Chamber Production at CERN 904. Department of Physics, Sungkyunkwan - university, Korea Dong- hyun kim. Contents. Introduction RPC Production Process RPC Production State PLAN. 1. Introduction. Resistive Plate Chamber(RPC) is Muon detector - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Chamber Production at CERN 904](https://reader036.vdocument.in/reader036/viewer/2022062816/56815591550346895dc36b2c/html5/thumbnails/1.jpg)
1
Chamber Produc-tion at CERN 904DEPARTMENT OF PHYSICS, SUNGKYUNKWAN-UNIVERSITY, KOREADONG-HYUN KIM
![Page 2: Chamber Production at CERN 904](https://reader036.vdocument.in/reader036/viewer/2022062816/56815591550346895dc36b2c/html5/thumbnails/2.jpg)
2Contents
1. Introduction2. RPC Production Process3. RPC Production State4. PLAN
![Page 3: Chamber Production at CERN 904](https://reader036.vdocument.in/reader036/viewer/2022062816/56815591550346895dc36b2c/html5/thumbnails/3.jpg)
31. Introduction
Resistive Plate Chamber(RPC) is Muon detector CMS RPC Upgrade project : Build a 4 layer(Front & End cap) Total construction Chambers : 144 (RE4/3 – 72, RE4/2 – 72)
New Build Part
![Page 4: Chamber Production at CERN 904](https://reader036.vdocument.in/reader036/viewer/2022062816/56815591550346895dc36b2c/html5/thumbnails/4.jpg)
42. RPC Production Process
1Frame cleaning
2Replace by new screw
3Add mylar
4Insulate with yellow-
tape
Mechanical Part
Gap Part
1Visual test
2Leak test
3Spacer test
4HV cable
5Dark current test
![Page 5: Chamber Production at CERN 904](https://reader036.vdocument.in/reader036/viewer/2022062816/56815591550346895dc36b2c/html5/thumbnails/5.jpg)
52. RPC Production Process
1Frame cleaning
2Replace by new screw
3Add mylar
4Insulate with yellow-
tape
Mechanical Part
Gap Part
1Visual test
2Leak test
3Spacer test
4HV cable
5Dark current test
![Page 6: Chamber Production at CERN 904](https://reader036.vdocument.in/reader036/viewer/2022062816/56815591550346895dc36b2c/html5/thumbnails/6.jpg)
62. RPC Production Process
1Frame cleaning
2Replace by new screw
3Add mylar
4Insulate with yellow-
tape
Mechanical Part
Gap Part
1Visual test
2Leak test
3Spacer test
4HV cable
5Dark current test
![Page 7: Chamber Production at CERN 904](https://reader036.vdocument.in/reader036/viewer/2022062816/56815591550346895dc36b2c/html5/thumbnails/7.jpg)
72. RPC Production Process
1Frame cleaning
2Replace by new screw
3Add mylar
4Insulate with yellow-
tape
Mechanical Part
Gap Part
1Visual test
2Leak test
3Spacer test
4HV cable
5Dark current test
![Page 8: Chamber Production at CERN 904](https://reader036.vdocument.in/reader036/viewer/2022062816/56815591550346895dc36b2c/html5/thumbnails/8.jpg)
82. RPC Production Process
Cooling & Electronic Part Cooling
Electronic
![Page 9: Chamber Production at CERN 904](https://reader036.vdocument.in/reader036/viewer/2022062816/56815591550346895dc36b2c/html5/thumbnails/9.jpg)
92. RPC Production Process
- COMPLETION -
![Page 10: Chamber Production at CERN 904](https://reader036.vdocument.in/reader036/viewer/2022062816/56815591550346895dc36b2c/html5/thumbnails/10.jpg)
102. RPC Production Process Chamber Cosmic Test
![Page 11: Chamber Production at CERN 904](https://reader036.vdocument.in/reader036/viewer/2022062816/56815591550346895dc36b2c/html5/thumbnails/11.jpg)
11 CERN – 904 site state( Built by Dong-Hyun Kim )
Dong-Hyun Kim Job list
3. RPC Production StateTYPE
RE4/3 RE4/2Production 25(Total 27) 21(Total 29)
Percent 92.59 % 71.41 %* At 28.Aug.2013
JOB LIST( From 01.April ~ )Mechanical preparation Chamber construction process management
Gap Test Visual & Gap leak Test data managementElectronic Test Summer-student training management
Dark Current & Cosmic Test installation
![Page 12: Chamber Production at CERN 904](https://reader036.vdocument.in/reader036/viewer/2022062816/56815591550346895dc36b2c/html5/thumbnails/12.jpg)
12 CERN – 904 site state( Built by Dong-Hyun Kim )
3. RPC Production State
![Page 13: Chamber Production at CERN 904](https://reader036.vdocument.in/reader036/viewer/2022062816/56815591550346895dc36b2c/html5/thumbnails/13.jpg)
134. PLAN
Construction RE4/2 & RE4/3 Chambers Study for a Cosmic test logic Study about the Cosmic test Study to Analysis CMS data
![Page 14: Chamber Production at CERN 904](https://reader036.vdocument.in/reader036/viewer/2022062816/56815591550346895dc36b2c/html5/thumbnails/14.jpg)
14Ref. Visual Test
< Visual Testing > < Visual Test sheet >
![Page 15: Chamber Production at CERN 904](https://reader036.vdocument.in/reader036/viewer/2022062816/56815591550346895dc36b2c/html5/thumbnails/15.jpg)
15Ref. Leak Test
< Leak Station > < Gas Pressure Sensor >
![Page 16: Chamber Production at CERN 904](https://reader036.vdocument.in/reader036/viewer/2022062816/56815591550346895dc36b2c/html5/thumbnails/16.jpg)
16Ref. Spacer Test
Spacer
Spacer Map
![Page 17: Chamber Production at CERN 904](https://reader036.vdocument.in/reader036/viewer/2022062816/56815591550346895dc36b2c/html5/thumbnails/17.jpg)
17Ref. HV Connector
< Jupiter Type > < Tripolar Type >
![Page 18: Chamber Production at CERN 904](https://reader036.vdocument.in/reader036/viewer/2022062816/56815591550346895dc36b2c/html5/thumbnails/18.jpg)
18Ref. Dark Current Test
< Test Result graph >
![Page 19: Chamber Production at CERN 904](https://reader036.vdocument.in/reader036/viewer/2022062816/56815591550346895dc36b2c/html5/thumbnails/19.jpg)
19CERN-904 Photo
![Page 20: Chamber Production at CERN 904](https://reader036.vdocument.in/reader036/viewer/2022062816/56815591550346895dc36b2c/html5/thumbnails/20.jpg)
20
- THANKS -