challenges of wheel/rail interface to combat leaf ... · operates bullet trains (shinkan-sen) and...
TRANSCRIPT
![Page 1: Challenges of Wheel/Rail Interface to combat Leaf ... · operates bullet trains (Shinkan-sen) and local trains •54,880 employees, 69 lines with 7,457 km in total •Worked as a](https://reader034.vdocument.in/reader034/viewer/2022042909/5f3c887ca9a234455a41581c/html5/thumbnails/1.jpg)
Challenges of Wheel/Rail Interface to combat Leaf Contamination
A Collaborative Project between East Japan Railway Company and the University of
Sheffield
Kei Ishizaka
East Japan Railway Company, Assistant Manager
Tokyo, Japan
![Page 2: Challenges of Wheel/Rail Interface to combat Leaf ... · operates bullet trains (Shinkan-sen) and local trains •54,880 employees, 69 lines with 7,457 km in total •Worked as a](https://reader034.vdocument.in/reader034/viewer/2022042909/5f3c887ca9a234455a41581c/html5/thumbnails/2.jpg)
Contents list
• Introduction
•Motive and Opportunity
• Leaf contamination problems in the UK
•Research highlights and outcomes
•Key aspects of the collaborative project
![Page 3: Challenges of Wheel/Rail Interface to combat Leaf ... · operates bullet trains (Shinkan-sen) and local trains •54,880 employees, 69 lines with 7,457 km in total •Worked as a](https://reader034.vdocument.in/reader034/viewer/2022042909/5f3c887ca9a234455a41581c/html5/thumbnails/3.jpg)
Introduction
• East Japan Railway Company (JRE) operates bullet trains (Shinkan-sen) and local trains
• 54,880 employees, 69 lines with 7,457 km in total
• Worked as a maintenance engineer (1 year), train conductor (2 years) and train driver (2 years)
• Joined the University of Sheffield as a Ph.D. student (3 years)
![Page 4: Challenges of Wheel/Rail Interface to combat Leaf ... · operates bullet trains (Shinkan-sen) and local trains •54,880 employees, 69 lines with 7,457 km in total •Worked as a](https://reader034.vdocument.in/reader034/viewer/2022042909/5f3c887ca9a234455a41581c/html5/thumbnails/4.jpg)
Motive and Opportunity
Nikko
Nikko Line
Japanese cedar
Continous steep slope
• Many colleagues suffered wheel-slips due to low adhesion
• Oil in fallen leaves was believed to be the main cause
• But low friction problem did not happen without water
Kanuma
?
https://pixabay.com, Shirley Hirst, Steve Buissinne
![Page 5: Challenges of Wheel/Rail Interface to combat Leaf ... · operates bullet trains (Shinkan-sen) and local trains •54,880 employees, 69 lines with 7,457 km in total •Worked as a](https://reader034.vdocument.in/reader034/viewer/2022042909/5f3c887ca9a234455a41581c/html5/thumbnails/5.jpg)
Motive and Opportunity
• Many UK universities have been conducting railway research
• Leaf contamination is a big problem in Euro, especially in the UK
• Professor Lewis is a leading researcher in the wheel/rail tribology at the University of Sheffield
• He published several articles about leaf contamination
• Sanding• Friction• Wear• Contact
fatigue• LeafProf. Roger Lewis
https://www.sheffield.ac.uk/ssid/maps/firth
https://www.sheffield.ac.uk/mecheng/staff/rlewis
https://pixabay.com, German Lopez
![Page 6: Challenges of Wheel/Rail Interface to combat Leaf ... · operates bullet trains (Shinkan-sen) and local trains •54,880 employees, 69 lines with 7,457 km in total •Worked as a](https://reader034.vdocument.in/reader034/viewer/2022042909/5f3c887ca9a234455a41581c/html5/thumbnails/6.jpg)
Motive and Opportunity
Many students
A few students• Opportunities to study
abroad with funding
• Many students in the USA but fewer students in Euro
• Making connections in European railway industries
• Chose the University of Sheffield
https://pixabay.com, Clker-Free-Vector-Images
![Page 7: Challenges of Wheel/Rail Interface to combat Leaf ... · operates bullet trains (Shinkan-sen) and local trains •54,880 employees, 69 lines with 7,457 km in total •Worked as a](https://reader034.vdocument.in/reader034/viewer/2022042909/5f3c887ca9a234455a41581c/html5/thumbnails/7.jpg)
Leaf contamination problem in the UK
• Black, hard and slippery leaf film• Low friction ( µ < 0.1, min 0.02)• Strong bonds between the leaf
and rail• Current measures (ex. sanding)
are not perfectOver ₤100 million annual loss in
the UK
Leaf film problems
Leaf films
Fallen leaves Wheel passeshttps://pixabay.com, Michael Gaida, Robert-Owen-Wahl
Hyde, P., Fletcher, D., Kapoor, A., Richardson, S., 2008. Full Scale Testing to Investigate the Effect of Rail Head Treatments of Differing pH on Railway Rail Leaf Films. Proceedings of the World Congress on Railway Research, May 18-22, 2008, Seoul, South Korea.
![Page 8: Challenges of Wheel/Rail Interface to combat Leaf ... · operates bullet trains (Shinkan-sen) and local trains •54,880 employees, 69 lines with 7,457 km in total •Worked as a](https://reader034.vdocument.in/reader034/viewer/2022042909/5f3c887ca9a234455a41581c/html5/thumbnails/8.jpg)
Research background
Low friction mechanismHow is the low friction condition caused?
Bonding mechanismWhich leaf constituent causes a strong bond?
Rail
Pectin?
Tannin?
Lignin?
Or other organics?
![Page 9: Challenges of Wheel/Rail Interface to combat Leaf ... · operates bullet trains (Shinkan-sen) and local trains •54,880 employees, 69 lines with 7,457 km in total •Worked as a](https://reader034.vdocument.in/reader034/viewer/2022042909/5f3c887ca9a234455a41581c/html5/thumbnails/9.jpg)
Research highlight: Black material synthesis
1-3 days
Leaf extract making1 g : 50 ml = Leaf : Water
Paper filtered
Leaf extract + Rail plate= Black precipitation (BP)
Black material was synthesised with leaf-extract and rail steel
BoiledDried & Ground
Sycamore
![Page 10: Challenges of Wheel/Rail Interface to combat Leaf ... · operates bullet trains (Shinkan-sen) and local trains •54,880 employees, 69 lines with 7,457 km in total •Worked as a](https://reader034.vdocument.in/reader034/viewer/2022042909/5f3c887ca9a234455a41581c/html5/thumbnails/10.jpg)
Research highlight: Low friction
Low µExtremely low
BP
BP from green leavesBP from brown leaves
5 mm stainless steel ball
Black precipitate (BP) with water
Rail plate
10 mm
Black precipitation from brown leaves showed extremely low friction
What’s inside the BP?
![Page 11: Challenges of Wheel/Rail Interface to combat Leaf ... · operates bullet trains (Shinkan-sen) and local trains •54,880 employees, 69 lines with 7,457 km in total •Worked as a](https://reader034.vdocument.in/reader034/viewer/2022042909/5f3c887ca9a234455a41581c/html5/thumbnails/11.jpg)
Characteristic X-ray
Research highlight: Iron detection
Iron dissolves into leaf extracts and forms the black precipitation
Cl K Ca Mn Fe
BP from green leaves
X-Ray Fluorescence
BP from brown leaves
Sample
X-ray
• Most metals are detectable
• Light elements are not detectable
ElementBefore[μg/L]
After[μg/L]
B 553 589
Fe 308 31040
Mn 1703 2262
Al 27 1254
ICP-MS• Metals in liquid
are detectable
![Page 12: Challenges of Wheel/Rail Interface to combat Leaf ... · operates bullet trains (Shinkan-sen) and local trains •54,880 employees, 69 lines with 7,457 km in total •Worked as a](https://reader034.vdocument.in/reader034/viewer/2022042909/5f3c887ca9a234455a41581c/html5/thumbnails/12.jpg)
Research highlight: Graphite-like carbon
Raman shift [cm-1]
Inte
nsi
ty
GDG*D*
ID/IG=0.77
ID/IG=0.83
1000 2000 3000 40000
BP from green leaves
BP from brown leaves
Raman Spectroscopy
• Graphite-like carbon on black precipitation surface
• Graphite is solid lubricant due to low shear strength
Low friction
Incidentlaser
Energy E0
= E0
> E0: Raman shift
< E0: Raman shift
Graphite-like carbon
![Page 13: Challenges of Wheel/Rail Interface to combat Leaf ... · operates bullet trains (Shinkan-sen) and local trains •54,880 employees, 69 lines with 7,457 km in total •Worked as a](https://reader034.vdocument.in/reader034/viewer/2022042909/5f3c887ca9a234455a41581c/html5/thumbnails/13.jpg)
Research highlight: Structure
OH CH
COO
C=O
C-O
Brown leaves
BP fromgreen leaves
BP frombrown leaves
Green leaves
Fe3+
C
O
ex. Fe2(C2O4)3
Iron-ligand is likely to be formed
FT-IR analysis
![Page 14: Challenges of Wheel/Rail Interface to combat Leaf ... · operates bullet trains (Shinkan-sen) and local trains •54,880 employees, 69 lines with 7,457 km in total •Worked as a](https://reader034.vdocument.in/reader034/viewer/2022042909/5f3c887ca9a234455a41581c/html5/thumbnails/14.jpg)
Research highlight: Chemical reaction
Carbon
Leaf extract
Rail
1. Fe ion dissolution
Fe2+ or Fe3+
2. Reaction with organic acids 3. Iron-ligand formation
Iron-ligand (carboxylate)
4. Further reaction 6. Further reaction5. Graphite-like carbon
Oxygen
Various ions Next questionChemical reaction can be stopped at
stage 2?
![Page 15: Challenges of Wheel/Rail Interface to combat Leaf ... · operates bullet trains (Shinkan-sen) and local trains •54,880 employees, 69 lines with 7,457 km in total •Worked as a](https://reader034.vdocument.in/reader034/viewer/2022042909/5f3c887ca9a234455a41581c/html5/thumbnails/15.jpg)
Other findings and outcomes
Other findings• Extremely low friction was confirmed with the fine leaf powder
(<160 μm) in rolling-sliding conditions using a twin disc machine• Surface temperature was found to have a significant impact on
the improvement of friction; possibly 240 ˚C could be enough to achieve the necessary friction coefficient for traction
Publication arising from this project• The low adhesion problem due to leaf contamination in the wheel/rail contact: Bonding and low adhesion mechanisms.
Wear. 2017;378–379:183–97.• Chemistry of black leaf films synthesised using rail steels and their influence on the low friction mechanism. RSC Adv.
2018;8(57):32506–21.
• Another article is now being peer-reviewed
![Page 16: Challenges of Wheel/Rail Interface to combat Leaf ... · operates bullet trains (Shinkan-sen) and local trains •54,880 employees, 69 lines with 7,457 km in total •Worked as a](https://reader034.vdocument.in/reader034/viewer/2022042909/5f3c887ca9a234455a41581c/html5/thumbnails/16.jpg)
Key aspects of the project
Interface problem of...
Track maintenance Department
Wheel side
Rail side
Transport & Rolling Stock Department
Mechanical Engineering
ChemistryMaterial
Organisation Academic
True challenge was to break down the walls between departments
![Page 17: Challenges of Wheel/Rail Interface to combat Leaf ... · operates bullet trains (Shinkan-sen) and local trains •54,880 employees, 69 lines with 7,457 km in total •Worked as a](https://reader034.vdocument.in/reader034/viewer/2022042909/5f3c887ca9a234455a41581c/html5/thumbnails/17.jpg)
Key aspects of the project
How can we break down the wall or fill the gap?
ChemistryMaterial Science
Biochemistry Engineering
Experience
Ideas
• Have your own idea based on your experience
• Expand your world with curiosity, explore other academic fields
• Share your ideas and expertise with others
• Get experts involved in your project• Never forget your colleagues – they
might suffer the problem right now
![Page 18: Challenges of Wheel/Rail Interface to combat Leaf ... · operates bullet trains (Shinkan-sen) and local trains •54,880 employees, 69 lines with 7,457 km in total •Worked as a](https://reader034.vdocument.in/reader034/viewer/2022042909/5f3c887ca9a234455a41581c/html5/thumbnails/18.jpg)
Summary
• The collaboration between East Japan Railway Company and the University of Sheffield was carried out as a Ph.D. research project
• Graphite-like carbon was found in black material synthesised with leaf extracts and rail steels
• Graphite-like carbon could be the main cause of low friction rather than oil in leaves
• A new method for the prevention of leaf contamination is now being tested, combining the research outcome with empirical knowledge