Challenges and vision of company future development within a competitive market

ČD, a.s., Jiří Havlíček EFRTC General meeting, 22/06/2012

In 2011 ČD carried 166 mil. travellers / year, means cca 450 000 daily

In 2011 ČD carried within integrated transport systems cca 49 mil. people, means cca 135 000 daily

Increase of revenues from tickets cca 5% compared to 2010

cca 450 000

Railway transport represents one of the key and accessible mode of transport

cca 135 000

+5 %

2

Passenger transport – ČD, a. s.

Regional Operated under long term

agreements with each of the 14 regions, including the city of Prague

Long-distance Consists of interregional and

international rail transportation activities

Operated under long term agreements with the state

Commercial Non-regulated passenger

transportation operations Includes „high-speed“ operations –

SuperCity Pendolino

3

Renewal of rolling stock fleet is ine of the key preconditions od ČD competitiveness

2008 2009 2010 2011

0

7,254

9,906

11,249

Signed contracts (mil. CZK) New and modernized Rolling stock

Rolling stock investments

2008 2009 2010 2011 2012 -

78 144

252 279

-

53

36

68 70

Nová ŽKV Modernizovaná ŽKVNew Modernization

4

Competition on Czech railway market

Freight transport

Market opened

63 licensed operators for freight transport

CD Cargo market share (86,84 % in gross tkm, 78,19 % in train km)

Passenger transport

Market opening (22 officially registered operators for passenger transport)

Tenders for operation of long-distance lines are being commenced by Ministry of Transport

First three tenders to be opened in 2012/13 - up to 8 % of market (9 interested parties for the first one)

5

Fair competition is desirable, motivates to the bid of higher quality

One of the major preconditions is harmonization of conditions with road transport

6

Imbalance between railway and road infrastructure development

Each train pays for use of any type of infrastructure, in road sector only selected group of cars pay on selected network

Higher requirements set in legislation for railway business

One of the major goals is finalization of corridor lines modenization with future construction of high speed lines and convergency of infrastructure priorities

Czech railways are under-invested and overall modernization runs slowly and with delays to original timeplans and in comparison with neighbouring countries

Insufficient parameters of modernized corridors limit competitive business (maximum speed up to 160 km/h on limited part of network)

Capacity issues around municipalities

Strategy of infrastructure development must reflectmarket needs and plans of „order parties“

7

Slow speed implies low interest in railways service

Examples of travel time by train, high speed line and bus on selected lines:

Line By train nowadaysHigh speed line

(estimation)By bus nowadays

Prague – Nürnberg 5 hod 46 min 3 hod 4 hod 15 min

Prague – Brno 2 hod 40 min 1 hod 2 hod 30 min

Prague – Pilsen 1 hod 35 min 30 min 1 hod

Prague - České Budějovice 2 hod 35 min 1 hod 35 min 2 hod 35 min

8

Railway system is very closely linked, sensitively reacting on any failures

Inhomogeneous and potentially

conflicting strategies

Missing economic motivation for

investments in the projects of

operators´interest

Global optimum of railway

system not achieved, synergies

not used, increase of costs of

railway system

State

SŽDC, state

organization

Infrastructure operation

Infrastructure maintenance and development

Allocation of capacity for operators

ČD, a.s.

Railway transport passenger operator

Railway stations

ČD - Cargo, a.s.

RISKSCurrent state in the Czech Republic

9

Organizational structure overviewThree main arguments in favor of the proposed organizational structure:

Considerable cost savings due to synergies and increased efficiency

Coordination of priorities between rail operator and infrastructure manager

Best practice option used by the most successful companies in the rail industry

Infra-structure

Freighttransport

Passenger transport

Station & Service

Reg

ula

tor

Railway holding

Share

d s

erv

ices

Potential solution might be an integrated railway holding with four subsidiaries

10

11

„Holding model“ management (implementation of joint policies, methodologies etc.)

Shared service centres for prioriti areas within ČD Group (IT, accountance, investments, treasury, purchasing)

Preparation of Passenger transport subsidiary company

Preparation of „Stations and service“ subsidiary company

ČD has already commenced the steps towards holding structure implementation

Czech Railways put a strong emphasis on the optimization of the railway station management

12

Introduction of station fee

Current projects

Optimization and standardization of services in stations along with the fee and the new categorization

Sale of non-essential railway station buildings to municipalities

Sale of other dispensable real estate property in the railway stations

Revitalisation of the Prague Main Station revitalisation in cooperation with Grandi Stazioni

Revitalisation of the station buildings through differentiated funding

• NUMBER OF PASSENGERS1

• REGIONAL VS. LONG-DISTANCE

• POSSIBILITY TO CHANGE TRAINS

3

Categorization has been updated recently based on these three parameters

13

Categorization reflects

the traffic importance of individual

stations

Reflects the volume of necessary services

Reflects number of passengers and the volume of necessary services

Reflects the time passengers usually spend in stationsand the volume of necessary services

2

14

Elementary services will further be completed with a range of additional services. However, these will not be granted for each category of stations (e.g. Bicycle depository, lost and found etc.)

Legislation changes are expected to be necessary to start the station fee

Exact date of fee introduction has not been set yet

The station fee is in preparation, being intensively discussed with the Ministry of Transport

15

ČD optimizes the property portfolio also by the sale of dispensable (non-core) real estate property

VOLUME OF non-core PROPERTY

EXPECTED EFFECTS

Process

Ca 4600 buildings

Ca 62 mil. m2 plots

Cash income Decrease of maintenance and

renovation cost Higher work efficiency

The sale process will be supported by a consorcium of companies (real estate agents, management consulting, investment banks)

Because of the enormous volume of property, ČD intends to sell it in large „packages“

Part of the property will be probably sold to the infrastructure manager (SŽDC – state organisation)

16

Main features of this revitalization:

Enlargement of underpasses

New Passenger service center

New luggage depository

Rennovation of the facade

The Prague Main Station is being successfully revitalisedin cooperation with Grandi Stazioni

17

ČD is trying to obtain European funding for the rennovation of railway st.

Currently a notification process is running to confirm this subsidy will not account for a inadequate state aid

The challenge is to find sufficient financing for the renovation of the core assets

• Regional operational programs

Programming period 2009-2013

600 m CZK

Renovation of station buildings