CHANGING TIDE: A PROPOSED ARTWORK FOR POINT SHERIDAN Richmond Marina at South Harbour Way
BCDC DESIGN REVIEW BOARD SUBMITTAL JULY 13, 2015
Prepared by the Arts and Culture Commission City of Richmond
Michele Seville, Arts and Culture Manager
TABLE OF CONTENTS SECTION 1: PROJECT DESCRIPTION 1. Art Project Site 2. Project Sponsors 3. Project Context: Port of Richmond 4. Art Components 5. BCDC Compliance 6. Resource Value 7. Project Schedule SECTION 2: SITE PLANS AND ILLUSTRATIONS Figure 1: Aerial View of Point Sheridan Figure 2: Port of Richmond Overview Figure 3: Bay Trail Overview Figure 4: Art Site in Context of BCDC Jurisdiction Figure 5: Art Site Looking West Figure 6: Art Site Looking Southeast Figure 7: Art Site in Context of Ferry Landing Figure 8: View of Bay From Harbour Way
Page of 12
2
SECTION 1: PROJECT DESCRIPTION 1. Project Site The proposed art project is located at Point Sheridan (also called Ford Point) at the end of Harbour Way South, at the southern edge of the Richmond Marina and approximately 1.5 miles south of the Richmond downtown core. Specifically the artwork will be located in an unpaved patch of land to the west of both the entry roadway and the Craneway Building (formerly the Ford Assembly Plant building). The unpaved section of land measures approximately 33’ x 65’ and looks out to Richmond’s Inner Harbor, with panoramic waterfront views of San Francisco, the Bay Bridge, Oakland, Berkeley and the Bay. It is approximately 60’ from the BCDC setback. The art site is located between the Ford Building to the east and the Marina’s end to the west and is just north west of the planned Richmond Ferry Service being designed by the Water Emergency Management Transportation Authority (WETA). (Figures 1 and 2) 2. Project Sponsors The public art project is funded by the Port of Richmond and administered by the City of Richmond Arts and Culture Commission thorough the Public Art Advisory Committee. The project has support from WETA who will collaborate with the project artists and the City on the landscape plans for the art site to ensure that all plants are compatible with in BCDC’s publication Shoreline Plants: a Landscape Guide for the San Francisco Bay and inclusive of, or complementary to, WETA’s own landscape plans. The City is also working with Orton Development, owners of the Craneway Pavilion, which is adjacent to the art site. 3. Project Context: Port of Richmond The Port of Richmond is generally outlined by three major streets: Harbour Way South and Canal Boulevard, both running generally north to south and connected by Cutting Boulevard, which runs east and west (See Figure 2). The San Francisco Bay Trail winds throughout this area, providing easily accessible recreation for hikers, joggers, bicyclists, and skaters. (Figure 3). 4. Art Components The artwork will repurpose the empty patch of land into an art site, complete with sculpture, seating elements, landscaping and lighting components. These v a r i o u s elements are described below. A. Sculpture
There will be 7 vertical “Eelgrass” sculptures, each 20’ high and fabricated in 316 stainless steel with a bronze patina at the lower ends. The sculptures are inset with thin-film solar panels and 24-volt, high-efficient L.E.D.s (Light Emitting Diodes). By day the sculptures capture solar energy along their central stalks (a technological p h o t o s y n t h e s i s using the thin-film panels). By night, the tall light shafts glow in ever-changing colors with programmable LED lights. After sunset at a low tide, the light tubes will slowly change
Page of 12
3
between reds, oranges and yellows, while at high tide, they will glow blue, green and purple, metaphorically referencing the changing tides along the shoreline.
The “eelgrass” sculptures evoke the tidal marshlands that once occupied the site. Eelgrass and shallow marshlands are critically important to fish habitat and bird populations and Richmond is home to some of the healthiest eelgrass beds in the Bay.
B. Landscape Elements
The existing dirt at the art site will be replaced with concrete in varying shades of earth tones. The textured ground-plane footing of the sculptures will be designed to elicit mudflats, reminiscent of the original geography of the area. Landscape plans have not yet been determined but will adhere to recommendations made in BCDC’s publication Shoreline Plants: a Landscape Guide for the San Francisco Bay and will be done in collaboration with the landscape planting to be done by WETA for the Ferry Landing project. Circulation paths around the art site will be designed in collaboration with WETA. It is anticipated that a new pathway will be constructed to lead pedestrians from the east side of the farthest parking lot to the west side of the sculpture. In addition, a new north/south pathway will be designed to lead pedestrians from the southeast corner of the parking lot closest to the Bay to the new Ferry Landing. The art site will also include four custom concrete benches shaped like shells that encircle the sculptural elements, creating a pleasant place to sit, relax and carry on a conversation. C. Interpretive Signage
Interpretive signage adjacent to the Bayshore trail will illustrate the changing landscape of the site over the century, the importance of marshlands to the Bayʼs ecosystem, and an explanation of the solar/light and tidal components of the sculpture. The design of the interpretive materials will be in keeping with signage already placed along the Bay Trail.
5. BCDC Compliance A. Prior to the final design, the City of Richmond will review all of the artwork
components for ADA compliancy. B. None of the art elements block views to the Bay from the site or from the roadway. C. No elements of the artwork are placed in the Bay.
6. Resource Value A. Community Input The proposed artwork will be an important and viable new cultural resource for the city residents, workers and visitors. A community-based selection panel chose the artwork during a competitive process whereby three artist/artist teams were selected as f ina l is ts from an applicant pool of 92 artists who submitted qualifications for the Point Sheridan project. All three f inal is ts ’ proposals were placed on view in Richmond City Hall for one week prior to the final selection process. The proposal by Reed Madden
Page of 12
4
Design received overwhelming support by community members and o ther members o f the pub ic who completed questionnaires on their responses to each of the three proposals. The proposal was unanimously endorsed by the Public Art Advisory Committee and by the Richmond Arts & Culture Commission, and was approved by the Richmond City Council on May 27, 2014.
B. Response to Site The artwork responds to the area’s cultural and physical environment by:
• Promoting alternative energies by showcasing wind and solar activities. • Highlighting the change of the tides in the adjacent Bay. • Providing interpretive materials that describe the history of the site, the impact of
human settlement on the Bay, and the health and extent of Richmond’s existing eelgrass, which comprises the largest and healthiest amount in the San Francisco Bay.
• Drawing visitors to the site with the graceful movement of the “blades of eel grass” in light or heavy wind.
• Enthralling both children and adults with seven tall shafts of changing light colors at night.
• Creating a colorful and kinetic performance to be enjoyed from up close, from afar, from the Craneway Pavilion and from ships passing in the Bay.
7. Project Timeline The final design, fabrication and installation of the art elements will begin upon approval from BCDC. The total time anticipated for project completion is 12 months from the date of approval.
Page of 12
5
SECTION 2: SITE PLANS AND ILLUSTRATIONS
Figure 1: Aerial view of Point Sheridan showing art site, Craneway Building and future
Ferry Landing Site
Page of 12
6
Figure 2: Port of Richmond Overview
>
>
>
>
> >
>
§̈¦580
Richmond
CAN
AL BLV
D
*****
HA
RB
OU
R W
Y S
JOHN T KNOX FRWY
BNSF RR
SE
AC
LIFF DR
CUTTING BLVD
WRIGHT AV
E CTC DR
W CUTTING BLVD
S 4
TH S
T
S M ALLAR D DR
HALL AV
F DR
WHARF
ST
S 9
TH S
T
HOFFMAN BLVD
S 2
ND
ST
S 1
3TH
ST
I-580 E EXIT 9
S 1
2TH
ST
I-580 W EXIT 9AI-580 W EXIT 9B
S 8
TH S
T
SANDPIPE
R S
PIT
S 7
TH S
T
S 1
ST
ST S
6TH
ST
SCOTT AV
S 3
RD
ST
CHANDLER AV
C D R
****
*
JOHN T KNOX FRWY
*****
*****
F D
R
C DR
*****
*****
E CTE CT
C DR
****
* *****
*****
C DR
*****
****
*
S 4
TH S
T
Port Offices
Port Terminal No 2
Port Terminal No 3
Fire Station No 67
MLK Community Center
Wastewater Treatment Plant
Point Potrero Marine Terminal
Data Source: - City of Richmond Geographic Information System (CORGIS) - Thomas Bros. Maps.
Data Disclaimer - Use At Your Own Risk "Reproduced with permission granted by THOMAS BROS. MAPS. This map is copyrighted by THOMAS BROS. MAPS. It is unlawful to copy or reproduce all or any part thereof, whether for personal use or resale, without the prior, written permission of THOMAS BROS. MAPS."
Legend
>City FacilityPortArea_StudyAreaBuilding FootprintPort Study AreaCity and County BoundariesParks and Other Public Areas
Port of Richmond Study Area
± 0 0.025 0.05Miles
Ford Building
CranewayC
AN
AL B
LVD
Page of 12
7
Figure 3: Overview of San Francisco Bay Trail at Project Site
One$Way
One$Way
One$Way
DORNAN
MAINE
23RD
$$
$$
OHIO$AV
TS1$
S S$2ND DR3$
S
HT4 $
S S$5TH
S$6TH
S$7TH HT8$S S$9TH
$YA
WRU
OBRAH
S$11TH
S$12TH
S$13TH H
T51 $
S
HT61 $
S
HT71 $
S
HT81 $
S
HT91 $
S
HT02 $
S
TS12 $
S
$
$
OHIO$AV
VIRGINIA$AV
CHANSLOR$AV
MACDONALD$AV
NEVIN
BARRETT$AV
PENNSYLVANIA$AV
NEVIN$AV
25TH
27TH
28TH
29TH
30TH
31ST
32ND
33RD
24TH
DR3222NDTS1220THHT9118THHT71
ROOSEVELT$AV
NEVIN$AV
BISSELL
NEVIN$$AV
GARRARD$BLVD
WRIGHT
MEEKER
S$4TH$
HOFFMAN
SEAVER$AV
HOFFMAN
HOFFMAN$BLVD
POTRERO$AV
POTRERO$AV
VIRGINIA$AV
MAINE$AV
RICHMOND
TEWKSBURY
WASHINGTON
C B A
9TH HT11
HT21 13TH
HAYES
PENNSYLVANIA$AV
ROOSEVELT
SCHOONER
FLORIDA$AV
HT92$
S
HT03$
S
TS13$S D
N23$
S
DR33$
S
SPRING
TS12
HT02
HT91
HT81
HT71
HT61
HT51
YA
W$ANI
RA
M
13TH
12TH
11TH
9THHT87TH
6TH
5TH
4THDR32NDT
S1
$
34TH
35TH
36TH
37TH
44TH
BISSELLCHANSLOR
OHIO
CENTER
FLORIDA$
DR33$
S
HT53$
S
HT73 $
S
WALLER$AV
WALL$AV
SOUTH$ST
CARLSON$AV
STEGE$AV
HT63$
S
HT73$
S
HT83$
S
HT93$
S
HT72 $
S
HT92 $
S
TS13$
S
Dornan$D
rive
BAYVIEW
S$51ST
ESPLANADE$DR.
S$22ND$
MELVILLE
PENINSULA$DR.
CASTRO$ST.
CUTTING$BLVD
CANAL$BLVD
22ND
23RD
SAN$PABLO$AVE
MACDONALD BARRETT$AV
MACDONALD$AV
26TH
BROADWAY$ST
CIVIC
CENTER$ST.
REGATTA$BLVD
COLLINS
HARBOUR$WAY$SOUTH
KaiserShipyard$No.$3
MARINA$WAY$SOUTH
Sheridan$Observation$Point
Lucretia$EdwardsPark
Barbara$&$Jay$Vincent$Park
ShimadaFriendshipPark
RosieMemorial
MARINA$BAY$PK
WY
Point$Richmond$
CANAL$BLVD
Marina$BayPark
CUTTING$BLVD
HALL$AV
MARINA$BAY$PKW
Y
SEACLIFF
$DRIVE
S$23RD
Point$Isabel
R I C H M O N D $ I N N E R $ H A R B O R
San$ Fr anci sco$ Bay
0 0.50.25
Miles
North
<$To$San$Rafael
To$Berkeley$>
80
580
$Visitor$Center
Paint$Shop
GeneralWarehouse
Machine$Shop
First$Aid$Station
Shipyard$No.$3Cafeteria
Atchison$Village
Richmond$Museum$of$History
RichmondBART/Amtrak
El$CerritoDel$NorteBART
Miller/Knox$Regional$Shoreline
jlb$6.10.10
6
7
1
2
3
5
4
9
8
10
1
3
Santa%Fe%ChannelREGATTA$BLVD
REGATTA$BLVD
Ford
Ass
embl
y Pl
ant
Tours Available
View Site From Outside
Entrance$Gate
CUTTING$BLVD
Reference MapNot necessarily accurate to scale
Rosie the RiveterMemorial
Ford Assembly Plant
Kaiser Shipyard No. 3
SS Red Oak Victory
Atchison Village
Nystrom Village
Kaiser Field Hospital
Richmond FireStation 67
Ruth C. PowersChild DevelopmentCenter
Maritime Child Development Center
.
Page of 12
8
Figure 4: Art Site in Context of BCDC Jurisdiction and Shoreline
Page of 12
9
Figure 5: Art Site looking west
Figure 6: Art Site looking southeast
Page of 12
10
Figure 7: Art Site in context of planned Ferry Landing
Page of 12
11
Figure 8: Art Project Overview
Figure 9: Detail of Sculptural Elements
Page of 12
12
Figure 10: Rendering illustrating view of Bay from Harbour Way