chairman & members from karnataka electricity regulatory commission

88
1 CHAIRMAN & MEMBERS FROM KARNATAKA ELECTRICITY REGULATORY COMMISSION SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED WELCOMES & DIRECTOR (TRANSMISSION) , KPTCL

Upload: gary-lynch

Post on 03-Jan-2016

52 views

Category:

Documents


0 download

DESCRIPTION

POWER GRID CORPORATION OF INDIA LIMITED. SOUTHERN REGIONAL LOAD DESPATCH CENTRE. WELCOMES. CHAIRMAN & MEMBERS FROM KARNATAKA ELECTRICITY REGULATORY COMMISSION. & DIRECTOR (TRANSMISSION) , KPTCL. PRESENTATION OVERVIEW. SOUTHERN REGIONAL GRID – QUICK FACTS - PowerPoint PPT Presentation

TRANSCRIPT

11

CHAIRMAN & MEMBERSFROM

KARNATAKA ELECTRICITY REGULATORY COMMISSION

SOUTHERN REGIONAL LOAD DESPATCH CENTRE

POWER GRID CORPORATION OF INDIA LIMITED

WELCOMES

& DIRECTOR (TRANSMISSION) , KPTCL

2

PRESENTATION OVERVIEW

SOUTHERN REGIONAL GRID – QUICK FACTS

SR GRID OPERATION – TYPICAL ISSUES IN PAST

SR GRID – CARDINAL EVENTS

SR GRID OPERATION – PRESENT STATUS

PROJECTS IN PIPELINE – KARNATAKA & SR

ISSUES OF INTEREST – FURTHER CHALLENGES/GOALS

3

SOUTHERN REGIONAL GRID

QUICK FACTS

4

SOUTHERN REGION

WESTERNREGION

EASTERN REGION

NORTHERN REGION

NORTH-EASTERN REGION

INSTALLED CAPACITY

NORTHERN :- 31,230 MW

EASTERN :- 17,697 MW

SOUTHERN :- 31,931 MW

WESTERN :- 32,354 MW

NORTH-EASTERN :- 2,357 MW

TOTAL 115,569 MW

REGIONAL GRIDS

5

SOUTHERN REGION

WESTERNREGION

EASTERN REGION

NORTHERN REGION

NORTH-EASTERN REGION

‘ ELECTRICAL’

REGIONS1

2

3

SAME FREQUENCY FROM GUJARAT TO ARUNACHAL PRADESH WITH EFFECT FROM MARCH 2003

ABOUT 2800 KMS! APART

6

SOUTHERN REGION

WESTERNREGION

EASTERN REGION

NORTHERN REGION

NORTH-EASTERN REGION

‘ELECTRICAL’

REGIONS

1

2

WITH THE COMMISSIONING OF THE TALA PROJECT CONNECTING THE EASTERN AND NORTHERN GRIDS, INDIA WILL HAVE ONLY TWO GRIDS

7

SOUTHERN REGION – GEOGRAPHY

ANDHRA PRADESH

TAMIL NADU

KARNATAKA

KE

RA

LA

POPULATION :- 22.5 CRORES ( 22% OF INDIA)

AREA :- 651 (‘000 SQ KM)(19% OF INDIA)

INSTALLED CAPACITY:- 31,931 MW(27.6%)

WEATHER :- South-west monsoon

North-east monsoon

SEA COAST :- AROUND 4000 KM

8

SR STATES – POWER SYSTEM STATISTICSANDHRA PRADESH

INSTALLED CAPACITY – 9531 MW

MAX DEMAND MET – 7441 MW

DAILY CONSUMPTION MAX – 166 MU

DAILY CONSUMPTION AVG – 130 MU

CONSUMER PROFILE –

DOM INDU AGRI COMML OTHERS

22% 29% 34% 5% 10% .

KARNATAKAINSTALLED CAPACITY – 5802 MW

MAX DEMAND MET – 5445 MW

DAILY CONSUMPTION MAX – 107 MU

DAILY CONSUMPTION AVG – 84 MU

CONSUMER PROFILE –

DOM INDU AGRI COMML OTHERS

37% 26% 33% 3% 1% .

KERALAINSTALLED CAPACITY – 2617 MW

MAX DEMAND MET – 2426 MW

DAILY CONSUMPTION MAX – 39 MU

DAILY CONSUMPTION AVG – 34 MU

CONSUMER PROFILE –

DOM INDU AGRI COMML

76% 2% 6% 16%.

TAMIL NADUINSTALLED CAPACITY – 7074 MW

MAX DEMAND MET – 7228 MW

DAILY CONSUMPTION MAX – 147 MU

DAILY CONSUMPTION AVG – 126 MU

CONSUMER PROFILE –

DOM INDU AGRI COMML OTHERS

21% 33% 27% 9% 10% .

9

GROWTH OF INSTALLED CAPACITY OF SR

1947

5

1983

0

2030

4

2129

8

2213

3

2298

3

2417

3 2616

3 2850

1

2952

6

10000

12000

14000

16000

18000

20000

22000

24000

26000

28000

30000

1994-95 1995-96 1996-97 1997-98 1998-99 1999-00 2000-01 2001-02 2002-03 2003-04

YEARS --->

IN MW

10

INSTALLED CAPACITY IN SR

STATES HYDRO THERMAL NUCLEARDIESEL/

GAS WIND OTHERS TOTAL %

AP 3586 2993   272 2   6853 21%

KAR 3166 1470   128 5   4769 15%

KER 1808     235     2043 6%

TN 1996 3570   423 19   6008 19%

C.S   6990 830 360     8180 26%

IPP 229 794 0 2432 245 377 4078 13%

TOTAL 10785 15817 830 3851 271 377 31931  

% 34% 50% 3% 12% 1% 1%    

The above capacity does not includes

--- About 1344 MW of Wind Mill Capacity in Tamil Nadu.

--- Micro and Captive plants in different states.

11

15817 (50%)

10785 (34%)377 (1%)

830 (3%)271 (0.8%)

3851 (12%)

HYDRO THERMAL GAS WIND NUCLEAR OTHERS

SOURCE-WISE INSTALLED CAPACITY OF SR IN MW

31,931 MW

HYDRO

THERMAL

WIND

NUCLEAR OTHERS

GAS

12

4769 (15%)

6853 (21%)4078 (13%)

8180 (26%)

6008 (18.8%)

2043 (6%)

AP KAR KER TN CS IPP

AGENCY-WISE INSTALLED CAPACITY OF SRIN MW31,931 MW

ANDHRA PRADESH

KARNATAKA

TAMIL NADU

CENTRAL SECTOR

IPP

KERALA

13

13000

14000

15000

16000

17000

18000

19000

20000

21000

22000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

TIME IN HRS --->

DE

MA

ND

IN

MW

---

>

MONSOON SUMMER WINTER

TYPICAL LOAD CURVE OF SR

WINTER

MONSOON

SUMMER

EVENING PEAK

WEATHER

RESERVOIR CONSUMPTION

14

6%

23%4%

37%

30%

Domestic Commercial Agriculture Industry Others

LOAD COMPOSITION IN SOUTHERN GRID Domestic

IndustryCommercial

Agriculture

Others

15

LOAD 500-1200 MW

LOAD 200-500 MW

TYPICAL

LOAD

SPREAD

IN SR

16

SR GRID - HIGHLIGHTS

• WIDE SPREAD TRANSMISSION NETWORK

• HIGHEST CAPACITY HVDC LINK IN COUNTRY

• GENERATING UNITS OF VARIED TYPE & CAPACITY

• 32 Nos. of 400 KV SUB-STATIONS

• 17600 MVA TRANSFORMATION CAPACITY

• INTER-REGIONAL LINKS WITH ALL NEIGHBOURING

REGIONS

17

SR GRID

TYPICAL ISSUES IN THE PAST

18

"If a path to the better there be, it

begins with a full look at the worst."

-- Thomas Hardy

19

SR GRID OPERATION – TYPICAL ISSUES IN PAST

• LOW FREQUENCY PROBLEMS

– FREQUENCY EXCURSES TO LOW VALUES

• LOW VOLTAGE OPERATION

– VOLTAGE AT EHV GRID LEVEL DIPPES TO CRITICALL LOW

LEVELS

• SYSTEM BROWNOUTS / BLACK OUTS

– LOADS FREQUENTLY CUT OFF DUE TO RELAY OPERATION

• INCREASED ELECTRICAL LOSSES– INEFFICIENT OPERATION OF ELECTRIC EQUIPMENTS

20

SR GRID OPERATION

PRESENT STATUS

21

GRID OPERATION – PRESENT STATUS

STABILISED SYSTEM FREQUENCY

IMPROVED VOLTAGES

MERIT ORDER OPERATION

OPERATIONAL EXCELLENCE

INTER REGIONAL EXCHANGES

IMPROVED GRID SECURITY

JAN - 02 JAN - 03 Vol

FGMO

22

SR GRID

CARDINAL EVENTS

23

SR GRID -- CARDINAL EVENTS

• AVAILABILITY BASED TARIFF

• UNIFIED LOAD DESPATCH SCHEME

• TALCHER-KOLAR HVDC LINK

• SPECIFIC ACTIONS BY SRLDC

• FINANCIAL DISCIPLINE

SCHD DRWL

24

PROJECTS IN PIPELINE

KARNATAKA & SR

25

PROJECTS IN SOUTHERN PROJECTS IN SOUTHERN REGIONREGION

400 KV MADURAI-TRIVANDRUM LINE400 KV MADURAI-TRIVANDRUM LINE 400 KV RAMAGUNDAM – HYDERABAD-400 KV RAMAGUNDAM – HYDERABAD-

RTPS-GOOTY-BANGALORE LINERTPS-GOOTY-BANGALORE LINE ADDITIONAL 500 MW HVDC POLE AT ADDITIONAL 500 MW HVDC POLE AT

GAZUWAKAGAZUWAKA SYSTEM AUGMENTATION PROJECTSSYSTEM AUGMENTATION PROJECTS

400 KV KHAMMAM-N’SAGAR400 KV KHAMMAM-N’SAGAR LILO OF N’SAGAR-GOOTY AT KURNOOLLILO OF N’SAGAR-GOOTY AT KURNOOL NEW 400 KV SS IN TAMIL NADUNEW 400 KV SS IN TAMIL NADU ADDITIONAL 400 KV SS NEAR MADRASADDITIONAL 400 KV SS NEAR MADRAS

400 KV BACKBONE CORRIDOR IN KERALA400 KV BACKBONE CORRIDOR IN KERALA KOODANKULAM EVACUATION SCHEME – KOODANKULAM EVACUATION SCHEME –

2000 MW CAPACITY2000 MW CAPACITY

26

PROJECTS IN PROJECTS IN KARNATAKAKARNATAKA

400 KV NELAMANGALA-MYSORE LINE 400 KV NELAMANGALA-MYSORE LINE WITH 400 KV SUBSTATION AT MYSOREWITH 400 KV SUBSTATION AT MYSORE

400 KV SUB STATION AT HIRIYUR400 KV SUB STATION AT HIRIYUR 400 KV KAIGA-NARENDRA-KOLHAPUR 400 KV KAIGA-NARENDRA-KOLHAPUR

LINKLINK 400 KV SUB STATION AT NARENDRA400 KV SUB STATION AT NARENDRA 400 KV RING MAIN AROUND BANGALORE400 KV RING MAIN AROUND BANGALORE 400 KV 2400 KV 2ndnd GOOTY-BANGALORE LINK GOOTY-BANGALORE LINK ADDITIONAL 400 KV EVACUATION LINK ADDITIONAL 400 KV EVACUATION LINK

FOR RAICHUR THERMAL POWER PLANTFOR RAICHUR THERMAL POWER PLANT

27

BANGALORE 400 KV RING BANGALORE 400 KV RING MAINMAIN

400 KV RING MAIN

SOMANAHALLI

NELAMANGALA

KOLAR

HOODY

28

ISSUES OF INTEREST

FURTHER CHALLENGES/GOALS

29

FURTHER CHALLENGES/GOALS

INTRA-STATE ABT

METERING AND BILLING

HARNESSING UNUTILISED CAPACITY

FACILITATING SHORT TERM OPEN ACCESS

ENHANCING BANKING/WHEELING VIABILITY

30

31

Voltage at Bangalore Jan 02 & 03

32

MONSOONS

SOUTH WEST MONSOON NORTH EAST

MONSOON

KHAMMAM

VIJAYAWADANAGARJUNASAGAR

VISAKHAPATNAM

(POWERGRID)HYDERABAD

RAICHUR

GOOTY

HOODY

SALEM

UDUMALPET

TRICHUR

MADURAI

TRICHY

MADRAS

NEYVELI

CUDDAPAHDAVANAGERE

KAIGA

115

317

RSTPP

BHADRAVATI

130x216

4x2

182

151

181

173

302

308172

277

279

155

178x

2

PONDICHERY

BANGALORE

SIRSI

MUNIRABAD

PP

P

P

P

P

P

P

P

P

P

PP

P

P

N

KOLAR

PALLOM

KAYANKULAMEDAMON

TALCHER

JEYPORE

63

187

2x78

2x221

54

HOSUR

KADRA

KODASAALY

Nagjhari

1

120

60

MAPS

P

SSLMM

MMDP

THIRUVANATHAPURAM

ALMATHI

NELLORE

400 KV LINE PRESENTLY

OPERATED AT 220 KV

NELAMANGALA

KURNOOL

GAZUWAKA(AP)

SIMHADRI NTPC

HIRIYUR

189

195

267x

2

258

242

175

179

127

130x

2

221x2

146x252x2

197x2

301x2

8x4

15x2

300

28

330

ABOUT 12000 CKM

400KV TRANSMISSION

TALGUPPA

GRID MAP

TYPICAL FLOWS ARE FROM NORTH TO SOUTH

GRID FOCAL POINT SHIFTED TO KOLAR AFTER COMMISSIONING OF HVDC

QUANTUM CHANGES IN FLOW PATTERN LIKELY AFTER COMMISSIONING OF KOODANKULAM 2000 MW

KOODANKULAM

THIRNELVALI

34

TRANSMISSION IN SOUTHERN TRANSMISSION IN SOUTHERN INDIAINDIA

ABOUT 2800 CKM OF 400 KV LINES ADDED IN THE PAST 2 YEARS

VOLTAGE LEVEL AP KAR KER TN CGS TOTAL

400 KV 2042 1614     8462 12118

220/230 KV 10050 7590 2650 6270 366 26926

132/110 KV 12360 6060 3720 10220   32360

TOTAL 24452 15264 6370 16490 8828 71404

35

Kolar

Chintamani

Cudappah

HoodyHosur

Salem

Udumalpet

Madras B’lore

+/- 500 KV DC line 1370 KM

ElectrodeStation

ElectrodeStation

TALCHER

400kv System

220kv system

KOLAR

TALCHER KOLAR TALCHER KOLAR SCHEMATICSCHEMATIC

GENERATING UNITS IN SOUTHERN REGION

A.PKAR

TNKERGENERATORS ABOVE 1000 MW

GENERATORS 500 – 1000 MW

GENERATORS BELOW 500 MW

TYPICAL

GENERATOR

SPREAD

IN SR

UNIT CAPACITY AP KAR KER TN CGS TOTAL

THERMAL (500 MW) 2 7 9

THERMAL

(200-250 MW)10 7 13 15 45

GAS/THERMAL

(100-150 MW)9 2 3 10 24

HYDRO

(>50 MW)27 27 16 15 85

TOTAL 48 36 19 38 163

- HYDRO

- THERMAL

- GAS / NAPTHA

- NUCLEAR

KHAMMAM

VIJAYAWADANAGARJUNASAGAR

GAZUWAKA

HYDERABAD

RAICHUR

GOOTY

HOODY

SALEM

UDUMALPET

TRICHUR

MADURAI

TRICHY

MADRAS

NEYVELI

CUDDAPAH

DAVANAGERE

RAMAGUNDAM

BANGALORE

MUNIRABAD

PP

P

P

P

P

P

P

P

P

P

PP

P

P

KOLAR

63

HOSUR

1

60

P

NELLORE

NELAMANGALA

KURNOOL

KALPAKKA

SIMHADRI

HIRIYUR

TALAGUPPA

MAMIDIPALLY

SRI SAILAM

-- OF NTPC

-- OF ANDHRA PRADESH

-- OF KARNATAKA

-- OF NLC

-- OF POWERGRID

400KV SUB-STATIONS IN SR

NEYVELI TPS I (EXP)

  POWERGRID STATE OTHERS TOTAL

AP 8 4 2 14

KAR 4 5   9

KER 1     1

TN 6   2 8

TOTAL 19 9 4 32

39

ICT SUMMARY IN SOUTHERN ICT SUMMARY IN SOUTHERN INDIAINDIA

VOLTAGE RATIO AP KAR KER TN CGS TOTAL

400/230 or 400/220 KV 7 7 2 5 29 50

400/132 or 400/110 KV --- --- --- 3 2 5

TOTAL 7 7 2 8 31 55

40POWERGRID SRLDC

A.P

KAR

T.N

KER

MAH

ORISSA

RAMAGUNDAM

NEYVELI

MAPS

GOA

PONDICHERRY

CHANDRAPUR

JEYPORE

GAZUWAKA

KOLHAPUR

BELGAUM

U.SILERUL.SILERU

BALIMELA

BARSUR

CSEB

AMBEWADI

INTER REGIONAL LINKSINTER REGIONAL LINKS

HVDC BI POLEHVDC B2B STATION

CENTRAL GEN.STATION

220 kV LINE

400 kV LINE

110 kV HVDC LINE

KOLAR

TALCHAR

KAIGA

Inter Regional Links

Present IR CapacityPresent IR Capacity= 9,000 MW= 9,000 MW

700 MW700 MW

1200MW1200MW

2000MW2000MW

700 MW700 MW

900 MW900 MW30,500 MW

16,000

32,700 MW

30,500 MW

2300

1850 MW1850 MW

1650 MW1650 MW

42

13450 MW

1000 MW6450 MW

4600 MW

1300 MW3200 MW

30,000 MW OF INTER-REGIONAL POWER BY 2012

EASTERN REGION

SOUTHERN REGION

WESTERNREGION

NORTHERN REGION

NORTH-EASTERN REGION

INTER-REGIONAL TRANSFER BY INTER-REGIONAL TRANSFER BY END OF 11END OF 11thth PLAN (2012) PLAN (2012)

43

THE INDIA ELECTRICITY THE INDIA ELECTRICITY MARKETMARKET

TIME LINETIME LINE

REAL TIME15 MT BLOCKS

LONG TERMLOAD FORECAST

FUND MOBILISATION

10-5 YEARS

POWER PURCHASEAGREEMENTS

CAPACITY COMMITTMENT

1-5 YEARS

SHORT TERMLOAD FORECAST

DAY-AHEAD SCHEDULING

WEEK TO DAY AHEAD

44

Components of inter-utility Components of inter-utility tarifftariff

(Pre – ABT Mechanism)(Pre – ABT Mechanism) Fixed chargesFixed charges Interest on loansInterest on loans DepreciationDepreciation O & M chargesO & M charges Return on equityReturn on equity Interest on Working CapitalInterest on Working Capital

Energy charges (fuel cost)Energy charges (fuel cost) IncentivesIncentives Surcharge & other leviesSurcharge & other levies No charge for reactive energyNo charge for reactive energy

45

Payment to Inter State Generating Payment to Inter State Generating Stations (ISGS) from beneficiaries underStations (ISGS) from beneficiaries under

Availability Based Tariff Availability Based Tariff (ABT)(ABT)

Capacity chargesCapacity charges Energy chargesEnergy charges Unscheduled Interchange (UI)Unscheduled Interchange (UI)

46

1000

900

800

700

600

500

400

300

200

100

0

0 2 4 6 8 10 12 14 16 18 20 22 24

Forecast ex-bus capability of Power Plant

Hours

MW

Net Injection Schedule

SEB - A's Requisition

SEB - A's Entitlement - (40%)

SCHEDULING

47

CAPACITY CHARGECAPACITY CHARGE

Capacity charge will be related Capacity charge will be related to ‘availability’ of the to ‘availability’ of the generating station and the generating station and the percentage capacity allocated to percentage capacity allocated to the state. ‘Availability’ for this the state. ‘Availability’ for this purpose means the readiness of purpose means the readiness of the generating station to deliver the generating station to deliver ex-bus output expressed as a ex-bus output expressed as a percentage of its rated ex-bus percentage of its rated ex-bus output capability.output capability.

48

ENERGY CHARGEENERGY CHARGE

Energy charges shall be worked Energy charges shall be worked out on the basis of a paise per out on the basis of a paise per kwh rate on ex-bus energy kwh rate on ex-bus energy scheduled to be sent out from scheduled to be sent out from the generating station as per the the generating station as per the following formulafollowing formula

Energy chargesEnergy charges = = Rate of Rate of energy energy charges (paise/kwh) x charges (paise/kwh) x ScheduledScheduled Generation (ex-bus Generation (ex-bus MWh)MWh)

49

UNSCHEDULED INTERCHANGE (U I) UNSCHEDULED INTERCHANGE (U I) ::

Variation in actual generation / drawal with Variation in actual generation / drawal with respect to scheduled generation / drawal shall respect to scheduled generation / drawal shall be accounted for through Unscheduled be accounted for through Unscheduled Interchange (UI).Interchange (UI).

UI for generating station shall be equal to its UI for generating station shall be equal to its total actual generation minus its scheduled total actual generation minus its scheduled generation.generation.

UI for beneficiary shall be equal to its total UI for beneficiary shall be equal to its total actual drawal minus its total scheduled actual drawal minus its total scheduled drawal.drawal.

50

UNSCHEDULED INTERCHANGE (U I) UNSCHEDULED INTERCHANGE (U I) ::

UI shall be worked out for each 15 UI shall be worked out for each 15 minute time block.minute time block.

Charges for all UI transactions Charges for all UI transactions shall be based on average shall be based on average frequency of the time block.frequency of the time block.

UI rates shall be frequency UI rates shall be frequency dependent and uniform dependent and uniform throughout the country.throughout the country.

51

0

50

100

150

200

250

300

350

400

450

500

550

600

650

48.9 49 49.1 49.2 49.3 49.4 49.5 49.6 49.7 49.8 49.9 50 50.1 50.2 50.3 50.4 50.5 50.6 50.7 50.8 50.9 51

Frequency ----------->

UI ra

te

-----

------

------

>

Below 49.0 Hz UI rate =570 p/u

At 50.0 Hz UI rate =150 p/u

At 49.8 Hz UI rate =210 p/u

Above 50.5 Hz UI rate =0 p/u

UI RATE

Rate of Unscheduled Drawal/Injection

Frequency Frequency (Hz)(Hz)

Rate Rate (p/u)(p/u)

Above 50.5Above 50.5 00

50.050.0 150150

49.849.8 210210

49.0 and 49.0 and belowbelow

570570

52

AVAILABILITY BASED TARIFFAVAILABILITY BASED TARIFF

(A)(A) CAPACITY CHARGECAPACITY CHARGE

(B)(B) ENERGY CHARGEENERGY CHARGE

(C)(C) ADJUSTMENT FOR DEVIATIONS ADJUSTMENT FOR DEVIATIONS

(U I CHARGE)(U I CHARGE)

(A) = a function of the Ex-Bus MW (A) = a function of the Ex-Bus MW availability of Power Plant for the day availability of Power Plant for the day declared before the day starts x declared before the day starts x SEB’s % allocation from the plantSEB’s % allocation from the plant

(B) = MWh for the day as per Ex-Bus drawal (B) = MWh for the day as per Ex-Bus drawal schedule for the SEB finalised before schedule for the SEB finalised before the day starts x Energy charge ratethe day starts x Energy charge rate

(C) = (C) = Σ Σ (Actual energy interchange in a 15 (Actual energy interchange in a 15 minute time block – scheduled energy minute time block – scheduled energy interchange for the time block) x UI rate interchange for the time block) x UI rate for the time block for the time block

TOTAL PAYMENT FOR THE DAY = (A) + (B) TOTAL PAYMENT FOR THE DAY = (A) + (B) ± ± (C) (C)

53

FEATURES :FEATURES :

((A) and (B) do not depend on actual plant A) and (B) do not depend on actual plant generation / drawal. No metering required generation / drawal. No metering required for this as they are based on off-line for this as they are based on off-line figures. All deviations taken care of by (C)figures. All deviations taken care of by (C)

No complication regarding deemed No complication regarding deemed generation.generation.

Perpetual incentive for maximizing Perpetual incentive for maximizing generation and reducing drawal during generation and reducing drawal during deficit, but no incentive to over generate deficit, but no incentive to over generate during surplus.during surplus.

54

STABILISED SYSTEM FREQUENCY

• TYPICAL FREQUENCY CURVE

• SCATTER DIAGRAM

• HISTOGRAM OF FREQUENCY

• FREQUENCY DURATION CURVE

• Df/dT CURVE

• RECORD FVI OF 0.04

55

47.50

48.00

48.50

49.00

49.50

50.00

50.50

51.00

25 26 27 28 29 30 31

DAYS ----->

FR

EQ

UE

NC

Y IN

HZ

---

->FREQUENCY PROFILE

2002, 2003 & 2004

56

FREQUENCY DURATION CURVE AUG TO OCT 04, 03 & 02

47.50

48.00

48.50

49.00

49.50

50.00

50.50

51.00

1 1117 2233 3349 4465 5581 6697 7813 8929 10045 11161 12277 13393 14509 15625 16741 17857 18973 20089 21205

% OF TIME --->

FR

EQ

UE

NC

Y IN

HZ

---

>

0 10 20 30 40 50 60 70 80 90 100

2004

2003

 

<49.049.0 & <49.5

49.5 & <50.5

50.5 & Above

Max Min Avg FVI St. Dev

 

2004 0.03 1.46 98.28 0.23 50.82 48.62 49.95 0.31 0.12

2003 0.17 8.32 90.66 0.85 50.85 48.60 49.81 0.95 0.18

2002 73.62 12.45 12.84 1.09 51.08 47.69 48.63 23.59 0.44

2002

57

320

330

340

350

360

370

380

390

400

410

42000

:05

01:0

5

02:0

5

03:0

5

04:0

5

05:0

5

06:0

5

07:0

5

08:0

5

09:0

5

10:0

5

11:0

5

12:0

5

13:0

5

14:0

5

15:0

5

16:0

5

17:0

5

18:0

5

19:0

5

20:0

5

21:0

5

22:0

5

23:0

5

TIME IN HRS --->

VO

LT

AG

E IN

KV

---

>

REALITY BITE:

FARMERS IN KARNATAKA ARE HAPPY WITH FEWER HOURS OF QUALITY POWER!!.

EFFICIENCY OF PUMPS AT TG HALLI WATER WORKS IMPROVED!

COMPARISION OF BANGALORE VOLTAGE-TYPICAL DAY

BETTER VOLTAGE PROFILE MEANS LESS ELECTRICAL LOSSES

58

WATER SUPPLY TO BANGALORE

LOW VOLTAGE PROBLEMS AROUND BANGALORE HAMPERED WATER SUPPLY EARLIER

WITH BETTER VOLTAGE NOW, PUMPING EFFICIENCY HAS IMPROVED

400 KV STATION AT MYSORE BEING COMMISSIONED ON WAR FOOTING TO FURTHER FORTIFY THIS PART OF THE GRID

PUMPING LOSSES REDUCED

ENORMOUS SAVINGS TO THE STATE

MOTOR BURNING AND MAINTENANCE COSTS ALSO CAME DOWN DRASTICALLY

59

VARIABLE COST(Ps) OF POWER STATION IN SR AS ON JUNE 2004

0

2000

4000

6000

8000

10000

12000

14000

16000

18000P

ON

DY

PC

L (3

2.5

MW

)(19

.61

PS

)

NE

YV

ELI

-II S

TG

1 *

*(63

0 M

W)(

67.9

9 P

S)

KO

VIL

KA

LAP

PA

L *(

105

MW

)(68

PS

)

JEG

UR

UP

AD

U (

GA

S)(

216

MW

)(82

PS

)

SP

EC

TR

UM

(G

AS

)(20

8 M

W)(

83 P

S)

VIJ

JES

WA

RA

M -

I(10

0 M

W)(

84 P

S)

VIJ

JES

WA

RA

M -

II(17

2.5

MW

)(86

PS

)

B S

E S

(A

P)(

GA

S)(

140

MW

)(87

PS

)

RE

INS

CA

LCIN

ING

LT

D.(

41 M

W)(

90 P

S)

RA

MA

GU

ND

AM

(210

0 M

W)(

90 P

S)

LAN

CO

(350

MW

)(91

.48

PS

)

NE

YV

ELI

-II S

TG

-II *

*(84

0 M

W)(

94.6

1 P

S)

SIM

HA

DR

I(10

00 M

W)(

96 P

S)

RA

MA

GU

ND

AM

-B(6

2.5

MW

)(96

PS

)

VIJ

AY

AW

AD

A T

.P.S

.-1&

2(10

50 M

W)(

101

PS

)

VIJ

AY

AW

AD

A T

.P.S

.-3(

210

MW

)(10

1 P

S)

KO

TH

AG

UD

EM

(B)(

210

MW

)(10

8 P

S)

RA

ICH

UR

.T.P

S. *

*(12

60 M

W)(

110

PS

)

KO

TH

AG

UD

EM

(A)(

240

MW

)(11

0 P

S)

KO

TH

AG

UD

EM

(C)(

220

MW

)(12

3.1

PS

)

KO

TH

AG

UD

EM

(D)(

500

MW

)(12

4 P

S)

RA

YA

LAS

EE

MA

TP

P(4

20 M

W)(

126

PS

)

NO

RT

H M

AD

RA

S.T

.P.S

(630

MW

)(13

0.98

PS

)

TU

TU

CO

RIN

.T.P

.S(1

050

MW

)(13

3.5

PS

)

ME

TT

UR

.T.P

.S(8

40 M

W)(

150

PS

)

V S

P *

(120

MW

)(16

9.11

PS

)

ST

-CM

S(2

50 M

W)(

171

PS

)

NE

YV

ELI

-I(6

00 M

W)(

185.

86 P

S)

EN

NO

RE

.T.P

.S(4

50 M

W)(

190.

2 P

S)

L V

S(3

7.8

MW

)(20

0 P

S)

YE

LEH

AN

KA

DE

ISE

L(12

7.92

MW

)(20

3.36

PS

)

NA

VB

HA

RA

T(3

5 M

W)(

205

PS

)

BR

AH

MA

PU

AM

D P

P(1

06.5

MW

)(21

4 P

S)

NE

LLO

RE

(30

MW

)(22

5 P

S)

B S

E S

(K

ER

ALA

)(16

5.5

MW

)(22

5 P

S)

TH

AN

NE

ER

BA

VI(

235

MW

)(22

8 P

S)

JIN

DA

L(26

0 M

W)(

247

PS

)

BA

LAJI

(SA

MA

YA

NA

LLU

R)(

105

MW

)(24

7 P

S)

KO

ZH

IKO

DE

DP

P(1

28.8

MW

)(25

0 P

S)

GM

R V

AS

AV

I(19

6 M

W)(

254

PS

)

SA

MA

LPA

TT

Y IP

P(1

05 M

W)(

263

PS

)

TA

TA

DE

ISE

L(81

.3 M

W)(

280

PS

)

KA

YA

MK

ULA

M N

TP

C(3

50 M

W)(

290

PS

)

KA

SA

RG

OD

P C

L(2

1 M

W)(

300

PS

)

RA

YA

LAS

EE

MA

(37.

8 M

W)(

330

PS

)

PP

NA

LLU

R(3

30.5

MW

)(41

5 P

S)

BA

SIN

BR

IDG

E(1

20 M

W)(

468

PS

)

CU

MU

LA

TIV

E IN

ST

AL

LE

D C

AP

AC

ITY

IN M

W

0

50

100

150

200

250

300

350

400

450

VA

RIA

BL

E C

OS

T IN

Ps/

UN

IT

VARIABLE COST

CUMULATIVEINSTALLE

ABOUT 7000 MW OF CAPACITY IS BELOW 100 Ps

ABOUT14200 MW OF CAPACITY IS BELOW 200 Ps

ABOUT 16000 MW OF CAPACITY IS BELOW 300 Ps

CUM. INS. CAP.

60

49.72 HZ

61

MERIT ORDER : UNITS BOXED UP

POWER STATION STATE CAPACITY(MW) FUELVARIABLE

COST

TATA DIESELKARNATAK

A 79 DIESEL 308

RAYALSEEMA DGPP

KARNATAKA 27 DIESEL 360

YELEHANKA DIESEL

KARNATAKA 128 DIESEL 314

THANRBHAVIKARNATAK

A 220 NAPTHA 325

SUB-TOTAL 454    

BRAHAMPURAM DPP KERALA 107 DIESEL 275

BSES KERALA 157 NAPTHA 308

KASARGODE PCL KERALA 22 NAPTHA 298

KAYAMKULAM KERALA 360 NAPTHA 322

SUB-TOTAL 646    

BASIN BRIDGETAMIL NADU 120 NAPTHA 584

P.P.NALLURTAMIL NADU 330 NAPTHA 415

SUB-TOTAL 450    

TOTAL 1550    

62

Growth Of Inter Regional Energy Exchanges

73508230

9730

13000

22500

0

5000

10000

15000

20000

25000

1999-2000 2000-2001 2001-2002 2002-2003 2003-2004

Year

To

tal M

U D

uri

ng

Th

e Y

ear

IR Energy Exchanges

63

(+) IMPORT / (-) EXPORT

• INTER REGIONAL UI (WR):- +357 MU – 211 MU• INTER REGIONAL UI (ER):- +693 MU – 21 MU• AVG RATE OF IMPORT FROM WR IN PS/U

– 134 PS/U @WR– 247 PS/U @SR

• AVG RATE OF EXPORT TO WR IN PS/U– 163 PS/U @SR– 287 PS/U @WR

• AVG RATE OF IMPORT FROM ER IN PS/U– 145 PS/U @ ER– 212 PS/U @ SR

INTER – REGIONAL(01/01/03 TO 10/10/04)

64

MAJOR AND MINOR DISTURBANCES SINCE 1994

0

1

2

3

4

5

6

7

8

9

10N

UM

BE

R O

F D

IST

UR

BA

NC

ES

---

----

->

1994

-95

1995

-96

1996

-97

1997

-98

1998

-99

1999

-00

2000

-01

2001

-02

2002

-03

2003

-04

2004

-05

YEAR ->

MAJOR MINOR

NO DISTURBANCES DESPITE LOSING ENTIRE SUPER GENERATING PLANTS LIKE

RAMAGUNDAM,VIJAYAWADA,KOTHAGUDEM, NORTH CHENNAI, SHARAVATHY ETC

SPS

65

DEEP VALLEY

DEEP VALLEY

SHARP

PEAK

66

KADAMPARAI PUMP OPERATION

-300

-200

-100

0

100

200

300

400

5000:

001:

002:

003:

004:

005:

006:

007:

008:

009:

0010

:00

11:0

012

:00

13:0

014

:00

15:0

016

:00

17:0

018

:00

19:0

020

:00

21:0

022

:00

23:0

00:

00

TIME ---->

IN M

W --

-->

48.50

49.00

49.50

50.00

50.50

51.00

FREQ

UENC

Y IN

HZ

---->

GENERATOR MODE

PUMP PUMP

SAVINGS OF RS 40 LAKHS EVERY DAY

INVESTMENT OF 1600 CRORES SAVED

67

OPPORTUNISTIC UI TRADEEXPORT TO WR ON 13/05/03-14/05/03

-300

-200

-100

0

100

200

300

400

500

600

00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 00 01 02 03 04 05 06 07 08

49

49.2

49.4

49.6

49.8

50

50.2

50.4

50.6

50.8

51POWER EXPORT TO WR ON

UI BASIS DURING LOAD CRASH

FREQ

68

UI TRANSACTION ON 31/08/03 SUNDAY, GANESH CHATURTHI

• Total UI imported from C. Grid by SR:8.88 MU• Max Power transfer in UI from C Grid:860 MW

AMOUNT SAVED : Rs. 107 LAKH IN ONE DAY!

HIGH FREQUENCY IN ER-WR GRID

POWER IMPORTED AT CHEAP PRICE

MUTUAL BENEFIT

69

OPTIMAL RESERVOIR UTILISATIONIDUKKI IN KERALA

KERALA SAVED RS 50 CRORES BY EFFICIENT UTILISATION OF THE RESERVOIRS AT IDUKKI!

POWERGRIDs 400 KV MADURAI-TRIVANDRUM LINE WILL HELP KERALA

SAVE EVEN MORE ENERGY IN THE COMING

YEAR

PLANT OPERATORS AT IDUKKI THINK OF THE RESERVOIR LEVEL IN RUPEES RATHER

THAN IN FEET!!!

Rs. Rs.

Rs.

Rs.

Rs.

Rs.Rs.

Rs.

Rs.

Rs.

Rs.

Rs.

Rs.

Rs.

Rs.Rs.

70

FREQUENCY CURVE FOR 9th SEPTEMBER 2004FVI = 0.04

Avg Freq = 49.99Hz

48.5

49.0

49.5

50.0

50.5

51.0

00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23

10 * ∑ (F – 50) 2

FVI = -------------------------------

24 * 60

71

SPECIFIC ACTION BY RLDC LOSS REDUCTION

• TAP CO-ORDINATION• FILTER CO-ORDINATION• REDUCED LINE OPENING• HVDC SET POINT CHANGES• VAR MANAGEMENT

REVIVAL OF DORMANT INTER-STATE LINES 100% DISBURSEMENT IN SETTLEMENT

SYSTEM OPTIMISATION OF INTER-REGIONAL

EXCHANGES MERIT ORDER OPERATION

72

RLDC,Bangalore

KalamasseryHyderabad BangaloreChennai

Cuddapah

Warangal

Vijayawada

Kalam’erry

Kannur

Trivandrum

Chennai

Erode

Madurai

Bangalore

Lingusugur

Hubli

CPCC SCC, Pondy

Hyderabad

Hierarchy of The ULDC Scheme in Southern Region

Andhra Kerala Tamilnadu Karnataka

73

EMS/SCADA Package … EMS/SCADA Package … ContdContd

Sl No:Sl No: ConstituentConstituent RTUs suppliedRTUs supplied Existing RTUs Existing RTUs integratedintegrated

Control Control CentresCentres

1.01.0 APTRANSCOAPTRANSCO 9191 -- 44

2.02.0 TNEBTNEB 4040 3535 33

3.03.0 KPTCLKPTCL 2222 2121 33

4.04.0 KSEBKSEB 3030 -- 33

5.05.0 UT of PondyUT of Pondy 55 99 11

6.06.0 Central SectorCentral Sector 2727 -- 11

TotalTotal 215215 6565 1515

RTUs Grand Total : 280 RTUs Grand Total : 280

74

Andhra Pradesh

Karnataka

Kerala

Tamilnadu

UT of Pondy

Vijayawada

Warangal

HYDERABADGhanapur

Chinkampalli

CHENNAI

Pondy

Madurai

Kannur-B

KALAMASSERY

Vydyuthi Bhavanam

Erode

MW LinkFO LinkState owneed Link

Sub-LDC

SLDC

RCLDC

Hubli

Davangeree

Bangalore

Information Flow to Control CentresInformation Flow to Control Centres

Satellite

Ramagundam

75

Communication Channel for Information flow

Sub-LDC

SLDC

RLDC

SLDC

Sub-LDC

RTU RTU

Wide Band /PLCC Commn

Wide Band Commn

Wide Band Commn(MW / FO)

RTU

76

ULDC TRAININGULDC TRAININGSL NAME OF THE TRAINING FROM TO Participants Man days

1CISCO ROUTER &

NETWORKING19-01-2004 24-01-2004 17 102

2 XA-21 USER LEVEL 23-02-2004 28-02-2004 10 60

3 RTNA WORKSHOP 29-03-2004 31-03-2004 14 42

4 AIX OPERATING SYSTEM 17-05-2004 22-05-2004 15 90

5 XA-21 USER LEVEL 21-06-2004 25-06-2004 6 30

6 DATABASE ADMINISTATION 22-11-04 04-12-04 19 228

77

Annual Inter-Regional Energy Transfer

≈10,000MU

Transformation Capacity ≈

45000 MVA

Transformers (220kV and above)

480 nos.

Installed Capacity≈31870 MW

Integrated Opn of Ten Power

Utilities

Dynamic Grid Conditions

Southern Region Grid Complexities in Monitoring & Control

Generators –Hydro, Thermal,Gas/IPP

422 nos.

Transmission Network 400/220kV

≈ 37500 Ckm

40,000 POINTS Active Power, Reactive Power,

Voltage, Frequency, Transformer Tap Position, Circuit Breaker Position,

Isolator Position etc.

78

Bouquet of Benefits

• Integrated System Operation with improved system visibility

• Enhanced Operation Efficiency

• Quality Power - Frequency and Voltage Control

• Merit Order and Economic Load Dispatch

• Fewer System Collapses & Faster Restoration

• First Step towards Sub-station Automation

• Adaptability to the ever growing Power System

79

DEVELOPMENT OF NATIONAL GRID

NER

ER

NR

WR

SR

EXISTING

500MW

MW1000

MW500

GAZUWAKA

CHANDRAPUR

VINDHYACHAL

SASARAM

UNDERCONST.

EXISTING

400 kV

220 kV

BONGAIGAONBIRPARA

MALDA

KORBA BUDHIPADAR

KOLHAPUR

BELGAUM

U.SILERU

BALIMELA

DEHRISAHUPURI

MALANPUR

AURAIYA

PHASE-I(By 2002)

HVDC STATION

KOLAR

(KARNATAKA)

TALCHER

ORISSA)

TALCHER KOLAR HVDC LINE

LENGTH:1400 KMS

80

TALCHER KOLAR LINKTALCHER KOLAR LINK ONE OF THE LONGEST HVDC LINES IN THE WORLDONE OF THE LONGEST HVDC LINES IN THE WORLD

DESIGNED TO EVACUATE 2000 MW DESIGNED TO EVACUATE 2000 MW

COMMISSIONED IN ADVANCE TO UTILISE NON-COMMISSIONED IN ADVANCE TO UTILISE NON-

PEAK SURPLUS POWER OF EASTERN REGIONPEAK SURPLUS POWER OF EASTERN REGION

COMMISSIONED 9 MONTHS AHEAD OF SCHEDULECOMMISSIONED 9 MONTHS AHEAD OF SCHEDULE

THE PROJECT HAS USED APPROXIMATELY 90,000 THE PROJECT HAS USED APPROXIMATELY 90,000

TONNES OF STEEL AND 16,000 KM OF CABLES TONNES OF STEEL AND 16,000 KM OF CABLES

81

TALCHER KOLAR HVDC LINKTALCHER KOLAR HVDC LINKBENEFITS TO SOUTHERN REGIONBENEFITS TO SOUTHERN REGION

SUBSTANTIAL IMPROVEMENT IN THE SUBSTANTIAL IMPROVEMENT IN THE VOLTAGE PROFILE FOR THE REGION.VOLTAGE PROFILE FOR THE REGION.

TRUNK LINE LOADINGS EASED – TRUNK LINE LOADINGS EASED – INCREASED TRANSFER MARGIN.INCREASED TRANSFER MARGIN.

MAX IMPORT FROM ER 1600 MWMAX IMPORT FROM ER 1600 MW MORE DEMAND IS BEING MET.MORE DEMAND IS BEING MET. DEPLETED HYDRO RESERVES IS BEING DEPLETED HYDRO RESERVES IS BEING

CONSERVED.CONSERVED. AVERAGE COST OF POWER IS BROUGHT DOWNAVERAGE COST OF POWER IS BROUGHT DOWN SURPLUS IN ER EFFECTIVELY UTILISEDSURPLUS IN ER EFFECTIVELY UTILISED PERFORMANCE IMPROVEMENT OF POWER PERFORMANCE IMPROVEMENT OF POWER

STATIONS IN EASTERN REGIONSTATIONS IN EASTERN REGION INCREASED STOA TRANSACTIONSINCREASED STOA TRANSACTIONS

82

TALCHER-KOLARTALCHER-KOLAR IMPORT OF 13447MUs FROM ER THROUGH TALCHER-KOLAR UPTO NOV-04

YEAR --->YEAR ---> 20022002 20032003 20042004

MONTHSMONTHSTOTAL TOTAL

ENERGY (IN ENERGY (IN MU)MU)

MAX FLOW MAX FLOW (IN MW)(IN MW)

TOTAL TOTAL ENERGY ENERGY (IN MU)(IN MU)

MAX MAX FLOW (IN FLOW (IN

MW)MW)

TOTAL TOTAL ENERGY (IN ENERGY (IN

MU)MU)

MAX MAX FLOW (IN FLOW (IN

MW)MW)

JANJAN ------ ------ 311311 850850 805805 15281528

FEBFEB ------ ------ 273273 10101010 701701 15081508

MARMAR ------ ------ 491491 13161316 837837 16001600

APRAPR ------ ------ 473473 11831183 923923 15001500

MAYMAY ------ ------ 172172 10261026 652652 13851385

JUNJUN ------ ------ 277277 994994 688688 14161416

JULJUL ------ ------ 319319 10751075 759759 14901490

AUGAUG ------ ------ 346346 10881088 628628 13411341

SEPSEP 66 200200 512512 15331533 742742 15521552

OCTOCT 5858 500500 508508 1458 1458  829829 15501550

NOVNOV 7777 500500 470470 1048 1048  719719 16001600

DECDEC 241241 750750   630630 1383 1383 

TOTALTOTAL 382382    47824782    82838283   

AVERAGEAVERAGE 9696    399399    753753   

MAX FLOWMAX FLOW    750750    15331533    16001600

83

RESERVOIR LEVEL - RESERVOIR LEVEL - COMPARISONCOMPARISON

LEVEL IN MTSLEVEL IN MTS LEVELLEVEL30-Nov-0330-Nov-03

LEVELLEVEL30-Nov-0430-Nov-04

JALAPUTJALAPUT 837.48837.48 836.17836.17

LINGANMAKKILINGANMAKKI 545.35545.35 548.61548.61

SUPASUPA 534.73534.73 545.48545.48

IDUKKIIDUKKI 715.65715.65 772.96772.96

KAKKIKAKKI 969.19969.19 972.43972.43

NILGIRISNILGIRIS

TOTALTOTAL

ENERGYENERGY30-Nov-0330-Nov-03

ENERGYENERGY30-Nov-0430-Nov-04

RISE IN RISE IN MUMU

% % RISERISE

514514 440440 - 7474 -1414

21482148 27082708 560560 2626

10621062 17871787 725725 6868

947947 14131413 466466 4949

528528 612612 8484 1616

559559 14631463 904904 162162

57585758 84238423 26652665 4646

• Only 7500MUs Reserve till next monsoon (6 Months)

• 40 MUs/day could be generated as against about 70 MUs/day at present.

84

GRID OPERATION:GRID OPERATION: A TIGHT ROPE WALK A TIGHT ROPE WALK

BLACK-OUTVOLTAGE

COLLAPSE IN-ECONOMIC

OPERATION

INSTABILITYPOWER

SWINGSINCREASED

LOSSES

85

UI IN SR (FROM 01/01/03 TO UI IN SR (FROM 01/01/03 TO 10/10/04)10/10/04)

TOTAL UI TURNOVER :- 5551 MUTOTAL UI TURNOVER :- 5551 MU

TOTAL UI AMOUNT DISBURSED:- TOTAL UI AMOUNT DISBURSED:- 1065 CR1065 CR

AVG WEEKLY TRANSACTION:- 60 MUAVG WEEKLY TRANSACTION:- 60 MU

AVG WEEKLY UI AMOUNT AVG WEEKLY UI AMOUNT DISBURSED:- 11.45 CRDISBURSED:- 11.45 CR

86

INTER-REGIONAL EXCHANGES WR A/C INTER-REGIONAL EXCHANGES WR A/C DETAILS UPTO 93 WKSDETAILS UPTO 93 WKS

TILL 10/10/04TILL 10/10/04

1. NET ENERGY TRANSACTION IS 146 MU (IMPORT BY SR).

2. AMOUNT ACCRUED IN SREB – IRE DUE TO DIFF. IN WR A/C = 41.83Crs

3. AMOUNT TO BE ACCRUED IN WREB – IRE DUE TO DIFF. IN SR A/C = 27.71Crs

4. AMOUNT DUE TO SR CONSTITUENTS ON 50:50 BASIS = 34.73Crs

5. AMOUNT ALREADY DISBURSED TO SR CONSTITUENTS = 33.39Crs

87

GENERATION vs FREQUENCY FOR

0

10

20

30

40

50

60

70

80

90

100

11

:41

12

:41

13

:41

14

:41

15

:41

16

:41

17

:41

18

:41

TIME IN HH:MM ----->

MW

---

-->

48.50

49.00

49.50

50.00

50.50

FR

EQ

IN H

Z -

----

>

FREE GOVERNOR MODE OF OPERATION ON 20-DEC-04

SHARAVATHI - 1

88

GENERATION vs FREQUENCY FOR

0

10

20

30

40

50

60

70

80

90

100

11

:41

12

:41

13

:41

14

:41

15

:41

16

:41

17

:41

18

:41

TIME IN HH:MM ----->

MW

---

-->

48.50

49.00

49.50

50.00

50.50

FR

EQ

IN H

Z -

----

>

FREE GOVERNOR MODE OF OPERATION ON 20-DEC-04

SHARAVATHI - 4

89

GENERATION vs FREQUENCY FOR

400

420

440

460

480

500

520

540

13

:21

14

:21

15

:21

16

:21

17

:21

18

:21

19

:21

20

:21

TIME IN HH:MM ----->

MW

---

-->

48.50

48.70

48.90

49.10

49.30

49.50

49.70

49.90

50.10

50.30

50.50

FR

EQ

IN H

Z -

----

>

FREE GOVERNOR MODE OF OPERATION ON 20-DEC-04

NTPC - 4