cesnet research department cef networks lighting: search for equipment stanislav sima november...

10
CESNET Research Department www.ces.net CEF Networks lighting: search for equipment Stanislav Sima November 23th, 2004

Upload: kaiya-baston

Post on 15-Jan-2016

223 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CESNET Research Department  CEF Networks lighting: search for equipment Stanislav Sima November 23th, 2004

CESNET Research Department www.ces.net

CEF Networks lighting: search for equipment

Stanislav Sima

November 23th, 2004

Page 2: CESNET Research Department  CEF Networks lighting: search for equipment Stanislav Sima November 23th, 2004

Prague November 23th, 2004

Lucent meeting 2

CESNET Research Department Equipment for CEF Networks www.ces.net

Dark fibres in RENs are available More than 20 000 km in Europe

(plus some fibres for GN2 and GN2 testbed) About 33 920 km in USA

(including National LambdaRail) About 6 700 km in Canada

But: old and very expensive transmission equipment is mostly used

Page 3: CESNET Research Department  CEF Networks lighting: search for equipment Stanislav Sima November 23th, 2004

Prague November 23th, 2004

Lucent meeting 3

CESNET Research Department Equipment for CEF Networks www.ces.net

Demands on Equipment for CEF RENs Big differences from ISP (not for profit, known

users, SLA, experiments, ….) Universities, research organisations and NRENs

should prefer payment for research and education, not for network equipment

Distances between university premises are usualy short: In-line equipment in huts are not necessary

Low cost transmission equipment enables – networking in developing countries (solving of digital

divide),– new research directions, etc.

Page 4: CESNET Research Department  CEF Networks lighting: search for equipment Stanislav Sima November 23th, 2004

Prague November 23th, 2004

Lucent meeting 4

CESNET Research Department Equipment for CEF Networks www.ces.net

CESNET’s approach NIL for distances up to about 300 km Multiple long span (n x about 150 km) CESNET-made equipment based on available

optical devices and modules, SPF, XPF, interface cards, FPGA, etc. (for example PC Light 2in1, Combo6)

Testing in CzechLight, CESNET2 Prepared testing in other NRENs, GN2 testbed,

SEEFIRE project, …

Page 5: CESNET Research Department  CEF Networks lighting: search for equipment Stanislav Sima November 23th, 2004

Prague November 23th, 2004

Lucent meeting 5

CESNET Research Department Equipment for CEF Networks www.ces.net

Page 6: CESNET Research Department  CEF Networks lighting: search for equipment Stanislav Sima November 23th, 2004

Prague November 23th, 2004

Lucent meeting 6

CESNET Research Department Equipment for CEF Networks www.ces.net

CzechLight structure and connections

Page 7: CESNET Research Department  CEF Networks lighting: search for equipment Stanislav Sima November 23th, 2004

Prague November 23th, 2004

Lucent meeting 7

CESNET Research Department Equipment for CEF Networks www.ces.net

Lighting of dark fibre: NIL approach Production lines G.652, 1550 nm, EDFA

189 km Praha – Pardubice GE since May 2002 235 km Brno – Ostrava GE since June 2003 235 km Brno – Ostrava OC-48 in 4 months 2004

Experimental lines G.652, 1550 nm, EDFA160 km Praha – Plzen GE April 2004 PC Light (one side)286 km Praha – Brno GE May 2004 (+Raman)

Experimental line G.655+G.652, 1550 nm, EDFA298 km Praha – Brno 10 GE November 2004 (+Raman)

More wavelengths possible

Page 8: CESNET Research Department  CEF Networks lighting: search for equipment Stanislav Sima November 23th, 2004

Prague November 23th, 2004

Lucent meeting 8

CESNET Research Department Equipment for CEF Networks www.ces.net

NIL tests in laboratory G.652 fibre spools, EDFA + Raman:

325 km GE 250 km OC-48 252 km 2x 10 GE 290 km 10 G DWDM

G.655 fibre spools (EDFA + Raman): 302 km 10 G DWDM

Big differences betweenDesign, Simulation, Laboratory testing, Field testing

Page 9: CESNET Research Department  CEF Networks lighting: search for equipment Stanislav Sima November 23th, 2004

Prague November 23th, 2004

Lucent meeting 9

CESNET Research Department Equipment for CEF Networks www.ces.net

Research cooperation between CESNET and Lucent ?

• CEF Networks recognized as emerging market for transmission and switching equipment• CESNET recognized as leading organization in long-span CEF Networks deployment• Suggested goals of cooperation:

•Design of low costs transmission technology for CEF networks• User laboratory and field testing of Lucent equipment

Page 10: CESNET Research Department  CEF Networks lighting: search for equipment Stanislav Sima November 23th, 2004

Prague November 23th, 2004

Lucent meeting 10

CESNET Research Department Equipment for CEF Networks www.ces.net

Acknowledgement Jan Gruntorad for support and GLIF entry Lada Altmanova for dark fibre acquiring Miroslav Karasek and Jan Radil for lighting of

CESNET2 and CzechLight fibres

Comment: presented ideas and opinions are result of our ongoing R&D activities and are opened to improvement