e CHANCELLOR PARK PRIMARY CAMPUS FUTURE FACILITIES REVIEW SITE OBSERVATONS: Minimum 300 student population growth Future proosed facilities include: • 8-10 GLA’s (640m2) Staff facilities (180m2) • SEP (68m2) • Covered outdoor learning area Other consideratons: • Current amenities facilities across campus are not compliant with new student population • Prep area requires a general upgrade and refurbishment • Parking across the campus is very poor SITE OPTION 1 SITE OPTION 3 SITE OPTION 4 SITE OPTION 1 • Removal/ relocation of existing 4 demountable buildings would be required during demolition. • Future extended on site parking oportunities Vehicle drop off zone with direct access to future SEP. • Closure of gated access from Siena Catholic College. • Construction site area within contained area to rear of site. • Easy direct connections to existing undercover pedestrian walkways SITE OPTION 3 • Future connection and integration to proposed new oval landscape works, which could provide cov- ered area to future tiered outdoor seating. • Direct connection to existing 2 storey GLA building • Removal of modular building required. • Future viewing balcony and covered outdoor learn- ing area to oval. • Direct connection to existing single level GLA SITE OPTION 4 * • Relocation of existing garden shed to northern oval aspect is within school works programe. • Removal of modular required • Direct connection to multipurpose hall. Direct connection off existing covered pedesterian links. • Close proximity to existing on site parking area. • Northern aspect to oval with outdoor covered learning areas, and viewing balcony opportunities. GLA PRIMARY DEMOUNTABLES MODULAR MODULAR SHED GLA ADMIN SITE OPTION 2 • Future GLA building, with covered undercroft to existing Greenspace area. Relocation of staff administration to ground level of new building. Existing admin building to be repurposed as staff offices and communal areas. • relocated path with clear signage as accessway to new building and admin. • Future upper level covered outdoor learning areas (balco- nies) with views over green play space. SITE OPTION 2

Upload: others

Post on 12-Apr-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CHANCELLOR PARK PRIMARY CAMPUS FUTURE ......e CHANCELLOR PARK PRIMARY CAMPUS FUTURE FACILITIES REVIEW SITE OBSERVATONS: Minimum 300 student population growth Future proosed facilities

e

CHANCELLOR PARK PRIMARY CAMPUS FUTURE FACILITIES REVIEW

SITE OBSERVATONS:Minimum 300 student population growth Future proosed facilities include:• 8-10 GLA’s (640m2)• Staff facilities (180m2)• SEP (68m2)• Covered outdoor learning areaOther consideratons:• Current amenities facilities across campus are not compliant with new

student population• Prep area requires a general upgrade and refurbishment• Parking across the campus is very poor

SITE OPTION 1 SITE OPTION 3 SITE OPTION 4

SITE OPTION 1• Removal/ relocation of existing 4 demountable buildings

would be required during demolition.• Future extended on site parking oportunities• Vehicle drop off zone with direct access to future SEP.• Closure of gated access from Siena Catholic College.• Construction site area within contained area to rear of site.• Easy direct connections to existing undercover pedestrian

walkways

SITE OPTION 3• Future connection and integration to proposed new

oval landscape works, which could provide cov-ered area to future tiered outdoor seating.

• Direct connection to existing 2 storey GLA building• Removal of modular building required.• Future viewing balcony and covered outdoor learn-

ing area to oval.• Direct connection to existing single level GLA

SITE OPTION 4 *• Relocation of existing garden shed to northern

oval aspect is within school works programe.• Removal of modular required• Direct connection to multipurpose hall.• Direct connection off existing covered pedesterian

links.• Close proximity to existing on site parking area.• Northern aspect to oval with outdoor covered

learning areas, and viewing balcony opportunities.

GLAPRIMARYD

EMO

UN

TABLES

MODULAR

MODULAR

SHEDGLA

ADMIN

SITE OPTION 2• Future GLA building, with covered undercroft to existing

Greenspace area.• Relocation of staff administration to ground level of new

building. Existing admin building to be repurposed as staff offices and communal areas.

• relocated path with clear signage as accessway to new building and admin.

• Future upper level covered outdoor learning areas (balco-nies) with views over green play space.

SITE OPTION 2

Page 2: CHANCELLOR PARK PRIMARY CAMPUS FUTURE ......e CHANCELLOR PARK PRIMARY CAMPUS FUTURE FACILITIES REVIEW SITE OBSERVATONS: Minimum 300 student population growth Future proosed facilities

CHANCELLOR PARK PRIMARY CAMPUSBUILDINGS FOR FUTURE DEMOLITION/ RELOCATION

EXISTINGSPORTS

OVAL

SIENA CATHOLIC COLLEGE

GREENSPACE

SCHOLARS DRIVE

OPTION 1

ADMIN

OPTION 2

OPTION 3

OPTION 4

Page 3: CHANCELLOR PARK PRIMARY CAMPUS FUTURE ......e CHANCELLOR PARK PRIMARY CAMPUS FUTURE FACILITIES REVIEW SITE OBSERVATONS: Minimum 300 student population growth Future proosed facilities

CHANCELLOR PARK PRIMARY CAMPUS PROPOSED NEW LEARNING BUILDING

EXISTINGSPORTS

OVAL

SIENA CATHOLIC COLLEGE

GREENSPACE

SCHOLARS DRIVE

DIRECT CONNECTION

VIEWS TO CONTAINED PLAY AREA

NEW ENTRY TO ADMINISTRATION FRONT OFFICE

SITEO

PTION

1

SITEO

PTION

2SITEO

PTION

2

SITEOPTION 4

SITEOPTION 3

EXISTING

ADMIN

UPGRADED

GREENSPACE

OUTDOOR

LEARNING AREA

Page 4: CHANCELLOR PARK PRIMARY CAMPUS FUTURE ......e CHANCELLOR PARK PRIMARY CAMPUS FUTURE FACILITIES REVIEW SITE OBSERVATONS: Minimum 300 student population growth Future proosed facilities
Page 5: CHANCELLOR PARK PRIMARY CAMPUS FUTURE ......e CHANCELLOR PARK PRIMARY CAMPUS FUTURE FACILITIES REVIEW SITE OBSERVATONS: Minimum 300 student population growth Future proosed facilities
Page 6: CHANCELLOR PARK PRIMARY CAMPUS FUTURE ......e CHANCELLOR PARK PRIMARY CAMPUS FUTURE FACILITIES REVIEW SITE OBSERVATONS: Minimum 300 student population growth Future proosed facilities

FEEDBACK FOR FACILITIES CONSULTATION MASTER PLAN REVIEW

Question 1.

What are the most important factors for the Facilities Working Party to consider when making recommendations about future facilities growth at Chancellor State College?

1 .....................................................................................................................................................................

2 .....................................................................................................................................................................

3 .....................................................................................................................................................................

4 .....................................................................................................................................................................

5 .....................................................................................................................................................................

6 .....................................................................................................................................................................

7 .....................................................................................................................................................................

8 .....................................................................................................................................................................

Question 2.

What is your preference with regards to additional buildings, single storey buildings or multi-storey with lifts?

1 .....................................................................................................................................................................

2 .....................................................................................................................................................................

3 .....................................................................................................................................................................

4 .....................................................................................................................................................................

Question 3.

Where would you like to see additional secondary building/s placed within the Master Plan?

1 .....................................................................................................................................................................

2 .....................................................................................................................................................................

3 .....................................................................................................................................................................

4 .....................................................................................................................................................................

5 .....................................................................................................................................................................

6 .....................................................................................................................................................................

Page 7: CHANCELLOR PARK PRIMARY CAMPUS FUTURE ......e CHANCELLOR PARK PRIMARY CAMPUS FUTURE FACILITIES REVIEW SITE OBSERVATONS: Minimum 300 student population growth Future proosed facilities

FEEDBACK FOR FACILITIES CONSULTATION MASTER PLAN REVIEW

Question 4.

Where would you like to see additional primary building/s placed within the Master Plan?

1 .....................................................................................................................................................................

2 .....................................................................................................................................................................

3 .....................................................................................................................................................................

4 .....................................................................................................................................................................

5 .....................................................................................................................................................................

6 .....................................................................................................................................................................

Question 5.

What features will be important in the new classrooms to ensure they are 21st Century learning spaces?

1 .....................................................................................................................................................................

2 .....................................................................................................................................................................

3 .....................................................................................................................................................................

4 .....................................................................................................................................................................

5 .....................................................................................................................................................................

6 .....................................................................................................................................................................

7 .....................................................................................................................................................................

8 .....................................................................................................................................................................

Other Comments

1 .....................................................................................................................................................................

2 .....................................................................................................................................................................

3 .....................................................................................................................................................................

4 .....................................................................................................................................................................

5 .....................................................................................................................................................................

6 .....................................................................................................................................................................

7 .....................................................................................................................................................................