MAINTENANCE
-
8/12/2019 CHAPTER 11 - Maintenance
2/20
1. Able to define maintenance.2. Able to describe two types of
maintenance.
3. Able to identify the costs ofmaintenance.
4. Able to understand the concept of
Total Productive Maintenance.
Objectives
-
8/12/2019 CHAPTER 11 - Maintenance
3/20
Activities relating to keeping facilities andequipments in good working conditionincluding repairing breakdown when it occurs
at minimal cost.
Activities relating to keeping the entireproduction/operations system facilities or
specific equipment in the system in operatingcondition. It concerned with avoiding orminimizing downtime or avoid undesirableresults due to system failure.
DEFINITION
-
8/12/2019 CHAPTER 11 - Maintenance
4/20
1. Avoid production or servicedisruptions.
2. Not adding costs due toneglected maintenance work.
3. Maintain high quality product and
process.4. Avoid missed delivery date.
IMPORTANCE OF MAINTENANCE
-
8/12/2019 CHAPTER 11 - Maintenance
5/20
1. Breakdown Maintenance- breakdown maintenance is when an equipmentmalfunctions or damaged and immediate repairsare needed to put it back to working condition.(includes repairs, replacement of parts, or evenoverhaul to ensure the machines is put back inoperating)
2. Preventive Maintenance- involves performing routine inspections andservicing and keeping facilities in good repair.These activities are intended to build a systemthat will find potential failures and makes
changes or repairs that will prevent failure.
-
8/12/2019 CHAPTER 11 - Maintenance
6/20
-
8/12/2019 CHAPTER 11 - Maintenance
7/20
Proactive option carried out on aregular basis.
Lubricate, adjust, clean, inspect,
replace. To reduce breakdown and
To reduce associated costs:- Idle time,schedule disruption,
injuries, loss of output
-
8/12/2019 CHAPTER 11 - Maintenance
8/20
Frequency of occurrence = Number of BreakdownThe total Period of Breakdown
Expected number of breakdowns =
Number of breakdowns x frequency of occurence Expected Cost for breakdown =
expected no of breakdown X cost of each breakdown Expected cost for preventive maintenance =
cost of preventive maintenance + cost of breakdown X average no of breakdown)
-
8/12/2019 CHAPTER 11 - Maintenance
9/20
Andersen and Associates is a CPA firm specializing in company tax preparation.
One of the firms valuable assets is a high-speed photocopy machine which hasbeen used to make copies of taxation assessments to be sent to the Inland
Revenue. The machine has been in the firm possession for almost 3 years. Over the
past 18 months, the machine has been continuously giving problem to the firm and
the breakdown figures are shown below:
Each time the machine breakdown, the firm has to payan average of RM600 for theService expenses. Recently, one of the Senior Partners has been approached by PM
Enterprise who made an offer to provide preventive maintenance with freebreakdown service, which will cost Andersen and Associates RM1,200per month.You are requested to help the partner to decide whether the contract of preventive
maintenance should be accepted.
Number of breakdowns 0 1 2 3Number of months that breakdown occured 2 2 6 8
-
8/12/2019 CHAPTER 11 - Maintenance
10/20
Number of
breakdowns
Number of
the
breakdownsoccured
Step 1 (a)Frequency of occurence =
Number of breakdown
The total Period of breakdwon
Step 2 (b)Expected number of breakdowns =
(Number of breakdowns x frequency
of occurence)
0 2 2/18 = 0.1111 0 X 0.1111 = 0
1 2 2/18 = 0.1111 1 X 0.1111 = 0.1111
2 6 6/18 = 0.3333 2 X 0.3333 = 0.6666
3 8 8/18 = 0.4444 3 X 0.4444 = 1.3333
= 18 = 2.111times per month
a. Compute the Frequency of Occurrence
b. Compute the Expected Number of Breakdown
-
8/12/2019 CHAPTER 11 - Maintenance
11/20
Step 3c. Breakdown cost
= 2.111 x RM600
= RM1,266.60 per month
Step 4d. Preventive Maintenance cost
= RM1,200 per month
Decision : Accept the preventive maintenance
offer because of RM1,266.60 RM1,200 = RM66.60 cost saving.
-
8/12/2019 CHAPTER 11 - Maintenance
12/20
e. The offer is to provide preventive maintenancethat cost Andersen and Associates RM1,200per month but there will still be one (1)
Breakdown every month.
Preventive Maintenance cost
= RM1,200 + RM600(1 breakdown)
= RM1,800 per month
Decision : Retain the breakdown maintenance policy because ofRM1800-RM1266.600) RM533.40 cost saving.
-
8/12/2019 CHAPTER 11 - Maintenance
13/20
Good Manufacturing, a firm specializing in production of modularcomponents. The firm has been successful in automating much of its work.The computerized approach, however has problems. Over the past 20
months, the machines have broken down at the rate indicated in thefollowing table:
Each time the machines breakdown, Good Manufacturing estimates that it
loses an average of RM400 in time and service expenses. One alternative isto purchase a service contract for preventive maintenance. Even if GoodManufacturing contracts for preventive maintenance, there will still bebreakdowns, averaging one breakdown per months. Give yourrecommendations whether Good Manufacturing should contract forpreventive maintenance or maintain with current breakdown policy.
Number of
breakdowns
Number of the
breakdowns
occured
0 4
1 2
2 5
3 4
4 5
-
8/12/2019 CHAPTER 11 - Maintenance
14/20
a. Compute the Frequency of Occurrence
b. Compute the Expected Number of Breakdown
c. Compute the expected costs for breakdown
d. Compute the expected cost for preventivemaintenance
e. Compare the two options and select the one thatwill cost less
-
8/12/2019 CHAPTER 11 - Maintenance
15/20
Gemilang Group's computer system has been down
several times over the past twelve months, as shownbelow:
Each time the system is down, the firm loses an averageof RM4,000 in time and service expenses. They areconsidering signing a contract for preventive maintenance.With preventive maintenance, the system would be serviced
on average twice a month with zero breakdowns. Thepreventive maintenance costs would be RM200 per service.Which is cheaper, breakdown or preventive maintenance?
Number of breakdowns 0 1 2 3 4Frequency of occurrence 0.45 0.10 0.10 0.20 0.05
-
8/12/2019 CHAPTER 11 - Maintenance
16/20
1. Compute the Frequency of Occurance
No calculation is needed because they arealready in the question.
2. Compute the Expected Number of Breakdown
ExpectednumberofB/down
0 x 0.45= 0 1 x 0.10= 0.1 2 x 0.10= 0.2 3 x 0.20= 0.6 4 x 0.05= 0.2= 0 + 0.1 + 0.2 + 0.6 + 0.2
=1.1 times per month
-
8/12/2019 CHAPTER 11 - Maintenance
17/20
3. Breakdown cost= RM4,000 per year
4. Preventive Maintenance cost
= RM200 per service x 2 times x 12 months= RM4,800 per year
Decision : Breakdown cost is cheaper because
it gives a cost saving of RM800.
-
8/12/2019 CHAPTER 11 - Maintenance
18/20
Total costs of
maintenance
Full cost of
breakdown
PM cost
Maintenance
Commitment
Costs
-
8/12/2019 CHAPTER 11 - Maintenance
19/20
The concept of employee involvement andexcellent maintenace record.
TPM includes:-1. Designing a reliable, easy to operate and maintain
machine2. Maintenance and service costs are included in the
agreement of purchasing the machine.
3. Train employees to operate and maintain any worn
out machines.
-
8/12/2019 CHAPTER 11 - Maintenance
20/20
Oct 2012 (A5) Apr 2011(A5)
Oct 2010 (Nil)
Apr 2010 (B3)
Oct 2009 (Nil)
Apr 2009 (B4)
Oct 2008 (A5)
Apr 2008 (B6) Oct 2007 (A5)
Apr 2007 (A5 - as seen)
Oct 2006 (B5)