds dkj.k vfrfjDr tksMuk 1013.61 1013.61TOTAL 15223.50 5428.29

TOTAL 15223.50 5428.29Add 3% Contingency Charges 457

TOTAL 15680 5428.29METARIAL 10252 SAY 9900/-LABOUR 5428 SAY 4700/-TOTAL 15680

TOTAL Rs. 15680 Say 15700

Page 177: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

NAME OF WORK : WASTE WEIR S.no Particular Qty. Cement Sand Aggregate Stone Bags Cum 50mm 20mm Cum

1 Cement concrete (1:3:6) mmHB (cum) 4.05,0.43,0.86 1.74 7.03 0.75 1.49

2 R R stone masonary (1:6)Foundation/ Super structure(cum) 1.40, 0.30, 1.10 6.40 8.95 1.92 7.04

3 Cement plaster (1:6)25 mmthick (sqm) 0.153 0.03 13.44 2.06 0.40

4 Raised &cut pointing (sqm)0.0.32, 0.0043

5 Stone kharanja in cementmortar (1:6)(cum)1.80, 0.375, 1.20

6 Cement concrete coping incement mortar1:1.5:3.75 mmthick 7.33,0.40,0.78 0.28 2.07 0.11 0.22

MATERIAL CONSUMPTION STATEMENT

thick 7.33,0.40,0.78 0.28 2.07 0.11 0.227 Dry stone pitching

TOTAL 20.11 3.18 1.71 7.04SAY 20 BAGS 1.01 MT

PLAN1.5 4.00 1.5

1.40

0.3 0.5

0.150.40

0.50 0.25G.L G.L

0.15

0.400.40

0.450.60

0.150.15

0.75

0.40

0.65

0.60

0.150.45

S.W.& H.Ex- X- Sec.

1.00

X-Section

G.L.

2.2.

Page 178: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

Name of work :- Weste WeirP,S, -Banera DISTT. BHILWARA

S.No.PARTICULAR No. LENGTHBREADTHHT/DEPTH QUANTITY1 Total Excavation

H.W. 1.00 4.00 0.75 0.60 1.80H.W.E. 2.00 1.50 0.45 0.60 0.81S.W. 2.00 1.75 0.45 0.60 0.95Toe wall 1.00 4.00 0.30 0.45 0.54Apron 1.00 4.00 1.00 0.45 1.80Wing Wall 2.00 0.50 0.45 0.60 0.27

Total (cu.m) 6.172 Excavation in hard soil dry or

most&disposal of excavatedmaterial within intial lead of30 m and liftof 1.5m includingdressing etc complete 10%of

DETAILED ESTIMATE

dressing etc complete 10%ofTotalExcavation

Total 6.175 cement concrete well mixed

in cement mortar(1:4:8) laidin position complete includingcuring Aggregate size upto50mm. HB Total ExcavationH.W. 1.00 4.00 0.75 0.15 0.45H.W.E. 2.00 1.50 0.45 0.15 0.20S.W. 2.00 1.75 0.45 0.15 0.24Toe Wall 1.00 4.00 0.30 0.15 0.18Apron 1.00 4.00 1.00 0.15 0.60Wing Wall 2.00 0.50 0.45 0.15 0.07

Total 1.746 Random rubble stone

masonary in cement sandmortar(1:6) for foundation H.W. 1.00 4.00 0.75 0.45 1.35H.W.E. 2.00 1.50 0.45 0.45 0.61S.W. 2.00 1.75 0.45 0.45 0.71Toe Wall 1.00 4.00 0.30 0.30 0.36Apron 1.00 4.00 1.00 0.15 0.60Apron 1.00 4.00 1.00 0.15 0.60Wing Wall 2.00 0.50 0.45 0.45 0.20

Total 3.837

Random rubble stonemasonary in cement sandmortar(1:6) forsuper structure

H.W. 1.00 4.00 0.58 0.50 1.15H.W.E 1.00 3.00 0.40 0.65 0.78S.W. 2.00 1.30 0.40 0.33 0.34

2.00 0.30 0.40 0.65 0.162.00 0.05 0.40 0.33 0.01

Wing Wall 2.00 0.50 0.40 0.33 0.13

Total 2.57

Page 179: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

9 Cement plaster includingsmooth finishing in cementmortar (1:3)25mm thickH.W. 1.00 4.00 0.50 2.00

1.00 4.00 0.80 3.201.00 4.00 0.30 1.20

S.W. 2.00 0.40 0.15 0.122.00 0.35 0.40 0.122.00 1.30 0.33 0.852.00 1.00 0.30 0.60

H.W.E. 1.00 3.00 0.50 1.50Toe Wall 1.00 4.00 0.15 0.60Wing Wall 2.00 0.50 0.25 0.25Apron 1.00 4.00 0.75 3.00

Total 13.4411 Cement concrete coping in

cement mortar1:2:4.75 mmthickH.W. 1.00 4.00 0.40 0.05 0.08S.W. 2.00 2.05 0.40 0.05 0.08H.W.E. 1.00 3.00 0.40 0.05 0.06H.W.E. 1.00 3.00 0.40 0.05 0.06Toe.Wall 1.00 4.00 0.30 0.05 0.06

Total 0.2812 E/W for bind / embankment

in dry or mosit soil includinglaying on layers 1.5cmBreaking of clods sort ing ofgrass pabbles ete anddressing in requred profilewhen compacted manually orby plain roller with initial leadof 30mt and lift 1.5 mt(exeluding charges ofwaterring and compaction)Hard soil Total 0

13 Dry stone pitching hammerdressing with packing ofvoids from small stoneincluding all lifts in reqiredprofile of depth of 20 to 23cm 0cm 0

Total 0

Page 180: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

0.10 P30.40

P1

0.50 w1 0.55 P2 0.25

0.17 w2

0.60

0.50

0.36

0.75

0.25 0.50

Page 181: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

Anar Plant Total plant 400 No C/C 5mx5m

S.N Details of work Qty Unit

1

Excavation of earth work in hard soil for digging of pits, 0.75 x0.75 x0.90 = 0.5062cum As per item no.189 B page 17 of G.K.N.2012 BSR of Bhilwara circle

202.50 cum 91 91 18427.50 18427.50

2 Treatment of pits

aThrough chemicals As per item no.144 page 14 of G.K.N.2012 BSR of Bhilwara circle

400.00 Per plant 0.55 0.55 220.00 220.00

bThrough mannure As per item no.145 page 14 of G.K.N.2012 BSR of Bhilwara circle

400.00 Per plant 0.27 0.27 108.00 108.00

2

Planting of plant with rehandling upto 100m,refilling of soil & compaction etc As per item no.153 page 15 of G.K.N.2012 BSR of Bhilwara circle

400.00 Per plant 7.40 7.40 2960.00 2960.00

3

Cost of Plant including transportation (16+2=18) As per item no.6 page Meterial cost of G.K.N.2012 BSR of Bhilwara circle

400.00 Per plant 0.00 18.00 0.00 7200.00

4

Making of thanwala,of 50 cm radious As per item no.151 page 14 of G.K.N.2012 BSR of Bhilwara circle

400.00 Per plant 2.40 2.40 960.00 960.00

5

Weeding & hoeing three times in the year (400x3x3=3600) As per item no.150 page 14 of G.K.N.2012 BSR of Bhilwara circle

3600.00 Per plant 1.20 1.20 4320.00 4320.00

6 Cost of Mannure including transportation As per iMarket Rate 400.00 Per Kg 0.50 2.00 200.00 800.00

7 Cost of Chemical including transportation As per iMarket Rate 400.00 Per plant 0.50 1.00 200.00 400.00

Total 27395.50 35395.508 Gap filling 20% 5479.1 7079.10

Total 32874.60 42474.607548.01 7548.01

40422.61 50022.61Say Rs 40423 50023

Contengency 3% 1501Grand total 51523

404231110151523

Labour AmMeterial Am

Total Am

MODEL ESTIMATE OF HORTICULTURE PLANTATION

Rate Amount

Je Hkkx esa 22.96 % etnwjh esa of̀) ds dkj.k vfrfjDr tksMuk

Page 182: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

Guava Plant Total plant 277 No C/C 6mx6m

S.N Details of work Qty UnitLc Total Lc Total

1

Excavation of earth work in hard soil for digging of pits, 0.75 x0.75 x0.90 = 0.5062cum As per item no.189 B page 17 of G.K.N.2012 BSR of Bhilwara circle

140.23 cum 91 91 12761 12761

2 Treatment of pits

aThrough chemicals As per item no.144 page 14 of G.K.N.2012 BSR of Bhilwara circle

277 Per plant 0.55 0.55 152.35 152.35

bThrough mannure As per item no.145 page 14 of G.K.N.2012 BSR of Bhilwara circle

277 Per plant 0.27 0.27 74.79 74.79

3

Planting of plant with rehandling upto 100m,refilling of soil & compaction etc As per item no.153 page 15 of G.K.N.2012 BSR of Bhilwara circle

277 Per plant 7.40 7.40 2049.8 2049.80

4

Cost of Plant including transportation (14+2=16) As per item no.6 page Meterial cost of G.K.N.2012 BSR of Bhilwara circle

277 Per plant 0.00 16.00 0 4432.00

5

Making of thanwala,of 50 cm radious As per item no.151 page 14 of G.K.N.2012 BSR of Bhilwara circle

277 Per plant 2.40 2.40 664.8 664.80

6

Weeding & hoeing three times in the year (277x3x3=2493)As per item no.150 page 14 of G.K.N.2012 BSR of Bhilwara circle

2493 Per plant 1.20 1.20 2991.6 2991.60

7 Cost of Mannure including transportation As per iMarket Rate 277 Per Kg 0.50 2.00 138.5 554.00

8 Cost of Chemical including transportation As per iMarket Rate 277 Per plant 0.25 1.00 69.25 277.00

Total 18902.13 23957.389 Gap filling 20% 3780.427 4791.48

Total 22682.56 28748.865207.92 5207.92

27890.48 33956.78Say 27890 33957

Contengency 3% 1019Grand total 34975

27890708534975

Labour AmMeterial Am

Total Am

MODEL ESTIMATE OF HORTICULTURE PLANTATION

Rate Amount

Je Hkkx esa 22.96 % etnwjh esa of̀) ds dkj.k vfrfjDr tksMuk

Page 183: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

Nimbu Plant Total plant 277 No C/C 6mx6m

S.N Details of work Qty UnitLc Total Lc Total

1

Excavation of earth work in hard soil for digging of pits, 0.75 x0.75 x0.90 = 0.5062cum As per item no.189 B page 17 of G.K.N.2012 BSR of Bhilwara circle

140.23 cum 91.00 91.00 12761.04 12761.04

2 Treatment of pits

aThrough chemicals As per item no.144 page 14 of G.K.N.2012 BSR of Bhilwara circle

277 Per plant 0.55 0.55

152.35

152.35

bThrough mannure As per item no.145 page 14 of G.K.N.2012 BSR of Bhilwara circle

277 Per plant 0.27 0.27

74.79

74.79

3

Planting of plant with rehandling upto 100m,refilling of soil & compaction etc As per item no.153 page 15 of G.K.N.2012 BSR of Bhilwara circle

277 Per plant 7.40 7.40

2049.80

2049.80

4

Cost of Plant including transportation (7+2=9) As per item no.6 page Meterial cost of G.K.N.2012 BSR of Bhilwara circle

277 Per plant 0.00 9.00

0.00

2493.00

5

Making of thanwala,of 50 cm radious As per item no.151 page 14 of G.K.N.2012 BSR of Bhilwara circle

277 Per plant 2.40 2.40

664.80

664.80

6

Weeding & hoeing three times in the year (156x3x3=1404) As per item no.150 page 14 of G.K.N.2012 BSR of Bhilwara circle

2493 Per plant 1.20 1.20

2991.60

2991.60

7Cost of Mannure including transportation As per iMarket Rate

277 Per Kg 0.50 2.00138.50

554.00

8Cost of Chemical including transportation As per iMarket Rate

277 Per plant 0.50 1.00138.50

277.00

Total 18971.38 22018.389 Gap filling 20% 3794.2768 4403.68

Total 22765.66 26422.065227.00 5227.00

27992.66 31649.06Say Rs 27993 31649

Contengency 3% 949Grand total 32599

27993460632599

Labour AmMeterial Am

Total Am

MODEL ESTIMATE OF HORTICULTURE PLANTATION

Rate Amount

Je Hkkx esa 22.96 % etnwjh esa of̀) ds dkj.k vfrfjDr tksMuk

Page 184: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

Orange Plantation ProductionTotal plant 277 No C/C 6mx6m

S.N Details of work Qty UnitLc Total Lc Total

1

Excavation of earth work in hard soil for digging of pits, 0.75 x0.75 x0.90 = 0.5062cum As per item no.189 B page 17 of G.K.N.2012 BSR of Bhilwara circle

140.23 cum 91.00 91.00 12761.04 12761.04

2 Treatment of pits

aThrough chemicals As per item no.144 page 14 of G.K.N.2012 BSR of Bhilwara circle

277.00 Per plant 0.55 0.55 152.35 152.35

bThrough mannure As per item no.145 page 14 of G.K.N.2012 BSR of Bhilwara circle

277.00 Per plant 0.27 0.27 74.79 74.79

3

Planting of plant with rehandling upto 100m,refilling of soil & compaction etc As per item no.153 page 15 of G.K.N.2012 BSR of Bhilwara circle

277.00 Per plant 7.40 7.40 2049.80 2049.80

4

Cost of Plant including transportation (16+2=18) As per item no.6 page Meterial cost of G.K.N.2012 BSR of Bhilwara circle

277.00 Per plant 0.00 18.00 0.00 4986.00

5

Making of thanwala,of 50 cm radious As per item no.151 page 14 of G.K.N.2012 BSR of Bhilwara circle

277.00 Per plant 2.40 2.40 664.80 664.80

6

Weeding & hoeing three times in the year (277x3x3=2493) As per item no.150 page 14 of G.K.N.2012 BSR of Bhilwara circle

2493.00 Per plant 1.20 1.20 2991.60 2991.60

7Cost of Mannure including transportation As per iMarket Rate

277.00 Per Kg 0.50 2.00 138.50 554.00

8Cost of Chemical including transportation As per iMarket Rate

277.00 Per plant 0.50 1.00 138.50 277.00

Total 18971.38 24511.389 Gap filling 20% 3794.277 4902.28

Total 22765.66 29413.665227.00 5227.00

27992.66 34640.66Say Rs 27993 34641

Contengency 3% 1039Grand total 35680

27993768735680

Labour AmMeterial Am

Total Am

MODEL ESTIMATE OF HORTICULTURE PLANTATION

Rate Amount

Je Hkkx esa 22.96 % etnwjh esa of̀) ds dkj.k vfrfjDr tksMuk

Page 185: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

BANERA4

No. of Trainees:- 30S.No Activities Rate Unit Total Remark

1 Daily allowance For Loading/ Boarding Trainees

30 Trainees for Four Days

800 per Trainees per Days

96000.00 As per Annexure I

2 Food Charges (Break fast, lunch, Dinner, Tea & Snakes

30 Trainees for Four Days

200 per Trainees per Days

24000.00 As per Annexure I

3 Stationary and Training Material ( Per Trainees )

30 Trainees 390 Per Trainees 11700.00 As per Annexure I

4 Honorium of resource person (4X2=8)

8 Resource person for One days per two hour

700 per resource person

5600.00 As per Annexure I

5 Honorium of Eminent Guest Speakers

2 Resource person for One days per two hour

2500 per resource person

5000.00 As per Annexure I

6 Daily allowance of resource person

10 Resource person for One days

800 per resource person

8000.00 As per Annexure I

7 Travelling allowance of resource person

10 Resource person for One days

100 Actual bus fare

1000.00 As per Annexure I

8 Tantage and class room facility creation

4 One days programme

3000 Actual 12000.00 As per Annexure I

9 Miscellaneous charges 3600.00 As per Annexure I

Total 166900.00

1669005600

Total Cost of 30 memberPer Member Cost

Say 5600/-Rs per Member per trainning

DETAILED EXPENDITURE OF PASTURE DEVELOPMENT & MANAGEMENT TRAINING

(Four Day Training )Training Date :- Panchayat Sameeti :-Training Place :- DISTICT LEVEL

No. Of Person

(a) Bannar (b) Photo

Actual

No. of Training Days :- Project Name :- IWMP -XVIINAME OF TRAINNERS :- PIA & WDT

Page 186: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

BANERA3

No. of Trainees:- 30S.No Activities Rate Unit Total Remark

1 Daily allowance For Loading/ Boarding Trainees

30 Trainees for Three Days 1000 per Trainees per Days

90000.00 As per Annexure I

2 Food Charges (Break fast, lunch, Dinner, Tea & Snakes

30 Trainees for Three Days 250 per Trainees per Days

22500.00 As per Annexure I

3 Stationary and Training Material ( Per Trainees )

30 Trainees 390 Per Trainees 11700.00 As per Annexure I

4 Honorium of resource person (3X2=6)

6 Resource person for One days per two hour

700 per resource person

4200.00 As per Annexure I

5 Honorium of Eminent Guest Speakers

2 Resource person for One days per two hour

2500 per resource person

5000.00 As per Annexure I

6 Daily allowance of resource person

8 Resource person for One days

1000 per resource person

8000.00 As per Annexure I

7 Travelling allowance of resource person

8 Resource person for One days

150 Actual bus fare

1200.00 As per Annexure I

8 Tantage and class room facility creation

3 One days programme 4000 Actual 12000.00 As per Annexure I

9 Miscellaneous charges 3600.00 As per Annexure I

Total 158200.00

1582005300

Total Cost of 30 memberPer Member Cost

Say 5300/-Rs per Member per trainning

DETAILED EXPENDITURE OF WDT & PIA TRANNING PROGRAMME(Three Day Training )

Training Date :- Panchayat Sameeti :-Training Place :- STATE LEVEL

(a) Bannar (b) Photo

Actual

NAME OF TRAINNERS :- PIA & WDT

No. of Training Days :- Project Name :- IWMP -XVII

No. Of Person

Page 187: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

Banera1

No. of Trainees:- 50S.No Activities Total Remark

1 Daily allowance For Loading/ Boarding Trainees

50 Trainees for One Days

125 per Trainees Days

6250.00 As per Annexure I

2 Stationary and Training Material ( Per Trainees )

50 Trainees 120 Per Trainees

6000.00 As Per Annexure II

3 Honorium of resource person

12 Resource person for One days

250 per resource person

3000.00 As Per Annexure III

4 Daily allowance of resource person

12 Resource person for One days

70 per resource person

840.00 As Per Annexure III

5 Travelling allowance of resource person

12 Resource person for One days

120 Actual bus fare

1440.00 As Per Annexure III

6 Tantage and class room facility creation

One days programme

2000 Actual 2000.00 As Per Annexure IV

7 Jeep hiring charges

4 Days jeep hiring

500 per day 2000.00 As PerAnnexure V

8 Miscellaneous charges

1500.00 As PerAnnexure VII

Total 23030.00

(a) Bannar (b) Photo

Training Place :- No. of Training Days :- Project Name :- IWMP-XVII

Stake holder :- Village CommunityNo. Of Person Rate

(2Day SHG Training )Training Date :- Panchayat Sameeti :-

Reference –

Actual

DETAILED ESTIMATE OF ONE DAY TRAINNING

Page 188: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

1 Days

No. of Trainees:- 50S.No Activities Total Remark

1 Daily allowance For Loading/ Boarding Trainees

50 Trainees for One Days

75 per Trainees Days

3750.00 As per Annexure I

2 Stationary and Training Material ( Per Trainees )

50 Trainees 50 Per Trainees

2500.00 As Per Annexure II

3 Honorium of resource person

4 Resource person for One days

250 per resource person

1000.00 As Per Annexure III

4 Daily allowance of resource person

4 Resource person for One days

70 per resource person

280.00 As Per Annexure III

5 Travelling allowance of resource person

4 Resource person for One days

110 Actual bus fare

440.00 As Per Annexure III

6 Tantage and class room facility creation

1 One days programme

750 Actual 750.00 As Per Annexure IV

7 Jeep hiring charges

2 Days jeep hiring

500 per day 1000.00 As PerAnnexure V

8 Miscellaneous charges

300.00 As PerAnnexure VII

Total 10020.00

Panchayat Sameeti :-

Reference –

Training Place :- No. of Training Days :-

DETAILED EXPENDITURE OF PASTURE DEVELOPMENT & MANAGEMENT TRAINING

(One Day Training )Training Date :-

(a) Bannar (b) Photo

Actual

Stake holder :- Village CommunityNo. Of Person Rate

Project Name :-

Page 189: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

1-

2- ;kstuk dk uke&

Je dqy Je ;ksx

1 5 ls 7 lseh xgjkbZ dk Mkxcsfyax dk;Z 1 2 50 1001 4 20 801 4 12 48

228 1.00 1.00 228.00 228.00

dk;kZy; iapk;r lfefr] cusMk ] ftyk HkhyokMk fuekZ.k dk;Z gsrq foLr`r ykxr&vuqeku

dk;Z dk Ukke& QkeZ ikS.M fuekZ.k dk;Z xzke& xzke iapk;r&

Total

izfr jfuax eh

iSans dh pkSM+kbZ 12 eh- & Åij dh pkSM+kbZ 20 eh- & xgjkbZ 2 ehVj Location- 0

Åij dk {ks=Qy

vkSlr {ks=Qy

xgjkbZ jkf'kek=k bdkbZ njØa-la- dk;Z dk fooj.k la0 iSnsa dk {ks=Qy

228 1.00 1.00 228.00 228.00

2 txay dh lQkbZ] lk/kkj.k ouLifr rFkk >kfM+;ksa dksdkVus lfgrA 1 44 32 1408 oxZ eh- 1.36 1.36 1914.88 1914.88

3uhao] [kkbZ] ijukyk esa 1-5 xgjkbZ rd feêh dh [kqnkbZdjuk] ry dks dwVuk] ikuh Mkyuk] cxy dks laokjuk][kqnh feêh dks ckgj fudkyuk] uhao Hkjus ds ckn A- l[r] fpduh] dadj feêh esa 60 izfr- vkSlr 1 144 400 272 1.2 326.4 ?ku eh- 91.00 91.00 29702.40 29702.40

B- eqjZe 1 144 400 272 0.4 108.8 ?ku eh- 99.00 99.00 10771.20 10771.20

C- fo?kfVr pV~Vku @eqjZe 20 izfr- vkSlr 1 144 400 272 0.4 108.8 ?ku eh- 134.00 134.00 14579.20 14579.204 vfrfjDr fy¶V dk dk;Z 1 144 196 170 0.5 85 l[;k 11.00 11.00 935.00 935.005 c.M ij /kke.k /kkl cqckbZ dk dk;ZA 15 ykbu esa 1 15 50 750 izfr

jfuax eh0.59 0.59 442.50 442.50

6 /kke.k /kkl [kjhn dk;ZA 6 fdxzk 0.00 82.00 0.00 492.00Total Total 58573.18 59065.18

13448.40 13448.40

;ksx 72022 72513.58

tksM+ 3 % dfUVu tsalh 2175.41

dqy

Je Hkkx esa 22.96 % etnwjh esa of̀) ds dkj.k vfrfjDr tksMuk

Total

dqy ;ksx

74689

SAY 74700

72020

268074700dqy ;ksx

ykxr Je en esa

ykxr lkexzh en esa

Page 190: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

1-

2- ;kstuk dk uke&

Je dqy Je ;ksx

1 5 ls 7 lseh xgjkbZ dk Mkxcsfyax dk;Z 1 2 50 100

1 4 20 80

dk;kZy; iapk;r lfefr] cusMk ] ftyk HkhyokMk fuekZ.k dk;Z gsrq foLr`r ykxr&vuqeku

dk;Z dk Ukke& QkeZ ikS.M fuekZ.k dk;Z xzke& xzke iapk;r&

MNREGS

izfr jfuax

iSans dh pkSM+kbZ 12 eh- & Åij dh pkSM+kbZ 20 eh- & xgjkbZ 2 ehVj Location- 0

Åij dk

{ks=Qy

vkSlr {ks=Qy

xgjkbZ jkf'kNREGS

ek=k bdkbZ njØa-la- dk;Z dk fooj.k la0 iSnsa dk {ks=Qy

1 4 20 801 4 12 48

228 0.88 0.88 200.64 200.64

2 txay dh lQkbZ] lk/kkj.k ouLifr rFkk >kfM+;ksa dksdkVus lfgrA 1 44 32 1408 oxZ eh- 1.20 1.20 1689.60 1689.60

3 uhao] [kkbZ] ijukyk esa 1-5 xgjkbZ rd feêh dh [kqnkbZdjuk] ry dks dwVuk] ikuh Mkyuk] cxy dks laokjuk][kqnh feêh dks ckgj fudkyuk] uhao Hkjus ds ckn A- l[r] fpduh] dadj feêh esa 60 izfr- vkSlr 1 144 400 272 1.2 326.4 ?ku eh- 73.80 81.00 24088.32 26438.40

B- eqjZe 1 144 400 272 0.4 108.8 ?ku eh- 79.30 88.00 8627.84 9574.40

C- fo?kfVr pV~Vku @eqjZe izfr- vkSlr 1 144 400 272 0.4 108.8 ?ku eh- 110.70 118.00 12044.16 12838.40

4 vfrfjDr fy¶V dk dk;Z 1 144 196 170 0.5 85.00 l[;k 10.00 10.00 850.00 850.00

5 c.M ij /kke.k /kkl cqckbZ dk dk;ZA 15 ykbu esa 1 15 50 750 izfr jfuax eh

0.52 0.52 390.00 390.00

6 /kke.k /kkl [kjhn dk;ZA 6 fdxzk 0.00 82.00 0.00 492.00

Total 47890.56 52473.44Total

izfr jfuax eh

Total

Total 47890.56 52473.4420521.105 20521.10

;ksx 68412 72994.54tksMs+ 3 ikuh okyk + vk;k

2052.35 2052.35

;ksx 70464 75046.891500.9476548

SAY 7660070460614076600

ykxr lkexzh en esa dqy ;ksx

TotalJe Hkkx esa 30 % VkLd dh deh ds dkj.k vfrfjDr tksMuk

dqy ;ksx

ykxr Je en esa

Page 191: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

Number of Participants 40Total no of Exposure 1

Sno DescriptionKm Rate in RS Unit Amount Remarks

1

Bus Charges 41/56 Seater for 6 days RSTC rate as per RSTC Jaipur Order dated 3/10/2011 (Insurance / Toll tex approx /Interstate permit )

2300 50 Per Km 115000 Both Side

2 Lodging and Boarding for 6 day 40 250 Per Person 60000 (40x250x6=60000)

3 Training Materials 40 150 Per Person 6000 (150x40=6000)

4 Honorarium Charges of Resource persons 6 1000 Per days 6000

1 day = 8 hrs, so there would be 4 sessions per day. Thus honorarium charges = RS 250/ 2hrs * 4 sessions

5 Hired Jeep 7 500 Per days 3500

6training hall , banner, medicines, WOTR A dministrative charges and other Misc expenses

20000 WOTR admin charges - 10 % of its overall expenses.

210500

Outer State Exposure trip of IWMP_17 Banera (Panchayat Samiti Banera)

Roadways Bus (RSTC)

OTHER STATE EXPOSURE TOUR ESTIMATE

Total Am

Page 192: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

dz-l- xkWao dk uke xzke iapk;r Qly dk

uke

d`"kd

dh

la[;k

nj jkf'k d`"kd dh

la[;k

jkf'k d`"kd dh

la[;k

jkf'k d`"kd dh

la[;k

jkf'k d`"kd

dh

la[;k

jkf'k d`"kd

dh

la[;k

jkf'k

eDdk 50 2116 105800 0 0 20 42320 20 42320 10 21160mMn 20 2363 47260 0 0 10 23630 5 11815 5 11815ewWax 20 2695 53900 0 0 10 26950 5 13475 5 13475fry 20 2163 43260 0 0 10 21630 5 10815 5 10815Xokj 20 2490 49800 0 0 10 24900 5 12450 5 12450

130 300020 0 0 0 0 60 139430 40 90875 30 69715eDdk 30 2116 63480 0 0 10 21160 10 21160 10 21160mMn 10 2363 23630 0 0 5 11815 5 11815 0 0

ewWax 10 2695 26950 0 0 5 13475 5 13475 0 0fry 10 2163 21630 0 0 5 10815 5 10815 0 0

Xokj 6 2490 14940 0 0 6 14940 0 0 0 0

66 150630 0 0 0 0 31 72205 25 57265 10 21160

eDdk 14 2116 29624 0 0 14 29624 0 0 0 0mMn 4 2363 9452 0 0 4 9452 0 0 0 0ewWax 4 2695 10780 0 0 4 10780 0 0 0 0fry 0 2163 0 0 0 0 0 0 0 0 0Xokj 0 2490 0 0 0 0 0 0 0 0 0

22 49856 0 0 0 0 22 49856 0 0 0 0eDdk 40 2116 84640 0 0 20 42320 10 21160 10 21160mMn 15 2363 35445 0 0 5 11815 5 11815 5 11815ewWax 15 2695 40425 623167 0 0 5 13475 5 13475 5 13475fry 14 2163 30282 0 0 5 10815 5 10815 4 8652Xokj 15 2490 37350 0 0 5 12450 5 12450 5 12450

99 228142 0 623167 0 0 40 90875 30 69715 29 67552eDdk 20 2116 42320 0 0 10 21160 5 10580 5 10580mMn 15 2363 35445 0 0 5 11815 5 11815 5 11815ewWax 15 2695 40425 0 0 5 13475 5 13475 5 13475fry 10 2163 21630 0 0 0 0 5 10815 5 10815Xokj 10 2490 24900 0 0 0 0 5 12450 5 12450

Total

Total

dklkSfj;k

4

dklkSfj;k dklkSfj;k

5

tklkSfj;k

iape o"kZ

2

?kjVk ?kjVk

3

dqf.M;k dykdqf.M;k dyk

Total

dqy ykxr

1

Mkcyk Mkcyk

Total

AREA IN HACT. 0.4O tyxzg.k {ks= es [kjhQ dh Qly izn'kZu izFke o"kZ f)rh; o"kZ r`rh; o"kZ prqFkZ o"kZ

Page 193: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

70 164720 0 0 0 0 20 46450 25 59135 25 59135eDdk 20 2116 42320 0 0 0 0 20 42320 0 0mMn 5 2363 11815 0 0 0 0 5 11815 0 0ewWax 5 2695 13475 0 0 0 0 5 13475 0 0fry 5 2163 10815 0 0 0 0 5 10815 0 0Xokj 5 2490 12450 0 0 0 0 5 12450 0 0

40 90875 0 0 0 0 0 0 40 90875 0 0eDdk 10 2116 21160 0 0 10 21160 0 0 0 0mMn 5 2363 11815 0 0 5 11815 0 0 0 0ewWax 5 2695 13475 0 0 5 13475 0 0 0 0fry 5 2163 10815 0 0 5 10815 0 0 0 0Xokj 5 2490 12450 0 0 5 12450 0 0 0 0

30 69715 0 0 0 0 30 69715 0 0 0 0eDdk 10 2116 21160 0 0 10 21160 0 0 0 0mMn 5 2363 11815 0 0 5 11815 0 0 0 0ewWax 5 2695 13475 0 0 5 13475 0 0 0 0fry 5 2163 10815 0 0 5 10815 0 0 0 0Xokj 5 2490 12450 0 0 5 12450 0 0 0 0

30 69715 0 0 0 0 30 69715 0 0 0 0487 1123673 0 623167 0 0 233 538246 160 367865 94 217562

eDdk 194 2116 410504mMn 79 2363 186677ewWax 79 2695 212905fry 69 2163 149247Xokj 66 2490 164340

487 1123673

Total

Total KharifTotal

Total

Total7

nsoiqjk dklkSfj;k

8

dkyh ihiyh

dklkSfj;k

Total

6

fot;iqj dklkSfj;k

Page 194: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

dz-l-

xkWao dk uke

xzke iapk;r

Qly dk uke

d`"kd dh

la[;k

nj jkf'k d`"kd dh

la[;k

jkf'k d`"kd dh

la[;k

jkf'k d`"kd dh

la[;k

jkf'k d`"kd dh

la[;k

jkf'k d`"kd dh

la[;k

jkf'k

xsgwWa 40 2600 104000 0 0 20 52000 10 26000 10 26000puk 20 3083 61660 0 0 10 30830 5 15415 5 15415ljlks 18 1894 34092 0 0 10 18940 4 7576 4 7576

78 199752 0 0 0 0 40 101770 19 48991 19 48991xsgwWa 20 2600 52000 0 0 10 26000 5 13000 5 13000puk 10 3083 30830 0 0 5 15415 5 15415 0 0ljlks 9 1894 17046 0 0 5 9470 4 7576 0 0

39 99876 0 0 0 0 20 50885 14 35991 5 13000xsgwWa 15 2600 39000 0 0 5 13000 5 13000 5 13000puk 5 3083 15415 0 0 2 6166 2 6166 1 3083ljlks 6 1894 11364 0 0 2 3788 2 3788 2 3788

26 65779 0 0 0 0 9 22954 9 22954 8 19871xsgwWa 20 2600 52000 0 0 10 26000 5 13000 5 13000puk 10 3083 30830 0 0 4 12332 4 12332 2 6166ljlks 10 1894 18940 0 0 4 7576 4 7576 2 3788

40 101770 0 0 0 0 18 45908 13 32908 9 22954xsgwWa 20 2600 52000 0 0 10 26000 5 13000 5 13000puk 10 3083 30830 0 0 5 15415 5 15415 0 0ljlks 10 1894 18940 0 0 5 9470 5 9470 0 0

40 101770 0 0 0 0 20 50885 15 37885 5 13000xsgwWa 27 2600 70200 0 0 10 26000 10 26000 7 18200puk 10 3083 30830 0 0 5 15415 5 15415 0 0ljlks 10 1894 18940 0 0 5 9470 5 9470 0 0

47 119970 0 0 0 0 20 50885 20 50885 7 18200xsgwWa 10 2600 26000 0 0 4 10400 4 10400 2 5200puk 5 3083 15415 0 0 2 6166 2 6166 1 3083ljlks 5 1894 9470 0 0 2 3788 2 3788 1 1894

20 50885 0 0 0 0 8 20354 8 20354 4 10177

4 dklkSfj;k dklkSfj;k

5

7

Total

6

1 Mkcyk Mkcyk

fot;iqj

Total

Total

3 dqf.M;k dyk

dqf.M;k dyk

Total

Total

Total

Total

2 ?kjVk ?kjVk

dklkSfj;k

tklkSfj;k dklkSfj;k

AREA IN HACT. 0.4O tyxzg.k {ks= es jch dh Qly izn'kZu izFke o"kZ f)rh; o"kZ r`rh; o"kZ prqFkZ o"kZ iape o"kZ

nsoiqjk dklkSfj;k

Page 195: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

xsgwWa 10 2600 26000 0 0 4 10400 4 10400 2 5200puk 5 3083 15415 0 0 5 15415 0 0 0 0ljlks 5 1894 9470 0 0 5 9470 0 0 0 0

20 50885 0 0 0 0 14 35285 4 10400 2 5200310 790687 0 0 0 0 149 378926 102 260368 59 151393

xsgwWa 162 2600 421200puk 75 3083 231225ljlks 73 1894 138262

310 790687Total

SUMMARY

Total Rabi

8 dkyh ihiyh

dklkSfj;k

Total

Page 196: CERTIFICATE - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 6317 population with Communities like SC, ST, Khati, Lohar, Choudary and Other. 1. Climatic

UNIT COST UNIT COST UNIT COST UNIT COST UNIT COST

1 GUAVAVA 5 34975 174875 0 0 0 0 2 69950 2 69950 1 34975

2 ANAR 5 51523 257615 0 0 0 0 2 103046 2 103046 1 51523

3 ORANGE 5 35680 178400 0 0 0 0 2 71360 2 71360 1 35680

4 NIMBU 4 32599 130396 0 0 0 0 2 65198 2 65198 0 0

19 741286 0 0 0 0 8 309554 8 309554 3 122178

39015

Qynkj iks/kk jksi.k S.NO.

TEYP OF PLANTS

UNIT Hact.

UINT COST /Ha. Total Cost

I YEAR II YEAR III YEAR IV YEAR V YEAR

TOTAL( C )