![Page 1: Chapter 4 continued. Intermittent Inspection –Oversight of several projects makes continuous observation impossible –Do weekly reports instead of dailies](https://reader036.vdocument.in/reader036/viewer/2022072014/56649eab5503460f94bb0c81/html5/thumbnails/1.jpg)
Chapter 4 continued
![Page 2: Chapter 4 continued. Intermittent Inspection –Oversight of several projects makes continuous observation impossible –Do weekly reports instead of dailies](https://reader036.vdocument.in/reader036/viewer/2022072014/56649eab5503460f94bb0c81/html5/thumbnails/2.jpg)
• Intermittent Inspection– Oversight of several projects makes
continuous observation impossible– Do weekly reports instead of dailies– Take lots of pictures and notes when on site
![Page 3: Chapter 4 continued. Intermittent Inspection –Oversight of several projects makes continuous observation impossible –Do weekly reports instead of dailies](https://reader036.vdocument.in/reader036/viewer/2022072014/56649eab5503460f94bb0c81/html5/thumbnails/3.jpg)
• Report of Field Correction– Provides info for A/E to understand problem , make
determination, issue instructions to field personnel– Only a source of info – Not an authorization for work or a change order– ID problem – why is original construction method not
recommended– Offer solution in detail– Isolated or general condition– RPR does not take any corrective action that will
result in a variation of the plans and specs without A/E approval
![Page 4: Chapter 4 continued. Intermittent Inspection –Oversight of several projects makes continuous observation impossible –Do weekly reports instead of dailies](https://reader036.vdocument.in/reader036/viewer/2022072014/56649eab5503460f94bb0c81/html5/thumbnails/4.jpg)
• Field Investigation Report– Need more info to resolve situation– RPR does investigation and reports findings
![Page 5: Chapter 4 continued. Intermittent Inspection –Oversight of several projects makes continuous observation impossible –Do weekly reports instead of dailies](https://reader036.vdocument.in/reader036/viewer/2022072014/56649eab5503460f94bb0c81/html5/thumbnails/5.jpg)
• Documentation of Dangerous Safety Hazard Warnings– Document actions taken by RPR staff and
contractor– V important for litigation
![Page 6: Chapter 4 continued. Intermittent Inspection –Oversight of several projects makes continuous observation impossible –Do weekly reports instead of dailies](https://reader036.vdocument.in/reader036/viewer/2022072014/56649eab5503460f94bb0c81/html5/thumbnails/6.jpg)
• Steps– 1. get people away from hazard and danger– 2. Notify contractor’s field rep– 3. Issue written notice to contractor to take
immediate action to correct hazard – record in diary
– 4. If refused note time of day, day, call OSHA and make report – record in diary
– 5. write a full report of incident– 6. Call owner to tell them report coming
![Page 7: Chapter 4 continued. Intermittent Inspection –Oversight of several projects makes continuous observation impossible –Do weekly reports instead of dailies](https://reader036.vdocument.in/reader036/viewer/2022072014/56649eab5503460f94bb0c81/html5/thumbnails/7.jpg)
Misc. Records
– Manufacturer’s certificates of products– Lab test reports– Truck delivery tickets– Records of pile driving– Record of inspection of structural welding– Sewer infiltration reports – Fab plant inspection reports– Special inspector’s reports– Weld radiographs
![Page 8: Chapter 4 continued. Intermittent Inspection –Oversight of several projects makes continuous observation impossible –Do weekly reports instead of dailies](https://reader036.vdocument.in/reader036/viewer/2022072014/56649eab5503460f94bb0c81/html5/thumbnails/8.jpg)
Misc. Records
– Acceptance certificates from public agencies– Discrepancy reports– Deviation requests and action taken– Concrete mix designs– And others– All need to be logged and maintained in the
files
![Page 9: Chapter 4 continued. Intermittent Inspection –Oversight of several projects makes continuous observation impossible –Do weekly reports instead of dailies](https://reader036.vdocument.in/reader036/viewer/2022072014/56649eab5503460f94bb0c81/html5/thumbnails/9.jpg)
Labor Standards Review Records
• Federal funds require Davis Bacon Act– Additional responsibilities for RPR– 1. On military projects employee interviews must be
conducted to determine classifications and rates of pay & fringe – record all on daily report to Inspector
– 2. Federal grant projects require certified payrolls from contractor - check for compliance
– 3. On site checks of type and classification of work performed, number of workers in each category
![Page 10: Chapter 4 continued. Intermittent Inspection –Oversight of several projects makes continuous observation impossible –Do weekly reports instead of dailies](https://reader036.vdocument.in/reader036/viewer/2022072014/56649eab5503460f94bb0c81/html5/thumbnails/10.jpg)
Labor Standards Review Records
– 4. Federal granting agency will make periodic inspections to check on compliance – be ready
– 5. Check that all equal employment opportunity laws are followed
![Page 11: Chapter 4 continued. Intermittent Inspection –Oversight of several projects makes continuous observation impossible –Do weekly reports instead of dailies](https://reader036.vdocument.in/reader036/viewer/2022072014/56649eab5503460f94bb0c81/html5/thumbnails/11.jpg)
• Job Conferences– Need to take minutes of conferences– Time, Date, who attended, end time– Include important statements and overview of
discussed points
![Page 12: Chapter 4 continued. Intermittent Inspection –Oversight of several projects makes continuous observation impossible –Do weekly reports instead of dailies](https://reader036.vdocument.in/reader036/viewer/2022072014/56649eab5503460f94bb0c81/html5/thumbnails/12.jpg)
• Construction Photographs– Picture is worth 1000 words– Use to detail progress, damage, technical
detail, type of materials, method of installation, evidence of site conditions, etc
– 4 basic types of photos• PR, progress, safety hazard, claims support
![Page 13: Chapter 4 continued. Intermittent Inspection –Oversight of several projects makes continuous observation impossible –Do weekly reports instead of dailies](https://reader036.vdocument.in/reader036/viewer/2022072014/56649eab5503460f94bb0c81/html5/thumbnails/13.jpg)
• Photo ID– Date, time, location on site, id of subject– Photo or negative number– For claims defense
• Time of day & photog name• Direction in which camera was pointed• Where photog was standing
– Log all photos taken• Easy to forget what picture is for if not immediately
recorded – validity in court