William Donovan Plant Manager Bay Park Sewage Treatment Plant 2 Marjorie Lane East Rockaway, NY 11518-2020 January 24, 2016 CERTIFIED MAIL Mr. Robert Wither, P.E. Chief, SPDES Compliance Information Section NYSDEC - Division of Water, Bureau of Water Compliance 625 Broadway 4th Floor Albany, New York 12233-3506 Re: Bay Park Sewage Treatment Plant SPDES Permit Number: NY 0026450 Discharge Monitoring Report for December 2015 Dear Mr. Wither: The County of Nassau entered into an Agreement for the Operation and Maintenance of the Nassau County Sewer System” with United Water Long Island Incorporated on September 10, 2014. Please take notice that on November 9, 2015, UWLI changed its name to SUEZ Water Long Island, Inc. The O&M Agreement remains unchanged, whereby SUEZ Water Long Island Inc., will continue to manage the County-owned assets and service areas of the Bay Park Sewage Treatment Plant, the Cedar Creek Water Pollution Control Plant and the Glen Cove Wastewater Treatment Plant, along with their respective collection systems and lift stations. Effective January 2, 2014, United Water Incorporated effectively began fulfilling our responsibilities associated with the subject Agreement. Accordingly, enclosed please find the Discharge Monitoring Report (DMR) for the Bay Park Sewage Treatment Plant (STP) for December 2015. Please note that the facility is still engaged in recovery efforts, repairing and replacing components of the plant that were damaged by superstorm Sandy in late October 2012. The plant was in compliance with all SPDES Permit effluent limitations aside from an excursion of the monthly action limits for Chloroform (limit of 1.7 lbs/d; result of 1.95 lbs/d), Chromium (limit of 5.7 lbs/d; result of 22.03 lbs/d). It is our belief that the subject excursions are an anomaly; however we will perform a short-term high- intensity monitoring program during January 2016 in an effort to discern if an untoward situation exists. The plants CBOD Influent and Effluent composite samples for 12/23/2015 analyzed by Pace Analytical Laboratories have been removed from the monthly calculations; the lab has indicated a problem with dilution water for seeded and unseeded CBOD samples. Pace Labs has drafted a letter stating the issue, see attached.

Upload: others

Post on 30-Apr-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CERTIFIED MAIL DMRs/Bay Park/BP… · Pulled feeder existing USS5 building power “A” bus – Energization (MOPO). Installed glazing, stair treads, grating, doors and sun shade

William Donovan

Plant Manager

Bay Park Sewage Treatment Plant

2 Marjorie Lane

East Rockaway, NY 11518-2020

January 24, 2016 CERTIFIED MAIL

Mr. Robert Wither, P.E.

Chief, SPDES Compliance Information Section

NYSDEC - Division of Water, Bureau of Water Compliance

625 Broadway – 4th Floor

Albany, New York 12233-3506

Re: Bay Park Sewage Treatment Plant

SPDES Permit Number: NY 0026450

Discharge Monitoring Report for December 2015

Dear Mr. Wither:

The County of Nassau entered into an Agreement for the Operation and Maintenance of the Nassau County

Sewer System” with United Water Long Island Incorporated on September 10, 2014. Please take notice that on

November 9, 2015, UWLI changed its name to SUEZ Water Long Island, Inc. The O&M Agreement remains

unchanged, whereby SUEZ Water Long Island Inc., will continue to manage the County-owned assets and

service areas of the Bay Park Sewage Treatment Plant, the Cedar Creek Water Pollution Control Plant and the

Glen Cove Wastewater Treatment Plant, along with their respective collection systems and lift stations.

Effective January 2, 2014, United Water Incorporated effectively began fulfilling our responsibilities associated

with the subject Agreement. Accordingly, enclosed please find the Discharge Monitoring Report (DMR) for the

Bay Park Sewage Treatment Plant (STP) for December 2015. Please note that the facility is still engaged in

recovery efforts, repairing and replacing components of the plant that were damaged by superstorm Sandy in late

October 2012.

The plant was in compliance with all SPDES Permit effluent limitations aside from an excursion of the monthly

action limits for Chloroform (limit of 1.7 lbs/d; result of 1.95 lbs/d), Chromium (limit of 5.7 lbs/d; result of 22.03

lbs/d). It is our belief that the subject excursions are an anomaly; however we will perform a short-term high-

intensity monitoring program during January 2016 in an effort to discern if an untoward situation exists.

The plants CBOD Influent and Effluent composite samples for 12/23/2015 analyzed by Pace Analytical

Laboratories have been removed from the monthly calculations; the lab has indicated a problem with dilution

water for seeded and unseeded CBOD samples. Pace Labs has drafted a letter stating the issue, see attached.

Page 2: CERTIFIED MAIL DMRs/Bay Park/BP… · Pulled feeder existing USS5 building power “A” bus – Energization (MOPO). Installed glazing, stair treads, grating, doors and sun shade

The following laboratories performed the analyses reported in the monthly DMR:

Laboratory ELAP ID

Number

Analyses Performed

Pace Analytical Services Inc. 10478 Metals, Total and Fecal Coliform, TSS, CBOD5,

Volatile and Semi-Volatile Organics

Nassau County Department of

Health

10339 Total and Fecal Coliform

We are continuing a thorough internal review that began in February and through the month of July, for the elevated fecal and total coliform values that occurred during the month of January and part of February. Once completed our analysis will be forwarded to your office.

Also, as discussed with the Region 1 office, attached is a summary of the repair and replacement progress made

during December 2015, with respect to the damages that the facility sustained as a result of Superstorm Sandy

Should you have any questions or comments concerning the above, please contact me at (516) 519-5560.

Very truly yours,

William Donovan

Plant Manager

Enc.

c.

NCDPW: Commissioner Shila Shah-Gavnoudias, Chief Deputy Commissioner Richard Millet, Richard

Cotugno, Pasquale Assalone

NCHD: Donald Irwin

NYSDEC: Joe Sun, Robert Wither

SWLI: Alan Weland, Joe Davenport

Page 3: CERTIFIED MAIL DMRs/Bay Park/BP… · Pulled feeder existing USS5 building power “A” bus – Energization (MOPO). Installed glazing, stair treads, grating, doors and sun shade

United Water has changed its brand to SUEZ

Head office – 461 From Road, Suite 400, Paramus, NJ 07652 – Tel: (201) 767-9300 – www.suez-na.com

William Donovan

Plant Manager

Bay Park Sewage Treatment Plant

2 Marjorie Lane

East Rockaway, NY 11518-2020

Bay Park Sewage Treatment Plant – Major Work Completed for the Month of December, 2015

The following is the Generator Control Project:

Installed new power meters for breakers in main substation.

Programed new power meters for breakers in main substation.

Installed blank cover panels on all four voltage regulator cabinets in basement on GeneratorBuilding.

Removed office trailer from site.

Continued training new generator controls.

The following is a summary of work for the Odor Control Biofilter Project:

Bay Park S.T.P.:

Continued training and turnover spare parts.

Continued working on punch list.

The following is a summary of work for the Final Settling Tanks Project:

Continued the installation of sludge collectors and scum removal systems for tank No. 5.

Completed the installation of tank drain sluice gate for Final Settling Tank No. 5.

Reprograming the scum system PLC as requested and programing FST No 6 with PLC.

Continued concrete repairs, and leaky expansion joints in Final Settling Tank No. 5.

Continued removing, disposing, mandreled, pulled wires, dressing, meggerred, labeling ofsludge sand scum electrical system for Final Settling Tank No. 5.

Final Settling Tank No. 3 turnover to the Contractor on December 2, 2015.

Completed power washing and demolishing and disposing of sludge collectors and scumremoval systems for Final Settling Tank No. 3.

Completed layout and started installation of sludge collectors and scum removal systems for tank

No. 3.

Continued concrete repairs, grouting and crack repair in Final Settling Tank No. 3.

The following is a summary of work for the Sludge Thickening Facility:

Start-up and testing Effluent Water Pump #1

Page 4: CERTIFIED MAIL DMRs/Bay Park/BP… · Pulled feeder existing USS5 building power “A” bus – Energization (MOPO). Installed glazing, stair treads, grating, doors and sun shade

2

Relocated GBT Control Panel #2 and completed 5 day Plant Testing

Relocated GBT Control Panel #4 and scheduled start-up Jan 5th

Continued installation of hot water supply and return piping to AHU.

Continued installation of stainless steel ductwork.

Continued Painting work activities throughout the Building.

Set Roof Top Exhaust Fans and roof parapet flashing.

The following is a summary of work for E-1, Electrical Distribution:

Continued submitting shop drawings and RFI’s.

USS 3:

Placed concrete ductbanks E-E, F-F (East and West), G-G, and H-H.

Installed low and medium switchgears and transformers.

Installed new catch basin & associated piping.

Continued structural steel painting.

Completed roofing.

Continued installation of metal ceiling panels.

Started installation of preformed metal siding system.

Tied in new storm water piping to existing.

Placed reinforced concrete for SBS lines under roadway.

Installed air cooled condensing units and associated piping.

Pulled communication cables from new USS No. 3 to existing USS No. 3.

USS 4:

Pulled feeder cables MCC-FA, MCC-FB, and MCC-X3.

Pulled feeder cables emergency generator.

Pulled and terminated “A” buss feeder cable.

Installed glazing, stair treads, grating, sun shades and hand railing on first floor.

Installed air cooled condensing units and associated piping.

Performed electric field testing on switchgears.

Performed water leakage test on preformed metal siding.

Installed condensation drip tray.

USS 5:

Energized Substation A side.

Connected MV switch to transformer, and transformer bus to switchboard.

Terminated “A” bus feeders in switchboard.

Pulled feeder existing USS5 building power “A” bus – Energization (MOPO).

Installed glazing, stair treads, grating, doors and sun shade.

The following is a summary of work for the Perimeter Flood Protection Berm and Flood Wall:

Continued submitting shop drawings and RFI’s.

Progressed T-Wall (completed monolith 45) and I-Wall (Sta. 34).

Progressed Gates 2 and 3 (concrete and formwork).

Page 5: CERTIFIED MAIL DMRs/Bay Park/BP… · Pulled feeder existing USS5 building power “A” bus – Energization (MOPO). Installed glazing, stair treads, grating, doors and sun shade

3

Progressed double retaining wall installation (Sta. 22 – 30).

Completed West duct bank installation work (Sta. 1 -3).

Progressed drainage installation work (Sta. 24 – 30), including North Gate Chamber S-09.

Progressed Harbor Road restoration work (sanitary sewer, light pole foundations).

East Park Improvements: Handball Court (Completed wall finish, striping remains to bedone).

The following is a summary of work for the Improvements to the Influent Screenings Facility:

Formed and placed concrete chemical containment walls in the Odor Control Room.

Installed channel Nos. 3 and 4 upstream hatches Nos. 9 and 10.

Installed channel Nos. 3 and 4 stilling wells for the upstream pressure transducers.

Installed channel Nos. 3 and 4 upstream pressure transducer.

Install stems, guides, bases, and actuators for upstream sluice gates SG-11 & SG-12 inchannel Nos. 3 and 4.

Installation of the steam cleaner receptacle in the Scavenger Waste Area.

Completed removal of existing MCC-A1.

The following is a summary of work for Grit Facility Improvements:

Completed Jet Grouting and Excavation in Tank 1.

Started rebar and concrete work in Tank 1.

Completed Excavation in Tank 2.

Continue to install rebar and concrete in Tank 2.

Removed existing plumbing and HVAC work and provided temporary piping and ductwork.

Installed vent piping on First Floor.

Installed structural steel for roof opening.

Removed MCC on the second floor and reroute temporary power to tie in the new Substation

5.

Removed lighting fixture and installed temporary lighting on Second Floor.

Tested stop logs and gates at Influent channel.

The following is a summary of work for Emergency Contract – Heating the Hot Water Piping System:

Continued submitting shop drawings and RFIs.

Continued installation of 10” Hot Water Supply and Return pipes in Main Tunnel.

Completed installation of 10” Hot Water Supply and Return pipes from Main Tunnel to WestWarehouse.

Completed installation of 6” Hot Water Supply and Return pipes from West Warehouse toSludge Thickening Building.

Page 6: CERTIFIED MAIL DMRs/Bay Park/BP… · Pulled feeder existing USS5 building power “A” bus – Energization (MOPO). Installed glazing, stair treads, grating, doors and sun shade

4

The following is a summary of work for Phase E2 – Unit Substation No. 2 & Electrical Distribution:

Continued submitting shop drawing and RFI’s.

Continued demolition of the building superstructure.

Started demolition of below-grade beams and pile caps at the Aeration Tank Odor ControlBuilding.

The following is a summary of work for Phase E3 – Main Unit Substation and Electrical Distribution:

Continued submitting shop drawings, subcontractors and RFI’s.

Excavated test pits at various locations throughout the site.

Started clearing of the Main Substation (MSS) site.

The following is a summary of work for Pump Stations No. 4 – Felix, Fox, Northern, and Grand:

Continued submitting shop drawings, subcontractors and RFI’s.

The following is a summary of work for Pump Stations No. 5 – Miller, Mott, Long Beach, Royal, and

Lido:

Continued submitting shop drawings, subcontractors and RFI’s.

The following is a summary of work for Sludge Dewatering:

Issued Notice to Proceed on December 7th.

Page 7: CERTIFIED MAIL DMRs/Bay Park/BP… · Pulled feeder existing USS5 building power “A” bus – Energization (MOPO). Installed glazing, stair treads, grating, doors and sun shade

PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)

Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)

Name Nassau (County) Bay Park STP

Address 2 Marjorie Lane

DISCHARGE NUMBER MAJOR

Facility Bay Park STP WWTP OUTFALL

Location 2 Marjorie Lane

East Rockaway, NY 11518-2020 FROM TO o

Attn: William Donovan

SAMPLE

MEASUREMENT

00010 1 0 PERMIT

Effluent Gross REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

Effluent Gross REQUIREMENT

SAMPLE

MEASUREMENT

00530 1 0 PERMIT

Effluent Gross REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENTI CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED

AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED

ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR

OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS

TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE

SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING

THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND

33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA

$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE

COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)

EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 1

East Rockaway, NY 11518-2020

pH 00400 1 0E ffluent Gross

DATE

**********

519-5560516

TELEPHONE

SIGNATURE OF PRICIPAL EXECUTIVE OFFICER

OR AUTHORIZED AGENT

01.7*****

NAME/TITLE PRINCIPAL EXECUTIVE OFFICER

Plant Manager

William Donovan

*****

*****

*****

*****

TYPED OR PRINTED

Temperature, water deg.

centigrade

001-ANY0026450

***** ***** *****

*****

*****

***** 20.5

***** ***** 6.7 ***** 7.3

0

0

PARAMETERQUANTITY OR LOADING QUALITY OR CONCENTRATION NO.

EX

**********

*****

FREQUENCY

OF ANALYSIS

SAMPLE

TYPEVALUE VALUE VALUE VALUE VALUE

GR

Grab

MM/DD/YYYY

12/01/2015

MM/DD/YYYY

12/31/2015

*****

***** Deg C

NUMBER

MAXIMUM

Daily MX

7

45

7 DA AVG

DMR Mailing ZIP Code

(SUBR 01)

External Outfall

11518-2020

Form Approved

OMB No. 2040-004

No Discharge

PERMIT NUMBER

MONITORING PERIOD

MM/DD/YYYY

1/24/2016

***** *****

Req. Mon

Daily MX

*****

06/01

UNITS UNITS

Nitrogen, nitrite total (as N)

00545 1 0

Effluent Gross

Six per Day

06/01

Six per Day

Req. Mon

Monthly Comp24

01/30

Monthly

24

Comp24

26,000

7 DA AVG

GR

Grab

01/30 24

SU

mg/L

*****

*****

6

30

MO AVG

Solids, Total Suspended2,143

18,000

30 DA AVG

2,549

mg/L

0 01/01

Daily

24

Comp24

6

MINIMUM

Solids, Total Suspended

00530 G 0

Raw, Sewage Influent

*****

**********

lb/d

219

Req. Mon

MO AVG

*****

mg/L*****

0 01/01

Daily

24

Comp24

*****

*****

*****

*****

*****

9

Solids, Settleable

00545 1 0

Effluent Gross

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

<0.10

0.3

Daily MXml/L

0 06/01

Six per Day

GR

Grab

*****

*****

*****

*****

Nitrogen, nitrite total (as N)

00545 1 0

*****

*****

*****

*****Raw, Sewage Influent

*****

*****

*****

*****

*****

*****

0.2

Req. Mon

Daily MXmg/L

0

Page 8: CERTIFIED MAIL DMRs/Bay Park/BP… · Pulled feeder existing USS5 building power “A” bus – Energization (MOPO). Installed glazing, stair treads, grating, doors and sun shade

PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)

Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)

Name Nassau (County) Bay Park STP

Address 2 Marjorie Lane

East Rockaway, NY 11518-2020 MAJOR

Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT)

Location 2 Marjorie Lane

East Rockaway, NY 11518-2020 FROM TO o

Attn: William Donovan

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENTI CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED

AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED

ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR

OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS

TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE

SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING

THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND

33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA

$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE

COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)

EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 2

Daily MX

Req. Mon *****

*****

*****

*****

**********

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

DISCHARGE NUMBER

PARAMETER

Nitrogen, nitrate total (as N)

Phosphorus, total (as P)

00665 1 0

Effluent Gross

Nitrogen, ammonia, total (as

NH3)

34726 1 0

Effluent Gross

Nitrogen, ammonia, total (as

NH3)

34726 1 0

Raw Sewage Influent

NAME/TITLE PRINCIPAL EXECUTIVE OFFICER

William Donovan

Plant Manager

TYPED OR PRINTED

QUANTITY OR LOADING

VALUE

*****

*****

*****

*****

*****

NY0026450

PERMIT NUMBER

MONITORING PERIOD

MM/DD/YYYY

12/01/2015

VALUE

MM/DD/YYYY

12/31/2015

001-M

QUALITY OR CONCENTRATION

*****

UNITS

*****

*****

*****

*****

VALUE

*****

*****

*****

*****

*****

*****

SIGNATURE OF PRICIPAL EXECUTIVE

OFFICER OR AUTHORIZED AGENT

VALUE

*****

2.8

Req. Mon

MO AVG

*****

28.5

Req. Mon

DMR Mailing ZIP Code

(SUBR 01)

External Outfall

VALUE

4.6

Daily MX

Daily MX

1,460.0

*****

19.8

33.4

TELEPHONE

mg/L

mg/L

516 519-5560

NUMBER

UNITS

mg/L

mg/L

mg/L

mg/L

mg/L

Form Approved

OMB No. 2040-004

11518-2020

No Discharge

NO.

EX

0

0

0

0

0

0

0

DATE

1/24/2016

MM/DD/YYYY

FREQUENCY

OF ANALYSIS

01/30

Monthly

01/30

Monthly

01/30

Monthly

01/30

Monthly

01/30

Monthly

01/30

Monthly

01/30

Monthly

SAMPLE

TYPE

24

Comp24

24

Comp24

24

Comp24

24

Comp24

24

Comp24

24

Comp24

24

Comp24

Req. Mon

0.2

Nitrogen, Kjeldahl, total (as N)

Req. Mon

Daily MX

Nitrogen, Kjeldahl, total (as N)

00625 1 0

Effluent Gross

00620 1 0

Effluent Gross

00625 1 0

Raw, Sewage Influent

***** ***** *****

*****

*****

*****

*****

Daily MX

Req. Mon

*****

Nitrogen, nitrate total (as N)

00620 1 0

Raw, Sewage Influent

*****

*****

***** *****

Req. Mon

Daily MX*****

*****

***** *****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

Page 9: CERTIFIED MAIL DMRs/Bay Park/BP… · Pulled feeder existing USS5 building power “A” bus – Energization (MOPO). Installed glazing, stair treads, grating, doors and sun shade

PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)

Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)

Name Nassau (County) Bay Park STP

Address 2 Marjorie Lane

East Rockaway, NY 11518-2020 MAJOR

Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT)

Location 2 Marjorie Lane

East Rockaway, NY 11518-2020 FROM TO o

Attn: William Donovan

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

I CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED

AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED

ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR

OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS

TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE

SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING

THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND

33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA

$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE

COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)

EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 3

30DA GEO*****

*****

*****

28

7 DA GEO

MPN/100

mL

*****

*****

*****23,000

7 DA AVG

*****

Continuous

99/99

Continuous

99/99

Daily MX

Req. Mon

DAILYMX

0.5

NO.

EX

0 01/01

Daily

50050 G

RCORDR

RC

RCORDR

RC

SAMPLE

TYPE

11518-2020

OMB No. 2040-004

Form Approved

mg/L

*****

*****

UNITS

FREQUENCY

OF ANALYSIS

0

*****

SIGNATURE OF PRICIPAL EXECUTIVE

OFFICER OR AUTHORIZED AGENT

*****

No Discharge

MM/DD/YYYY

1/24/2016

DATE

0

DMR Mailing ZIP Code

*****

*****

*****

VALUE

NUMBER

519-5560516

TELEPHONE

0.24

VALUE

QUALITY OR CONCENTRATION

DISCHARGE NUMBER

001-M

12/31/2015

MM/DD/YYYY

QUANTITY OR LOADING

VALUE

External Outfall

(SUBR 01)

*****

*****

*****

*****

UNITS

*****

*****

*****

*****

VALUE

12/01/2015

MM/DD/YYYY

MONITORING PERIOD

PERMIT NUMBER

NY0026450

*****

*****

45.9

VALUE

TYPED OR PRINTED

Plant Manager

William Donovan

NAME/TITLE PRINCIPAL EXECUTIVE OFFICER

Effluent Gross

50060 1 0

Chlorine, total residual

Effluent Gross

Flow, in conduit or thru

treatment plant

PARAMETER

Phosphorus, In Total

orthophosphate

70507 1 0

Effluent Gross

*****

*****

*****

*****

*****

*****

***** *****

*****

2.8

***** mg/L

0 01/30

Monthly

24

Comp24

*****

***** 17Coliform, Fecal General

74055 1 0

Effluent Gross

*****

***** 200

GR

Grab

Coliform, Total General

81383 K

Effluent Gross

*****

*****

*****

*****

***** 280 *****

*****MPN/100

mLMO MEDIAN

0 01/01

Daily

GR

Grab

BOD, carbonaceous, 5 day, 20

C 0 01/01

700

80082 1 0

Effluent Gross

812

15,000

MO AVG

1,440

Lb/d

***** 2 4

mg/L4025

7 DA AVGMO AVGDaily

24

Comp24

BOD, carbonaceous, 5 day, 20

C

80082 G 0

Raw Sewage Influent

*****

*****

*****

*****

*****

*****

***** 151 *****

*****MO AVG

Reg. Monmg/L

0 01/01

Daily

24

Comp24

400

70

MO AVG***** *****

*****

*****

*****

*****

*****

Page 10: CERTIFIED MAIL DMRs/Bay Park/BP… · Pulled feeder existing USS5 building power “A” bus – Energization (MOPO). Installed glazing, stair treads, grating, doors and sun shade

PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)

Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)

Name Nassau (County) Bay Park STP

Address 2 Marjorie Lane

East Rockaway, NY 11518-2020 MAJOR

Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT)

Location 2 Marjorie Lane

East Rockaway, NY 11518-2020 FROM TO o

Attn: William Donovan

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

I CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED

AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED

ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR

OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS

TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE

SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING

THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND

33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA

$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE

COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)

EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 4

85

85

MO AV MIN

MO AV MIN

*****

*****

99

*****

**********

*****

*****

CALCTD

CA

Monthly

01/300

%

CALCTD

CA

*****

*****

Percent Removal

81383 K

Carbonaceous oxygen demand,

% removal

*****

*****

Monthly

01/30

FREQUENCY

OF ANALYSIS

MM/DD/YYYY

1/24/2016

DATE

0

NO.

EX

No Discharge

11518-2020

OMB No. 2040-004

Form Approved

SAMPLE

TYPE

%

UNITS

NUMBER

519-5560516

TELEPHONE

SIGNATURE OF PRICIPAL EXECUTIVE

OFFICER OR AUTHORIZED AGENT

*****

*****

VALUE

External Outfall

(SUBR 01)

DMR Mailing ZIP Code

*****

*****

VALUE

97

VALUE

QUALITY OR CONCENTRATION

DISCHARGE NUMBER

001-M

12/31/2015

MM/DD/YYYY

*****

*****

UNITS

*****

VALUE

12/01/2015

MM/DD/YYYY

MONITORING PERIOD

PERMIT NUMBER

NY0026450

*****

*****

VALUE

QUANTITY OR LOADING

TYPED OR PRINTED

Plant Manager

William Donovan

NAME/TITLE PRINCIPAL EXECUTIVE OFFICER

Percent Removal

81011 K 0

Solids, suspended percent

removal

PARAMETER

Page 11: CERTIFIED MAIL DMRs/Bay Park/BP… · Pulled feeder existing USS5 building power “A” bus – Energization (MOPO). Installed glazing, stair treads, grating, doors and sun shade

PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)

Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)

Name Nassau (County) Bay Park STP

Address 2 Marjorie Lane

East Rockaway, NY 11518-2020 MAJOR

Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT)

Location 2 Marjorie Lane

East Rockaway, NY 11518-2020 FROM TO o

Attn: William Donovan

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

I CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED

AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED

ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR

OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS

TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE

SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING

THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND

33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA

$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE

COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)

EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 1

Daily MX

24COMP24

24

FREQUENCY

OF ANALYSIS

SAMPLE

TYPE

Weekly

01/07

No Discharge

MM/DD/YYYY

1/24/2016

DATE

0

NO.

EX

11518-2020

OMB No. 2040-004

Form Approved

*****

*****

UNITS

NUMBER

519-5560516

TELEPHONE

SIGNATURE OF PRICIPAL EXECUTIVE

OFFICER OR AUTHORIZED AGENT

*****

*****

VALUE

External Outfall

DMR Mailing ZIP Code

*****

*****

VALUE

001-F

12/31/2015

MM/DD/YYYY

*****

*****

lb/d

UNITS

5.0

VALUE

12/01/2015

MM/DD/YYYY

MONITORING PERIOD

PERMIT NUMBER

VALUE

QUALITY OR CONCENTRATION

DISCHARGE NUMBER

(SUBR 01)

NY0026450

*****

*****

VALUE

QUANTITY OR LOADING

TYPED OR PRINTED

Plant Manager

William Donovan

NAME/TITLE PRINCIPAL EXECUTIVE OFFICER

Copper. total (as Cu)

PARAMETER

Effluent Gross

01042 1 0

Page 12: CERTIFIED MAIL DMRs/Bay Park/BP… · Pulled feeder existing USS5 building power “A” bus – Energization (MOPO). Installed glazing, stair treads, grating, doors and sun shade

PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)

Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)

Name Nassau (County) Bay Park STP

Address 2 Marjorie Lane

East Rockaway, NY 11518-2020 MAJOR

Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT)

Location 2 Marjorie Lane

East Rockaway, NY 11518-2020 FROM TO o

Attn: William Donovan

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENTI CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED

AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED

ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR

OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS

TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE

SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING

THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND

33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA

$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE

COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)

EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 2

Comp24

24

Comp24

24

Comp24

24

Comp24

24

Comp24

24

SAMPLE

TYPE

Monthly

01/30

Monthly

01/30

Monthly

01/30

Monthly

0

0

01/30

Monthly

01/30

Monthly

MM/DD/YYYY

1/24/2016

DATE

1

0

0

Comp24

24

Comp24

24

1

0

NO.

EX

No Discharge

11518-2020

OMB No. 2040-004

01/30

FREQUENCY

OF ANALYSIS

01/30

Monthly

Form Approved

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

UNITS

NUMBER

519-5560516

TELEPHONE

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

VALUE

External Outfall

QUALITY OR CONCENTRATION

(SUBR 01)

DMR Mailing ZIP Code

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

VALUE

SIGNATURE OF PRICIPAL EXECUTIVE

OFFICER OR AUTHORIZED AGENT

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

VALUE

DISCHARGE NUMBER

001-V

12/31/2015

MM/DD/YYYY

lb/d

lb/d

lb/dDaily MX

lb/d

lb/d

lb/d

Daily MX

1.7

1.95

Daily MX

87

15.89

0.9

<0.36

Daily MX

9

1.41

Daily MX

4.2

<0.36

Daily MX

5.2

22.03

Daily MX

1.5

<0.36

VALUE

12/01/2015

MM/DD/YYYY

MONITORING PERIOD

lb/d

UNITS

PERMIT NUMBER

NY0026450

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

VALUE

QUANTITY OR LOADING

TYPED OR PRINTED

Plant Manager

William Donovan

NAME/TITLE PRINCIPAL EXECUTIVE OFFICER

See Comments

32106 V 0

Chloroform

See Comments

01092 V 0

Zinc, total (as Zn)

See Comments

01077 V 0

Silver total (as Ag)

Effluent Gross

01067 V 0

Nickel, total (as Ni)

See Comments

01051 V 0

Lead, total (as Pb)

PARAMETER

See Comments

01034 V 0

Chromium, total (as Cr)

See Comments

01027 V 0

Cadmium, total (as Cd)

Page 13: CERTIFIED MAIL DMRs/Bay Park/BP… · Pulled feeder existing USS5 building power “A” bus – Energization (MOPO). Installed glazing, stair treads, grating, doors and sun shade

PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)

Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)

Name Nassau (County) Bay Park STP

Address 2 Marjorie Lane

East Rockaway, NY 11518-2020 MAJOR

Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT)

Location 2 Marjorie Lane

East Rockaway, NY 11518-2020 FROM TO o

Attn: William Donovan

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENTI CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED

AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED

ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR

OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS

TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE

SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING

THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND

33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA

$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE

COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)

EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 2

Comp24

24

Comp24

24

Comp24

24

Comp24

24

Comp24

24

SAMPLE

TYPE

Monthly

01/30

Monthly

01/30

Monthly

01/30

Monthly

0

0

01/30

Monthly

01/30

Monthly

MM/DD/YYYY

1/24/2016

DATE

0

0

0

Comp24

24

Comp24

24

0

0

NO.

EX

No Discharge

11518-2020

OMB No. 2040-004

01/30

FREQUENCY

OF ANALYSIS

01/30

Monthly

Form Approved

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

UNITS

NUMBER

519-5560516

TELEPHONE

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

VALUE

External Outfall

QUALITY OR CONCENTRATION

(SUBR 01)

DMR Mailing ZIP Code

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

VALUE

SIGNATURE OF PRICIPAL EXECUTIVE

OFFICER OR AUTHORIZED AGENT

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

VALUE

DISCHARGE NUMBER

001-V

12/31/2015

MM/DD/YYYY

lb/d

lb/d

lb/dDaily MX

lb/d

lb/d

lb/d

Daily MX

3.8

<0.36

Daily MX

5.9

<0.36

2.4

<0.36

Daily MX

0.6

<0.36

Daily MX

0.6

<0.36

Daily MX

1.1

<0.36

Daily MX

47

<1.81

VALUE

12/01/2015

MM/DD/YYYY

MONITORING PERIOD

lb/d

UNITS

PERMIT NUMBER

NY0026450

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

VALUE

QUANTITY OR LOADING

TYPED OR PRINTED

Plant Manager

William Donovan

NAME/TITLE PRINCIPAL EXECUTIVE OFFICER

See Comments

34475 V 0

Tetrachloroethylene

See Comments

34423 V 0

Methylene Chloride

See Comments

34336 V 0

Diethyl Phthalate

Effluent Gross

34242 V 0

Benzo (k) Fluoranthe

See Comments

34030 V 0

Benzene

PARAMETER

See Comments

34010 V 0

Toluene

See Comments

32730 V 0

Phenolics, Total

Page 14: CERTIFIED MAIL DMRs/Bay Park/BP… · Pulled feeder existing USS5 building power “A” bus – Energization (MOPO). Installed glazing, stair treads, grating, doors and sun shade

PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)

Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)

Name Nassau (County) Bay Park STP

Address 2 Marjorie Lane

East Rockaway, NY 11518-2020 MAJOR

Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT)

Location 2 Marjorie Lane

East Rockaway, NY 11518-2020 FROM TO o

Attn: William Donovan

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENTI CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED

AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED

ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR

OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS

TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE

SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING

THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND

33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA

$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE

COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)

EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 3

Comp24

24

Comp24

24

Comp24

24

Comp24

24

Comp24

24

SAMPLE

TYPE

Monthly

01/30

Monthly

01/30

Monthly

01/30

Monthly

0

0

01/30

Monthly

01/30

Monthly

MM/DD/YYYY

1/24/2016

DATE

0

0

0

Comp24

24

Comp24

24

0

0

NO.

EX

No Discharge

11518-2020

OMB No. 2040-004

01/30

FREQUENCY

OF ANALYSIS

01/30

Monthly

Form Approved

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

UNITS

NUMBER

519-5560516

TELEPHONE

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

VALUE

External Outfall

QUALITY OR CONCENTRATION

(SUBR 01)

DMR Mailing ZIP Code

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

VALUE

SIGNATURE OF PRICIPAL EXECUTIVE

OFFICER OR AUTHORIZED AGENT

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

VALUE

DISCHARGE NUMBER

001-V

12/31/2015

MM/DD/YYYY

lb/d

lb/d

lb/dDaily MX

lb/d

lb/d

lb/d

Daily MX

1.7

<0.36

Daily MX

11

<0.36

11

<0.36

Daily MX

1.0

<0.61

Daily MX

0.6

<0.36

Daily MX

1.5

<0.36

Daily MX

0.8

<0.36

VALUE

12/01/2015

MM/DD/YYYY

MONITORING PERIOD

lb/d

UNITS

PERMIT NUMBER

NY0026450

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

VALUE

QUANTITY OR LOADING

TYPED OR PRINTED

Plant Manager

William Donovan

NAME/TITLE PRINCIPAL EXECUTIVE OFFICER

See Comments

39180 V 0

Trichloroethylene

See Comments

39110 V 0

Di-n-Butyl Phthalate

See Comments

39100 V 0

Bis(2-ethylhexyl)Phtalate

Effluent Gross

39032 V 0

Pentachlorophenol

See Comments

34526 V 0

Benzo (a) Anthracine

PARAMETER

See Comments

34506 V 0

1,1,1 Trichloroethane

See Comments

345010 V 0

1,1Dichloroethylene

Page 15: CERTIFIED MAIL DMRs/Bay Park/BP… · Pulled feeder existing USS5 building power “A” bus – Energization (MOPO). Installed glazing, stair treads, grating, doors and sun shade

PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)

Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)

Name Nassau (County) Bay Park STP

Address 2 Marjorie Lane

East Rockaway, NY 11518-2020 MAJOR

Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT)

Location 2 Marjorie Lane

East Rockaway, NY 11518-2020 FROM TO o

Attn: William Donovan

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

I CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED

AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED

ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR

OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS

TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE

SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING

THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND

33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA

$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE

COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)

EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 4

PARAMETER

Tetrachloroethane

78028 V 0

See Comments

NAME/TITLE PRINCIPAL EXECUTIVE OFFICER

William Donovan

Plant Manager

TYPED OR PRINTED

QUANTITY OR LOADING

VALUE

*****

*****

NY0026450

PERMIT NUMBER

MONITORING PERIOD

MM/DD/YYYY

12/01/2015

VALUE

<0.36

UNITS

lb/d

MM/DD/YYYY

12/31/2015

001-V

DISCHARGE NUMBER

QUALITY OR CONCENTRATION

VALUE

*****

SIGNATURE OF PRICIPAL EXECUTIVE

OFFICER OR AUTHORIZED AGENT

VALUE

*****

DMR Mailing ZIP Code

(SUBR 01)

External Outfall

VALUE

*****

TELEPHONE

516 519-5560

NUMBER

UNITS

*****

*****

Form Approved

OMB No. 2040-004

11518-2020

No Discharge

NO.

EX

0

DATE

1/24/2016

MM/DD/YYYY

FREQUENCY

OF ANALYSIS

01/30

Monthly

SAMPLE

TYPE

24

Comp24*****Daily MX

***** *****2.2

Page 16: CERTIFIED MAIL DMRs/Bay Park/BP… · Pulled feeder existing USS5 building power “A” bus – Energization (MOPO). Installed glazing, stair treads, grating, doors and sun shade

PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)

Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)

Name Nassau (County) Bay Park STP

Address 2 Marjorie Lane

East Rockaway, NY 11518-2020 MAJOR

Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT)

Location 2 Marjorie Lane

East Rockaway, NY 11518-2020 FROM TO o

Attn: William Donovan

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

I CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED

AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED

ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR

OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS

TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE

SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING

THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND

33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA

$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE

COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)

71900 1 0

Mercury, Total (as Hg)

PARAMETER

Effluent Gross*****

*****

VALUE

QUANTITY OR LOADING

TYPED OR PRINTED

Plant Manager

William Donovan

NAME/TITLE PRINCIPAL EXECUTIVE OFFICER

PERMIT NUMBER

NY0026450

*****

*****

VALUE

10/01/15

MM/DD/YYYY

MONITORING PERIOD

*****

*****

UNITS

DISCHARGE NUMBER

001-Q

12/31/15

MM/DD/YYYY

*****

*****

VALUE

*****

*****

VALUE

SIGNATURE OF PRICIPAL EXECUTIVE

OFFICER OR AUTHORIZED AGENT

(SUBR 01)

DMR Mailing ZIP Code

DAILY MX

200

4.34

VALUE

External Outfall

QUALITY OR CONCENTRATION

NUMBER

519-5560516

TELEPHONE

ng/L

ng/L

UNITS

Form Approved

0

NO.

EX

No Discharge

11518-2020

OMB No. 2040-004

01/90

FREQUENCY

OF ANALYSIS

MM/DD/YYYY

1/25/2016

DATE

Quarterly Grab

GR

SAMPLE

TYPE

Page 17: CERTIFIED MAIL DMRs/Bay Park/BP… · Pulled feeder existing USS5 building power “A” bus – Energization (MOPO). Installed glazing, stair treads, grating, doors and sun shade

EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 1

Page 18: CERTIFIED MAIL DMRs/Bay Park/BP… · Pulled feeder existing USS5 building power “A” bus – Energization (MOPO). Installed glazing, stair treads, grating, doors and sun shade

BAY PARK SEWAGE TREATMENT PLANT

MONTHLY LABORATORY REPORT

PLANT PRIMARY GBT RETURN AERATION AERATION PLANT PRIMARY

INFLUENT EFFLUENT FILRATE SLUDGE EFFLUENT AVERAGE INFLUENT EFFLUENT

mg/L mg/L mg/L mg/L mg/L mg/L °C mg/L mg/L mg/L %TS %VS %TS %VS

12/01/15 180 66 31.00 7.2 2,425 1,193 1,645 215 183 19.4 233 142 6.0 181 4.0 88.7 2.0 78.1

12/02/15 172 62 6.4 2,250 1,132 1,602 203 180 19.3 143 136 3.0 215

12/03/15 200 67 89.00 6.8 2,100 1,113 1,668 203 183 19.4 153 139 3.0 249 3.6 88.6 2.1 77.9

12/04/15 188 54 6.4 2,488 1,038 1,510 190 184 19.3 142 131 2.0 195

12/05/15 232 66 4.8 215 19.2 202 155 < 2.0 180

12/06/15 178 52 4.4 19.1 159 152 < 2.0 176

12/07/15 206 64 < 4.0 2,362 1,183 1,590 235 198 19.1 164 150 < 2.0 145

12/08/15 210 61 199.00 4.8 2,725 1,088 1,550 200 187 19.0 182 138 < 2.0 157 4.9 86.7 2.1 77.8

12/09/15 190 66 4.8 2,650 1,090 1,698 195 181 19.0 146 130 < 2.0 124

12/10/15 192 60 167.00 < 4.0 2,563 1,070 1,460 173 159 19.1 141 130 < 2.0 255 4.7 87.3 2.1 78.0

12/11/15 206 75 < 4.0 2,525 973 1,500 173 179 19.1 144 101 < 2.0 214

12/12/15 222 66 5.2 185 19.4 148 142 < 2.0 221

12/13/15 234 84 4.0 19.5 174 115 < 2.0 263

12/14/15 180 59 4.0 2,388 938 1,535 170 179 19.4 161 176 < 2.0 134

12/15/15 182 151 177.00 4.0 2,375 1,015 1,530 208 203 19.4 155 130 < 2.0 177 3.9 87.6 2.0 76.7

12/16/15 468 78 4.8 2,388 1,117 1,558 188 168 19.3 173 121 < 2.0 175

12/17/15 166 66 256.00 < 4.0 2,438 1,088 1,528 170 157 19.2 135 137 < 2.0 175 3.2 86.3 2.1 77.1

12/18/15 178 70 6.0 2,463 1,063 1,558 160 149 19.0 118 128 < 2.0 273

12/19/15 210 88 4.4 18.6 119 98 < 2.0 194

12/20/15 230 86 5.6 18.8 127 79 < 2.0 229

12/21/15 240 140 6.4 2,625 1,060 1,655 18.9 128 58 < 2.0 132

12/22/15 204 65 86.00 4.0 2,775 1,165 1,623 168 144 19.1 88 74 < 2.0 157 3.9 85.6 2.1 77.5

12/23/15 206 73 4.0 2,813 1,098 1,715 155 138 19.1 66 67 < 2 192

12/24/15 194 70 209.00 6.8 2,463 1,193 1,715 175 144 19.1 164 152 < 2.0 171 3.8 87.9 2.0 77.5

12/25/15 284 70 7.6 175 19.1 156 121 < 2.0 181

12/26/15 238 78 7.2 158 18.8 175 135 < 2.0 229

12/27/15 258 44 7.2 158 19.0 120 79 < 2.0 162

12/28/15 234 67 7.2 2,575 1,615 1,575 18.9 154 142 < 2.0 123

12/29/15 274 69 298.00 8.8 2,400 1,133 1,583 18.3 153 122 < 2.0 113 4.1 86.6 1.9 76.9

12/30/15 204 84 260.00 7.2 2,500 1,045 1,450 148 142 18.5 132 121 2.0 194

12/31/15 232 70 7 2,837 1,118 1,613 160 143.13 18.7 150 170 2.0 192

MAXIMUM 468.00 151.00 298.00 8.80 2837.00 1615.20 1715.20 235.00 203.01 19.53 233 176 6.00 273.00 4.90 88.70 2.10 78.10

MINIMUM 166.00 44.00 31.00 < 4.00 2100.00 937.60 1450.00 147.50 138.23 18.33 88 58 2.00 113.00 3.20 85.60 1.90 76.65

AVERAGE 219.10 73.26 177.20 < 6 2505.82 1114.81 1584.51 182.29 168.51 19.07 151 123 2 186.39 4.01 87.26 2.04 77.50

6 972 99

DEPARTMENT OF PUBLIC WORKS

COUNTY OF NASSAU

SLUDGE SOLIDS

INFLUENT

CHLORIDES

CBOD5AERATION

EFFLUENT

TEMPERATURESLUDGE

INDEX

AERATION

30 MINUTE

SETTLING

TOTAL SUSPENDED SOLIDS

December, 2015

DATE DIGESTERS PRIMARY SETTLING TANKS

PLANTPLANT

mg/L

EFFLUENTEFFLUENT

mg/L

Page 19: CERTIFIED MAIL DMRs/Bay Park/BP… · Pulled feeder existing USS5 building power “A” bus – Energization (MOPO). Installed glazing, stair treads, grating, doors and sun shade

INFLUENTEFFLUEN

TINFLUENT

EFFLUEN

T%TS %TVS %TS %Solids mg/L mg/L mg/L mg/L mL/L mL/L Minimum Maximum Minimum Maximum °C °C MGD

12/01/15 5 88 1.84 17.99 326 7.19 4,613 107 0.02 0.02 12.7 <0.10 7.0 7.5 6.9 7.1 18.7 19.6 45.4

12/02/15 1.84 17.83 305 7.14 0.11 8.9 <0.10 7.0 7.4 7.0 7.1 19.2 20.3 44.8

12/03/15 5 87 1.88 17.84 373 7.01 4,718 184 0.04 0.03 7.6 <0.10 7.0 7.5 6.8 7.1 19.1 20.0 43.5

12/04/15 1.80 17.92 288 7.20 0.24 9.8 <0.10 7.1 7.4 6.8 7.1 18.9 19.8 43.6

12/05/15 7.00 0.02 8.1 <0.10 7.0 7.5 6.9 7.1 18.4 19.3 44.2

12/06/15 7.04 4,743 152 0.03 0.03 8.4 <0.10 7.1 7.4 6.7 7.0 18.7 19.0 44.5

12/07/15 1.86 18.27 290 7.19 0.06 11.5 <0.10 7.0 7.4 6.9 7.1 18.0 19.0 44.7

12/08/15 5 87 1.80 18.45 290 7.20 4,908 180 0.04 0.03 11.1 <0.10 7.1 7.4 6.8 7.1 18.7 18.7 43.3

12/09/15 1.84 17.69 353 7.16 0.02 8.5 <0.10 7.0 7.5 6.9 7.1 18.0 18.9 43.5

12/10/15 5 87 1.82 17.94 78 7.22 4,475 167 0.04 0.05 8.8 <0.10 7.0 7.4 6.8 7.1 19.1 19.5 45.5

12/11/15 1.81 17.71 93 7.13 0.03 8.2 <0.10 7.0 7.5 6.9 7.1 18.7 20.0 44.8

12/12/15 7.12 0.01 8.0 <0.10 7.1 7.6 6.7 7.1 19.2 20.3 43.9

12/13/15 7.12 5,253 126 0.02 0.01 7.9 <0.10 7.1 7.4 6.8 7.0 19.3 20.5 45.7

12/14/15 1.78 17.92 298 0.01 9.8 <0.10 6.9 7.3 6.9 7.1 18.7 19.0 44.4

12/15/15 5 87 1.80 17.79 298 7.04 5,060 128 0.03 0.02 9.8 <0.10 7.2 7.4 6.9 7.1 19.4 19.7 44.9

12/16/15 1.82 17.93 95 7.06 0.02 9.9 <0.10 7.0 7.4 6.9 7.1 18.9 20.1 42.8

12/17/15 5 88 1.79 18.04 105 5,030 167 0.03 0.01 9.3 <0.10 6.9 7.3 6.9 7.1 18.7 20.0 49.3

12/18/15 1.79 17.69 255 7.07 0.01 9.0 <0.10 7.0 7.3 6.8 7.3 18.0 18.7 46.0

12/19/15 1.74 17.55 7.19 0.01 8.7 <0.10 7.0 7.5 6.9 7.1 17.8 18.8 46.0

12/20/15 0.01 8.7 <0.10 7.0 7.4 6.8 7.0 17.9 18.2 44.7

12/21/15 1.88 17.60 325 7.16 4,723 128 0.03 0.01 9.6 <0.10 7.0 7.4 6.8 7.1 18.3 18.7 44.6

12/22/15 6 88 1.77 17.87 460 7.00 4,700 116 0.03 0.01 9.6 <0.10 7.0 7.3 6.8 7.1 18.7 19.3 46.4

12/23/15 1.73 17.83 180 7.17 0.01 11.3 <0.10 6.9 7.4 6.8 7.1 19.1 19.6 49.0

12/24/15 5 87 188 7.18 4,963 102 0.02 0.01 7.5 <0.10 7.0 7.3 6.8 7.1 19.5 19.8 51.6

12/25/15 7.28 0.01 7.6 <0.10 6.9 7.3 6.8 7.0 18.8 20.1 47.2

12/26/15 7.25 0.01 7.9 <0.10 6.9 7.6 6.8 7.0 18.2 19.3 45.9

12/27/15 7.27 0.01 9.0 <0.10 7.1 7.4 6.8 7.0 18.5 19.4 47.2

12/28/15 1,360 7.22 5,195 102 0.02 0.01 10.5 <0.10 7.0 7.6 6.9 7.1 16.3 17.7 45.4

12/29/15 5 88 315 7.16 5,400 128 0.02 0.01 9.6 <0.10 7.0 7.4 7.0 7.1 16.0 17.3 49.1

12/30/15 268 7.14 0.01 8.0 <0.10 7.1 7.3 6.9 7.1 17.6 18.4 48.9

12/31/15 338 7.14 5,290 94 0.02 0.01 9.3 <0.10 7.0 7.3 6.9 7.1 18.5 19.2 52.5

MAXIMUM 5.50 88.00 1.88 18.45 1360 7.28 5400 184 0.04 0.24 12.67 <0.10 7.10 7.60 7.0 7.3 19.5 20.5 52.5

MINIMUM 4.70 87.00 1.73 17.55 78 7.00 4475 94 0.02 0.01 7.50 <0.10 4.20 7.30 6.7 7.0 16.0 17.3 42.8

AVERAGE 5.10 87.44 1.81 17.88 313 7.14 4933 134 0.03 0.03 9.18 <0.10 6.92 7.41 6.8 7.1 18.5 19.3 45.9

PLANT PRIMARY PLANT

INFLUENT EFFLUENT EFFLUENT

TSS - mg/L 219 73.3 66.6 6.0 97.0

CBOD5 - mg/L 149 124.9 15.9 2.0 99.0

% REMOVED % REMOVED

TREATMENT PLANT EFFICIENCY - MONTHLY AVERAGE

pHAVERAGE DAILY

SETTLEABLE SOLIDS

AVERAGE

DAILY

CHLORINE

RESIDUAL

GRAVITY BELT

THICKENERS VOLATILE

ACIDS/

ALKALINIT

Y

VOLATIL

E ACIDS

DIGESTERSDE-WATERED SLUDGE

ALKALINITYAVERAGE

pH

FILTRATECAKEDATEDAILYDAILYTHICKENED SLUDGE

FEED

SLUDGE

PLANT

EFFLUENT

FLOW

AVERAGE DAILY

TEMPERATURES

pH

EFFLUENTINFLUENT

Page 20: CERTIFIED MAIL DMRs/Bay Park/BP… · Pulled feeder existing USS5 building power “A” bus – Energization (MOPO). Installed glazing, stair treads, grating, doors and sun shade

December, 2015

WEEK WEEK WEEK WEEK WEEK MONTHLY

PERMIT OF OF OF OF OF TOTALS

LIMIT 29-Nov-15 06-Dec-15 13-Dec-15 20-Dec-15

05-Dec-15 12-Dec-15 19-Dec-15 26-Dec-15 Date Sampled:

12/08/15 mg/L

TEMPERATURE; INFLUENT [°C] HIGHEST DAILY VALUE 19.5

TEMPERATURE; EFFLUENT [°C] HIGHEST DAILY VALUE 20.5 INFLUENT 1 33.40

EFFLUENT 1 19.80

pH; INFLUENT LOWEST DAILY VALUE 7.2

HIGHEST DAILY VALUE 7.6 INFLUENT 1 0.2

EFFLUENT 1 1.7

pH; EFFLUENT LOWEST DAILY VALUE 6.00 6.7

HIGHEST DAILY VALUE 9.00 7.3 INFLUENT 1 0.2

EFFLUENT 1 4.6

MONTHLY AVERAGE [lbs/day] 83,782

MONTHLY AVERAGE [mg/L] 219 INFLUENT 1 1,460.0

EFFLUENT 1 28.5

MONTHLY AVERAGE [lbs/day] 18000 lbs/d 2,143

WEEKLY AVERAGE [lbs/day] 26000 lbs/d 2,549 1,645 1,693 2,332 2,549 INFLUENT 1 4.3

MONTHLY AVERAGE [mg/L] 30 mg/L 6 EFFLUENT 1 2.8WEEKLY AVERAGE [mg/L] 45 mg/L 7 4 4 6 7

INFLUENT 1 2.7

SETTLEABLE SOLIDS; INFLUENT DAILY MAXIMUM 12.7 EFFLUENT 1 2.2

SETTLEABLE SOLIDS; EFFLUENT DAILY MAXIMUM 0.3 mL/L <0.10

NUMBER OF READINGS >0.3 0.0

EFFLUENT FLOW MONTHLY AVERAGE [MGD] 70 MGD 45.9

Date Sampled: LBS/DAY LBS/DAY

COLIFORM, FECAL MONTHLY GEOMETRIC MEAN 200/100mL 17 METHYLENE CHLORIDE 5.90 <0.36

WEEKLY GEOMETRIC MEAN 400/100mL 28 24 17 10 28 1,1-DICHLOROETHYLENE 0.80 <0.36

# OF DAYS>2400 (Interstate Parameter) 0 1,1,1-TRICHLOROETHANE 1.40 <0.36

TRICHLOROETHYLENE 1.70 <0.36

COLIFORM, TOTAL MONTHLY MEDIAN <700 700/100mL 280 TETRACHLOROETHANE 2.20 <0.36

COLIFORM, TOTAL NO MORE THAN 10% EXCEEDING 2300 10% 0 TETRACHLOROETHYLENE 3.80 <0.36

BENZO (a) ANTHRACENE 0.60 <0.36

MONTHLY AVERAGE LBS/DAY 56,722 BENZO (k) FLUORANTHENE 0.60 <0.36

MONTHLY AVERAGE mg/L 151 DIETHYL PHTHALATE 2.40 <0.36

DI-N-BUTHYL PHTHALATE 11.00 <0.36

MONTHLY AVERAGE [lbs/day] 15000 lbs/d 812 BIS (2-ETHYLHEXYL) PHTHALATE 11.00 <0.36

WEEKLY AVERAGE [lbs/day] 23000 lbs/d 1,440 739 760 676 1,440 PENTACHLOROPHENOL 1.00 <0.61

MONTHLY AVERAGE [mg/L] 25 mg/L 2 CHLOROFORM 1.70 1.95

WEEKLY AVERAGE [mg/L] 40 mg/L 4 2 2 2 4 BENZENE 0.60 <0.36

TOLUENE 1.10 <0.36

TSS; % REMOVAL MONTHLY PERCENT REMOVAL 85% 97 PHENOLICS, TOTAL 47.00 <1.81

CBOD5; % REMOVAL MONTHLY PERCENT REMOVAL 85% 99

6 97

CHLORINE, TOTAL RESIDUAL LOWEST DAILY VALUE 2 99 0

DAILY MAX 0.5 mg/L 0.24

METALS PERMIT LIMIT

12/05/15 12/12/15 12/19/15 12/26/15 01/02/16

COPPER, TOTAL 24 LBS/DAY 4.167 3.5 4.9 5.0 5.010/29/2015

MERCURY, TOTAL 200 ng/L 4.34 4.34

METALS ACTION LEVEL MAXIMUM

12/05/15 12/12/15 12/19/15 12/26/15 01/02/16

CADMIUM, TOTAL 1.5 LBS/DAY <0.36 <0.36

CHROMIUM, TOTAL 5.2 LBS/DAY 22.03 22.03

LEAD, TOTAL 4.2 LBS/DAY <0.36 <0.36

NICKEL, TOTAL 9.3 LBS/DAY 1.41 1.41

SILVER, TOTAL 0.9 LBS/DAY <0.36 <0.36

ZINC, TOTAL 87 LBS/DAY 15.89 15.89

TOTAL KJELDAHL NITROGEN

AMMONIA AS NH3-N

NITRITE AS N

TOTAL SUSPENDED SOLIDS;

EFFLUENT

TOTAL SUSPENDED SOLIDS;

INFLUENT

CBOD5 EFFLUENT

CBOD5 INFLUENT

MAXIMUM

VALUE

ANALYTICAL

RESULTS

ACTION

LEVEL

NUMBER OF

SAMPLES

ORTHOPHOSPHATE AS P

DATE MAXIMUM

DATE

MONITORING REQUIREMENTS

BAY PARK SEWAGE TREATMENT PLANT

ORGANIC COMPOUNDS

SUMMARY

OPERATIONS AND LABORATORY ANALYSES

PHOSPHORUS, TOTAL AS P

NITRATE AS N

Page 21: CERTIFIED MAIL DMRs/Bay Park/BP… · Pulled feeder existing USS5 building power “A” bus – Energization (MOPO). Installed glazing, stair treads, grating, doors and sun shade

Effluent

Dissolved

Oxygen

Effluent

Temperature

Chlorine

ResidualFlow Total Coliform Fecal Coilform

[mg/L] [°C] [mg/L] [MGD] [MPN/100mL] [MPN/100mL]

Tuesday 12/01/2015 11:11 am 6.56 20.0 0.0 58.0 790 46

Wednesday 12/02/2015 5:35 am 6.30 20.0 0.0 22.0 79 4

Wednesday 12/02/2015 11:33 am 6.71 19.5 0.0 0.0 220 33

Thursday 12/03/2015 11:40 am 7.25 21.0 0.0 57.0 790 49

Friday 12/04/2015 11:57 am 4.27 18.7 0.1 56.7 79 13

Saturday 12/05/2015 11:29 am 3.72 20.2 0.0 56.5 330 23

Sunday 12/06/2015 11:30 am 4.78 17.8 0.0 59.0 330 8

Monday 12/07/2015 5:30 am 7.09 17.9 0.0 22.7 79 9

Monday 12/07/2015 11:51 am 4.01 20.5 0.0 58.0 490 70

Tuesday 12/08/2015 11:50 am 6.42 18.2 0.0 56.0 790 46

Wednesday 12/09/2015 5:33 am 7.10 19.0 0.0 22.0 130 8

Wednesday 12/09/2015 11:52 am 5.78 18.4 0.0 57.0 230 22

Thursday 12/10/2015 11:26 am 7.23 19.7 0.0 61.5 790 49

Friday 12/11/2015 11:40 am 5.70 20.3 0.0 66.0 350 23

Saturday 12/12/2015 11:50 am 7.09 20.3 0.0 55.0 490 49

Sunday 12/13/2015 11:40 am 6.75 21.1 0.0 56.0 700 22

Monday 12/14/2015 5:30 am 6.91 18.7 0.0 22.4 230 8

Monday 12/14/2015 11:50 am 5.52 19.4 0.1 57.0 2,300 230

Tuesday 12/15/2015 11:30 am 5.42 19.2 0.0 59.0 79 2

Wednesday 12/16/2015 5:38 am 5.80 17.5 0.0 23.0 79 <2

Wednesday 12/16/2015 11:49 am 5.90 19.2 0.0 55.0 170 33

Thursday 12/17/2015 11:26 am 5.70 21.0 0.0 57.0 460 49

Friday 12/18/2015 11:55 am 6.34 17.2 0.0 61.9 490 33

Saturday 12/19/2015 11:45 am 7.17 15.4 0.0 56.0 330 13

Sunday 12/20/2015 11:45 am 4.63 18.4 0.0 56.0 49 7

Monday 12/21/2015 5:30 am 7.77 17.3 0.0 23.7 79 2

Monday 12/21/2015 11:56 am 4.74 18.9 0.0 59.4 490 43

Tuesday 12/22/2015 11:40 am 3.52 19.2 0.0 58.4 330 17

Wednesday 12/23/2015 5:36 am 7.20 19.0 0.0 25.0 23 <2

Wednesday 12/23/2015 11:42 am 6.24 19.3 0.0 58.0 170 13

Thursday 12/24/2015 11:45 am 6.90 18.8 0.0 62.0 130 33

Friday 12/25/2015 11:21 am 6.27 19.8 0.0 43.9 33 11

Saturday 12/26/2015 11:22 am 7.00 18.5 0.0 47.1 49 11

Sunday 11/27/2015 11:46 am 7.13 18.3 0.0 51.0 230 17

Monday 12/28/2015 5:30 am 7.02 16.4 0.0 23.0 49 2

Monday 12/28/2015 11:47 AM 6.89 19.1 0.0 53.0 490 9

Tuesday 12/29/2015 11:26 am 5.52 18.1 0.0 51.8 330 22

Wednesday 12/30/2015 5:32 am 6.50 17.5 0.0 29.0 130 11

Wednesday 12/30/2015 11:18 am 6.34 12.5 0.0 63.4 1,300 49

Thursday 12/31/2015 11:24 am 5.96 18.8 0.0 55.3 330 79

LIMITS

280 700 28

17 200 24

28 400 17

10

3.52

December, 2015

Fecal Coliform Weekly Max

Monthly Minimum DO

Date Time

WEEKLY COLIFORM GEOMETRIC MEAN

Week One

Week Two

Week Three

Week Four

Week Five

Bay Park Sewage Treatment Plant

Total and Fecal Coliform Sampling Results and Miscellaneous Effluent Data

Day

MONTHLY COLIFORM RESULTS

Total Coliform Monthly Median

Fecal Coliform Monthly Geometric Mean