Page 1: Cesc limited

P. MukherjeeDy. General Manager

IT - New Initiatives7th October, 2013

Distribution Related Engineering Asset Management System(DREAMS)

Page 2: Cesc limited

CESC – Electricity Generation & Distribution Company

Serving Calcutta & its adjoining areas since 1897.

The electrification of Calcutta took place 17 years after New York & 11 years after London.

The Calcutta Tramways switched to electricity from horse drawn carriages in 1902.

CESC now belongs to the youngest & one of the most vibrant industrial houses – RP - Sanjiv Goenka Group since 2011.

Page 3: Cesc limited

CESC – Electricity Generation & Distribution Company

Licensed Area of 567 sq. km.

Total Generating Capacity : 1225 MW

Peak Demand : 1900 MW

Average Demand : 1600-1700 MW

Total Low Tension Consumer Base : 27.20 Lacs

Total High Tension Consumer Base : 1726

Page 4: Cesc limited

CESC’s ExperienceEarlier Scenario :

Unstructured and non uniform practices followed in maintaining records of Asset and their up-keep.

CM & CBM were mostly not supported.

Leading to disproportionately more unplanned maintenance than planned maintenance .

Difficulty in estimating maintenance cost and analyzing maintenance performance.

Solution : CESC’s Asset Management Software.

Distribution Related Engineering Asset Management System

(DREAMS)

Page 5: Cesc limited

Features and Functionalities of DREAMS

Integrated Asset Register of major electrical plant and equipment in use including allied assets such as Substations building, premises and yards.

Maintenance Management functionalities encompassing Preventive Maintenance(PM) Status & Condition Monitoring (SM&CM) Condition Based Maintenance (CBM) Repair/Breakdown Maintenance (BM)Abnormal Observation (AO)

Carrying out all maintenance activities as per SM,CM,PM regimes stored in the system.

Analyze, interpret and maintain the transformers with the help of the Dissolve Gas Analysis (DGA) Dash-Board tool integrated with the system.

Handing Over Taking Over (HOTO) Module for managing assets during creation, installation and commissioning before handing over to Operations & Maintenance (O/M) group.

Page 6: Cesc limited

ASSETS CONSIDERED

Power Transformer 33/0.4 kV Earthing Transformer 33/0.4 kV Auxiliary Transformer Indoor Switchboard Outdoor Circuit Breaker Outdoor Isolator Outdoor CT Outdoor VT

Distribution Transformer Outdoor Lightning Arrester Ring Main Unit (RMU) Premises Neutral Earthing Switch Outdoor Cable Sealing End Battery Battery Charger Capacitor Bank

DREAMS

Total No. of Assets as on date : 24578

Page 7: Cesc limited

CODIFICATION OF ASSETS

DREAMS

An algorithm was formulated to assign an 8 character unique code to all assets

The left most character signifies the Super Category like Power Transformer etc. The next left most character denotes the Primary Voltage like 220KV etc. The next five digits from left is a unique serial number The right most character is used to differentiate amongst assets of same primary voltage but with different secondary voltage.

Super Category : Power Transformer

220/132/33 KV Power Transformer A7*****O

132/33 KV Power Transformer A6*****O

33/20 KV Power Transformer A5*****A

33/11 KV Power Transformer A5*****B

33/11-6 KV Power Transformer A5*****C

33/6 KV Power Transformer A5*****D

20/6 KV Power Transformer A4*****O

11/6 KV Power Transformer A3*****O

6/3.3 KV Power Transformer A2*****O

Super Category : Distribution Transformer

11/0.4 KV Distribution Transformer B3*****A

11/6-0.4 KV Distribution Transformer B3*****B

6/0.4 KV Distribution Transformer B2*****O

Page 8: Cesc limited

ASSET REGISTERDREAMS

Asset Searching Assets searched using different criteria such as

category/location/make/name/Asset No. All criteria appear on the upper part of left pane of the screen. General Tab The list of assets based on the selected searching criteria appears on the right

pane. All the attributes displayed alongside the asset no. with a scrolling facility.

Page 9: Cesc limited

ASSET REGISTERDREAMS

Asset Sorting & Filtering Sorting of Assets based on the values of any attribute in ascending/descending

order. Application of Filter on the values of any attribute of Assets.

Page 10: Cesc limited

ASSET REGISTERDREAMS

Health Tab Indication of health of any asset through color codes based on the last observations

from SM/CM/AO. ‘RED’ -> URGENT ’BLUE’ -> IMPORTANT

Page 11: Cesc limited

ASSET REGISTERDREAMS

Maintenance Tab Display of schedule for forthcoming maintenance activity (SM/CM/PM) as on date

through color codes based on the periodicity as mentioned in the maintenance Regime. ‘RED’ -> OVERDUE ’BLUE’ -> scheduled within one month.

Page 12: Cesc limited

MAINTENANCE FUNCTIONSDREAMS

Status Monitoring (SM) Monitoring of assets through visual inspection. Urgent/Important observations posted in the system. Job Allocation & Attending to the job by O&M engineers.

Page 13: Cesc limited

MAINTENANCE FUNCTIONSDREAMS

Condition Monitoring (CM) Monitoring of assets by measurements through Intrusive & Non-Intrusive activities. Non-Intrusive CM (e.g. Thermo-graphic Scanning etc.) measurements posted in the system. Job Allocation & Attending to the job by O&M engineers. Non-Intrusive CM Re-measurement done again. Intrusive CM measurements (e.g. IR & PI Values etc.) are taken & posted by O&M

departments. Non-Intrusive CM

Page 14: Cesc limited

MAINTENANCE FUNCTIONSDREAMS

Preventive Maintenance (PM) The Preventive Maintenance (PM) done by O&M departments as per the schedule

mentioned in the PM Regime.

Page 15: Cesc limited

MAINTENANCE FUNCTIONSDREAMS

Maintenance Regime The SM/CM/PM Regime for different categories of assets are stored in the system.

Page 16: Cesc limited

MAINTENANCE FUNCTIONSDREAMS

Queries & Reports There are a host of queries & reports which caters to the diverse requirements

across all user departments.

Page 17: Cesc limited

MAINTENANCE FUNCTIONSDREAMS

Dissolve Gas Analysis (DGA) Dash Board The results of gases (CH4,C2H2,C2H4 etc.) from oil samples of Power Transformer posted

inside the DGA Dash Board. Six different interpretation methods such as :- IEC Reference, ROGER’s Ratio, DORNENBERG’s

Ratio, Key Gas Method, Combustible Gas Method, Permissible Concentration Gas Method used to interpret the health of the transformer.

Page 18: Cesc limited

MAINTENANCE FUNCTIONSDREAMS

Dissolve Gas Analysis (DGA) Dash Board The results of gases CH4,C2H2,C2H4 can also be plotted on Duval Triangle . Trend Analysis of dissolved gases through Line & Bar Chart is also possible.

Page 19: Cesc limited

HARDWARE PLATFORM

DATA CENTRE

CENTRAL SERVER REGIONAL SERVICES

C

E

S

C

N

E

T

PCs at User End

ONLINE

ACCESS

SUNM4000 (App)

SUNM4000 (DB)

SUN StorageTek 6580 (16 TB)

CENTRALISED ARCHITECTURE

DREAMS

4 Ultra Sparc VII+128 GB

4 Ultra Sparc VII+

128 GB

Page 20: Cesc limited

SOFTWARE PLATFORM

State of the Art Technology

O/S : Sun Solaris 10

Database : Oracle 10g Enterprise Edition

Application tier : J2EE (Glassfish)

Front end : Web browser (Internet Explorer)

Architecture : 3-Tier Browser - Application Server - Database Server

DREAMS

Page 21: Cesc limited

ENGINEERING EXCELLENCE Pioneering effort in conceptualization, design, development and implementation of a state-of-the-art IT application for Engineering Asset Management, developed in-house.

Multi-faceted Asset Register.

Provides entire Asset database on finger tips.

An innovatively designed single window for viewing all asset information, health & maintenance schedules together.

DREAMS

Dissolve Gas Analysis (DGA) Dashboard :

A perfect analysis tool to identify failure prone Power Transformers and thereby taking proactive measures to avoid breakdown.

Page 22: Cesc limited

KEY IMPACTS Significant reduction in un-planned maintenance. Inculcating a new philosophy of planned maintenance through :

Status Monitoring (SM) Condition Monitoring (CM) & Condition Based Maintenance (CBM) Preventive Maintenance (PM)

DREAMS

24

112

136

18

63

81

0

20

40

60

80

100

120

140

160

11 KV DOWNSTREAM SWITCHGEAR

6 KV DOWNSTREAM SWITCHGEAR

TOTAL DOWNSTREAM SWITCHGEAR

2011-12 2012-13

Till Mar 2013

Resultant Fault Reduction in Switchgears

Page 23: Cesc limited

KEY IMPACTS DREAMS

Financial

Till Mar 2013Rupees in Lacs

Green Initiative Paper-less storage of asset information and maintenance records. Paper-less communication through system generated emails.

Page 24: Cesc limited

KEY IMPACTS

Tracking of assets throughout its lifecycle.

Planning and allocation of appropriate resources by O&M Departments well ahead of time.

A host of queries and reports available to monitor the timely completion of O&M activities, identify performing & non-

performing assets.

Analysis of commissioning and maintenance related data in order to provide insight into asset performance and planning for its

replacement.

DREAMS

Page 25: Cesc limited

FUTURE READINESSDREAMS

Having potential to make itself scalable at the enterprise level by including assets of Generation and Transmission.

Capable of Integration with Geographical Information Systems (GIS)

Capable of Integration with ERP for Finance and Purchase Divisions.